Technical Baseline
Performance and design requirements, criteria, and characteristics derived from the mission need that provides the basis for project direction and execution, and aligns with the contractual scope requirements.
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 413.3-5A Chg 1 (Admin Chg 1)U.S Department of Energy Performance Baseline Guide
- DOE G 413.3-5U.S. Department of Energy Performance Baseline Guide
- DOE G 413.3-5AU.S. Department of Energy Performance Baseline Guide
- BOP-50.004Program Requirements Document (PRD) for Construction Projects
- DOE N 4700.5Project Control Systems Guidelines
- BOP 413.2 Admin Chg 1, Program Requirements Document for Construction Projects (Redline)
- BOP-06.02 Admin Chg 1Program Requirements Document for Construction Projects
- BOP 413.2 Admin Chg 1Program Requirements Document for Construction Projects
- BOP 413.9, Cost Analysis Requirements Description (Redline)
- BOP-06.08Cost Analysis Requirements Description
- BOP 413.9Cost Analysis Requirements Description
- DOE G 430.1-3Deactivation Implementation Guide
- BOP 413.3, Independent Cost Estimates Procedure (Redline)
- BOP-06.03Independent Cost Estimates Procedure
- BOP 413.3Independent Cost Estimates Procedure
- DOE-STD-1073-93 Part IGuide for Operational Configuration Management Program
- NAP 413.9Cost Analysis Requirements Description
- DOE O 4700.1 Chg 1Project Management System
- DOE-STD-1175-2019Senior Technical Safety Manager Functional Area Qualification Standard
- DOE-HDBK-1230-2019Commercial Grade Dedication Application Handbook