Section 1
U.S. Department of Energy MINOR CHANGE
Washington, DC
Approved: 11-29-2010
Chg 5 (MinChg): 04-12-2018
SUBJECT: MINOR CHANGE TO DOE O 413.3B, PROGRAM AND PROJECT MANAGEMENT
FOR THE ACQUISITION OF CAPITAL ASSETS
1. EXPLANATION OF CHANGES. This minor change adjusts the time-frame to achieve
Critical Decision (CD)-2, Approve Performance Baseline, following a Congressional
Budget Request for construction funds to two years before requiring Energy Systems
Acquisition Advisory Board (ESAAB) review and Deputy Secretary approval. It also
aligns the Order with DOE-STD-1189-2016, and changes were made to ESAAB
membership to reflect the Department’s current organizational structure.
2. LOCATIONS OF CHANGES:
Page Paragraph Changed To
Gen References to DOE-STD-
1189-2008
DOE-STD-1189-2016
Gen References to DOE-STD-
1073-2003
DOE-STD-1073-2016
Gen References to DOE-STD-
3006-2010
Deleted from the Order
Gen Acronyms for CSVR, PSDR,
and PSVR
Deleted from the Order
Gen References to GAO-15-37 GAO-16-22
Gen References Reflect their current version
3 3.c.(4).
Second Bullet
An on-going set of active
capital asset projects, post CD-
2, of over 10 projects at any
time during the current Fiscal
Year (FY); and
An on-going set of active capital
asset projects, post CD- 2, of over
5 projects at any time during the
current Fiscal Year (FY); and
5 6. Language did not previously
exist.
INVOKED STANDARDS. The
following DOE technical
standards and industry standards
are invoked as required methods
in this Order in accordance with
the applicability and conditions
DOE O 413.3B
Page Paragraph Changed To
described within this Order. Any
technical standard or industry
standard that is mentioned in or
referenced by this Order, but is
not included in the list below, is
not invoked by this Order. Note:
DOE O 251.1D, Appendix J,
provides a definition for “invoked
technical standard.”
a. DOE-STD-1189-2016,
Integration of Safety into the
Design Process. This DOE
technical standard is required to
be used for development and
integration of safety analysis and
supporting design for new nuclear
facilities and applicable
modifications. See Appendix A
and Attachment 1 for specific
requirements.
b. DOE-STD-1073-2016,
Configuration Management. This
DOE technical standard is
required to be used in the
establishment of a configuration
management process for new
nuclear facilities and applicable
modifications. See Attachment 1,
Section 9 for specific
requirements.
c. DOE-STD-1104-2016, Review
and Approval of Nuclear Facility
Safety Basis and Safety Design
Basis Documents. This DOE
technical standard is invoked by
DOE O 420.1C, Facility Safety,
and therefore treated as a
requirement in this Order for
DOE review and approval of
safety basis and safety design
basis documents for nuclear
facilities.
5 6.-8. Renumbered 7.-9.
Page Paragraph Changed To
A-5 4.b. This process uses a systems
engineering methodology that
integrates requirements
analysis, risk identification and
analysis, acquisition strategies,
and concept exploration….
This process uses a systems
engineering methodology that
integrates requirements analysis,
safety strategies, risk
identification and analysis,
acquisition strategies, and concept
exploration….
A-8 Table 2.1 Conduct a Preliminary
Security Vulnerability
Assessment from prior to CD-
2
Prior to CD-1
A-8 Table 2.1 For Hazard Category 1, 2, and
3 nuclear facilities, prepare a
Safety Design Strategy (SDS),
with the concurrence of the
CNS or with written advice of
the CDNS, as appropriate, for
projects subject to DOE-STD-
1189-2008.
Section 2
For Hazard Category 1, 2, and 3
nuclear facilities, prepare a Safety
Design Strategy (SDS) to guide
the development of the conceptual
design, with the concurrence of
the CNS or with written advice of
the CDNS, as appropriate, for
projects subject to DOE-STD-
1189-2016.
A-8 Table 2.1 Approval authority of the
CSDR from SBAA via the
CSVR
SBAA via the Safety Review
Letter
A-8 Table 2.1 Prepare a Conceptual Safety
Validation Report (CSVR),
with concurrence from the
FPD, on the DOE review of
the CSDR for Hazard Category
1, 2, and 3 nuclear facilities.
(Refer to DOE-STD-1189-
2008.)
Prepare a Safety Review Letter,
with concurrence from the FPD,
on the DOE review of the CSDR
for Hazard Category 1, 2, and 3
nuclear facilities. (Refer to DOE-
STD-1189-2016 and DOE-STD-
1104-2016.)
A-9 Table 2.1
Note 4
Per 10 CFR 830.206(b), a
major modification of an
existing Hazard Category 1, 2
or 3 nuclear facility requires
DOE approval of the nuclear
safety design criteria to be
used in the PDSA, unless the
contractor uses the design
criteria in DOE O 420.1,
Facility Safety. Per DOE-STD-
1189-2008, a SDS must be
developed that addresses: (1)
the need for a CSDR or
Preliminary Safety Design
Per 10 CFR 830.206(b), a major
modification of an existing
Hazard Category 1, 2 or 3 nuclear
facility requires DOE approval of
the nuclear safety design criteria
to be used in the PDSA, unless the
contractor uses the design criteria
in DOE O 420.1C, Facility Safety.
Content requirements and
guidance for the SDS are
specified in DOE-STD-1189-
2016.
Page Paragraph Changed To
Report (PSDR) as well as the
required PDSA, to support
project phases; (2) the graded
content of the PDSA necessary
to support the design and
modification; (3) the
application of nuclear safety
design criteria; and (4) the
interface with the existing
facility, its operations, and
construction activities.
A-11 Table 2.2 Prepare a Preliminary Safety
Design Report (PSDR)3 that
updates the CSDR for Hazard
Category 1, 2, and 3 nuclear
facilities based on updated
hazard analysis and design
information. For a project
involving a major modification
of an existing facility, the SDS
must address the need for a
PSDR, as well as the required
PDSA. (Refer to DOE-STD-
1189-2008.)
Approval authority from
SBAA via the PSVR
Prepare Preliminary Safety and
Design Results3 that update the
CSDR for Hazard Category 1, 2,
and 3 nuclear facilities based on
updated hazard analysis and
design information. These results
complete the preliminary design
phase and allow for DOE review
prior to completing the final
design phase. (Refer to DOE-
STD-1189-2016.)
SBAA via the Safety Review
Letter
A-11 Table 2.2 Prepare a Preliminary Safety
Validation Report (PSVR),
with concurrence from the
FPD, based on a DOE review
of the PSDR for Hazard
Category 1, 2, and 3 nuclear
facilities. (Refer to DOE-STD-
1189-2008.)
Prepare a Safety Review Letter,
with concurrence from the FPD,
based on a DOE review of the
Preliminary Safety and Design
Results for Hazard Category 1, 2,
and 3 nuclear facilities. This DOE
review should be scheduled as
early as practicable, after
contractor completion of the
preliminary design, to minimize
project risk. (Refer to DOE-STD-
1189-2016 and DOE-STD-1104-
2016.)
A-11 Table 2.2 Prepare a Safety Evaluation
Report, with concurrence from
the FPD, based on review of
the PDSA for Hazard Category
1, 2, and 3 nuclear facilities.
Prepare a Safety Evaluation
Report, with concurrence from the
FPD, based on review of the
PDSA for Hazard Category 1, 2,
and 3 nuclear facilities. (Refer to
Section 3
Page Paragraph Changed To
(Refer to 10 CFR Part 830,
Subpart B.)
10 CFR Part 830, Subpart B, and
DOE-STD-1104-2016.)
A-12 Table 2.2
Note 4
Per 10 CFR 830.206(b), a
major modification of an
existing Hazard Category 1, 2
or 3 nuclear facility requires
DOE approval of the nuclear
safety design criteria to be
used in the PDSA, unless the
contractor uses the design
criteria in DOE O 420.1,
Facility Safety. Per DOE-STD-
1189-2008, a SDS must be
developed that addresses: (1)
the need for a CSDR or
Preliminary Safety Design
Report (PSDR) as well as the
required PDSA, to support
project phases; (2) the graded
content of the PDSA necessary
to support the design and
modification; (3) the
application of nuclear safety
design criteria; and (4) the
interface with the existing
facility, its operations, and
construction activities.
Per 10 CFR 830.206(b), a major
modification of an existing
Hazard Category 1, 2 or 3 nuclear
facility requires DOE approval of
the nuclear safety design criteria
to be used in the PDSA, unless the
contractor uses the design criteria
in DOE O 420.1C, Facility Safety.
Content requirements and
guidance for the SDS are
specified in DOE-STD-1189-
2016.
A-12 Table 2.2
Note 5
Language did not previously
exist.
5. There are some statutory
(appropriation and authorization)
and/or regulatory provisions that
implicate this Order. Solely for
purpose of the application of
appropriations and authorization
laws and regulations and for any
approvals under those laws and
regulations, CD-3A (or CD-3X)
will be treated as separate from
and not within the scope of those
laws and regulations as they
pertain to CD-2 and CD-3. For all
other purposes, from a project
management perspective, CD-3A
(or CD-3X) remains part of the
project total scope and remains
embedded in the project TPC.
Page Paragraph Changed To
A-12 4.c.(2)
Bullet 1
Bullet 3
Bullet 4
Optional budget request
process for construction
projects. Upon PME approval,
a construction project can
submit a line item budget
request prior to CD-2 approval,
provided the PME accepts the
following conditions:
• Project will document the
strategy to request funds
prior to CD-2 approval in the
AS and preliminary PEP.
• CD-2 approval is obtained
within one year following
OMB budget submission to
Congress. Typically, there
are no exceptions and
subsequent budget requests
would not be allowed until
CD-2 approval.
• If CD-2 approval is not
achieved within one year
following budget
submission, any future
budget requests for
construction must be
approved by the CE through
the ESAAB process.
Optional budget request process
for construction projects.
Normally, funds for construction
cannot be requested until CD-2
approval is obtained, or when CD-
3A approval is obtained to support
CD-3A scope of work. Upon
PME approval, a construction
project can submit a line item
budget request prior to CD 2
approval, provided the PME
accepts the following conditions:
• Project will document the
strategy to request funds (i.e.,
CD-3A) prior to CD-2 approval
in the AS and preliminary PEP.
• CD-2 approval is obtained
within two years following
OMB budget submission to
Congress. Typically, there are
no exceptions and subsequent
budget requests would not be
allowed until CD-2 approval.
• If CD-2 approval is not achieved
within two years following
budget submission, any future
budget requests for construction
must be approved by the CE
through the ESAAB process.
Section 4
A-16 Table 2.4 Prepare a Safety Evaluation
Report (SER) based on a
review of the Documented
Safety Analysis and Technical
Safety Requirements for
Hazard Category 1, 2, and 3
nuclear facilities. (Refer to 10
CFR Part 830, Subpart B.)
Prepare a Safety Evaluation
Report (SER) based on a review
of the Documented Safety
Analysis and Technical Safety
Requirements for Hazard
Category 1, 2, and 3 nuclear
facilities. (Refer to 10 CFR Part
830, Subpart B, and DOE-STD-
1104-2016.)
A-16 Table 2.4 For nuclear facilities, the Code
of Record must be included as
part of the turnover
documentation from a design
and construction phase
contractor to the operating
phase contractor; from an
operating phase contractor to
For nuclear facilities, the Code of
Record must be included as part
of the turnover documentation
from a design and construction
phase contractor to the operating
phase contractor; from an
operating phase contractor to the
decommissioning phase
Page Paragraph Changed To
the decommissioning phase
contractor; and when a change
in contractor occurs during any
single life cycle phase and is
maintained under
configuration control.
contractor; and when a change in
contractor occurs during any
single life cycle phase and is
maintained under configuration
control. (Refer to DOE-STD-
1189-2016)
A-18 5.c. Language did not previously
exist.
For projects involving
construction of new Hazard
Category 1, 2, and 3 nuclear
facilities, DOE-STD-1189-2016
provides requirements for
contractor justification of long-
lead procurement items. DOE-
STD-1104-2016 establishes the
required method for DOE review
and approval of long-lead
procurement items.
A-22 7.a.(2) and (3) ESAAB Membership. The
members are (including
anyone acting in such
capacity):
(2) Under Secretary for
Management and Performance
(3) Under Secretary for
Science and Energy
ESAAB Membership. The
members are (including anyone
acting in such capacity):
(2) Under Secretary of Energy
(3) Under Secretary for Science
A-23 7.a. The Deputy Secretary will
serve as the Chair and the
Under Secretary for
Management and Performance
will serve as the Vice Chair. In
the event that the Deputy
Secretary position is vacant or
the Deputy Secretary is
recused from a matter
involving the ESAAB or is
otherwise unable to attend an
ESAAB meeting, the Chair of
the ESAAB shall be filled by
the Vice Chair. In the event
that the Under Secretary for
Management and Performance
position is vacant, the
Secretary shall designate a
Vice Chair from among the
members. In the event that
The Deputy Secretary will serve
as the Chair. In the event that the
Deputy Secretary position is
vacant, the Secretary shall
designate a Chair from among the
members. If the Deputy Secretary
is recused from a matter involving
the ESAAB or is otherwise unable
to attend an ESAAB meeting, the
Deputy shall designate a Chair
from among the members. The
Chair may elect to choose a Chair
pro tempore, from among the
members, to convene an ESAAB
meeting to review a CD and to
transmit the recommendation of
the ESAAB to the Chair.
Page Paragraph Changed To
both the Deputy Secretary and
Under Secretary for
Management and Performance
positions are vacant, the
position of the Chair shall be
filled by the Secretary. The
Chair may elect for the Vice
Chair to convene an ESAAB
meeting to review a CD and to
transmit the recommendation
of the ESAAB to the Chair.
Section 5
A-27 7.f.(2) and (3) Membership. The Secretary
shall appoint the members of
the committee. All committee
members shall be federal
employees who are experts in
their representative fields or
senior leaders with significant
decision making authorities.
Standing members shall
include:
(2) Director, Office of Project
Management Oversight and
Assessments, Office of the
Under Secretary for
Management and Performance
(Secretariat)
(3) Director, Office of Project
Assessments, Office of the
Under Secretary of
Management and Performance
Membership. The Secretary shall
appoint the members of the
committee. All committee
members shall be federal
employees who are experts in
their representative fields or
senior leaders with significant
decision making authorities.
Standing members shall include:
(2) Director, Office of Project
Management Oversight and
Assessments, Office of the Under
Secretary of Energy (Secretariat)
(3) Director, Office of Project
Assessment, Office of
Environmental Management,
Office of the Under Secretary for
Science
C-5 6.a. Design Management for
Nuclear Facilities.
Nuclear construction projects
are DOE/NNSA projects that
build facilities with
technologies to manage, store,
process or handle nuclear
materials, shall comply with
DOE-STD-1189-2008 design
safety requirements. Projects
designated as Hazard Category
1, 2, and 3 nuclear facilities
shall achieve at least 90
Design Management for Nuclear
Facilities.
Projects involving construction of
new Hazard Category 1, 2, and 3
nuclear facilities intended to
manage, store, process or handle
nuclear materials shall comply
with DOE-STD-1189-2016 and
shall achieve at least 90 percent
design completion before CD-2.
The objective of this requirement
is to ensure systems, structures,
and components, the overall
design, are sufficiently mature to
Page Paragraph Changed To
percent design completion
before CD-2.
The objective is to ensure
systems, structures, and
components, the overall
design, are sufficiently mature
to meet project requirements
and outcomes and thus
fulfilling the mission need.
meet project requirements and
outcomes and thus fulfilling the
mission need.
C-13 9.a.(2) and (3) (2) Prior to CD-2, a PSDR is
developed from the CSDR to
reflect more refined analyses
based on the evolving design
and safety integration activities
during preliminary design. The
PSDR should include the
results of process hazards
analyses and confirm or adjust,
as appropriate, the items
included in the CSDR.
(3) Prior to CD-2, a PDSA is
prepared which updates the
safety information in the
PSDR and identifies and
justifies changes from the
design approach described in
the PSDR.
(2) At completion of the
Preliminary Design Phase,
Preliminary Safety and Design
Results are developed to reflect
more refined analyses based on
the evolving design and safety
integration activities during
preliminary design. The
Preliminary Safety and Design
Results should include the results
of process hazards analyses and
confirm or adjust, as appropriate,
the items included in the CSDR.
(3) Prior to CD-2, a PDSA is
prepared which updates and
expands the safety information in
the Preliminary Safety and Design
Results and identifies and justifies
any changes from the design
approach described in the
Preliminary Safety and Design
Results.
C-14 9.b.(2) Prior to CD-2, a Hazard
Analysis Report is developed
by updating the PHAR to
include any new or revised
information on facility hazards
and safety design.
Section 6
Prior to CD-2, a Hazard Analysis
Report is developed by updating
the PHAR to include any new or
revised information on facility
hazards and safety design. If the
hazard characterization is below
Hazard Category 3 by analysis,
the SBAA should approve this
analysis before CD-2.
C-23 23.c.(1) Language did not previously
exist.
(1) DOE Review of Preliminary
Safety and Design Results.
For Hazard Category 1, 2, and 3
nuclear facilities, DOE conducts
Page Paragraph Changed To
an independent review of the
Preliminary Design and Safety
Results to determine whether final
design should proceed. The
review may consist of a single
review or a series of reviews,
based on when the preliminary
design of the facility (or of
defined segments of the design) is
complete and ready to enter final
design. This review is conducted
by a DOE-selected team of
experts and its results provided to
the FPD for review and action as
necessary. The size and
composition of the team reflects
the size and complexity of the
project. More than one review
may be conducted at the
discretion of the FPD; the SDS
should define segments when
more than one review is planned.
The independent review(s) should
be scheduled as early as
practicable, after completion of
preliminary design, to minimize
project risk. This review may be
handled by the TIPR, as long as
the appropriate experts are part of
the review team. Refer to DOE-
STD-1104-2016 for the required
method for DOE personnel to
review and approve the
Preliminary Design and Safety
Results.
C-24 23.c.(2) Completion of the TIPR is
required prior to the start of
any subsequent reviews
(including EIRs) and is
required prior to CD-2
approval.
CNS or CDNS concurrence, as
appropriate, is required for
reviews of projects that must
implement DOE-STD-1189-
2008.
Completion of the TIPR is
required at or near the completion
of preliminary design, and prior to
the start of any subsequent
reviews (including EIRs) and is
required prior to CD-2 approval.
CNS or CDNS concurrence in
CD-2 approval is required for
reviews of projects that must
implement DOE-STD-1189-2016.
Page Paragraph Changed To
C-32 27.e. CD-3A may be needed for
long lead item procurement.
While there is potential risk in
procuring equipment before
the design is complete, the
potential schedule
improvement may be
significant and more than
compensate for the risk. If the
long lead item is nuclear safety
related or nuclear safety
related equipment, safety
document maturity must also
be considered.
CD-3A may be needed for long
lead item procurement. While
there is potential risk in procuring
equipment before the design is
complete, the potential schedule
improvement may be significant
and more than compensate for the
risk. If the long lead item is
nuclear safety related or nuclear
safety related equipment, safety
document maturity must also be
considered (refer to DOE-STD-
1189-2016 and DOE-STD-1104-
2016).
Atch 1
Pg.5
14. For projects that are Hazard
Category 1, 2, and 3 nuclear
facilities or include major
modifications thereto (as
defined in 10 CFR Part 830),
the requirements in DOE-STD-
1189-2008 shall be fully
implemented. The following
documents must be submitted:
Safety Design Strategy (CD-
1), Conceptual Safety Design
Report (CD-1), Preliminary
Safety Design Report (CD-2),
Preliminary Documented
Safety Analysis (CD-2), and
Documented Safety Analysis
with Technical Safety
Requirements (CD-4). For
major modifications, the
Conceptual Safety Design
Report (CSDR) and the
Preliminary Safety Design
Report (PSDR) may either be
separate documents or be
subsumed within the
Preliminary Documented
Safety Analysis. The need to
maintain the CSDR and PSDR
as separate documents shall be
based on the design
development phases. Projects
with conceptual and/or
preliminary design phases shall
Section 7
For projects involving
construction of new Hazard
Category 1, 2, and 3 nuclear
facilities or include major
modifications thereto (as defined
in 10 CFR Part 830), the
requirements in DOE-STD-1189-
2016 shall be fully implemented.
The following documents must be
submitted, as applicable: Safety
Design Strategy (CD-1),
Conceptual Safety Design Report
(CD-1), Preliminary Safety and
Design Results (CD-2),
Preliminary Documented Safety
Analysis (CD-2), and
Documented Safety Analysis with
Technical Safety Requirements
(CD-4).
Page Paragraph Changed To
develop the corresponding
safety documentation.
Atch 2
Pg.2
15. Code of Record. A set of
requirements, including
Federal and state laws, as
defined in contracts and
Standards or Requirements
Identification Documents (or
their equivalent), that are in
effect at the time a facility or
item of equipment was
designed and accepted by
DOE. It is initiated during the
conceptual design phase, and
prior to approval of CD-1. It is
placed under configuration
control to ensure it is updated
to include more detailed design
requirements as they are
developed during preliminary
design, and prior to approval
of CD-2. It is controlled during
final design and construction
with a process for reviewing
and evaluating new and
revised requirements to
determine their impact on
project safety, cost and
schedule before a decision is
taken to revise the Code of
Record. It is maintained and
controlled through facility
decommissioning.
Code of Record. A set of design
and operational requirements,
including Federal and state laws,
in effect at the time a facility or
item of equipment was designed
and accepted by DOE. It is (i)
initiated during the conceptual
design phase, placed under
configuration control to ensure it
is updated to include more
detailed design requirements as
they are developed during
preliminary design, (ii) controlled
during final design and
construction with a process for
reviewing and evaluating new and
revised requirements to determine
their impact on project safety, cost
and schedule before a decision is
taken to revise the Code of
Record, and (iii) maintained and
controlled through facility
decommissioning. The Code of
Record may be defined in
contracts, Standards or
Requirements Identification
Documents (or their equivalent),
or project-specific documents.
[DOE-STD-1189-2016]
Atch 2
Pg.7
55. General Plant Project.
Miscellaneous minor
construction project, of a
general nature, for which the
total estimated cost may not
exceed the congressionally
established limit. GPPs are
necessary to adapt facilities to
new or improved production
techniques, to effect
economies of operations, and
to reduce or eliminate health,
fire and security problems.
General Plant Project.
Miscellaneous minor construction
project, of a general nature, for
which the total estimated cost may
not exceed the congressionally
established limit. GPPs are
necessary to adapt facilities to
new or improved production
techniques, to effect economies of
operations, and to reduce or
eliminate health, fire and security
problems. These projects provide
for design, construction, additions,
Page Paragraph Changed To
These projects provide for
design and/or construction,
additions, improvements to
land, buildings, replacements
or additions to roads, and
general area improvements.
(Refer to DOE O 430.1B and
50 USC 2743)
and/or improvements to land,
buildings, replacements or
additions to roads, and general
area improvements. (Refer to 50
USC 2743)
Section 8
Atch 2
Pg.12
107. Technical Independent Project
Review. An independent
project review conducted prior
to obtaining CD-2, for Hazard
Category 1, 2, and 3 nuclear
facilities. At a minimum, the
focus of this review is to
determine that the safety
documentation is sufficiently
conservative and bounding to
be relied upon for the next
phase of the project.
Technical Independent Project
Review. An independent project
review conducted at or near the
completion of preliminary design,
and is required prior to CD-2
approval, for Hazard Category 1,
2, and 3 nuclear facilities. At a
minimum, the focus of this review
is to determine that the safety
documentation is sufficiently
conservative and bounding to be
relied upon for the next phase of
the project.
1. EXPLANATION OF CHANGES
2. LOCATIONS OF CHANGES