Constructability
The effective and timely integration of construction knowledge into the conceptual planning, design, construction, and field operations of a project to achieve the overall project objectives in the best possible time and accuracy at the most cost-effective levels. (Source: CII)
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 413.3-23Nuclear Facilities Commissioning
- DOE G 413.3-12U.S. Department of Energy Project Definition Rating Index Guide
- DOE G 413.3-12AFront-End Planning and Project Definition Rating Index for Nuclear and Non-Nuclear Constructions Projects
- DOE G 413.3-2Quality Assurance Guide for Project Management
- DOE G 413.3-2 Chg 1 (Admin Chg)Quality Assurance Guide for Project Management
- DOE G 413.3-12 Chg 1 (Admin Chg)U.S. Department of Energy Project Definition Rating Index Guide for Traditional Nuclear and Non-Nuclear Construction Projects
- DOE-STD-1180-2004Construction Management Functional Area Qualification Standard
- DOE G 413.3-5U.S. Department of Energy Performance Baseline Guide
- DOE G 413.3-5A Chg 1 (Admin Chg 1)U.S Department of Energy Performance Baseline Guide
- DOE G 413.3-5AU.S. Department of Energy Performance Baseline Guide
- DOE G 413.3-9U.S. Department of Energy Project Review Guide for Capital Asset Projects
- DOE G 413.3-9 Chg 1 (Admin Chg)U.S. Department of Energy Project Review Guide for Capital Asset Projects
- DOE O 413.3B Chg 1 (Admin Chg)Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3BProgram and Project Management for the Acquisition of Capital Assets
- SD 413.3 Admin Chg 1Program and Project Management for the Acquistion of Capital Assets
- DOE G 430.1-1Cost Estimating Guide
- SD 413.3 Admin Chg 1, Program and Project Management for the Acquisition of Capital Assets - Redline
- DOE G 413.3-9AProject Reviews for Capital Asset Projects
- DOE G 413.3-18AIntegrated Project Team Guide for Formation and Implementation
- DOE G 413.3-18A Chg 1 (Admin Chg)Integrated Project Team Guide for Formation and Implementation