Performance Measurement Baseline (PMB)
The baseline cost that encompasses all contractor project work packages and planning packages, derived from summing all the costs from the Work Breakdown Structure. Undistributed management reserve, contingency, profit, fee and DOE direct costs are not part of the Performance…
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 413.3-20 Chg 1 (Admin Chg)Change Control Management Guide
- DOE G 413.3-20Change Control Management Guide
- DOE G 415.1-1Information Technology Project Execution Model Guide
- DOE G 413.3-5A Chg 1 (Admin Chg 1)U.S Department of Energy Performance Baseline Guide
- NAP 413.9Cost Analysis Requirements Description
- BOP 413.9, Cost Analysis Requirements Description (Redline)
- BOP-06.08Cost Analysis Requirements Description
- BOP 413.9Cost Analysis Requirements Description
- DOE G 413.3-8Environmental Management (EM) Cleanup Projects
- DOE G 413.3-15AProject Execution Plans
- DOE G 413.3-10Earned Value Management System (EVMS)
- DOE G 413.3-5AU.S. Department of Energy Performance Baseline Guide
- DOE G 413.3-10BIntegrated Project Management Using the Earned Value Management System
- DOE O 413.3CProgram and Project Management for the Acquisition of Capital Assets
- DOE G 413.3-7ARisk Management Guide
- DOE G 413.3-7A Chg 1 (AdminChg)Risk Management Guide
- DOE G 413.3-7A Chg 2 (LtdChg)Risk Management Guide
- DOE G 413.3-10A Chg 1 (Admin Chg)Earned Value Management System (EVMS)
- DOE G 413.3-24Planning and Scheduling
- DOE G 413.3-10AEarned Value Management System (EVMS)