DOE O 420.2A, Safety of Accelerator Facilities
Functional areas: Defense Nuclear Facility Safety and Health Requirement, Work Processes
To establish accelerator-specific safety requirements which, when supplemented by other applicable safety and health requirements, will serve to prevent injuries and illnesses associated with Department of Energy (DOE) or National Nuclear Security Administration (NNSA) accelerator operations.
Cancels DOE O 420.2. Canceled by DOE O 420.2B.
Supersedes:
DOE O 420.2 Chg 1, Safety of Accelerator Facilities on Jan 08, 2001
Superseded By:
DOE O 420.2B, Safety of Accelerator Facilities on Jul 23, 2004
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE O 420.2BSafety of Accelerator Facilities (Jul 23, 2004)
Supersedes
Earlier documents this one replaced.
- DOE O 420.2 Chg 1Safety of Accelerator Facilities (Jan 08, 2001)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DOE 420.2A
01-08-01
THIS PAGE IS TO REMAIN WITH DOE O 420.2A.
THE ONLY ADMINISTRATIVE CHANGES THAT OCCURRED IN THIS
REVISION WERE-
TO BRING THIS DIRECTIVE INTO COMPLIANCE WITH THE
1. NATIONAL NUCLEAR SECURITY ADMINISTRATION (NNSA),
AND
2. TO UPDATE ORGANIZATIONS TITLES.
DISTRIBUTION: INITIATED BY:
All Departmental Elements Office of Science
DOE O 420.2A
U.S. Department of Energy ORDER
Washington, D.C.
Approved: 01-08-01
Sunset Review: 01-08-03
Expires: 01-08-05
SUBJECT: SAFETY OF ACCELERATOR FACILITIES
1. OBJECTIVE. To establish accelerator-specific safety requirements which, when
supplemented by other applicable safety and health requirements, will serve to prevent injuries
and illnesses associated with Department of Energy (DOE) or National Nuclear Security
Administration (NNSA) accelerator operations.
2. CANCELLATION. DOE O 420.2, SAFETY OF ACCELERATOR FACILITIES, dated
11-5-98.
3. APPLICABILITY.
a. DOE Elements, including the NNSA. Except for the exclusions in Paragraph 3c, this
Order applies to all DOE elements, including the NNSA, involved with the operation of
accelerators.
b. Contractors. Except for the exclusions in Paragraph 3c, the Contractor Requirements
Document (CRD), Attachment 1, sets forth requirements that must be applied to all
contractors awarded contracts and subcontracts for performing accelerator operations
for DOE or NNSA at DOE or NNSA-owned or -leased facilities. Contractor
compliance with the CRD must be required to the extent set forth in a contract.
Contractors must be directed to continue to comply with the requirements of the Order
canceled by this Order until their contracts are modified to delete the reference to the
requirements of the canceled Order.
c. Exclusions.
(1) Unmodified commercially available units that are acceptable for industrial
applications, including (but not limited to) electron microscopes, ion implant
devices, and x-ray generators.
(2) Accelerator facilities not capable of creating a “radiological area” as defined in
Title 10, Code of Federal Regulations (CFR), Part 835, “Occupational
Radiation Protection; Final Rule.”
2 DOE O 420.2A
1-08-01
(3) Naval Nuclear Propulsion Program accelerators covered under Executive
Order 12344 (42 United States Code 7158 Note).
(4) Non-medical x-ray devices with the capability of accelerating particles to
energies not greater than 10 MeV, which are operated in accordance with
American National Standards Institute (ANSI) N43.3-1993, General
Radiation Safety—Installations Using Non-Medical X-Ray and Sealed
Gamma-Ray Sources, Energies Up to 10 MeV, or in accordance with
another applicable consensus standard as directed by the cognizant field
element manager/NNSA field manager.
(5) Low-voltage neutron generators incapable of creating a “high-radiation area” as
defined in 10 CFR 835, “Occupational Radiation Protection; Final Rule,” and
which are operated in accordance with National Council on Radiation
Protection (NCRP) Report 72-1983, Radiation Protection and
Measurements for Low-Voltage Neutron Generators, or in accordance with
another applicable consensus standard as directed by the cognizant field
element manager/NNSA field manager. For the purpose of this Order, a low-
voltage neutron generator is defined as a bench-top scale, single-purpose
device generating neutrons by accelerating deuterons or tritons into targets
through a maximum accelerating potential not greater than 600 kV.
Section 2
(6) Entire DOE or NNSA facilities or portions thereof where DOE 5480.23,
NUCLEAR SAFETY ANALYSIS REPORTS, is applied.
4. REQUIREMENTS. DOE elements, including the NNSA, must require the following of the
contractor:
a. Safety Assessment Document.
(1) A Safety Assessment Document (SAD) must identify hazards and associated
on-site and off-site impacts to workers, the public, and the environment from
the facility for both normal operations and credible accidents.
(2) The SAD must contain sufficient descriptive information and analytical results
pertaining to specific hazards and risks identified during the safety analysis
process to provide an understanding of risks presented by the proposed
operations.
(3) The SAD must provide appropriate documentation and detailed description of
engineered controls (e.g., interlocks and physical barriers) and administrative
measures (e.g., training) taken to eliminate, control, or mitigate hazards from
operation.
DOE O 420.2A 3
1-08-01
(4) The SAD must include or reference a description of facility function, location,
and management organization in addition to details of major facility components
and their operation.
(5) The SAD must be prepared as a single document addressing the hazards of the
entire accelerator facility or as separate SADs prepared for discrete modules of
the facility such as injectors, targets, experiments, experimental halls, or any
other type modules.
(6) The SAD must be maintained current and consistent with the administrative
control measures and physical configuration of the facility and major safety
equipment.
b. Accelerator Safety Envelope.
(1) A documented Accelerator Safety Envelope (ASE) must define the set of
physical and administrative bounding conditions for safe operations based on
the safety analysis documented in the SAD.
(2) Any activity violating the ASE must be terminated immediately; the activity must
not recommence before DOE or the NNSA has been notified.
c. Unreviewed Safety Issue. Activities that involve an Unreviewed Safety Issue must not
be performed if significant safety consequences could result from either an accident or a
malfunction of equipment important to safety for which a safety analysis has not been
performed. Activities involving an identified Unreviewed Safety Issue must not
commence before DOE or the NNSA has provided written approval.
d. Accelerator Readiness Reviews. Accelerator Readiness Reviews (ARRs) must be
performed prior to approval for commissioning and routine operation and as directed
by the Cognizant Secretarial Officer/NNSA Deputy Administrator or a field element
manager/NNSA field manager.
e. Training and Qualification.
(1) Training and qualification requirements must be established for each individual
at an accelerator facility whose activities could affect safety and health
conditions or whose safety and health could be affected by facility activities.
Training and qualification must be documented and kept current.
(2) Only appropriately trained and qualified personnel, or trainees under the direct
supervision of trained and qualified personnel, are permitted to perform tasks
that may affect safety and health.
4 DOE O 420.2A
1-08-01
(3) All personnel assigned to or using the accelerator facility (including emergency
response personnel) must be trained in the safety and health practices and
emergency plans consistent with their involvement and the hazards present.
f. Written Procedures.
Section 3
(1) Written procedures that provide clear instructions for safely conducting
activities must be maintained current and consistent with management systems
and the configuration of the facility and equipment and must be approved by
facility senior line manager in the contractor’s organization who are actively
involved in the day-to-day operation of the facility.
(2) Written procedures must include a description of the tasks to be performed,
appropriate safety and health precautions and controls, and where applicable,
requirements for verifying initial conditions, operating conditions to be
maintained, and data to be recorded.
(3) At a minimum, the contractor must prepare procedures for operation startup,
normal operation, emergency conditions, conduct of maintenance, approval and
conduct of experiments, review and approval of facility modifications,
management of safety-related changes, and control of facility access.
g. Internal Safety Review System.
(1) An internal safety review system must be established and maintained to
periodically assess and document the condition of the facility, equipment, and
engineered safety systems.
(2) Appropriateness and implementation of procedures, administrative controls,
and personnel training and qualifications must be periodically reviewed and
documented by the internal safety review system.
h. Shielding Policy. The contractor must approve and implement a written statement of
the shielding policy for ionizing and non-ionizing radiation.
5. RESPONSIBILITIES.
a. Cognizant Secretarial Officer/NNSA Deputy Administrator.
(1) Approve for an accelerator facility or module thereof that has potential for more
than minor on-site or more than negligible off-site impacts to workers, the
public, or the environment:
DOE O 420.2A 5
1-08-01
(a) ASE,
(b) commencement of commissioning activities,
(c) commencement of routine operation activities, and
(d) exemptions from requirements of this Order.
(2) Approve recommencement of an activity at an accelerator facility after a
shutdown ordered by the DOE Cognizant Secretarial Officer/NNSA Deputy
Administrator, or Assistant Secretary for Environment, Safety and Health
because of an Unreviewed Safety Issue, violation of an ASE, or other safety
concern.
(3) Provide written guidance to line organizations for implementing the requirements
of this Order.
b. DOE Field Element Manager/NNSA Field Manager.
(1) Approve the commencement of commissioning activities for an accelerator
facility or module thereof that does not have potential for more than minor on-
site or more than negligible off-site impacts to workers, the public, or the
environment after—
(a) approving a specific ASE upon finding that it will appropriately bound
commissioning activities;
(b) finding that an appropriate ARR was conducted; and
(c) finding that the risks as analyzed in the SAD are acceptable when
commissioning activities are conducted within the specified ASE.
(2) Approve the commencement of routine operation activities for an accelerator
facility or module thereof that does not have potential for more than minor on-
site or more than negligible off-site impacts to workers, the public, or the
environment after—
(a) approving the ASE upon finding that it will appropriately bound routine
operation activities;
(b) finding that an appropriate ARR was conducted; and
(c) finding that the risks as analyzed in the SAD are acceptable when
routine operation activities are conducted within the specified ASE.
Section 4
6 DOE O 420.2A
1-08-01
(3) After performing the duties in Paragraph 5b(1)(b) and 5b(1)(c),
recommend DOE Cognizant Secretarial Officer/NNSA Deputy
Administrator approval for commencement of commissioning activities
for an accelerator facility or module thereof that has the potential for more
than minor on-site or more than negligible off-site impacts to workers, the
public, or the environment.
(4) After performing the duties in Paragraphs 5b(2)(b) and 5b(2)(c),
recommend DOE Cognizant Secretarial Officer/NNSA Deputy
Administrator approval for commencement of initial routine operation
activities for an accelerator facility or module thereof that has the potential
for more than minor on-site or more than negligible off-site impacts to
workers, the public, or the environment.
(5) Approve recommencement of an activity at an accelerator facility after
shutdown ordered by a DOE field element manager/NNSA field manager
because of an Unreviewed Safety Issue, violation of an ASE, or other
safety concern.
(6) Approve exemptions from requirements of this Order for an accelerator
facility or module thereof that does not have the potential for more than
minor on-site or more than negligible off-site impacts to workers, the
public, or the environment.
c. For those activities designated as major or strategic systems, as defined in DOE N
430.1, ENERGY SYSTEM ACQUISITION ADVISORY BOARD
PROCEDURES, the approvals as listed in Paragraphs 5a and 5b of this DOE
Order must be secured prior to request for approval to start operations by the
appropriate Acquisition Executive Authority.
6. CONTACT. Questions concerning this Order should be addressed to the Office of
Science, 301-903-6800.
BY ORDER OF THE SECRETARY OF ENERGY:
T.J. GLAUTHIER
DEPUTY SECRETARY
DOE O 420.2A Attachment 1
1-08-01 Page 1
CONTRACTOR REQUIREMENTS DOCUMENT
DOE O 420.2A, SAFETY OF ACCELERATOR FACILITIES
The following items are required of the contractor organization.
1. Safety Assessment Document.
a. A Safety Assessment Document (SAD) must identify hazards and associated on-site
and off-site impacts to workers, the public, and the environment from the facility for
both normal operations and credible accidents.
b. The SAD must contain sufficient descriptive information and analytical results pertaining
to specific hazards and risks identified during the safety analysis process to provide an
understanding of risks presented by the proposed operations.
c. The SAD must provide appropriate documentation and detailed description of
engineered controls (e.g., interlocks and physical barriers) and administrative measures
(e.g., training) taken to eliminate, control, or mitigate risks of operation.
d. The SAD must include or reference a description of facility function, location, and
management organization in addition to details of major facility components and their
operation.
e. The SAD must be prepared as a single document addressing the hazards of the entire
accelerator facility or as separate SADs prepared for discrete modules of the facility
such as injectors, targets, experiments, experimental halls, and other type modules.
f. The SAD must be maintained current and consistent with the administrative control
measures and physical configuration of the facility and major safety equipment.
2. Accelerator Safety Envelope.
a. A documented Accelerator Safety Envelope (ASE) must define the set of physical and
administrative bounding conditions for safe operations, based on the safety analysis
documented in the SAD.
Section 5
b. Any activity violating the ASE must be terminated immediately; the activity must not
recommence before the Department of Energy (DOE)/National Nuclear Safety
Administration (NNSA) has been notified.
Attachment 1 DOE O 420.2A
Page 2 1-08-01
3. Unreviewed Safety Issue. Activities that involve an Unreviewed Safety Issue must not be
performed if significant safety consequences could result from either an accident or a
malfunction of equipment important to safety for which a safety analysis has not been
performed. Activities involving an identified Unreviewed Safety Issue must not commence
before DOE or NNSA has provided written approval.
4. Accelerator Readiness Reviews. Accelerator Readiness Reviews (ARRs) must be performed
prior to approval for commissioning and routine operation and as directed by the Cognizant
Secretarial Officer/NNSA Deputy Administrator or a field element manager/NNSA field
manager.
5. Training and Qualification.
a. Training and qualification requirements must be established for each individual at an
accelerator facility whose activities could affect safety and health conditions or whose
safety and health could be affected by facility activities. Training and qualification must
be documented and kept current.
b. Only appropriately trained and qualified personnel, or trainees under the direct
supervision of trained and qualified personnel, are permitted to perform tasks that may
affect safety and health.
c. All personnel assigned to or using the accelerator facility (including emergency response
personnel) must be trained in the safety and health practices and emergency plans
consistent with their involvement and the hazards present.
6. Written Procedures.
a. Written procedures that provide clear instructions for safely conducting activities must
be maintained current and consistent with management systems and the configuration of
the facility and equipment and must be approved by facility senior line management in
the contractor’s organization who are actively involved in the day-to-day operation of
the facility.
b. Written procedures must include a description of the tasks to be performed,
appropriate safety and health precautions and controls, and where applicable,
requirements for verifying initial conditions, operating conditions to be maintained, and
data to be recorded.
c. At a minimum, the contractor must prepare procedures for operation startup, normal
operation, emergency conditions, conduct of maintenance, approval and conduct of
experiments, review and approval of facility modifications, management of safety-
related changes, and control of facility access.
DOE O 420.2A Attachment 1
1-08-01 Page 3 (and Page 4)
7. Internal Safety Review System.
a. An internal safety review system must be established and maintained to periodically
assess and document the condition of the facility, equipment, and engineered safety
systems.
b. Appropriateness and implementation of procedures, administrative controls, and
personnel training and qualifications must be periodically reviewed and documented by
the internal safety review system.
8. Shielding Policy. The contractor must approve and implement a written statement of the
shielding policy for ionizing and non-ionizing radiation.
DOE O 420.2A
1. Objective
2. Cancellation
3. Applicability
4. Requirements
5. Responsibilities
6. Contact
Attachment 1, Contractor Requirements Document