Testing Stage
Begins after the product or feature has been developed. The test plans developed during the planning phase are utilized to verify that the features or product meets the business requirements. User Acceptance Testing (UAT) and the Operational Readiness Document are utilized as…
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 200.1-1 Ch 8Software Integration and Testing Stage
- DOE G 200.1-1 Ch 7Programming Stage
- DOE G 200.1-1Software Engineering Methodology TOC
- DOE G 200.1-1 App CAppendix C Conducting Structured Walkthroughs
- DOE G 415.1-2Information Technology Project Execution Model Guide for Small and Medium Projects
- DOE G 415.1-1Information Technology Project Execution Model Guide
- DOE G 200.1-1 Ch 4Requirements Definition Stage
- DOE G 413.3-4U.S. Department of Energy Technology Readiness Assessment Guide
- DOE G 413.3-4ATechnology Readiness Assessment Guide
- DOE G 413.3-4A Chg 1 (Admin Chg)Technology Readiness Assessment Guide