DOE O 5700.6C Chg 1, Quality Assurance
Functional areas: Energy Program and Policies
Canceled by DOE O 414.1.
Superseded By:
DOE O 414.1, Quality Assurance on Nov 24, 1998
Cancels:
DOE O 5700.6B, Quality Assurance on May 10, 1996
Canceled By:
DOE O 414.1, Quality Assurance on Nov 24, 1998
Version history and related documents
Superseded by
A newer version replaces this document.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
U.S. Department of Energy ORDER
Washington, D.C.
DOE 5700.6C
8-21-91
SUBJECT: QUALITY ASSURANCE
1. PURPOSE. To establish quality assurance requirements for the Department
of Energy (DOE).
2. CANCELLATION. DOE 5700.6B, QUALITY ASSURANCE, of 9-23-86.
3. SCOPE. The. provisions of this Order apply to the work performed by all
Departmental Elements and management and operating (M&O) contractors as
provided by law and/or contract and as implemented by the Department’s
Contracting Officer. If conflicts between this and other Departmental
Orders exist, the quality assurance requirements of DOE 5700.6C take
precedent.
4. EXEMPTIONS. Specifically excluded from this Order is:
a.
b.
c.
d.
e.
Work associated with nuclear weapons administered by the Assistant
Secretary for Defense Programs. (Work associated with the design,
construction, fabrication, operations, maintenance, decommissioning,
and decontamination of facilities and equipment used to produce
weapons are not excluded from this Order. Appropriate attention
shall be given to the weapons component and production facility
interfaces.)
Work administered by the Energy Information Administration.
Work conducted under the Naval Nuclear Propulsion Program
(subparagraph 9f).
Work licensed by the U.S. Nuclear Regulatory Commission (NRC) or an
NRC Agreement State and subject to the quality assurance requirements
of that agency.
Research and development work results which undergo peer review for
publication.
5. REFERENCES . The following references are provided for general
information.
a. DOE 1324.2A, RECORDS DISPOSITION, of 9-13-88, which defines Federal
records and the requirements for their maintenance and
retention/disposition.
DISTRIBUTION: INITIATED BY:
All Departmental Elements
Printed with soy ink on recycled paper
Office of Nuclear Energy
Office of Environment,
Safety, and Health.
2
b.
c.
d.
e.
f.
g.
h.
DOE 5700.6C
8-21-91
DOE 2030.4A, REPORTING FRAUD, WASTE , AND ABUSE TO THE OFFICE OF
INSPECTOR GENERAL, of 3-19-91, which establishes policies and
procedures for reporting fraud, waste, and abuse to the Department of
Energy’s Office of the Inspector General (IG).
DOE 4330.4A, MAINTENANCE MANAGEMENT PROGRAM, of 10-17-90, which
provides general policy and objectives for the establishment of
programs for the management and performance of cost-effective
maintenance and repair of DOE property, including facilities.
DOE 4700.1, PROJECT MANAGEMENT SYSTEM, of 3-06-87, which provides the
principles and requirements governing the development, approval, and
execution of DOE’s outlay program acquisitions as embodied within the
project management system.
DOE 5480.1B, ENVIRONMENT, SAFETY, AND HEALTH PROGRAM FOR DEPARTMENT
OPERATIONS, of 9-23-86, which sets forth responsibilities and
requirements for the program.
DOE 5480.4, ENVIRONMENTAL PROTECTION, SAFETY, AND HEALTH PROTECTION
STANDARDS, of 5-15-84, which specifies the application of mandatory
environmental protection, safety, and health protection (ES&H)
standards to DOE operations.
DOE 5480.19, CONDUCT OF OPERATIONS, of 7-9-90, which establishes
requirements for conduct of operations at DOE facilities to ensure
acceptable operations, provide for continuing improvements in
operations, and ensure the maintenance of acceptable margins of
safety.
Standards which provide additional interpretive guidance for the
development and implementation of quality assurance programs,
including the following:
Section 2
(1) American Society of Mechanical Engineers (ASME)/NQA-1, Quality
Assurance Program Requirements for Nuclear Facilities,
(2) ASME/NQA-2, Quality Assurance Requirements for Nuclear Facility
Applications,
(3) ASME/NQA-3, Quality Assurance Program Requirements for the
Collection of Scientific and Technical Information for Site
Characterization of High-Level Nuclear Waste Repositories,
(4) International Atomic Energy Agency (IAEA) International Nuclear
Safety Advisory Group’s Safety Series No. 75-INSAG-3, Basic
Safety Principles for Nuclear Power Plants, and
(5) International Standard for Standardization (IS0) 9000, Quality
Management and Quality Assurance Standards-Guidelines for
Selection and Use.
DOE 5700.6C
8-21-91
3
i. Environmental Protection Agency (EPA) gui
to environmental protection and/or remed
following:
(1) QAMS 004,
Plans,
(2) QAMS 005,
Project Pl
(3) Chapter 1
dance documents that apply
iation, including the
Guidelines and Specifications for Preparing QA Program
Interim Guidelines and Specifications for Preparing QA
ans,
of SW-846, Test Methods for Evaluating Solid Wastes,
(4) EPA 540, Data Quality Objectives for Remedial Response
Activities, and
(5) IEPA 530, Technical Guidance Document: Construction QA for Land
Disposal Facilities.
j. American Society for Testing and Materials (ASTM) standards,
including ASTM C1009, Establishing a QA Program for Analytical
Chemistry Laboratories Within the Nuclear Industry.
6. DEFINITIONS.
a.
b.
c.
d.
e.
f.
Assessment/Verification. The act of reviewing, inspecting, testing,
checking, conducting surveillances, auditing, or otherwise
determining and documenting whether items, processes, or services
meet specified requirements. The terms assessment and verification,
as used in DOE 5700.6C, are synonymous: their use is determined by
who is performing the work. Assessments are performed by or for
senior management. Verifications are performed by the line
organization.
Item. An all-inclusive term used in place of any of the following:
appurtenance, facility, sample, assembly, component, equipment,
material, module. part, structure, subassembly, subsystem, system,
unit, documented concepts or data.
Process. A series of actions that achieves an end or result.
Program Secretarial Officer (PSO). The heads of DOE offices with
responsibility for specific facilities. These include the Assistant
Secretaries for Conservation and Renewable Energy; Nuclear Energy;
Defense Programs: and Fossil Energy and the Directors of the Offices
of Energy Research: Civilian Radioactive Waste Management;
Environmental Restoration and Waste Management; and New Production
Reactors.
.
Quality. The degree to which an item or
user’s requirements and expectations.
Quality Assurance. Actions that provide
achieved.
process meets or exceeds the
confidence that quality is
4 DOE 5700.6C
Quality Assurance Program.
8-21-91
g. The overall program established by an
organization to implement the requirements of this Order. The
Program assigns responsibilities and authorities, defines policies
and requirements, and provides for the performance and assessment of
work.
h. Service. The performance of work, such as design, fabrication,
inspection, nondestructive examination, repair, or installation.
Section 3
i. Senior Management. The manager or managers responsible for mission
accomplishment and overall operations. For the DOE. the DOE PSOs and
Field Office Managers are responsible for mission accomplishment. and
overall operations. For DOE M&O contractors, the General Manager or
similar top position is responsible for mission accomplishment and
overall performance in accordance with the requirements of their
contracts or other agreements.
Work.j . — Process of performing a defined task or activity; for example,
research and development, operations, maintenance and repair,
administration, software development and use, inspection, safeguards
and security. data collection, and analysis.
7. POLICY. It is DOE policy to establish quality assurance requirements to
ensure that risks and environmental impacts are minimized and that safety.
reliability, and performance are maximized through the application of
effective management systems commensurate with the risks posed by the
facility and its work. This Order implements the policy of the Department
to ensure that quality assurance requirements are clearly specified for
the broad spectrum of work performed by DOE and its contractors. including
safeguards and security.
8. OBJECTIVES. DOE’s objectives are to ensure the following:
a. That senior management provides planning. organization, direction.
control, and support to achieve the organization’s objectives;
b. That the line organization achieves quality; and
c. That overall performance is reviewed and evaluated using a rigorous
assessment process.
9. REQUIREMENTS.
a. General.
(1) Senior management shall be responsible for Quality Assurance
Program (QAP) implementation, assessment, and improvement.
Departmental Elements and M&O contractors shall develop their
QAPs by applying the quality assurance criteria specified in
subparagraph 9b. The quality assurance program shall include a
discussion of how the criteria will be satisfied taking into
consideration the risk associated with the work, Appropriate
standards shall be used, wherever applicable, to develop and
implement QAPs.
(3)
(4)
(5)
(6)
5
Guidance for developing and implementing QAPs is provided in
Attachment I. This guidance may not be appropriate in its
entirety for application to every type of work. Additional
Implementation Guides, such as for research and development
work, will be developed, and after approval, be incorporated
into the provisions of this Order.
Contractors shall obtain DOE approval of new QAPs prior to
commencing work. Contractors working to existing quality
assurance programs shall ensure that their QAPs meet the
requirements of this Order and shall re-submit their QAPs,
together with an implementation plan, to the Lead Program
Secretarial Officers (PSOSs) for approval within 180 days after
this Order becomes effective. Quality assurance programs shall
be regarded as approved by DOE 180 days after submittal,
including any modifications which have been made or directed by
DOE during this period, or receipt of a letter, whichever occurs
first.
DOE contractors may, at any time. make changes to their DOE-
approved QAPs. Changes made over the previous year to DOE-
approved QAPs shall be submitted annually to the Lead PSO for
review. All changes shall be regarded as approved by DOE 90
days after submittal. including any modifications which have
been made or directed by DOE during this period, or receipt of a
letter, whichever occurs first. The submittals shall identify
the changes. the pages affected, the reason for the changes, and
the basis for concluding that the revised program continues to
satisfy the requirements of this Order. Changes made to correct
spelling, punctuation, or other editorial items do not require
explanation.
Section 4
Assessments of DOE and contractor work shall be conducted based
on the DOE-approved quality assurance program.
Programs. guides. and policies which implement this Order shall
meet the requirements of DOE 1324.2A. (The Records and Reports
Branch, AD-241.1. is available for any needed assistance
regarding records management. )
b. Quality Assurance Criteria.
(1) Management.
(a) Criterion l--Program. Organizations shall develop,
implement. and maintain a written Quality Assurance Program.
The QAP shall describe the organizational structure,
functional responsibilities, levels of authority, and
interfaces for those managing, performing, and assessing
adequacy of work. The QAP shall describe the management
system, including planning, scheduling, and cost control
considerations.
DOE 5700.6C
8-21-91
(2)
6 DOE 5700.6C
(b) Criterion 2--Personnel Training and Qualification
Personnel shall be trained and qualified to ensure they are
capable of performing their assigned work. Personnel shall
be provided continuing training to ensure that job
proficiency is maintained.
(c) Criterion 3--Quality Improvement. The organization shall
establish and implement processes to detect and prevent
quality problems and to ensure quality improvement. Items
and processes that do not meet established requirements
shall be identified, controlled, and corrected. Correction
shall include identifying the causes of problems and
preventing recurrence. Item reliability, process
implementation, and other quality-related information shall
be reviewed and the data analyzed to identify items and
processes needing improvement..
(d) Criterion, 4- -Documents and Records. Documents shall be
prepared, reviewed, approved, issued, used, and revised to
prescribe processes, specify requirements, or establish
design. Records shall be specified. prepared, reviewed.
approved, and maintained.
(2) Performance.
(a)
(b)
(c)
Criterion 5--Work Processes. Work shall be performed to
established technical standards and administrative contols.
work shall De performed under controlled conditions using
approved instructions, procedures, or other appropriate
means. Items shall be identified and controlled to ensure
their proper use. Items shall be maintained to prevent
their damage, loss, or deterioration. Equipment used for
process monitoring or data collection shall be calibrated
and maintained.
Criterion 6--Design. Item and processes shall be designed
using sound engineering/scientific principles and
appropriate standards. Design work, including changes.
shall incorporate applicable requirements and design bases.
Design interfaces snail be identified and controlled. The
adequacy of design products shall be verified or validated
by individuals or groups other than those who performed the
work. Verification and validation work shall be completed
before approval and implementation of the design.
Criterion 7--Procurement. The organization shall ensure
that procured items and services meet established
requirements and perform as specified. Prospective
suppliers shall be evaluated and selected on the basis of
specified criteria. The organization shall ensure that
approved suppliers can continue to provide acceptable items
and Services.
8-21-91
DOE 5700.6C
8-21-91
7
(d) Criterion 8--Inspection and Acceptance Testing. Inspection
and acceptance testing of specified items and processes
shall be conducted using established acceptance and
performance criteria. Equipment used for inspections and
tests shall be calibrated and maintained.
Section 5
(3) Assessment.
(a) Criterion 9--Management Assessment. Management at al?
levels shall periodically assess the integrated quality
assurance program and its performance. Problems that hinder
the organization from achieving its objectives shall be
identified and corrected.
(b) Criterion 10-- Independent Assessment. Planned and periodic
independent assessments shall be conducted to measure item
quality and process effectiveness and to promote
improvement. The organization performing independent
assessments shall have sufficient authority and freedom from
the line organization to carry out its responsibilities.
Persons conducting independent assessments shall be
technically qualified and knowledgeable in the areas
assessed.
10. RESPONSIBILITIES AND AUTHORITIES .
a. Lead Program Secretarial Officers have the responsibility to ensure
that the requirements of this Order are implemented. Additionally,
they have the following responsibilities: “
(1) Ensure that DOE Field Offices and contractors to which this
Order applies implement the requirements in Paragraph 9, as
applicable;
(2) Provide program and project direction and resources for work
within their purview:
(3) Review and approve quality assurance programs and changes
thereto within their purview;
(4) Assess quality assurance program adequacy and implementation;
(5) For nuclear work. provide the Assistant Secretary for Nuclear
Energy (NE-1) with recommendations for additions or revisions to
nuclear quality assurance standards, guides, and codes; and for
non-nuclear work, provide similar recommendations to the
Assistant Secretary for Environment, Safety and Health (EH-1);
(6) Ensure that Field Office Managers comply
below;
(7) Remain accountable for those responsib
delegate:
with Paragraph 10e,
ilities which they
DOE 5700.6C
(8) Develop and implement a quality assurance program governing t-he
work of their organization in accordance with the requirements
of Paragraph 9, as applicable;
(9) Designate an individual or individuals to be responsible for
bringing the following to the attention of the Department’s
Contracting Officer: (a) each procurement requiring the
application of this Order, (b) requirements for flowdown of
provisions of this order to any subcontract or sub-award, and
(c) identification of the parts of this Order with which the
contractor or subcontractor is to comply. Unless another
individual is designated. the responsibility is that of the
procurement Request Originator (the individual responsible for
initiating a requirement of DOE F 4200.33). Contracting
Officers, based on the advice of the Procurement Request
Originator or other designated individual, shall apply
applicable provisions of this Order to awards falling within its
scope.
(10) Ensure that appropriate attention is given to the weapons
component and production facility interface, where applicable.
b. Assistant Secretary for Nuclear Energy (NE-1), in addition to the
responsibilities prescribed in subparagraph 10a. has overall
responsibility for developing and coordinating Departmental policy
for nuclear reactors and non-reactor nuclear facility safety. The
Assistant Secretary for Nuclear Energy has the following additional
responsibilities :
(3) In concert with EH-1, provide a central point for coordination
within DOE and liason with other agencies and groups in the
development of quality assurance policy, standards, guidance,
and requirements: and
Section 6
(4) Review proposed statutes (where appropriate). regulations,
standards, and requirements for their application to and
potential impact on DOE programs.
c. Director of the Office of Nuclear Safety (NS-1), acting as the
Department’s independent element responsible for nuclear safety
oversight, has the following responsibilities:
(1) Assess and report to the Secretary of Energy on all aspects of
nuclear safety related to the implementation of this Order,
including the-performance of the Program Offices, Field Offices,
and contractors: and
8
8-21-91
(1) Develop, promulgate, and maintain quality assurance policy for
DOE nuclear work:
(2) Provide advice and assistance to PSOs concerning implementation
of this Order;
DOE 5700.6C 9
8-21-91
(2) Review proposed quality assurance policy, regulations,
standards. and requirements to assess their potential effects on
the nuclear safety of DOE facilities.
d. Assistant Secretary for Environment, Safety and Health (Eli-l), acting
as DOE’s independent element responsible for oversight of worker
health and safety (including radiation protection), environmental
protection, and safeguards and security, has the following
responsibilities in addition to those prescribed in subparagraph 10a:
(1) Develop, promulgate, and maintain quality assurance policy for
DOE non-nuclear work;
(2) Develop, promulgate, and maintain quality assurance policy for
environmental compliance and data collection activities that is
consistent with the guidelines established by the Environmental
Protection Agency’s Quality Assurance Management Staff office;
(3) Provide advice and assistance to PSOs concerning implementation
of this Order;
(4) In concert with NE-1, provide a central point of contact for
coordination within DOE and liaison with other agencies and
groups in the development of quality assurance policy,
standards. guidance, and requirements;
(5) Review proposed statutes (where appropriate), regulations,
standards, and requirements for their application to and
potential impact on DOE programs; and
(6) Assess non-nuclear work to monitor implementation of this Order.
e. DOE Field Office Managers have the following responsibilities:
(1) As directed by the Lead PSO, ensure the adequacy and
implementation of contractors’ quality assurance programs by
performing independent assessments in accordance with Paragraph
9b (3 ) (b) . Coordinate work with, and utilize resources of, other
cognizant DOE organizations, as appropriate; and
(2) Develop and implement a quality assurance program governing the
work of the Field Office in accordance with the requirements of
Paragraph 9, as applicable. Submit the program to the Lead PSO
for approval.
f. Administrators of the Power Marketing Administrations: Section 302
of the DOE Organization Act (PL 95-91) directs the Secretary to
operate and maintain the Power Marketing Administrations by and
through their Administrators. The Administrators have statutory and
public utility responsibilities for the safety, security, and
reliability of the systems operated by their organizations. The
Administrators shall review and approve the quality assurance
standards, policies, and activities appropriate for their facilities
10 DOE 5700.6C
8-21-91
and operations. Such determination shall include appropriate
consideration of the criteria set forth in this Order.
Section 7
g. Director of the Naval Nuclear Propulsion Program: Executive Order
12344, statutorily prescribed by P.L. 98-525 (42 U.S.C. 7158. note)
establishes the responsibilities; and authority of the Director, Naval
Nuclear Propulsion Program (who is also the Deputy Assistant
Secretary for Naval Reactors within the Department) for all
facilities and work which comprise the Program, a joint Navy-DOE
organization. These executive and legislative actions establish the
responsibilities of the Director as including the safety of reactors
and associated naval nuclear propulsion plants, the control of
radiation and radioactivity associated with naval nuclear propulsion
plants, and the operating practices and procedures applicable to
naval nuclear propulsion plants. Accordingly, the provisions of this
Order do not apply to the Naval Nuclear Propulsion Program. The
Director shall establish the quality assurance requirements
implemented within the program.
11. INTERPRETATIONS. Requests for interpretation of the requirements of this
Order shall be forwarded for action, together with proposed resolutions.
to NE-1 for nuclear work and to EH-1 for non-nuclear work.
BY ORDER OF THE SECRETARY OF ENERGY:
JOHN J. NETTLES, JR.
Director of Administration
and Human Resource Management
DOE 5700.6C Chg 1 Attachment I
5-10-96 Page 1 (and 2)
Vertical line denotes change.
Guidance for developing and implementing Quality Assurance Programs (QAPs) that satisfy the
requirements of this Order is provided by G-830.120-REV. 0, IMPLEMENTATION GUIDE