Archives of Directives

Technical Independent Project Review (TIPR)

An independent project review conducted at or near the completion of preliminary design, and is required prior to CD-2 approval, for Hazard Category 1, 2, and 3 nuclear facilities. At a minimum, the focus of this review is to determine that the safety documentation is…
Mentioned in (auto-detected)

Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.

Something wrong with this record? Tell us