Preliminary Documented Safety Analysis
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE-STD-1189-2008Integration of Safety Into the Design Process
- DOE O 413.3B Chg 5 (MinChg), Program and Project Management for the Acquisition of Capital Assets - Change Chart
- DOE-STD-1189-2016Integration of Safety into the Design Process (Invoked)
- BOP-50.001NNSA ESAAB Equivalent Process
- DOE-STD-1104 Master Acronyms List
- DOE-STD-3009 Master Acronyms List
- DOE-STD-1183-2004Nuclear Safety Specialist Functional Area Qualification Standard
- DOE O 413.3A Chg 1Program and Project Management for the Acquisition of Capital Assets
- NA-2023-DES-NA1-NAESH-01Designation to Ahmad Al-Daouk, Associate Administrator for Environment, Safety, and Health
- DOE O 413.3AProgram and Project Management for the Acquisition of Capital Assets
- SD 450.2-1A, NNSA Delegation of Authority Order (template)
- DOE-STD-1183-2016Nuclear Safety Specialist Functional Area Qualification Standard
- DOE-STD-1183-2026Nuclear Safety Specialist Functional Area Qualification Standard
- SD 450.2-1A, NNSA Delegation Evaluation (template)
- DOE-STD-1183-2019Nuclear Safety Specialist Functional Area Qualification Standard
- BOP-50.004Program Requirements Document (PRD) for Construction Projects
- BOP 413.2 Admin Chg 1, Program Requirements Document for Construction Projects (Redline)
- BOP-06.02 Admin Chg 1Program Requirements Document for Construction Projects
- BOP 413.2 Admin Chg 1Program Requirements Document for Construction Projects
- DOE O 425.1FVerification Of Readiness To Startup Or Restart Nuclear Facilities