Life Cycle Phases
Lifecycle phases are distinct periods in a project’s lifespan. Each period is comprised of tangible and intangible deliverables that upon fulfilling will help advance the project closer towards completion. The PEM Lifecycle Phases include the: Pre-Project, Initiation, Planning…
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- WQA Bulletin Weapon Quality Policy WQMS and Product Realization
- DOE G 413.3-14Information Technology Project Guide
- DOE N 430.1Energy Systems Acquisitions Advisory Board Procedures
- NAP-24Weapon Quality Policy
- DOE-STD-3011-2016Preparation of Documented Safety Analysis for Interim Operations at DOE Nuclear Facilities
- DOE G 430.1-2Implementation Guide for Surveillance and Maintenance during Facility Transition and Disposition
- NAP 413.9Cost Analysis Requirements Description
- BOP 413.9, Cost Analysis Requirements Description (Redline)
- BOP-06.08Cost Analysis Requirements Description
- BOP 413.9Cost Analysis Requirements Description
- DOE-STD-1073-93 Part IGuide for Operational Configuration Management Program
- DOE O 430.1ALife Cycle Asset Management
- DOE M 450.4-1Integrated Safety Management System Manual
- DOE G 414.1-4Safety Software Guide for Use with 10 CFR 830, Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance
- DOE-STD-6002-96Safety of Magnetic Fusion Facilities: Requirements
- DOE G 430.1-4Decommissioning Implementation Guide
- DOE G 450.4-1CIntegrated Safety Management System Guide
- DOE G 430.1-3Deactivation Implementation Guide
- DOE-STD-1120-2016Preparation of Documented Safety Analysis for Decommissioning and Environmental Restoration Activities
- DOE G 430.1-5Transition Implementation Guide