Total Estimated Cost
All engineering design costs (after conceptual design), facility construction costs and other costs specifically related to those construction efforts. TEC will include, but is not limited to: project, design and construction management; contract modifications (to include…
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE O 1130.7BDepartmental Conference Activity
- DOE O 5100.4Internal Review Budget Process
- DOE O 5100.5Office of Management and Budget - Budget Process
- DOE O 5100.6ACongressional Budget Review
- DOE O 5100.3Field Budget Process
- DOE G 413.3-15Department of Energy Guide for Project Execution Plans
- DOE G 413.3-15 Chg 1 (Admin Chg)Department of Energy Guide for Project Execution Plans
- DOE O 5100.14AAllotment and Approved Funding Program Process
- BOP-50.001AEnergy System Acquisition Advisory Board (ESAAB) Equivalent Process
- DOE O 413.3Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3 Chg 1Program and Project Management for the Acquisition of Capital Assets
- DOE G 430.1-1Cost Estimating Guide
- DOE O 413.3AProgram and Project Management for the Acquisition of Capital Assets
- DOE O 361.1BAcquisition Career Management Program
- DOE O 413.3A Chg 1Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3B Chg 5 (MinChg), Program and Project Management for the Acquisition of Capital Assets - Change Chart
- DOE O 5700.2DCost Estimating, Analysis, and Standardization
- DOE O 5700.2CCost Estimating, Analysis, and Standardization
- DOE O 413.3B Chg 7 (LtdChg), Program and Project Management for the Acquisition of Capital Assets - Change Chart
- DOE O 413.3B Chg 7 (LtdChg), Program and Project Management for the Acquisition of Capital Assets - Change Chart