Work Breakdown Structure
Used by the project management team to organize and define a project into manageable objectives and create a blueprint by which the steps leading to the completion of a project are obtained. It is an outline of the project that becomes more detailed under the subheadings or work…
Follow changes to Work Breakdown Structure and its other editions: RSS feed
Source 1:
Source 4:
Source 5:
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE O 1332.1A Chg 1Uniform Reporting System
- NAP 413.1Data Collection for Cost Estimating
- NAP 413.1 (Recertified)Data Collection for Cost Estimating
- DOE G 415.1-2Information Technology Project Execution Model Guide for Small and Medium Projects
- DOE M 413.3-1Project Management for the Acquisition of Capital Assets
- DOE O 1332.2Uniform Reporting System for Federal Assistance (Grants and Cooperative Agreements)
- DOE G 413.3-9U.S. Department of Energy Project Review Guide for Capital Asset Projects
- DOE G 413.3-9 Chg 1 (Admin Chg)U.S. Department of Energy Project Review Guide for Capital Asset Projects
- DOE G 413.3-15Department of Energy Guide for Project Execution Plans
- DOE G 413.3-15 Chg 1 (Admin Chg)Department of Energy Guide for Project Execution Plans
- DOE G 413.3-10AEarned Value Management System (EVMS)
- DOE G 413.3-10A Chg 1 (Admin Chg)Earned Value Management System (EVMS)
- DOE G 430.1-1Cost Estimating Guide
- NAP 413.9Cost Analysis Requirements Description
- BOP-06.08Cost Analysis Requirements Description
- BOP 413.9, Cost Analysis Requirements Description (Redline)
- BOP 413.9Cost Analysis Requirements Description
- NAP 412.1AFinancial Integration
- DOE O 4700.1 Chg 1Project Management System
- DOE G 413.3-5A Chg 1 (Admin Chg 1)U.S Department of Energy Performance Baseline Guide