Acceptance Testing
The process of exercising or evaluating a system or system component by manual or automated means to ensure that it satisfies the specified requirements and to identify differences between expected and actual results in the operating environment.
Similar Terms:
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 200.1-1 Ch 9Installation and Acceptance Stage
- DOE G 200.1-1 Ch 4Requirements Definition Stage
- DOE-STD-3022-98DOE HEPA Filter Test Program
- DOE-ER-STD-6001-92Implementation Guide for Quality Assurance Programs for Basic and Applied Research
- DOE G 200.1-1 Ch 10Software Maintenance
- DOE-STD-1167-2003 (Reaffirmed 2018)Respiratory Acceptance Program for Supplied Air Suits (Invoked)
- DOE G 460.1-1 AttPackaging and Transportation Attachments
- DOE-HDBK-1169-2003Nuclear Air Cleaning Handbook, Chapter 8, Testing
- DOE-STD-1167-2003The Department of Energy Respiratory Acceptance Program for Supplied-Air Suits
- DOE G 414.1-2B Chg 2 (Admin Chg)Quality Assurance Program Guide
- DOE O 5700.6C Chg 1Quality Assurance
- DOE G 414.1-2AQuality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance
- DOE-HDBK-1221-2016 Chg Notice 1Suspect/Counterfeit Items Resource Handbook
- DOE G 414.1-4Safety Software Guide for Use with 10 CFR 830, Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance
- DOE-HDBK-1221-2016Suspect/Counterfeit Items Resource Handbook
- DOE G 413.3-23Nuclear Facilities Commissioning
- DOE O 414.1CQuality Assurance
- DOE G 440.1-6Implementation Guide For Use With Suspect/Counterfeit Items Requirements of DOE O 440.1, Worker Protection Management; 10 CFR 830.120; and DOE 5700.6C, Quality Assurance
- DOE G 413.3-3Safeguards and Security for Program and Project Management
- DOE O 414.1Quality Assurance