Technical Independent Project Review (TIPR)
An independent project review conducted at or near the completion of preliminary design, and is required prior to CD-2 approval, for Hazard Category 1, 2, and 3 nuclear facilities. At a minimum, the focus of this review is to determine that the safety documentation is…
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 413.3-9AProject Reviews for Capital Asset Projects
- BOP 10.003Site Integrated Assessment Plan (SIAP) Development, Updating and Reporting
- SD 413.3-1Project Reviews
- BOP 413.4, Project Reviews (Redline)
- BOP-06.04Project Reviews
- BOP 413.4Project Reviews
- SD 413.3-7Project Management for Non-nuclear, Non-complex Capital Asset Acquisition
- DOE G 413.3-4U.S. Department of Energy Technology Readiness Assessment Guide
- DOE G 413.3-12U.S. Department of Energy Project Definition Rating Index Guide
- DOE G 413.3-12 Chg 1 (Admin Chg)U.S. Department of Energy Project Definition Rating Index Guide for Traditional Nuclear and Non-Nuclear Construction Projects
- DOE O 413.3B Chg 3 (PgChg)Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3B Chg4 (MinChg)Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3B Chg 5 (MinChg)Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3CProgram and Project Management for the Acquisition of Capital Assets
- DOE O 413.3B Chg 1 (Admin Chg)Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3B Chg 6 (LtdChg)Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3B Chg 7 (LtdChg)Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3B Chg 2 (PgChg)Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3BProgram and Project Management for the Acquisition of Capital Assets