Final Design
Completion of the design effort and production of all the approved design documentation necessary to permit procurement, construction, testing, checkout and turnover to proceed.
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE-STD-1189-2008Integration of Safety Into the Design Process
- DOE-STD-1189-2016Integration of Safety into the Design Process (Invoked)
- BOP 413.4, Project Reviews (Redline)
- BOP-06.04Project Reviews
- BOP 413.4Project Reviews
- DOE G 413.3-12U.S. Department of Energy Project Definition Rating Index Guide
- DOE G 413.3-12 Chg 1 (Admin Chg)U.S. Department of Energy Project Definition Rating Index Guide for Traditional Nuclear and Non-Nuclear Construction Projects
- DOE O 413.3B Chg 5 (MinChg)Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3B Chg 7 (LtdChg)Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3CProgram and Project Management for the Acquisition of Capital Assets
- DOE G 413.3-3A Chg 1 (Admin Chg)Safeguards and Security for Program and Project Management
- DOE O 413.3B Chg 6 (LtdChg)Program and Project Management for the Acquisition of Capital Assets
- DOE G 413.3-6BHigh Performance Sustainable Building
- DOE G 413.3-3Safeguards and Security for Program and Project Management
- DOE O 413.3B Chg 3 (PgChg)Program and Project Management for the Acquisition of Capital Assets
- DOE O 413.3B Chg4 (MinChg)Program and Project Management for the Acquisition of Capital Assets
- DOE G 413.3-6AHigh Performance Sustainable Building
- DOE O 413.3B Chg 5 (MinChg), Program and Project Management for the Acquisition of Capital Assets - Change Chart
- DOE O 413.3B Chg 2 (PgChg)Program and Project Management for the Acquisition of Capital Assets
- DOE G 413.3-6A Chg 1 (Admin Chg)High Performance Sustainable Building