Replanning
A realignment of schedule or reallocation of budget for remaining effort within the existing constraints of the contract. In this case, the total allocated budget (TAB) does not exceed the CBB, nor is the schedule adjusted to extend beyond the contractually defined milestones.
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 413.3-20 Chg 1 (Admin Chg)Change Control Management Guide
- DOE G 413.3-20Change Control Management Guide
- DOE G 413.3-10BIntegrated Project Management Using the Earned Value Management System
- DOE O 1332.1A Chg 1Uniform Reporting System
- DOE N 4700.5Project Control Systems Guidelines
- DOE O 413.3Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3 Chg 1Program and Project Management for the Acquisition of Capital Assets
- DOE G 450.3-3Tailoring for Integrated Safety Management Applications
- DOE G 413.3-10A Chg 1 (Admin Chg)Earned Value Management System (EVMS)
- DOE G 413.3-10AEarned Value Management System (EVMS)
- DOE G 413.3-9U.S. Department of Energy Project Review Guide for Capital Asset Projects
- DOE G 413.3-9 Chg 1 (Admin Chg)U.S. Department of Energy Project Review Guide for Capital Asset Projects
- DOE G 450.4-1CIntegrated Safety Management System Guide