Stages
In addition to the lifecycle phases, the IT PEM also incorporates six project stages which support IT project lifecycle requirements. The PEM Stages include: Design, Development, Testing, Implementation, Closure, and Retirement stages.
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 200.1-1 Ch 2Lifecycle Model
- DOE M 5632.7-1Firearms Qualification Courses Manual
- DOE G 200.1-1 Ch 10Software Maintenance
- DOE G 200.1-1 App CAppendix C Conducting Structured Walkthroughs
- DOE G 415.1-1Information Technology Project Execution Model Guide
- DOE G 200.1-1 App EAppendix E Stage Exit Process Guide
- DOE G 200.1-1 App DAppendix D In-Stage Assessment Process Guide
- DOE M 473.2-1Firearms Qualification Courses Manual
- DOE M 473.2-1 Chg 1Firearms Qualification Courses Manual
- DOE G 415.1-2Information Technology Project Execution Model Guide for Small and Medium Projects
- BOP-003.0507Management and Operating Contact Administration Guide (CAGs)
- DOE G 200.1-1 Ch 4Requirements Definition Stage
- DOE M 473.2-1AFirearms Qualification Courses Manual
- DOE-HDBK-1169-2003Nuclear Air Cleaning Handbook, Chapter 2, System Considerations
- DOE G 430.1-1Cost Estimating Guide
- DOE G 200.1-1 Ch 1Introduction
- DOE G 200.1-1 Ch 3Planning Stage
- DOE-STD-1189-2008Integration of Safety Into the Design Process
- DOE P 141.2Public Participation and Community Relations
- DOE P 455.1Use of Risk-Based End States