Actual Cost
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- NAP 413.1Data Collection for Cost Estimating
- NAP 413.1 (Recertified)Data Collection for Cost Estimating
- DOE G 413.3-10Earned Value Management System (EVMS)
- DOE O 5700.2DCost Estimating, Analysis, and Standardization
- BOP-50.005Establishment of an Independent Cost Estimate (ICE) Policy
- DOE O 5700.2CCost Estimating, Analysis, and Standardization
- DOE M 552.1-1A Chg1 (LtdChg), U.S. Department of Energy Travel Manual - Change Chart
- DOE O 1700.1 Chg 4Freedom of Information Program
- DOE N 4700.5Project Control Systems Guidelines
- BOP-05.02Permanent Change of Station
- DOE G 413.3-10BIntegrated Project Management Using the Earned Value Management System
- BOP 550.1, Permanent Change of Station (Redline)
- BOP 550.1Permanent Change of Station
- DOE O 551.1Official Foreign Travel
- DOE O 551.1AOfficial Foreign Travel
- DOE O 551.1A Chg 1Official Foreign Travel
- DOE G 413.3-10A Chg 1 (Admin Chg)Earned Value Management System (EVMS)
- DOE O 4210.7BIndirect Cost Rate Responsibilities
- DOE G 413.3-10AEarned Value Management System (EVMS)
- DOE G 413.3-14Information Technology Project Guide