DOE O 420.2E, Safety of Accelerators
The order defines accelerators and establishes accelerator specific safety requirements and approval authorities which when supplemented by other applicable safety and health requirements promote safe operations to ensure protection of workers the publ
Supersedes:
DOE O 420.2D, Safety of Accelerators on Aug 05, 2026
Version history and related documents
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
AVAILABLE ONLINE AT: INITIATED BY:
www.directives.doe.gov Office of Science
U.S. Department of Energy ORDER
Washington, D.C.
Approved: 08-05-2026
SUBJECT: SAFETY OF ACCELERATORS
1. PURPOSE. To establish accelerator-specific safety requirements for the United States
Department of Energy (DOE), including National Nuclear Security Administration
(NNSA), accelerators and their operations1 that, when supplemented by other applicable
safety and health requirements, promote safe operations to ensure adequate protection of
workers, the public, and the environment.
2. CANCELS/SUPERSEDES. DOE Order (O) 420.2D, Safety of Accelerators, dated
September 9, 2022.
Cancellation of a directive does not, by itself, modify or otherwise affect any contractual
or regulatory obligation to comply with the directive. Contractor Requirements
Documents (CRDs) that have been incorporated into a contract remain in effect
throughout the term of the contract unless and until the contract or regulatory
commitment is modified to either eliminate requirements that are no longer applicable or
substitute a new set of requirements.
3. APPLICABILITY.
a. Departmental Applicability. Except for the exemptions/equivalencies in
Section 3.c, this Order applies to any DOE Element with programs involving
accelerators, and their operations. The Administrator of the NNSA must assure
that NNSA employees comply with their responsibilities under this directive.
Nothing in this directive will be construed to interfere with the NNSA
Administrator’s authority under Section 3212(d) of Public Law (P.L.) 106-65 to
establish Administration-specific policies, unless disapproved by the Secretary.
b. DOE Contractors. Except for the equivalencies/exemptions in Section 3.c the
CRD, Attachment 1, sets forth requirements of this Order that apply to contracts
that include the CRD. The CRD, Attachment 1, must be included in site/facility
management contracts that involve the management and operation of accelerators
and accelerator facilities unless superseded by an alternative standard authorized
through an exemption or equivalency process.
c. Exemptions/Equivalencies for DOE O 420.2E. Requests for exemptions and
equivalencies to the requirements of this Order which are not addressed in this
section must be processed in accordance with DOE O 251.1, Departmental
Directives Program, current version.
1 See definition of Accelerator Operations in Attachment 2, Definition.
DOE O 420.2E
2 DOE O 420.2E
08-05-2026
A periodic onsite validation process must be established to ensure accelerators
and devices granted exemptions or equivalencies through DOE O 251.1 continue
to be operated under the conditions of the approved exemption or equivalency.
Exemptions are also subject to requirements in Section 4.d if an accelerator and its
operations have the potential for inadvertent criticality.
(1) Exemption. Devices operated in accordance with 10 Code of Federal
Regulations (CFR) § 34, Licenses for Industrial Radiography and
Radiation Safety Requirements for Industrial Radiographic Operations,
are exempt from requirements in Section 4 of this Order.
(2) Exemption. NNSA nuclear weapons designed neutron generators are
exempt from requirements in Section 4.b of this Order.
(3) Exemption. Accelerators with operating energy of less than or equal to
10 MeV or Accelerators whose hazards can be safely managed under the
provisions of 10 CFR § 835 and § 851 that are non-complex and that
produce only local work area impacts are exempt from requirements in
Section 4.a through 4.c of this Order. Examples of such facilities include:
Section 2
(a) Commercially available equipment including, but not limited to,
electron microscopes, ion implant devices, and x-ray generators.
(b) Neutron generators (accelerating potential below 600 keV).
(c) A room-sized accelerator with an active safety system and limited
entry into the hazardous area.
4. REQUIREMENTS.
a. DOE Elements are required to have oversight, consistent with current DOE
oversight policy, over contractors who design, build, and manage accelerators
and their operations to be consistent with the DOE mission and operational
objectives and to comply with accelerator safety program provisions as described
in the CRD.
(1) This includes oversight of all accelerators and their operations and all
facilities that transition into operating accelerators.
(2) Also included is oversight of modifications to an accelerator and/or its
equipment or program elements that have the potential to impact the risk,
complexity, visibility, safety, and security of operating or maintaining the
accelerator and their operation.
b. Accelerators under this Order must establish the following program elements
prior to commissioning and routine operations:
(1) A Safety Assessment Document (SAD);
DOE O 420.2E 3
08-05-2026
(2) A DOE-approved Accelerator Safety Envelope (ASE);
(3) An Unreviewed Safety Issue (USI) process; and
(4) An Accelerator Readiness Review (ARR) process.
c. Accelerators under this Order must establish a current listing/inventory of
accelerators managed under this Order.
d. Accelerators and their operations with the potential for inadvertent criticality must
implement a DOE-approved criticality safety program in accordance with
DOE O 420.1, Facility Safety, current version, in addition to the requirements of
this Order. This requirement cannot be exempted under the provisions of
Section 3.c of this Order.
5. RESPONSIBILITIES.
a. DOE Program Secretarial Officer (PSO)/NNSA Cognizant Secretarial Officer
(CSO) for Safety,2 or Designee.
(1) Oversee the safe operation of accelerators and their operations through the
implementation of this Order to ensure adequate protection of workers, the
public, and the environment and to meet regulatory requirements.
(2) Approve or disapprove the ASE for accelerators and their operations
where site boundary mitigated consequences for credible postulated
accident scenarios potentially exceed 1 rem (0.01 Sv) and/or values
established under the Emergency Response Planning Guide-2 (ERPG-2).
b. DOE Field Element Managers. For sites under their purview:3
(1) Ensure the safe operation of accelerators and their operations through the
implementation of this Order.
(2) Ensure accelerators and devices granted exemptions or equivalencies
through DOE O 251.1 continue to be operated under the conditions of the
approved exemption or equivalency.
(3) Ensure a process exists that periodically reviews and updates contractor
accelerator safety program elements.
2 The NNSA Cognizant Secretarial Officer (CSO) for Safety related matter functions and responsibilities are
described in NNSA Supplemental Directive (SD) 450.2B, Functions, Responsibilities, and Authorities (FRA) for
Safety Management (or successor document).
3 The responsibilities in Section 5.b cannot be delegated.
4 DOE O 420.2E
08-05-2026
(4) Notify contracting officers of the applicability of the CRD and any
alternate safety standards, requirements, regulations, or DOE directives
made applicable pursuant to Sections 3.c and/or 4.d of this Order.
Section 3
(5) Review the listing/inventory of accelerators managed under this Order
for appropriateness.
(6) Recommend to the DOE PSO (or NNSA CSO for Safety) approval or
disapproval of the ASE for accelerators and their operations where site
boundary mitigated consequences for credible postulated accident
scenarios potentially exceed 1 rem (0.01 Sv) and/or values established
under the ERPG-2.
(7) Subject to the provisions of Section 5.a.(2), approve or disapprove the
following prior to their initiation/use, as applicable in Section 4.b:
(a) The ASE and any updates or amendments to the approved ASE.
(b) The restart of an accelerator, accelerator facility or activity after a
DOE-mandated shutdown because of an ASE violation.
(c) Implementation or start of activities associated with a Reviewed
Safety Issue that introduces accelerator-specific hazards that are not
adequately addressed by the approved ASE.
(8) Notify the contractor of any approved or denied requests for exemptions or
equivalencies and any conditions of approval.
c. Cognizant Contracting Officer. Upon notification of applicability by the DOE
Field Element Manager, the contracting officer is responsible for incorporating
the CRD, and any alternate safety standards, requirements, regulations, or DOE
directives made applicable pursuant to Sections 3.c and/or 4.d of this Order, into
the contracts of affected contractors.
6. INVOKED STANDARDS. This Order does not invoke any DOE technical standards or
industry standards as required methods. Any technical standard or industry standard that
is mentioned in or referenced by this Order is not invoked by this Order. Note: DOE
O 251.1E, Appendix D, provides a definition for “invoked technical standard.”
Accelerators with the potential for inadvertent criticality must implement a DOE-
approved criticality safety program in accordance with DOE O 420.1, current version, and
any applicable invoked standards.
7. REFERENCES.
a. P.L. 106-65, National Defense Authorization Act for Fiscal Year 2000, as
amended.
DOE O 420.2E 5
08-05-2026
b. 10 CFR § 34, Licenses for Industrial Radiography and Radiation Safety
Requirements for Industrial Radiographic Operations.
c. 10 CFR § 835, Occupational Radiation Protection.
d. American Industrial Hygiene Association (AIHA) 2020 Emergency Response
Planning Guidelines (ERPG) and Workplace Environmental Exposure Levels
(WEELs) Handbook.
e. DOE O 251.1, Departmental Directives Program, current version.
f. DOE O 420.1, Facility Safety, current version.
g. DOE O 450.2, Integrated Safety Management, current version
8. DEFINITIONS. See Attachment 2.
9. CONTACT. Questions concerning this Order should be addressed to the Office of
Science, Office of the Deputy Director for Field Operations, at (202) 586-5434.
BY ORDER OF THE SECRETARY OF ENERGY:
JAMES P. DANLY
Deputy Secretary
DOE O 420.2E Attachment 1 – CRD, Contractors Only
08-05-2026 Page 1-1
ATTACHMENT 1
CONTRACTOR REQUIREMENTS DOCUMENT
DOE O 420.2E, SAFETY OF ACCELERATORS
This Contractor Requirements Document (CRD) sets forth requirements that apply to contractors
whose contracts include this CRD. Regardless of who performs the work, the contractor is
responsible for complying with the requirements of this CRD. The contractor is responsible for
flowing down the requirements of this CRD to subcontractors at any tier to the extent necessary
to ensure the contractor’s compliance with the requirements and the safe performance of work.
Section 4
In addition to the requirements set forth in this CRD, Attachment 2, Definitions, to DOE
O 420.2E, Safety of Accelerators, is referenced in and made a part of this CRD and provides
definitions and information applicable to contracts in which this CRD is inserted. The
requirements in this CRD apply to all accelerators and their operations1 and all facilities that
transition into operating accelerators.
1. EXEMPTIONS/EQUIVALENCIES. Requests for exemptions and equivalencies not
listed below must be processed in accordance with DOE O 251.1, Departmental
Directives Program, current version. The contractor must establish a periodic onsite
validation process to ensure accelerators and devices granted exemptions or equivalencies
through DOE O 251.1 continue to be operated under the conditions of the approved
exemption or equivalency.
a. Exemption. Devices operated in accordance with 10 CFR § 34, Licenses for
Industrial Radiography and Radiation Safety Requirements for Industrial
Radiographic Operations, are exempt from requirements in Section 2 of
this CRD.
b. Exemption. NNSA nuclear weapons designed neutron generators are exempt
from requirements in Section 2.a of this CRD.
c. Exemption. Accelerators with operating energy of less than or equal to 10 MeV
or accelerators whose hazards can be safely managed under the provisions of
10 CFR § 835 and § 851 that are non-complex and that produce only local work
area impacts are exempt from requirements in Section 2 of this CRD. Examples
of such facilities include:
(1) Commercially available equipment including, but not limited to, electron
microscopes, ion implant devices, and x-ray generators.
(2) Neutron generators (accelerating potential below 600 keV).
(3) A room-sized accelerator with an active safety system and limited entry
into the hazardous area.
1 See definition of Accelerator Operations in Attachment 2, Definitions.
Attachment 1– CRD, Contractors Only DOE O 420.2E
Page 1-2 08-05-2026
d. Contractors who manage accelerators and their operations with the potential for
inadvertent criticality must implement a DOE-approved criticality safety program
in accordance with DOE O 420.1, Facility Safety, current version, in addition to
the requirements of this CRD. This requirement cannot be exempted under the
provisions of Section 3.c of DOE O 420.2E, Safety of Accelerators, or this CRD.
2. PROGRAM ELEMENTS.
a. Contractors that manage accelerators under this Order must establish the
following program elements prior to commissioning and routine operations:
(1) A Safety Assessment Document (SAD);
(2) A DOE-approved Accelerator Safety Envelope (ASE);
(3) An Unreviewed Safety Issue (USI) process; and
(4) An Accelerator Readiness Review (ARR) process.
b. Contractors that manage accelerators under this Order must:
(1) Establish a current listing/inventory of accelerators managed under
this Order.
(2) Establish process(es) to periodically review program elements and update
them as appropriate.
c. Accelerator Safety Envelope. The ASE is a documented set of verifiable physical
and administrative requirements, bounding conditions, and credited controls that
ensure safe operation and address accelerator-specific hazards and risks.
(1) The ASE, and any updates or amendment to the approved ASE, must be
submitted to the DOE Field Element Manager for approval.
Section 5
(2) Any activity violating the ASE must be terminated immediately and be put
in a safe and stable configuration. Affected operations must be terminated
immediately and put in a safe and stable configuration for discovered
conditions that create or reveal an ASE violation. The DOE Field Element
Manager must approve the restart of any activity or affected operations
after a DOE-mandated shutdown because of an ASE violation.
d. Safety Assessment Document. The purpose of the SAD is to provide a
description of the facility, an analysis of accelerator-specific safety hazards, and
necessary controls to eliminate or mitigate those hazards such that associated risks
are clearly understood. All hazards at an accelerator fall within two categories:
(1) hazards that are safely managed by other applicable safety and health
programs and/or processes; or (2) accelerator-specific hazards that are analyzed
and safely managed by the SAD and provisions of the ASE. The amount of detail
provided and the depth of analysis must be tailored to be commensurate with the
DOE O 420.2E Attachment 1 – CRD, Contractors Only
08-05-2026 Page 1-3
magnitude and types of hazards present and the complexity of the facility. The
SAD, which represents the technical basis for the bounding conditions and
controls in the ASE, must be maintained so it reflects current hazards and
controls. The contractor must notify the DOE Field Element Manager, or
designee, when the SAD is revised and approved. The SAD must:
(1) Identify hazards at the accelerator facility and determine if each hazard
requires analysis as an accelerator-specific hazard. Non-accelerator-
specific hazards must be evaluated to determine if they could serve as
initiators or contributors to accelerator-specific hazards.
(a) Hazards from radiation and residual radioactivity associated with
beam operations must be evaluated for onsite and offsite impacts
from routine operations and credible accidents as appropriate.
(b) Evaluation of radioactive material to determine if it is an
accelerator-specific hazard must consider direct radiation,
contamination, and airborne dispersion as appropriate.
(2) Analyze accelerator-specific hazards, including initiators or contributors
determined by Section 2.d.(1), and identify necessary controls to eliminate
or mitigate hazards to workers, the public, and the environment. Provide a
description of uncontrolled risk (i.e., without mitigation) and risk with
controls in place associated with accelerators and their operations.
(3) Provide a description of controls used to mitigate accelerator-specific
hazards. This must include:
(a) Detailed descriptions of credited controls (e.g., interlocks and
physical barriers) that are stated in the ASE.
(b) Descriptions, as necessary, of administrative requirements
(e.g., training, procedures), and bounding conditions that are stated
in the ASE.
(c) Descriptions of additional controls taken to eliminate or mitigate
hazards to workers, the public, and the environment,
as appropriate.
(4) Include or reference a description of the accelerator and accelerator facility
function, location, and management organization in addition to details of
major accelerator and accelerator facility components and their operation.
Attachment 1– CRD, Contractors Only DOE O 420.2E
Page 1-4 08-05-2026
Section 6
e. Unreviewed Safety Issue Process. The USI process evaluates proposed activities
or discovered conditions that introduce new or previously unreviewed accelerator-
specific hazards to ensure controls are in place to prevent or mitigate hazards as
described in the current SAD and approved ASE. The term “activities” includes
modifications, temporary changes, permanent changes, and new activities. The
contractor must document how the USI process is implemented, identify how the
requirements listed below are addressed, and notify the DOE Field Element
Manager, or designee, when the USI process is revised.
(1) The USI process must:
(a) Evaluate whether adequate controls are in place to prevent or
mitigate accelerator-specific hazards.
(b) Identify activities expected to exceed ASE bounding conditions
and ensure such activities are evaluated through the USI process
prior to implementation.
(c) Once an USI has been appropriately reviewed, the issue becomes a
Reviewed Safety Issue and may be considered as an addendum to
the SAD.
(2) For a proposed activity, DOE approval is required if the USI process
determines that:
(a) It involves accelerator-specific hazards that are not adequately
addressed by the approved ASE prior to implementation of the
proposed activity; or
(b) It is expected to exceed the bounding conditions of the ASE.
(3) If conditions are discovered that introduce accelerator-specific hazards that
are not adequately addressed by the approved ASE:
(a) Impacted/affected operations must be suspended immediately and
put in a safe and stable configuration.
(b) DOE must approve activities that are not adequately addressed by
the approved ASE.
f. Accelerator Readiness Reviews. ARRs must be performed before commissioning
and/or routine operation. A single ARR may be conducted prior to
commissioning that addresses both commissioning and routine operations. As
part of the ARR process, the contractor must ensure an appropriately
comprehensive and independent ARR has been conducted, identified pre-start
issues have been resolved, commissioning activities required for safe operations
have been completed as appropriate, and the following are in place:
DOE O 420.2E Attachment 1 – CRD, Contractors Only
08-05-2026 Page 1-5
(1) Hardware, personnel, and procedures adequate to support the proposed
accelerator activities safely, consistent with the SAD and approved ASE.
(2) A Configuration Management Program that addresses accelerator
safety; and
(3) Appropriate administrative processes related to accelerator safety
(training, USI process, etc.).
g. The contractor must inform the DOE Field Element Manager prior to:
(1) The start of commissioning activities; and
(2) The start of routine operations.
h. Decommissioning Activities. Contractors who manage accelerators and their
operations under this CRD must inform the DOE Field Element Manager prior to
the start of accelerator decommissioning activities.
DOE O 420.2E Attachment 2 – Federal Employees and Contractors
08-05-2026 Page 2-1
ATTACHMENT 2
DEFINITIONS
This Attachment provides definitions of terms used in the United States Department of Energy
(DOE) Order (O )420.2E, Safety of Accelerators, as well as information applicable to contracts in
which the associated Contractor Requirements Document (CRD) (Attachment 1 to DOE
O 420.2E, Safety of Accelerators) is inserted.
Section 7
1. Accelerator. A device and its components employing electrostatic or electromagnetic
fields to impart kinetic energy to molecular, atomic, or subatomic particles to
intentionally produce an accelerated particle beam and capable of creating a radiological
area as defined by 10 CFR § 835, Occupational Radiation Protection. Accelerator
components include injectors, targets, beam dumps, detectors, experimental enclosures,
accelerator enclosures, experimental areas, and experimental apparatus utilizing the
accelerator. The accelerator also includes associated support and test facilities,
equipment, systems, and utilities necessary to operate the accelerator or utilize the
accelerated beam.
2. Accelerator Facility. The accelerator, plant, buildings, structures, and equipment
supporting the accelerator and its operations that are under the direct control of
the contractor.
3. Accelerator Operations. Activities within the accelerator facility that, over the life cycle of
the facility, support (1) production or utilization of accelerator beams; ( 2) research and
experimental activities utilizing accelerator beams; (3) handling, storage and analysis of
accelerator induced radioactive components and materials within the accelerator facility
boundary; (4) receipt, preparation, assembly, inspection, and installation of samples into
the accelerator beam; or (5) removal, disassembly, handling, analysis, and storage for
radioactive dose minimization to meet the definition of as low as reasonably achievable
(ALARA) in 10 CFR § 835, Occupational Radiation Protection, or transportation
requirements, and packaging of samples after use in the accelerator beam. Accelerator
Operations excludes radioisotope processing activities that are not required to operate or
maintain the accelerator.
4. Accelerator Readiness Review. A structured method for verifying that hardware,
personnel, and procedures associated with commissioning or routine operations are ready
to permit the activity to be undertaken safely.
5. Accelerator Safety Envelope. A documented set of verifiable physical and administrative
requirements, bounding conditions, and credited controls that ensure safe operation and
address accelerator-specific hazards and risks.
6. Commissioning. A phase of an accelerator facility operation that is typically used to
conduct initial beam testing and/or verify design specifications. Commissioning periods
may be tailored to the needs of each facility, and there may be great variations in their
duration, breadth, and formality, but in all cases, the activities will be bound by an ASE.
Attachment 2 – Federal Employees and Contractors DOE O 420.2E
Page 2-2 08-05-2026
7. Credited Controls. Controls determined through a Safety Analysis to be essential for safe
operation directly related to the protection of workers, the public, and the environment.
8. DOE Element. First-tier organizations at DOE/NNSA HQ and in the field as listed in the
Correspondence Style Guide, Office of the Executive Secretariat.
9. DOE Field Element Manager. The manager having overall responsibility for a DOE field
element, including execution of oversight policy implementation. The Field Element
Manager directs activities of DOE/NNSA field or site offices and has line accountability
for all site program and project execution and contract management.
Section 8
10. DOE Program Secretarial Officer. An Assistant Secretary, Office Director, Head of
Program Element, or NNSA Deputy Administrator to whom designated field offices
directly report and who has overall landlord responsibilities for the assigned direct
reporting elements.
11. Operating Energy. The operating energy of an accelerator is the nominal energy of the
accelerated particle beam that the accelerator is being used to produce. It does not
include the theoretical accelerating potential of a device and does not include the energy
of secondary particles that may be produced through interactions of the accelerated
particle beam.
12. Radiation. Ionizing radiation, including the accelerated particle beam and the radiation
produced when the beam interacts with matter or changes direction. Radiation includes
alpha particles, beta particles, gamma rays, X-rays, neutrons, high-speed electrons, high-
speed protons, and other particles capable of producing ions.
13. Radioisotope Processing. Chemical, thermal, or physical actions taken to separate, isolate,
refine, or enrich specific isotopes of a chemical element.
14. Residual Radioactivity. Radioactivity in structures, materials, soils, groundwater, and
other media at a site resulting from the accelerator or accelerator operations.
15. Reviewed Safety Issue. The outcome of the evaluation and determination phase of the
USI process.
16. Risk. A quantitative or qualitative expression of possible harm, which considers both the
probability that a hazard will cause harm and the amount of harm; or, alternatively, an
estimate of the probability of occurrence of a hazard-related incident and the severity of
the consequence associated with the incident.
17. Safety Analysis. A documented process to systematically identify the hazards of a given
operation, including a description and analyses of the adequacy of measures taken to
eliminate, control, or mitigate the hazards and risks of normal operation and identification
and analyses of potential accidents and their associated risks.
DOE O 420.2E Attachment 2 – Federal Employees and Contractors
08-05-2026 Page 2-3
18. Safety Assessment Document. A document containing the results of a Safety Analysis
for an accelerator or accelerator facility pertinent to understanding the risks to workers,
the public, and the environment of operating the accelerator.
19. Unreviewed Safety Issue. An activity or discovered condition with accelerator-specific
hazards that have yet to be evaluated to determine if the activity or discovered condition
introduces accelerator-specific hazards that are not adequately addressed by the current
SAD and approved ASE.
20. USI Process. The process or methodology used to evaluate/review USIs to determine if
the activity or discovered condition is adequately addressed by the current SAD and
approved ASE.