DOE O 420.2 Chg 1, Safety of Accelerator Facilities
Functional areas: Work Processes
Cancels DOE O 5480.25. Canceled by DOE O 420.2A.
Superseded By:
DOE O 420.2A, Safety of Accelerator Facilities on Jan 08, 2001
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE O 420.2ASafety of Accelerator Facilities (Jan 08, 2001)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DISTRIBUTION: INITIATED BY:
All Departmental Elements Office of Science
U.S. Department of Energy ORDER
Washington, D.C.
Approved: 11-5-98
Review Date: 11-5-00
Change 1: 5-26-99
SUBJECT: SAFETY OF ACCELERATOR FACILITIES
1. OBJECTIVE. To establish accelerator-specific safety requirements which, when
supplemented by other applicable safety and health requirements, will serve to prevent
injuries and illnesses associated with Department of Energy (DOE) accelerator
operations.
2. CANCELLATION. DOE 5480.25, SAFETY OF ACCELERATOR FACILITIES, dated
11-3-92.
3. APPLICABILITY.
a. DOE Elements. Except for the exclusions in Paragraph 3c, this Order applies to
all DOE Elements involved with the operation of accelerators.
b. Contractors. Except for the exclusions in Paragraph 3c, the Contractor
Requirements Document (CRD), Attachment 1, sets forth requirements that must
be applied to all contractors awarded contracts and subcontracts for performing
accelerator operations for DOE at DOE-owned or -leased facilities. Contractor
compliance with the CRD must be required to the extent set forth in a contract.
Contractors must be directed to continue to comply with the requirements of the
Order canceled by this Order until their contracts are modified to delete the
reference to the requirements of the canceled Order.
c. Exclusions.
(1) Unmodified commercially available units that are acceptable for industrial
applications, including (but not limited to) electron microscopes, ion
implant devices, and x-ray generators.
(2) Accelerator facilities not capable of creating a “radiological area” as defined
in Title 10, Code of Federal Regulations (CFR), Part 835, “Occupational
Radiation Protection; Final Rule.”
(3) Naval Nuclear Propulsion Program accelerators covered under Executive
Order 12344 (42 United States Code 7158 Note).
DOE O 420.2
Useful Information
Change 1 of this Order has been incorporated into the document.
2 DOE O 420.2
11-5-98
(4) Non-medical x-ray devices with the capability of accelerating particles to energies
not greater than 10 MeV, which are operated in accordance with American
National Standards Institute (ANSI) N43.3-1993, General Radiation
Safety—Installations Using Non-Medical X-Ray and Sealed Gamma-Ray
Sources, Energies Up to 10 MeV, or in accordance with another applicable
consensus standard as directed by the cognizant Field Element manager.
(5) Low-voltage neutron generators incapable of creating a “high-radiation area” as
defined in 10 CFR 835, “Occupational Radiation Protection; Final Rule,” and
which are operated in accordance with National Council on Radiation Protection
(NCRP) Report 72-1983, Radiation Protection and Measurements for Low-
Voltage Neutron Generators, or in accordance with another applicable consensus
standard as directed by the cognizant Field Element manager. For the purpose of
this Order, a low-voltage neutron generator is defined as a bench-top scale,
single-purpose device generating neutrons by accelerating deuterons or tritons
into targets through a maximum accelerating potential not greater than 600 kV.
(6) Entire DOE facilities or portions thereof where DOE 5480.23, NUCLEAR
SAFETY ANALYSIS REPORTS, is applied.
4. REQUIREMENTS. DOE Elements must require the following of the contractor:
a. Safety Assessment Document.
(1) A Safety Assessment Document (SAD) must identify hazards and associated on-
site and off-site impacts to workers, the public, and the environment from the
facility for both normal operations and credible accidents.
Section 2
(2) The SAD must contain sufficient descriptive information and analytical results
pertaining to specific hazards and risks identified during the safety analysis
process to provide an understanding of risks presented by the proposed
operations.
(3) The SAD must provide appropriate documentation and detailed description of
engineered controls (e.g., interlocks and physical barriers) and administrative
measures (e.g., training) taken to eliminate, control, or mitigate hazards from
operation.
(4) The SAD must include or reference a description of facility function, location, and
management organization in addition to details of major facility components and
their operation.
DOE O 420.2 Chg 1 3
5-26-99
Vertical line denotes change.
(5) The SAD must be prepared as a single document addressing the hazards of
the entire accelerator facility or as separate SADs prepared for discrete
modules of the facility such as injectors, targets, experiments, experimental
halls, or any other type modules.
(6) The SAD must be maintained current and consistent with the administrative
control measures and physical configuration of the facility and major safety
equipment.
b. Accelerator Safety Envelope.
(1) A documented Accelerator Safety Envelope (ASE) must define the set of
physical and administrative bounding conditions for safe operations based on
the safety analysis documented in the SAD.
(2) Any activity violating the ASE must be terminated immediately; the activity
must not recommence before DOE has been notified.
c. Unreviewed Safety Issue. Activities that involve an Unreviewed Safety Issue must
not be performed if significant safety consequences could result from either an
accident or a malfunction of equipment important to safety for which a safety
analysis has not been performed. Activities involving an identified Unreviewed
Safety Issue must not commence before DOE has provided written approval.
d. Accelerator Readiness Reviews. Accelerator Readiness Reviews (ARRs) must be
performed prior to approval for commissioning and routine operation and as
directed by the cognizant Secretarial Officer or a Field Element manager.
e. Training and Qualification.
(1) Training and qualification requirements must be established for each
individual at an accelerator facility whose activities could affect safety and
health conditions or whose safety and health could be affected by facility
activities. Training and qualification must be documented and kept current.
(2) Only appropriately trained and qualified personnel, or trainees under the
direct supervision of trained and qualified personnel, are permitted to
perform tasks that may affect safety and health.
(3) All personnel assigned to or using the accelerator facility (including
emergency response personnel) must be trained in the safety and health
practices and emergency plans consistent with their involvement and the
hazards present.
Useful Information
4 DOE O 420.2
11-5-98
f. Written Procedures.
(1) Written procedures that provide clear instructions for safely conducting activities
must be maintained current and consistent with management systems and the
configuration of the facility and equipment and must be approved by facility senior
line manager in the contractor’s organization who are actively involved in the day-
to-day operation of the facility.
(2) Written procedures must include a description of the tasks to be performed,
appropriate safety and health precautions and controls, and where applicable,
requirements for verifying initial conditions, operating conditions to be
maintained, and data to be recorded.
Section 3
(3) At a minimum, the contractor must prepare procedures for operation startup,
normal operation, emergency conditions, conduct of maintenance, approval and
conduct of experiments, review and approval of facility modifications,
management of safety-related changes, and control of facility access.
g. Internal Safety Review System.
(1) An internal safety review system must be established and maintained to
periodically assess and document the condition of the facility, equipment, and
engineered safety systems.
(2) Appropriateness and implementation of procedures, administrative controls, and
personnel training and qualifications must be periodically reviewed and
documented by the internal safety review system.
h. Shielding Policy. The contractor must approve and implement a written statement of
the shielding policy for ionizing and non-ionizing radiation.
5. RESPONSIBILITIES.
a. Cognizant Secretarial Officer.
(1) Approve for an accelerator facility or module thereof that has potential for more
than minor on-site or more than negligible off-site impacts to workers, the public,
or the environment:
(a) ASE,
(b) commencement of commissioning activities,
(c) commencement of routine operation activities, and
(d) exemptions from requirements of this Order.
DOE O 420.2 Chg 1 5
5-26-99
Vertical line denotes change.
(2) Approve recommencement of an activity at an accelerator facility after a
shutdown ordered by the DOE cognizant Secretarial Officer or Assistant
Secretary for Environment, Safety and Health because of an Unreviewed
Safety Issue, violation of an ASE, or other safety concern.
(3) Provide written guidance to line organizations for implementing the
requirements of this Order.
b. DOE Field Element Manager.
(1) Approve the commencement of commissioning activities for an accelerator
facility or module thereof that does not have potential for more than minor
on-site or more than negligible off-site impacts to workers, the public, or
the environment after—
(a) approving a specific ASE upon finding that it will appropriately bound
commissioning activities;
(b) finding that an appropriate ARR was conducted; and
(c) finding that the risks as analyzed in the SAD are acceptable when
commissioning activities are conducted within the specified ASE.
(2) Approve the commencement of routine operation activities for an
accelerator facility or module thereof that does not have potential for more
than minor on-site or more than negligible off-site impacts to workers, the
public, or the environment after—
(a) approving the ASE upon finding that it will appropriately bound routine
operation activities;
(b) finding that an appropriate ARR was conducted; and
(c) finding that the risks as analyzed in the SAD are acceptable when
routine operation activities are conducted within the specified ASE.
(3) After performing the duties in Paragraph 5b(1)(b) and 5b(1)(c), recommend
DOE cognizant Secretarial Officer approval for commencement of
commissioning activities for an accelerator facility or module thereof that
has the potential for more than minor on-site or more than negligible off-
site impacts to workers, the public, or the environment.
Useful Information
6 DOE O 420.2
11-5-98
(4) After performing the duties in Paragraph 5b(2)(b) and 5b(2)(c), recommend DOE
cognizant Secretarial Officer approval for commencement of initial routine
operation activities for an accelerator facility or module thereof that has the
potential for more than minor on-site or more than negligible off-site impacts to
workers, the public, or the environment.
Section 4
(5) Approve recommencement of an activity at an accelerator facility after shutdown
ordered by a DOE Field Element manager because of an Unreviewed Safety Issue,
violation of an ASE, or other safety concern.
(6) Approve exemptions from requirements of this Order for an accelerator facility or
module thereof that does not have the potential for more than minor on-site or
more than negligible off-site impacts to workers, the public, or the environment.
c. For those activities designated as major or strategic systems, as defined in DOE N
430.1, ENERGY SYSTEM ACQUISITION ADVISORY BOARD PROCEDURES,
the approvals as listed in Paragraphs 5a and 5b of this DOE Order must be secured
prior to request for approval to start operations by the appropriate Acquisition
Executive Authority.
6. CONTACT. Questions concerning this Order should be addressed to the Office of Science,
301-903-6800.
BY ORDER OF THE SECRETARY OF ENERGY:
RICK FARRELL
DIRECTOR OF HUMAN RESOURCES
AND ADMINISTRATION
DOE O 420.2 Attachment 1
11-5-98 Page 1-1
CONTRACTOR REQUIREMENTS DOCUMENT
DOE O 420.2, SAFETY OF ACCELERATOR FACILITIES
The following items are required of the contractor organization:
a. Safety Assessment Document.
(1) A Safety Assessment Document (SAD) must identify hazards and associated on-
site and off-site impacts to workers, the public, and the environment from the
facility for both normal operations and credible accidents.
(2) The SAD must contain sufficient descriptive information and analytical results
pertaining to specific hazards and risks identified during the safety analysis
process to provide an understanding of risks presented by the proposed
operations.
(3) The SAD must provide appropriate documentation and detailed description of
engineered controls (e.g., interlocks and physical barriers) and administrative
measures (e.g., training) taken to eliminate, control, or mitigate risks of operation.
(4) The SAD must include or reference a description of facility function, location, and
management organization in addition to details of major facility components and
their operation.
(5) The SAD must be prepared as a single document addressing the hazards of the
entire accelerator facility or as separate SADs prepared for discrete modules of
the facility such as injectors, targets, experiments, experimental halls, and other
type modules.
(6) The SAD must be maintained current and consistent with the administrative
control measures and physical configuration of the facility and major safety
equipment.
b. Accelerator Safety Envelope.
(1) A documented Accelerator Safety Envelope (ASE) must define the set of physical
and administrative bounding conditions for safe operations, based on the safety
analysis documented in the SAD.
(2) Any activity violating the ASE must be terminated immediately; the activity must
not recommence before the Department of Energy (DOE) has been notified.
Attachment 1 DOE O 420.2
Page 1-2 11-5-98
c. Unreviewed Safety Issue. Activities that involve an Unreviewed Safety Issue must not
be performed if significant safety consequences could result from either an accident or a
malfunction of equipment important to safety for which a safety analysis has not been
performed. Activities involving an identified Unreviewed Safety Issue must not
commence before DOE has provided written approval.
d. Accelerator Readiness Reviews. Accelerator Readiness Reviews (ARRs) must be
performed prior to approval for commissioning and routine operation and as directed
by the cognizant Secretarial Officer or a Field Element manager.
Section 5
e. Training and Qualification.
(1) Training and qualification requirements must be established for each individual at
an accelerator facility whose activities could affect safety and health conditions or
whose safety and health could be affected by facility activities. Training and
qualification must be documented and kept current.
(2) Only appropriately trained and qualified personnel, or trainees under the direct
supervision of trained and qualified personnel, are permitted to perform tasks that
may affect safety and health.
(3) All personnel assigned to or using the accelerator facility (including emergency
response personnel) must be trained in the safety and health practices and
emergency plans consistent with their involvement and the hazards present.
f. Written Procedures.
(1) Written procedures that provide clear instructions for safely conducting activities
must be maintained current and consistent with management systems and the
configuration of the facility and equipment and must be approved by facility senior
line management in the contractor’s organization who are actively involved in the
day-to-day operation of the facility.
(2) Written procedures must include a description of the tasks to be performed,
appropriate safety and health precautions and controls, and where applicable,
requirements for verifying initial conditions, operating conditions to be
maintained, and data to be recorded.
(3) At a minimum, the contractor must prepare procedures for operation startup,
normal operation, emergency conditions, conduct of maintenance, approval and
conduct of experiments, review and approval of facility modifications,
management of safety-related changes, and control of facility access.
DOE O 420.2 Attachment 1
11-5-98 Page 1-3 (and 1-4)
g. Internal Safety Review System.
(1) An internal safety review system must be established and maintained to
periodically assess and document the condition of the facility, equipment, and
engineered safety systems.
(2) Appropriateness and implementation of procedures, administrative controls, and
personnel training and qualifications must be periodically reviewed and
documented by the internal safety review system.
h. Shielding Policy. The contractor must approve and implement a written statement of
the shielding policy for ionizing and non-ionizing radiation.
Distribution: Initiated By:
All Departmental Elements Office of Science
U.S. DEPARTMENT OF ENERGY PAGE CHANGE
WASHINGTON, D.C.
5-26-99
SUBJECT: SAFETY OF ACCELERATOR FACILITIES
1. PURPOSE. To transmit revised pages to DOE O 420.2, SAFETY OF
ACCELERATOR FACILITIES, of 11-5-98.
2. EXPLANATION OF CHANGE. In Paragraph 4a(5) change the word “and” to “any”
and in Paragraph 5b(2)(a) change the acronym “ARR” (Accelerator Readiness
Review) to “ASE” (Accelerator Safety Envelope).
3. FILING INSTRUCTIONS.
a. Remove Pages Dated Insert Page Dated
3 11-5-98 3 5-26-99
5 11-5-98 5 5-26-99
b. After filing the attached pages, this transmittal may be discarded.
BY ORDER OF THE SECRETARY OF ENERGY:
RICK FARRELL
DIRECTOR OF HUMAN RESOURCES
AND ADMINISTRATION
DOE O 420.2 Chg 1