Baseline Change Proposal
A document that provides a complete description of a proposed change to an approved performance baseline, including the resulting impacts on the project scope, schedule, design, methods, and cost baselines.
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE N 430.1Energy Systems Acquisitions Advisory Board Procedures
- BOP-50.001NNSA ESAAB Equivalent Process
- DOE G 413.3-20 Chg 1 (Admin Chg)Change Control Management Guide
- DOE G 413.3-20Change Control Management Guide
- BOP 413.8, Energy Systems Acquisition Advisory Board Equivalent (ESAAB-E) Process (Redline)
- BOP-06.06Energy Systems Acquisition Advisory Board Equivalent (ESAAB-E) Process
- BOP 413.8Energy Systems Acquisition Advisory Board Equivalent (ESAAB-E) Process
- Office of Science is Exempt from DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets (SC)
- SD 413.3-6Energy Systems Acquisition Advisory Board Equivalent Process
- DOE G 413.3-5A Chg 1 (Admin Chg 1)U.S Department of Energy Performance Baseline Guide
- DOE G 413.3-5AU.S. Department of Energy Performance Baseline Guide
- BOP-50.001AEnergy System Acquisition Advisory Board (ESAAB) Equivalent Process
- DOE G 413.3-9U.S. Department of Energy Project Review Guide for Capital Asset Projects
- DOE G 413.3-9AProject Reviews for Capital Asset Projects
- DOE G 413.3-9 Chg 1 (Admin Chg)U.S. Department of Energy Project Review Guide for Capital Asset Projects
- DOE G 413.3-15AProject Execution Plans
- DOE O 413.3B Chg 1 (Admin Chg)Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3BProgram and Project Management for the Acquisition of Capital Assets
- DOE G 413.3-10BIntegrated Project Management Using the Earned Value Management System
- DOE O 413.3CProgram and Project Management for the Acquisition of Capital Assets