Economic Escalation
Cost increases caused by unit price increases. Whereas the cost of projects can increase because of poor management, scope growth, and schedule delays, economic escalation is concerned only with forecasting price increases caused by an increase in the cost of labor, material, or…
Source 1:
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE O 5700.2CCost Estimating, Analysis, and Standardization
- DOE O 5700.2DCost Estimating, Analysis, and Standardization
- DOE G 430.1-1Cost Estimating Guide
- DOE O 231.1Safety and Health Reporting Requirements
- DOE O 231.1 Chg 1Environment, Safety, and Health Reporting
- DOE O 231.1 Chg 2Safety and Health Reporting Requirements
- BOP-50.005Establishment of an Independent Cost Estimate (ICE) Policy
- DOE G 413.3-21 Chg 1 (Admin Chg)Cost Estimating Guide
- DOE G 413.3-21Cost Estimating Guide
- DOE O 4700.1 Chg 1Project Management System
- DOE G 413.3-9U.S. Department of Energy Project Review Guide for Capital Asset Projects
- DOE G 413.3-9 Chg 1 (Admin Chg)U.S. Department of Energy Project Review Guide for Capital Asset Projects
- DOE G 413.3-21ACost Estimating Guide