Performance Measurement Baseline
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 413.3-20 Chg 1 (Admin Chg)Change Control Management Guide
- DOE G 413.3-20Change Control Management Guide
- DOE G 413.3-10Earned Value Management System (EVMS)
- DOE N 4700.5Project Control Systems Guidelines
- DOE G 413.3-15Department of Energy Guide for Project Execution Plans
- DOE G 413.3-15 Chg 1 (Admin Chg)Department of Energy Guide for Project Execution Plans
- DOE G 413.3-5U.S. Department of Energy Performance Baseline Guide
- DOE G 415.1-1Information Technology Project Execution Model Guide
- DOE G 415.1-2Information Technology Project Execution Model Guide for Small and Medium Projects
- NAP 413.1Data Collection for Cost Estimating
- NAP 413.1 (Recertified)Data Collection for Cost Estimating
- DOE O 413.3AProgram and Project Management for the Acquisition of Capital Assets
- DOE G 413.3-8Environmental Management (EM) Cleanup Projects
- DOE O 413.3A Chg 1Program and Project Management for the Acquisition of Capital Assets
- DOE G 413.3-5A Chg 1 (Admin Chg 1)U.S Department of Energy Performance Baseline Guide
- NAP 413.9Cost Analysis Requirements Description
- DOE G 413.3-10A Chg 1 (Admin Chg)Earned Value Management System (EVMS)
- BOP 413.9, Cost Analysis Requirements Description (Redline)
- BOP-06.08Cost Analysis Requirements Description
- BOP 413.9Cost Analysis Requirements Description