Commissioning
A phase of an accelerator facility operation that is typically used to conduct beam testing and to verify specifications in a new or designed functional mode. Commissioning periods may be tailored to the needs of each facility and there may be great variations in their duration…
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 413.3-23Nuclear Facilities Commissioning
- DOE G 413.3-16A Chg 1 (Admin Chg)Project Completion/Closeout Guide
- DOE G 413.3-16AProject Completion/Closeout Guide
- DOE G 413.3-16Project Transition/Closeout (CD-4)
- DOE G 413.3-6High Performance Sustainable Building
- DOE G 413.3-6BHigh Performance Sustainable Building
- DOE G 413.3-6AHigh Performance Sustainable Building
- DOE G 413.3-6A Chg 1 (Admin Chg)High Performance Sustainable Building
- DOE O 5480.25Safety of Accelerator Facilities
- DOE G 420.2-1AAccelerator Facility Safety Implementation Guide for DOE O 420.2C, Safety of Accelerator Facilities
- DOE O 420.2DSafety of Accelerators
- DOE O 420.2CSafety of Accelerator Facilities
- DOE O 420.2ESafety of Accelerators
- DOE O 420.2ASafety of Accelerator Facilities
- DOE O 420.2 Chg 1Safety of Accelerator Facilities
- DOE O 420.2BSafety of Accelerator Facilities
- DOE G 420.2-1Accelerator Facility Safety Implementation Guide for DOE O 420.2B, Safety of Accelerator Facilities
- SD 436.1Energy Performance Contracts
- SD 413.3-7Project Management for Non-nuclear, Non-complex Capital Asset Acquisition
- BOP 436.1, Supplemental Procedures for Alternative Financed Energy Savings Projects (Redline)