DOE O 420.2B, Safety of Accelerator Facilities
Functional areas: Accelerator Safety, Environment, Safety, and Health, Facility Authorization, Safety
To establish accelerator-specific safety requirements which, when supplemented by other applicable safety and health requirements, will serve to prevent injuries and illnesses associated with Department of Energy (DOE) or National Nuclear Security Administration (NNSA) accelerator operations.
Cancels DOE O 420.2A. Certified 5-13-08. Canceled by DOE O 420.2C.
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE O 420.2CSafety of Accelerator Facilities (Jul 21, 2011)
Supersedes
Earlier documents this one replaced.
- DOE O 420.2ASafety of Accelerator Facilities (Jul 23, 2004)
Related documents
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
U.S. Department of Energy ORDER
Washington, D.C.
DOE O 420.2B
Approved: 7-23-04
Certified 5-13-08
SUBJECT: SAFETY OF ACCELERATOR FACILITIES
1. OBJECTIVE. To establish accelerator-specific safety requirements which, when
supplemented by other applicable safety and health requirements, will serve to prevent
injuries and illnesses associated with Department of Energy (DOE) or National Nuclear
Security Administration (NNSA) accelerator operations.
2. CANCELLATION. DOE O 420.2A, Safety of Accelerator Facilities, dated 1-8-01.
Cancellation of an Order does not, by itself, modify or otherwise affect any contractual
obligation to comply with the Order. Cancelled Orders that are incorporated by reference
in a contract remain in effect until the contract is modified to delete the references to the
requirements in the cancelled Orders.
3. APPLICABILITY.
a. Primary DOE Organizations, Including NNSA Organizations. Except for the
exclusions in paragraph 3c, this Order applies to any of those Primary DOE
Organizations involved with accelerator facilities (accelerators and their
operations) or modules thereof, including injectors, targets, beam dumps,
detectors, experiments, experimental halls, etc. (See Attachment 1 for a complete
list of Primary DOE Organizations. This list automatically includes Primary
DOE Organizations created after the Order is issued.)
The Administrator of NNSA shall assure that NNSA employees and contractors
comply with their respective responsibilities under this Order.
b. Site/Facility Management Contractors.
(1) Except for the exclusions in paragraph 3c, the Contractor Requirements
Document (CRD), Attachment 2, sets forth requirements of this Order that
will apply to site/facility management contractors whose contracts include
the CRD.
(2) This CRD must be included in site/facility management contracts that
involve the management and operation of accelerators unless superseded
by an alternative standard that is in accordance with the terms of the laws,
regulations, and DOE directives clause of the contracts.
(3) This Order does not apply to other than site/facility management
contractors. Any application of any requirements of this Order to other
AVAILABLE ONLINE AT: INITIATED BY:
http://www.directives.doe.gov Office of Science
2 DOE O 420.2B
7-23-04
than site/facility management contractors will be communicated separately
from this Order.
(4) The office identified in the responsibilities paragraph is responsible for
notifying the contracting officer of which site/facility management
contractors are affected. Once notified, the contracting officer is
responsible for incorporating the CRD into the contracts of affected
site/facility management contractors via the laws, regulations, and DOE
directives clause of the contracts.
(5) As the laws, regulations, and DOE directives clause of site/facility
management contracts states, regardless of the performer of the work,
site/facility management contractors with the CRD incorporated into their
contracts are responsible for compliance with the requirements of the
CRD.
(a) Affected site/facility management contractors are responsible for
flowing down the requirements of this CRD to subcontractors at
any tier to the extent necessary to ensure the site/facility
management contractors’ compliance with the requirements.
Section 2
(b) Contractors must not unnecessarily or imprudently flow down
requirements to subcontractors. That is, contractors will—
1 ensure that they and their subcontractors comply with the
requirements of the CRD and
2 incur only those costs that would be incurred by a prudent
person in the conduct of competitive business.
c. Exclusions.
(1) Unmodified commercially available units that are acceptable for industrial
applications, including (but not limited to) electron microscopes, ion
implant devices, and x-ray generators.
(2) Accelerator facilities not capable of creating radiological areas as defined
in Title 10, Code of Federal Regulations (CFR), Part 835, “Occupational
Radiation Protection; Final Rule.”
(3) Naval Nuclear Propulsion Program accelerators covered under Executive
Order 12344 (42 United States Code 7158 Note).
(4) Nonmedical x-ray devices with the capability of accelerating particles to
energies not greater than 10 MeV, which are operated in accordance with
American National Standards Institute N43.3-1993, General Radiation
Safety Standard for Installations Using Non-Medical X-Ray and Sealed
DOE O 420.2B 3
7-23-04
Gamma-Ray Sources, Energies Up to 10 MeV, or in accordance with
another applicable consensus standard as directed by the cognizant field
element manager/NNSA field manager.
(5) Low-voltage neutron generators incapable of creating high-radiation areas
(as defined in 10 CFR 835, “Occupational Radiation Protection; Final
Rule,”), which are operated in accordance with National Council on
Radiation Protection Report 72-1983, Radiation Protection and
Measurements for Low-Voltage Neutron Generators, or in accordance
with another applicable consensus standard as directed by the cognizant
DOE/NNSA field manager. For the purpose of this Order, a low-voltage
neutron generator is defined as a bench-top scale, single-purpose device
generating neutrons by accelerating deuterons or tritons into targets
through a maximum accelerating potential not greater than 600 kV.
(6) Entire DOE/NNSA accelerator facilities or modules thereof when and
only when accelerators and their operations involve or produce a sufficient
inventory of fissionable materials to create the potential for criticality.
4. REQUIREMENTS. DOE/NNSA elements must require the following of contractors.
a. Safety Assessment Document (SAD). A SAD must—
(1) identify hazards and associated onsite and offsite impacts to workers, the
public, and the environment from the facility for both normal operations
and credible accidents;
(2) contain sufficient descriptive information and analytical results pertaining
to specific hazards and risks identified during the safety analysis process
to provide an understanding of risks presented by the proposed operations;
(3) provide appropriate documentation and detailed descriptions of
engineered controls (e.g., interlocks and physical barriers) and
administrative measures (e.g., training) taken to eliminate, control, or
mitigate hazards from operation;
(4) include or reference a description of facility function, location, and
management organization in addition to details of major facility
components and their operation;
(5) be prepared as a single document addressing the hazards of the entire
accelerator facility or as separate SADs prepared for discrete modules of
the facility such as injectors, targets, experiments, experimental halls, or
other types of modules; and
4 DOE O 420.2B
7-23-04
Section 3
(6) be maintained current and consistent with the administrative control
measures and physical configuration of the facility and major safety
equipment.
b. Accelerator Safety Envelope (ASE).
(1) A documented ASE must define the physical and administrative bounding
conditions for safe operations based on the safety analysis documented in
the SAD.
(2) Any activity violating the ASE must be terminated immediately, and the
activity must not recommence before DOE/NNSA has been notified.
c. Unreviewed Safety Issues. Activities that involve unreviewed safety issues must
not be performed if significant safety consequences could result from either an
accident or a malfunction of equipment that is important to safety or for which a
safety analysis has not been performed. Activities involving identified
unreviewed safety issues must not commence before DOE/NNSA has provided
written approval.
d. Accelerator Readiness Reviews (ARRs). ARRs must be performed before
approval for commissioning and routine operation and as directed by the DOE
cognizant Secretarial Officer/NNSA Deputy Administrator or a DOE/NNSA field
manager.
e. Training and Qualification.
(1) Requirements must be established for each individual at an accelerator
facility whose activities could affect safety and health conditions or whose
safety and health could be affected by facility activities. Training and
qualification must be documented and kept current.
(2) Only appropriately trained and qualified personnel, or trainees under the
direct supervision of trained and qualified personnel, are permitted to
perform tasks that may affect safety and health.
(3) All personnel assigned to or using the accelerator facility (including
emergency response personnel) must be trained in the safety and health
practices and emergency plans consistent with their involvement and the
hazards present.
f. Written Procedures.
(1) Written procedures and instructions for conducting activities safely must
be maintained; must be clear, current, and consistent with management
systems and the configuration of the facility and equipment; and must be
DOE O 420.2B 5
7-23-04
approved by a facility contractor’s senior line manager who is actively
involved in the day-to-day operation of the facility.
(2) Procedures must include descriptions of the tasks to be performed;
appropriate safety and health precautions and controls; and requirements
for initial conditions to be verified, operating conditions to be maintained,
and data to be recorded, as applicable.
(3) At a minimum, the contractor must prepare procedures for—
(a) operation startup,
(b) normal operation,
(c) emergency conditions,
(d) conduct of maintenance,
(e) approval and conduct of experiments,
(f) review and approval of facility modifications,
(g) management of safety-related changes, and
(h) control of facility access.
g. Internal Safety Review System.
(1) A system must be established and maintained to periodically assess and
document the condition of the facility, equipment, and engineered safety
systems.
(2) Appropriateness and implementation of procedures, administrative
controls, and personnel training and qualifications must be periodically
reviewed and documented by the internal safety review system.
h. Shielding Policy. The contractor must approve and implement a written
statement of the shielding policy for ionizing and nonionizing radiation.
5. RESPONSIBILITIES.
Section 4
NOTE: For those activities designated as major or strategic systems as defined in DOE
O 413.3, Program and Project Management for the Acquisition of Capital Assets,
dated 10-13-00, the approvals listed in paragraphs 5a and 5b of this Order must be
secured before request for approval to start operations by the appropriate acquisition
executive authority.
6 DOE O 420.2B
7-23-04
a. DOE Cognizant Secretarial Officer/NNSA Deputy Administrator.
(1) For an accelerator facility or module that has potential for more than
minor onsite or more than negligible offsite impacts to workers, the
public, or the environment, approves the following:
(a) ASE,
(b) start of commissioning activities,
(c) start of routine operation activities, and
(d) exemptions from requirements of this Order.
(2) Approves restart of an activity at an accelerator facility after a shutdown
ordered by the DOE cognizant Secretarial Officer/NNSA Deputy
Administrator or Assistant Secretary for Environment, Safety and Health
because of an unreviewed safety issue, violation of an ASE, or other
safety concern.
(3) Provides to line organizations written guidance for implementing the
requirements of this Order.
b. DOE/NNSA Field Element Manager.1
(1) Approves the start of commissioning for an accelerator facility (or
module) that does not have potential for more than minor onsite or more
than negligible offsite impacts to workers, the public, or the environment
after evaluating the ASE, ARR, and SAD and determining—
(a) that a specific ASE will appropriately bound commissioning,
(b) that an appropriate ARR was conducted, and
(c) that the risks as analyzed in the SAD are acceptable when
commissioning is conducted within the specified ASE.
(2) Approves start of routine operation for an accelerator facility (or module)
that does not have potential for more than minor onsite or more than
negligible offsite impacts to workers, the public, or the environment after
evaluating the ASE, ARR, and SAD and determining—
(a) that the ASE will appropriately bound routine operation,
(b) that an appropriate ARR was conducted, and
1The head of a field office or the head of a regional office of a federally staffed laboratory.
DOE O 420.2B 7 (and 8)
7-23-04
(c) that the risks as analyzed in the SAD are acceptable when routine
operations are conducted within the specified ASE.
(3) After completing the process defined in paragraphs 5b(1)(b) and 5b(1)(c),
recommends to the DOE cognizant Secretarial Officer/NNSA Deputy
Administrator approval for start of commissioning activities for an
accelerator facility (or module ) that has the potential for more than minor
onsite or more than negligible offsite impacts to workers, the public, or the
environment.
(4) After completing the process defined in paragraphs 5b(2)(b) and 5b(2)(c),
recommends to the DOE cognizant Secretarial Officer/NNSA Deputy
Administrator approval for start of initial routine operation activities for
an accelerator facility (or module) that has the potential for more than
minor onsite or more than negligible offsite impacts to workers, the
public, or the environment.
(5) Approves restart of an activity at an accelerator facility after shutdown
that was ordered by a DOE/NNSA field manager because of an
unreviewed safety issue, violation of an ASE, or other safety concern.
(6) Approves exemptions from requirements of this Order for an accelerator
facility or module that does not have the potential for more than minor
onsite or more than negligible offsite impacts to workers, the public, or the
environment.
Section 5
(7) Ensures that the CRD or alternative standard, consistent with paragraph
3b(2), is incorporated into the contract of each affected site/facility
management contractor through the cognizant contracting officer.
6. CONTACT. Questions concerning this Order should be addressed to the Office of
Science, 301-903-6800.
BY ORDER OF THE SECRETARY OF ENERGY:
KYLE E. McSLARROW
Deputy Secretary
DOE O 420.2B Attachment 1
7-23-04 Page 1 (and Page 2)
PRIMARY DEPARTMENT OF ENERGY ORGANIZATIONS
TO WHICH DOE O 420.2B, Safety of Accelerator Facilities, IS APPLICABLE
Office of the Secretary
Office of the Chief Information Officer
Office of Civilian Radioactive Waste Management
Office of Congressional and Intergovernmental Affairs
Office of Counterintelligence
Departmental Representative to the Defense Nuclear Facilities Safety Board
Office of Economic Impact and Diversity
Office of Electric Transmission and Distribution
Office of Energy Assurance
Office of Energy Efficiency and Renewable Energy
Energy Information Administration
Office of Environment, Safety and Health
Office of Fossil Energy
Office of General Counsel
Office of Hearings and Appeals
Office of Independent Oversight and Performance Assurance
Office of Inspector General
Office of Intelligence
Office of Legacy Management
Office of Management, Budget and Evaluation and Chief Financial Officer
National Nuclear Security Administration
Office of Nuclear Energy, Science and Technology
Office of Policy and International Affairs
Office of Public Affairs
Office of Science
Secretary of Energy Advisory Board
Office of Security
Office of Security and Safety Performance Assurance
Bonneville Power Administration
Southeastern Power Administration
Southwestern Power Administration
Western Area Power Administration
DOE O 420.2B Attachment 2
7-23-04 Page 1
CONTRACTOR REQUIREMENTS DOCUMENT
DOE O 420.2B, Safety of Accelerator Facilities
Regardless of the performer of the work, the contractor is responsible for compliance with the
requirements of this Contractor Requirements Document (CRD). The contractor is responsible
for flowing down the requirements of this CRD to subcontracts at any tier to the extent necessary
to ensure the contractor’s compliance with the requirements. In doing so, the contractor must
not unnecessarily or imprudently flow down requirements to subcontractors. That is, the
contractor will ensure that it and its subcontractors comply with the requirements of this CRD to
the extent necessary to ensure the contractor’s compliance and only incur costs that would be
incurred by a prudent person in the conduct of competitive business.
The following items are required of the contractor organization.
1. Safety Assessment Document (SAD). A SAD must—
a. identify hazards and associated onsite and offsite impacts to workers, the public,
and the environment from the facility for both normal operations and credible
accidents;
b. contain sufficient descriptive information and analytical results pertaining to
specific hazards and risks identified during the safety analysis process to provide
an understanding of risks presented by the proposed operations;
c. provide appropriate documentation and detailed descriptions of engineered
controls (e.g., interlocks and physical barriers) and administrative measures
(e.g., training) taken to eliminate, control, or mitigate risks of operation;
d. include or reference a description of facility function, location, and management
organization in addition to details of major facility components and their
operation;
Section 6
e. be prepared as a single document addressing the hazards of the entire accelerator
facility or as separate SADs prepared for discrete modules of the facility such as
injectors, targets, experiments, experimental halls, and other type modules; and
f. be maintained current and consistent with the administrative control measures and
physical configuration of the facility and major safety equipment.
2. Accelerator Safety Envelope (ASE).
a. A documented ASE must define the set of physical and administrative bounding
conditions for safe operations, based on the safety analysis documented in the
SAD.
Attachment 2 DOE O 420.2B
Page 2 7-23-04
b. Any activity violating the ASE must be terminated immediately and the activity
must not be restarted before the Department of Energy (DOE)/National Nuclear
Safety Administration (NNSA) has been notified.
3. Unreviewed Safety Issues. Activities that involve unreviewed safety issues must not be
performed if significant safety consequences could result from either an accident or a
malfunction of equipment that is important to safety and for which a safety analysis has
not been performed. Activities involving identified unreviewed safety issues must not
commence before DOE/NNSA has provided written approval.
4. Accelerator Readiness Reviews (ARRs). ARRs must be performed before approval for
commissioning and routine operation and as directed by the DOE cognizant Secretarial
Officer/NNSA Deputy Administrator or a DOE/NNSA field manager.
5. Training and Qualification.
a. Training and qualification requirements must be established for each individual at
an accelerator facility whose activities could affect safety and health conditions or
whose safety and health could be affected by facility activities. Training and
qualification must be documented and kept current.
b. Only appropriately trained and qualified personnel, or trainees under the direct
supervision of trained and qualified personnel, are permitted to perform tasks that
may affect safety and health.
c. All personnel assigned to or using the accelerator facility (including emergency
response personnel) must be trained in the safety and health practices and
emergency plans consistent with their involvement and the hazards present.
6. Written Procedures.
a. Written procedures for conducting activities safely must be maintained; must be
clear, current, and consistent with management systems and the configuration of
the facility and equipment; and must be approved by the facility contractor’s
senior line management who are actively involved in the day-to-day operation of
the facility.
b. Procedures must include descriptions of the tasks to be performed; safety and
health precautions and controls; and requirements for initial conditions to be
verified, operating conditions to be maintained, and data to be recorded, as
applicable.
c. At a minimum, the contractor must prepare procedures for—
(1) operation startup,
DOE O 420.2B Attachment 2
7-23-04 Page 3 (and Page 4)
(2) normal operation,
(3) emergency conditions,
(4) conduct of maintenance,
(5) approval and conduct of experiments,
(6) review and approval of facility modifications,
(7) management of safety-related changes, and
(8) control of facility access.
7. Internal Safety Review System.
a. An internal safety review system must be established and maintained to
periodically assess and document the condition of the facility, equipment, and
engineered safety systems.
Section 7
b. Appropriateness and implementation of procedures, administrative controls, and
personnel training and qualifications must be periodically reviewed and
documented by the internal safety review system.
8. Shielding Policy. The contractor must approve and implement a written statement of the
shielding policy for ionizing and nonionizing radiation.
OBJECTIVE
CANCELLATION
APPLICABILITY
Primary DOE Organizations, Including NNSA Organizations
Site/Facility Management Contractors
Exclusions
REQUIREMENTS
Safety Assessment Document (SAD)
Accelerator Safety Envelope (ASE)
Unreviewed Safety Issues
Accelerator Readiness Reviews (ARRs)
Training and Qualification
Written Procedures
Internal Safety Review System
Shielding Policy
RESPONSIBILITIES
DOE Cognizant Secretarial Officer/NNSA Deputy Administrator
DOE/NNSA Field Element Manager
CONTACT
ATTACHMENT 1. PRIMARY DEPARTMENT OF ENERGY ORGANIZATIONS TO WHICH DOE O 420.2B, Safety of Accelerator Facilities, IS APPLICABLE
ATTACHMENT 2. CONTRACTOR REQUIREMENTS DOCUMENT DOE O 420.2B, Safety of Accelerator Facilities