Contingency
The portion of the project budget that is available for risk uncertainty within the project scope, but outside the scope of the contract. Contingency is budget that is not placed on the contract and is included in the Total Project Cost (TPC). Contingency is controlled by…
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- NAP-14.12NNSA Contingency Planning and Operations
- DOE-STD-1213-2014 Chg Notice 2Protective Force Contingency Planning Technical Standard
- DOE G 413.3-7A Chg 2 (LtdChg)Risk Management Guide
- DOE-STD-1213-2014Protective Force Contingency Planning Technical Standards
- DOE G 413.3-7A Chg 1 (AdminChg)Risk Management Guide
- DOE G 473.2-1Guide for Establishment of a Contingency Protective Force
- DOE-STD-1213-2014 Chg Notice 1Protective Force Contingency Planning Technical Standard
- DOE G 413.3-7ARisk Management Guide
- DOE G 413.3-7A Chg2 (LtdChg), Risk Management Guide - Change Chart
- DOE G 413.3-8Environmental Management (EM) Cleanup Projects
- DOE G 413.3-5U.S. Department of Energy Performance Baseline Guide
- DOE G 413.3-5A Chg 1 (Admin Chg 1)U.S Department of Energy Performance Baseline Guide
- DOE G 413.3-5AU.S. Department of Energy Performance Baseline Guide
- DOE G 413.3-24Planning and Scheduling
- DOE-STD-1134-99Review Guide for Criticality Safety Evaluations
- DOE G 413.3-21Cost Estimating Guide
- DOE G 413.3-21ACost Estimating Guide
- DOE G 413.3-21 Chg 1 (Admin Chg)Cost Estimating Guide
- DOE G 413.3-20 Chg 1 (Admin Chg)Change Control Management Guide
- DOE G 413.3-20Change Control Management Guide