DOE O 420.1C Chg 1 (PgChg), Facility Safety
Functional areas: DNFSB, Defense Nuclear Facility Safety and Health Requirement, Facility Safety, Requires Crosswalk When Revised, Safety, Security
The Order establishes facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH) mitigation, and System Engineer Program. This Page Change is limited in scope to changes necessary to invoke DOE-STD-1104, Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Document, and revised DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility Documented Safety Analysis as required methods. DOE O 420.1C Chg 1, dated 2-27-15, supersedes DOE O 420.1C. Superseded by DOE O 420.1C Chg2 (MinChg)
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE O 420.1C Chg 2 (MinChg)Facility Safety (Jul 26, 2018)
Related documents
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
AVAILABLE ONLINE AT: INITIATED BY:
www.directives.doe.gov Office of Environment, Health, Safety and Security
U.S. Department of Energy ORDER
Washington, D.C.
Approved: 12-4-2012
Chg 1: 2-27-2015
SUBJECT: FACILITY SAFETY
1. OBJECTIVE. To establish facility and programmatic safety requirements for the
Department of Energy (DOE), including the National Nuclear Security Administration
(NNSA), for:
a. Nuclear safety design criteria;
b. Fire protection;
c. Criticality safety;
d. Natural phenomena hazards (NPH) mitigation; and,
e. Cognizant system engineer (CSE) program.
Facility safety requirements for explosive, chemical, and industrial hazards are contained
in other DOE rules and directives.
2. CANCELLATIONS. This Order (O) cancels: DOE O 420.1B, Chg 1, Facility Safety,
dated 04-19-10; DOE Guide (G) 420.1-2, Guide for the Mitigation of Natural Phenomena
Hazards for DOE Nuclear Facilities and Nonnuclear Facilities, dated 03-28-00; and,
DOE G 420.1-3, Implementation Guide for DOE Fire Protection and Emergency
Services Programs for Use with DOE O 420.1B, Facility Safety, dated 09-27-07.
Cancellation of a directive does not, by itself, modify, or otherwise, affect any contractual
or regulatory obligation to comply with the directive. Contractor Requirements
Documents (CRDs) that have been incorporated into a contract remain in effect
throughout the term of the contract unless, and until, the contract or regulatory
commitment is modified to either eliminate requirements that are no longer applicable or
to substitute a new set of requirements.
3. APPLICABILITY.
a. Departmental Applicability. This Order applies to all DOE elements with
responsibility for design, construction, management, operation, decontamination,
decommissioning, or demolition of government-owned or government-leased
facilities and onsite contractor-leased facilities used for DOE mission purposes.
The NNSA Administrator will ensure that NNSA employees comply with their
respective responsibilities under this directive. Nothing in this Order will be
construed to interfere with the NNSA Administrator’s authority under section
3212(d) of Public Law (P.L.) 106-65, National Defense Authorization Act for
Fiscal Year 2000, to establish Administration-specific policies, unless
disapproved by the Secretary.
DOE O 420.1C
http://www.directives.doe.gov/
2 DOE O 420.1C
12-4-2012
b. DOE Contractors. Except for the equivalencies and exemptions in Section 3.c,
the CRD (see Attachment 1 of this Order) sets forth requirements of this
Order that will apply to contracts that include the CRD. The CRD, or its
requirements, must be inserted into all contracts that require design,
construction, management, operation, decontamination, decommissioning, or
demolition of government-owned and government-leased facilities.
c. Equivalencies and Exemptions.
(1) Requests for equivalencies and exemptions to the requirements of this
Order are processed in accordance with DOE O 251.1C, Departmental
Directives Program, dated 01-15-09. Central Technical Authority (or
designee) concurrence is required for both exemptions and
equivalencies to this Order for nuclear facilities. (Note: This includes
exemptions to DOE technical standards and industry codes, and
standards required by this Order.)
(2) Equivalencies to DOE technical standards, as well as industry codes,
and standards, determined to be applicable to the facility design or
Section 2
operations must demonstrate an equivalent level of safety (i.e., meets
or exceeds the level of protection) and must be approved by the DOE
field element. The DOE field element must follow provisions for relief
if specified in DOE technical standards and industry codes and
standards. (Note: Different codes and standards may use different
terminology for relief; e.g., for building code applications, the terms
‘modification’ or ‘alternative’ may be substituted for ‘equivalency’.)
(3) Equivalency. In accordance with the responsibilities and authorities
assigned by Executive Order 12344, codified in 50 U.S.C. sections
2406 and 2511, and to ensure consistency through the joint Navy/DOE
Naval Nuclear Propulsion Program, the Deputy Administrator for
Naval Reactors (Director) will implement and oversee requirements
and practices pertaining to this Directive for activities under the
Director’s cognizance, as deemed appropriate.
(4) Exemption. This Order does not apply to activities that are regulated
by the Nuclear Regulatory Commission (NRC) or a state under an
agreement with the NRC, including activities certified by the NRC
under Section 1701 of the Atomic Energy Act. DOE orders,
regulations, technical standards, and/or guidelines will apply to
activities where the NRC does not exercise regulatory authority or by
agreement with NRC.
(5) Exemption. This Order does not apply to transportation activities that
are regulated by the Department of Transportation.
DOE O 420.1C 3
12-4-2012
(6) Exemption. The following portions of this Order do not apply to
accelerator facilities that are covered by DOE O 420.2C, Safety of
Accelerator Facilities, dated 07-21-11: (1) nuclear safety design
requirements, and (2) system engineer program requirements.
(7) Exemption. Specific, individual requirements of this Order do not apply to
Nuclear Explosive and Weapons Surety Program activities for the
prevention of nuclear detonations if application of such specific
requirements would compromise the safety and effectiveness of these
activities. In the event of such conflicts between specific requirements of
this Order and those of DOE O 452.1D, Nuclear Explosive and Weapon
Surety Program, dated 04-14-09 or DOE O 452.2D, Nuclear Explosive
Safety, dated 04-14-09, the related requirements of these latter weapons
and explosives safety directives take precedence.
(8) Exemption. This Order does not apply to the Bonneville Power
Administration, in accordance with Secretarial Delegation Order Number
00-033.00B to the Bonneville Power Administrator and Chief Executive
Officer, dated 07-20-09.
(9) Exemption. The design requirements in this Order do not apply to projects
that have reached a high level of design maturity, as determined by the
appropriate Secretarial Offices, as of the issuance date of this Order.
Examples of projects that have reached a high level of design maturity
include projects that have completed the critical decision (CD)-2
milestone or those projects that have completed the CD-1 milestone with a
high level of design maturity. This exemption is provided to control
project costs; new design requirements in this Order may be considered
for inclusion where they provide significant benefits and/or net cost
savings.
(10) Exemption. This Order does not apply to off-site office facilities that are
owned or leased by the General Services Administration.
d. Government-Owned, Government-Operated Facilities. The CRD (see
Section 3
Attachment 1 of this Order) sets forth requirements that must also be applied to
DOE government-owned, government-operated facilities. Government operators
must comply with the requirements in the CRD, as set forth in Attachment 1 of
this Order.
4. REQUIREMENTS. DOE must:
a. Approve and oversee contractor programs, as specified in Section 5 of this Order;
b. Implement the requirements in Attachment 1 of this Order for government-owned
government-operated facilities;
4 DOE O 420.1C
12-4-2012
c. Provide oversight of the contractor CSE program and the operability of safety
systems under the purview of the CSE program;
d. Document any operational responsibilities that are assigned to the contractor
regarding the authority having jurisdiction (AHJ) for matters involving fire
protection as defined by the National Fire Protection Association (NFPA) codes;
e. Document any authorities associated with the building code official, as defined
in DOE Standard (STD)-1066-2012, Fire Protection, that are assigned to the
contractor;
f. Establish an integrated site-wide wildland fire management plan, consistent with
the relevant portions of the Federal Wildland Fire Management Policy;
g. Direct its contractors, as applicable, to use DOE-STD-3009-2014, Preparation
of Nonreactor Nuclear Facility Documented Safety Analysis, for preparing
documented safety analyses, when the DOE-STD-3009 method is used to satisfy
10 Code of Federal Regulations (C.F.R.) Part 830, Nuclear Safety Management,
requirements for new DOE non-reactor nuclear facilities and major
modifications to existing DOE non-reactor nuclear facilities [note: for such
major modifications to existing non-reactor nuclear facilities, the appropriate
Secretarial Officer, with concurrence by the applicable Central Technical
Authority, may approve use of DOE-STD-3009-94];
h. Direct its contractors, as applicable, to use DOE-STD-3009-2014, for reviewing
and revising applicable documented safety analyses, when the DOE-STD-3009
method is used to satisfy 10 C.F.R. Part 830 requirements for existing DOE non-
reactor nuclear facilities that have mitigated off-site dose estimates greater than
25 rem; and,
i. Review and approve safety basis and safety design basis documents in
accordance with DOE-STD-1104-2014, Review and Approval of Nuclear
Facility Safety Basis and Safety Design Basis Documents.
5. RESPONSIBILITIES.
a. Secretarial Officers.
(1) Ensure that the requirements of this Order and the CRD are implemented
for facilities, activities, or programs under their cognizance. Review, and
where justified, approve requests for equivalencies and exemptions to the
requirements of this Order, processed in accordance with
DOE O 251.1C.
(2) In accordance with Section 3.c.(1) of this Order, approve the basis for not
including multiple physical barriers to prevent or mitigate the unintended
release of radioactive materials to the environment, as part of the hazard
DOE O 420.1C 5
12-4-2012
category 1, 2 and 3 nuclear facility designs, where justified by sound
technical basis.
(3) Review and approve safety basis and safety design basis documents in
accordance with DOE-STD-1104-2014.
b. Associate Under Secretary, Office of Environment, Health, Safety and Security.
(1) Develop and maintain policy, requirements, guidance, and technical
standards relating to this Order and the CRD.
(2) Provide technical advice and assistance on the implementation of policy,
Section 4
requirements, guidance, and technical standards related to this Order and
the CRD.
(3) Provide comments on requests for exemptions from requirements of this
Order.
c. Director, Office of Independent Enterprise Assessments.
(1) Plan and conduct independent oversight reviews of implementation of the
requirements of this Order and the CRD (see DOE O 226.1B,
Implementation of Department of Energy Oversight Policy, dated
04-25-11, and DOE O 227.1, Independent Oversight Program, dated
08-30-11, for details).
d. Heads of Field Elements.
(1) Ensure that the facilities, activities, and programs under their purview
operate in compliance with the requirements of this Order and the CRD.
(2) Identify contracts to which the CRD applies and notify contracting officers
when contracts are affected by this Order.
(3) Review and, where justified, approve equivalencies to DOE technical
standards and industry codes and standards determined to be applicable to
the facility design or operations.
(4) Approve contractors’ emergency services organization baseline needs
assessments (BNAs) that meet the requirements in Attachment 2, Chapter
II, Section 3.e.(1) of this Order.
(5) Approve contractors’ fire protection program (this may be accomplished
in conjunction with 10 C.F.R. Part 851, Worker Health and Safety
Program).
6 DOE O 420.1C
12-4-2012
(6) Fulfill the roles and responsibilities for the AHJ for matters involving fire
protection, as defined by the NFPA, including documentation of any
delegation or assignment of related responsibilities.
(7) Fulfill the roles and responsibilities for the building code official, as
defined in DOE-STD-1066-2012, including documentation of any
delegation or assignment of related responsibilities.
(8) Perform responsibilities of ‘owner,’ or other equivalent term in the
application of DOE technical standards or industry codes and standards,
including documentation of any delegation or assignment of related
responsibilities. .
(9) Approve the contractors’ criticality safety program documentation, ensure
that it meets requirements in Chapter III of Attachment 2 of this Order.
(This may be accomplished through the safety basis documentation
approval process.)
(10) Approve periodic NPH assessment evaluations, any recommended update
actions, and any recommended upgrade plans, in accordance with Chapter
IV of Attachment 2 of this Order.
(11) Provide oversight for contractor CSE programs and the operability of
associated safety systems.
(12) Consistent with DOE O 226.1B, establish and implement an appropriate
self-assessment and oversight program for the elements of this Order.
(13) In accordance with DOE-STD-1104-2014, review and approve safety
basis and safety design basis documents.
e. Contracting Officers. Incorporate the CRD, or its requirements, into affected
contracts and procurement requests in a timely manner when notified.
f. Central Technical Authorities.
(1) Review and, where justified, concur on requests for equivalencies and
exemptions to the requirements of this Order, processed in accordance
with DOE O 251.1C.
(2) Provide support, as requested by the DOE field element, on review of
equivalencies to DOE technical standards and industry codes and
standards determined to be applicable to the facility design or operations.
DOE O 420.1C 7 (and 8)
12-4-2012
6. REFERENCES AND ACRONYMS. References and acronyms can be found in
Attachment 4 of this Order.
Section 5
7. CONTACT. Address inquiries to the Office of Environment, Health, Safety and Security;
Office of Nuclear Safety, 301-903-3331.
BY ORDER OF THE SECRETARY OF ENERGY:
ELIZABETH SHERWOOD-RANDALL
Deputy Secretary
DOE O 420.1C Attachment 1
12-4-2012 Page 1
CONTRACTOR REQUIREMENTS DOCUMENT
DOE O 420.1C, FACILITY SAFETY
This contractor requirements document (CRD) includes requirements outlined in Attachments 2
and 3 of Department of Energy (DOE) Order (O) 420.1C, Facility Safety, referenced in and
made a part of this CRD, and which provides program requirements and/or information
applicable to contracts in which this CRD is inserted.
1. GENERAL REQUIREMENTS.
a. This CRD establishes facility safety requirements for design, construction,
operation, management, decontamination, decommissioning and demolition of
DOE sites or facilities. Regardless of the performer of the work, the contractors
are responsible for complying with the requirements of this CRD. The contractors
are responsible for flowing down the requirements of this CRD to subcontractors
at any tier, to the extent necessary, to ensure the contractors’ compliance with the
requirements.
b. Contractors must satisfy the requirements set forth in Attachments 2 and 3 of
DOE O 420.1C.
c. For design and construction activities, contractors must identify the applicable
industry codes and standards, including the International Building Code (IBC),
and the applicable DOE requirements and technical standards. If approved by the
responsible field element manager, state, regional, and local building codes may
be used in lieu of the IBC upon contractor submission of a report that
demonstrates that implementation of the substituted code for the specific
application will meet or exceed the level of protection that would have been
provided by the IBC. Additionally, DOE O 413.3B, Program and Project
Management for the Acquisition of Capital Assets, dated 11-29-10, requires
nuclear projects to establish and maintain a Code of Record (COR) early in
project design for identifying applicable industry codes and standards.
d. Contractors must satisfy the requirements (i.e., mandatory statements) in DOE
technical standards and industry codes and standards that are identified as
applicable in accordance with Section 1.c above, unless relief is approved in
accordance with Section 2, below.
e. When the DOE-STD-3009 methodology is used to satisfy 10 Code of Federal
Regulations (C.F.R.) Part 830, Nuclear Safety Management, safety basis
requirements, DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility
Documented Safety Analysis, must be used for new DOE non-reactor nuclear
facilities and major modifications to existing DOE non-reactor nuclear facilities.
Note: for such major modifications to existing non-reactor nuclear facilities, the
appropriate Secretarial Officer, with concurrence by the applicable Central
Technical Authority, may approve use of DOE-STD-3009-94.
Attachment 1 DOE O 420.1C
Page 2 12-4-2012
f. DOE-STD-3009-2014 must be used for existing DOE non-reactor nuclear
facilities that use the DOE-STD-3009 method to satisfy 10 C.F.R. 830
requirements when those facilities have mitigated off-site dose estimates greater
than 25 rem.
2. RELIEF FROM REQUIREMENTS, CODES AND STANDARDS.
a. Requests for equivalencies and exemptions to the requirements of this attachment
are processed in accordance with DOE O 251.1C, Departmental Directives
Section 6
Program, dated 01-15-09. For such equivalencies and exemptions, DOE O
251.1C requires approval, in consultation with the Office of Primary Interest, by
the program secretarial officer or designee, or in the case of NNSA, by the
administrator or designee. Requests for equivalencies and exemptions must be
provided to the responsible contracting officer for further processing. This
includes exemptions to applicable requirements in DOE technical standards and
industry codes and standards required by DOE O 420.1C.
b. Equivalencies to DOE technical standards and industry codes and standards
determined to be applicable to the facility design or operations must demonstrate
an equivalent level of safety (i.e., meets or exceeds the level of protection) and be
approved by the DOE field element.
3. REFERENCES. Attachment 4 of DOE O 420.1C provides a list of reference documents:
rules, directives, guidance, DOE technical standards, and industry codes and standards.
DOE O 420.1C Attachment 2
12-4-2012 Page i (and Page ii)
FACILITY SAFETY REQUIREMENTS
This attachment provides information and/or requirements associated with the Department of
Energy (DOE) Order (O) 420.1C, Facility Safety, as well as information and/or requirements
applicable to contracts into which the associated Contractor Requirements Document (CRD),
(see Attachment 1 of DOE O 420.1C) is inserted.
DOE O 420.1C Attachment 2
12-4-2012 Page I-1
CHAPTER I. NUCLEAR SAFETY DESIGN CRITERIA
1. OBJECTIVE. To establish requirements for safety design of DOE hazard category 1, 2,
and 3 nuclear facilities to support implementation of DOE Policy (P) 420.1, Department
of Energy Nuclear Safety Policy, dated 02-08-11
1
.
The requirements of this chapter (and the criteria in Attachment 3 of DOE O 420.1C)
support implementation of the requirements for hazard category 1, 2 and 3 nuclear
facilities in 10 Code of Federal Regulations (C.F.R.) Part 830, Nuclear Safety
Management, Subpart B, Safety Basis Requirements.
2. APPLICABILITY.
a. This chapter applies to the design and construction of:
(1) New hazard category 1, 2, and 3 nuclear facilities, as defined by 10 C.F.R.
Part 830; and,
(2) Major modifications to hazard category 1, 2, and 3 nuclear facilities, as
defined in 10 C.F.R. Part 830, that could substantially change the facility
safety basis (Note: See DOE Standard (STD)-1189-2008, Integration of
Safety into the Design Process, for criteria and discussion on major
modifications).
b. This chapter does not impose requirements on existing facilities, except for major
modifications
2
to those facilities. The requirements of this chapter may be used to
develop comparisons of existing facilities to the requirements for new facilities, as
one aide to judgment when evaluating the costs and benefits of non-mandatory
upgrades to existing facilities.
c. Except for the requirements of Section 3.b.(3), this chapter does not apply to
nuclear deactivation or decontamination and decommissioning activities at
end-of-facility-life if the safety analysis demonstrates that adequate protection is
provided consistent with the requirements of 10 C.F.R. Part 830 through alternate
means and it is not cost beneficial to apply the provisions of this chapter for the
limited remaining life of the activity.
3. REQUIREMENTS.
a. Integration of Safety with Design.
(1) Safety must be integrated into the design early in, and throughout, the
design process through use of DOE-STD-1189-2008.
Section 7
1
DOE’s nuclear safety policy (DOE P 420.1) is to design, construct, operate, and decommission its nuclear
facilities in a manner that ensures adequate protection of workers, the public, and the environment.
2
DOE-STD-1189-2008 provides definition and examples of major modifications.
Attachment 2 DOE O 420.1C
Page I-2 12-4-2012
(2) Safety analyses must be used to:
(a) identify safety-class and safety-significant structures, systems and
components (SSCs) needed to fulfill the safety functions in order to
prevent and/or mitigate design basis accidents, including natural
and man-induced hazards and events;
(b) identify the safety functional requirements of the safety-class and
safety-significant SSCs; and,
(c) identify specific administrative controls (SACs) needed to fulfill
safety functions. (Note: See DOE-STD-1186-2004, Specific
Administrative Controls, for details on specific administrative
controls.)
b. Nuclear Facility Design.
(1) The nuclear facility design must include multiple layers of protection (as
part of the design defense-in-depth) to prevent or mitigate the unintended
release of radioactive materials into the environment.
(2) Defense-in-depth must include all of the following:
(a) choosing an appropriate site;
(b) minimizing the quantity of material-at-risk;
(c) applying conservative design margins;
(d) applying quality assurance;
(e) using successive/multiple physical barriers for protection against
radioactive releases (Note: If an exemption to having multiple
barriers is required, it is the Secretarial Officer’s responsibility to
approve, or disapprove, the exemption for not including multiple
physical barriers);
(f) using multiple means to ensure safety functions are met by—
1 controlling processes;
2 maintaining processes in safe status;
3 providing preventive and/or mitigative controls for
accidents with the potential for radiological releases; and,
4 providing means for monitoring facility conditions to
support recovery from upset or accident conditions;
DOE O 420.1C Attachment 2
12-4-2012 Page I-3
(g) using equipment in combination with administrative controls that—
1 restrict deviation from normal operations;
2 monitor facility conditions during and after an event; and,
3 provide for response to accidents to achieve a safe
condition;
(h) providing means to monitor accident releases as required for
emergency response (see DOE O 151.1C, Comprehensive
Emergency Management System, dated 11-02-05, for detailed
requirements); and,
(i) establishing emergency plans for minimizing the effects of an
accident (see DOE O 151.1C for detailed requirements).
(3) Hazard category 1, 2, and 3 nuclear facilities with uncontained radioactive
materials (as opposed to materials determined by safety analyses to be
adequately contained within qualified drums, grout, or vitrified materials)
must have the means to confine the uncontained radioactive materials to
minimize their potential release in facility effluents during normal
operations and during and following accidents, up to and including design
basis accidents (DBAs). Confinement design must include the following:
(a) For a specific nuclear facility, the number, arrangement, and
characteristics of confinement barriers as determined on a case-by
case basis.
(b) The type, quantity, form, and conditions for dispersing the
radioactive material in the confinement system design.
(c) An active confinement ventilation system as the preferred design
Section 8
approach for nuclear facilities with potential for radiological
release.
3
Alternate confinement approaches may be acceptable if a
technical evaluation demonstrates that the alternate confinement
approach results in very high assurance of the confinement of
radioactive materials.
The guidance for confinement ventilation systems and evaluation
of the alternatives, is provided in DOE Guide (G) 420.1-1A,
Nonreactor Nuclear Safety Design Guide for Use with
DOE O 420.1C, Facility Safety.
3
The safety classification (if any) of the ventilation system is determined by the facility documented safety analysis.
Attachment 2 DOE O 420.1C
Page I-4 12-4-2012
(d) Documentation of the adequacy of confinement systems consistent
with the safety in design process as described in
DOE-STD-1189-2008.
(4) Hazard category 1, 2, and 3 nuclear facilities must be designed to:
(a) facilitate safe deactivation, decommissioning, decontamination, and
demolition at the end of facility life, including incorporation of
design considerations during the operational period that facilitate
future decontamination and decommissioning;
(b) facilitate inspections, testing, maintenance, repair, and replacement
of safety-SSCs as part of a reliability, maintainability, and
availability program with the objective of maintaining the facility in
a safe state;
(c) keep occupational radiation exposures within regulatory limits, and
as low as reasonably achievable;
(d) provide controls consistent with the hierarchy described in
DOE-STD-1189-2008; and,
(e) protect against chemical hazards and toxicological hazards
consistent with DOE-STD-1189-2008 and direction from the
responsible program office. Appendix B of DOE-STD-1189-2008
provides additional guidance for protection against chemical
hazards and toxicological hazards.
(5) Facility process systems must be designed to minimize waste production
and mixing of radioactive and non-radioactive wastes.
(6) Safety-SSCs and safety software must be designed to perform their safety
functions when called upon.
(7) Active safety-class systems must be designed to meet single failure
4
criterion.
(8) DOE G 420.1-1A provides an acceptable method to meet the requirements
stated in this chapter. DOE O 251.1C requires that any implementation
selected must be justified to ensure that an adequate level of safety
commensurate with the identified hazards is achieved.
4
IEEE-Std-379-2000, IEEE Standard Application of the Single-Failure Criterion to Nuclear Power Generating
Station Safety Systems, provides a definition of single failure criterion. ANS 58.9-2002 (R 2009), Single Failure
Criteria for Light Water Reactor Safety-Related Fluid Systems, provides additional guidance for single failure
criteria for mechanical systems.
DOE O 420.1C Attachment 2
12-4-2012 Page I-5 (and Page I-6)
(9) New DOE nuclear reactors must comply with the requirements of this
attachment, as well as the design requirements of DOE O 5480.30 Chg 1,
Nuclear Reactor Safety Design Criteria, dated 01-19-93.
(10) Critical experiments facilities must be designed and operated in
accordance with American National Standards Institute (ANSI) and the
American Nuclear Society (ANS) standards, ANSI/ANS-1-2000, Conduct
of Critical Experiments, or ANSI/ANS-14.1-2004, Operation of Fast
Pulse Reactors.
(11) Facility design must also be integrated with other design requirements, as
applicable, including explosive safety, industrial safety, and nuclear
Section 9
explosive safety (if applicable).
DOE O 420.1C Attachment 2
12-4-2012 Page II-1
CHAPTER II. FIRE PROTECTION
1. OBJECTIVE. To establish requirements for comprehensive fire protection programs for
DOE facilities and emergency response organizations to:
a. Minimize the likelihood of occurrence of a fire-related event;
b. Minimize the consequence of a fire-related event affecting the public, workers,
environment, property and missions; and,
c. Provide a level of safety protection consistent with the “highly protected risk”
class of industrial risks.
2. APPLICABILITY. This chapter applies to organizations that have responsibility for the
design, construction, maintenance, or operation of government-owned or
government-leased facilities and on-site contractor-leased facilities used for DOE mission
purposes. For leased facilities that are not nuclear hazard category 1, 2, or 3 facilities, the
design requirements of Section 3.c of this chapter apply to the extent determined by the
field element. (Note: DOE-STD-1066-2012, Fire Protection, provides guidance on a
graded approach to fire protection for leased facilities.)
3. REQUIREMENTS.
a. General Fire Protection Program Requirements.
(1) Policy Statement. A policy must be established that affirms the
contractor’s commitment to provide a comprehensive fire protection and
emergency response program that meets the requirements of this chapter,
related DOE directives, and other applicable requirements.
(2) Codes and Standards. The applicable building code and National Fire
Protection Association (NFPA) codes and standards must be identified in
the fire protection and emergency response programs. (Note: see
Attachment 1, Section 2 for obtaining equivalencies and exemptions to the
applicable codes and standards).
(a) Facilities and major modifications thereto, must be constructed to
meet applicable codes and standards that are in effect when design
criteria are approved (otherwise known as the code of record, or
COR). Other facility changes must meet the most recent applicable
codes and standards to the extent determined by the authority
having jurisdiction (AHJ).
(b) Provisions of subsequent editions of codes or standards
(promulgated after the COR is established) are mandatory only to
the extent that they are explicitly stated to be applicable to existing
facilities.
Attachment 2 DOE O 420.1C
Page II-2 12-4-2012
(c) Conflicts between DOE O 420.1C, NFPA codes and standards, and
--the applicable building code must be resolved as follows:
1 Requirements of DOE O 420.1C take precedence over all
NFPA and building code requirements and are subject to the
relief requirements of DOE O 420.1C.
2 Conflicts between NFPA requirements and the applicable
building code requirements are resolved by the head of the
field element following consultation with designated
building code and fire protection subject matter experts.
b. Fire Protection Program Administration.
(1) Documentation. A documented fire protection program that includes the
elements and requirements identified in this chapter for design, operations,
emergency response, fire analysis and assessments, wildland fire, and
specific fire protection program criteria must be developed, implemented,
and maintained by the contractor. Contractor must submit this documented
fire protection program to the DOE field element for review and approval
(note: this may be accomplished in conjunction with submittals required
Section 10
by 10 C. F. R. Part 851, Worker, Health and Safety Program).
(2) Self-Assessments. A documented comprehensive self-assessment of the
fire protection program must be performed at least every three years, or at
a frequency with appropriate justification approved by the DOE head of
field element.
c. Design.
(1) Design Process. A process must be established to ensure that fire
protection program requirements are documented and incorporated into
plans and specifications for design of new facilities and modifications to
existing facilities.
(2) Protection Thresholds.
(a) New facilities (non-relocatable) exceeding 5,000 sq. ft. of floor area
must be of Type I or Type II construction, as defined in the
applicable building codes.
(b) Automatic fire suppression systems must be provided throughout
new facilities exceeding 5,000 sq. ft. of floor area or where a
maximum possible fire loss exceeds $5 million (in 2012 dollars),
unless the NFPA code(s) allow for specific relief within the facility.
(c) Automatic fire suppression systems must be provided throughout
facilities in which any of the following conditions exist:
DOE O 420.1C Attachment 2
12-4-2012 Page II-3
1 where required by safety basis document (for example, to
prevent loss of safety functions or provide
defense-in-depth);
2 significant life safety hazards;
3 where fire may cause unacceptable mission or program
interruption if automatic fire suppression systems are not
provided;
4 where a modification to an existing facility would cause the
maximum possible fire loss (MPFL) to exceed $5 million
(in 2012 dollars) for the facility; or,
5 where a modification to an existing facility results in facility
floor area that exceeds 5,000 sq. ft.
(d) For property protection, multiple fire protection approaches, such
as a fire suppression system and a fire detection and alarm system,
must be provided in areas where the MPFL exceeds $150 million
(in 2012 dollars) (refer to DOE-STD-1066-2012).
(e) For property protection, fire areas must be established such that the
MPFL for each fire area does not exceed $350 million (in 2012
dollars). Fire area walls or other separation approaches may be used
to meet this requirement.
(3) Fire Protection and Life Safety Systems.
(a) Fire Suppression. The inadvertent operation or failure of fire
suppression systems must not result in the loss of function of
safety-class or safety-significant systems. (Note: This requirement
addresses proper design of the fire suppression system to ensure it
does not impact safety systems and is not intended to drive need for
redundancy in safety-significant system design.)
(b) Fire Barriers. Complete fire-rated construction and barriers,
commensurate with the applicable codes and/or safety basis
requirements, must be provided to isolate hazardous areas and
minimize fire spread and loss potential consistent with limits as
established in this chapter. Fire barrier locations and construction
must be documented.
(c) Fire Detection. Automatic fire detection must be provided to the
extent required by applicable industry codes and standards.
(d) Life Safety. Requirements for life safety and means of egress are
provided in 10 C.F.R. Part 851, Worker Health and Safety
Attachment 2 DOE O 420.1C
Page II-4 12-4-2012
Program. Other codes and standards, such as the International
Building Code, and NFPA 101, Life Safety Code, may also be
applicable.
( e ) Water Supply and Distribution. A reliable and adequate water
Section 11
supply and distribution system must be provided for fire
suppression, as documented through appropriate analysis.
(f) Emergency Notification. A means to notify responders and building
occupants of a fire must be provided (e.g., fire alarm signaling
system and/or site-wide mass notification capabilities for major
incidents affecting the site).
(4) Special Hazards. Fire protection systems or features, and appropriate
procedures to address fire and related hazards, that are special or unique to
DOE and not addressed by industry codes and standards, must be
established.
d. Operations.
(1) Criteria and Procedures. Comprehensive, written fire protection criteria
and procedures must be established to implement the fire protection
program requirements that include:
(a) site-specific requirements;
(b) staff organization, resources, training, roles and responsibilities;
(c) inspection, testing, and maintenance of fire protection systems;
(d) use and storage of combustible, flammable, radioactive, and
hazardous materials;
(e) a “hot-work” control program;
(f) identification and tracking of fire protection system impairments;
(g) fire prevention measures (e.g., combustible loading, hot-work, and
ignition source controls);
(h) facility and fire hazard analysis (FHA) assessment programs;
(i) design and construction oversight; and,
(j) equivalencies, exemptions, modifications, and variances processes.
(2) Implementation. To ensure effective implementation of these
requirements, the following elements must be addressed.
DOE O 420.1C Attachment 2
12-4-2012 Page II-5
(a) Staffing. The contractor must ensure it has access to qualified,
trained fire protection staff (that includes fire protection engineers,
technicians, and fire fighting personnel) needed to implement the
requirements of this chapter.
(b) Design Review. Documented review of plans, specifications,
procedures, and acceptance tests must be conducted by a fire
protection engineer (FPE) (Note: A definition for FPE is provided
in DOE-STD-1066-2012). A process must be established to oversee
fire protection-related activities from conceptual design to final
acceptance.
(c) Equivalencies and Exemptions. A process must be established for
developing and requesting DOE AHJ approval of fire protection
equivalencies and exemptions to fire protection requirements.
Records of technical justification must be maintained and
reevaluated for appropriateness as activities or operations change.
(d) Assigned Authority. If assigned, the contractor must document the
level of authority to execute the duties and responsibilities of the
AHJ, in accordance with the contractor’s overall fire protection and
emergency response programs.
e. Emergency Response. Provide emergency response capabilities, as necessary, to
meet site needs as established by the baseline needs assessment (BNA), safety
basis requirements, and applicable regulations, codes and standards.
(1) Baseline Needs Assessment. A BNA of the fire protection and emergency
response organization must be conducted and the BNA must:
(a) establish capabilities to provide:
1 effective response to extinguish fires;
2 emergency medical, rescue and hazardous materials
response; and,
3 staffing, apparatus, facilities, equipment, training,
pre-incident plans, mutual aid, and procedures.
(b) reflect applicable requirements of NFPA codes and standards, and
DOE direction;
(c) be submitted to the DOE field element for approval;
Section 12
(d) be reviewed at least every three years, or whenever a significant
new hazard that is not covered by the current BNA is introduced,
Attachment 2 DOE O 420.1C
Page II-6 12-4-2012
and be updated as appropriate (Note: If no update is necessary, this
result must be documented following the review); and,
(e) be incorporated into site emergency plans, FHAs, and safety basis
documentation.
(2) Pre-Incident Plans. Pre-incident strategies, plans, and standard operating
procedures must be established to enhance the effectiveness of manual fire
suppression activities, including areas within or adjacent to,
moderator-controlled areas. The criticality safety staff must review
pre-incident plans and procedures related to moderator-controlled areas.
(3) Manual Fire Suppression Activities.
(a) Physical access and appropriate equipment that is accessible for
effective manual fire fighting intervention must be provided.
(b) Procedures governing the use of fire fighting water or other neutron
moderating materials to suppress fire within, or adjacent to,
moderation controlled areas must be established and reviewed by a
criticality subject matter expert prior to release.
(c) Procedures governing fire fighting techniques to be used during
deactivation, decontamination, and demolition phases, must be
established, when applicable.
(d) Where no alternative exists to criticality safety restrictions on the
use of water for fire suppression, the need for such restrictions must
be fully documented with written technical justification.
f. Fire Hazard Analyses and Facility Assessments.
(1) Fire Hazards Analyses. FHAs, using a graded approach, must be
conducted for the following cases: (1) all hazard category 1, 2, and 3
nuclear facilities and major modifications thereto; (2) facilities that
represent unique fire safety risks; (3) new facilities or modifications to
existing facilities with value greater than $150 million (in 2012 dollars
5
);
and (4) when directed by the responsible DOE authority. The FHAs must
be:
(a) performed under the direction of an FPE;
5
DOE G 413.3-21, Cost Estimating Guide, dated May 9, 2011, Section 6.4.4 provides guidance on historical cost
estimates and historical cost indexes. To convert 2012 dollar amounts to present value, an applicable historical cost
index is selected, documented, and used, as described in G 413.3-21.
DOE O 420.1C Attachment 2
12-4-2012 Page II-7 (and Page II-8)
(b) reviewed every three years by an FPE and revised as appropriate
(Note: If no revision is necessary, this result must be documented
following the review);
(c) revised when
1 changes to the facility structure or layout, processes,
occupancy, safety basis documentation or BNA impacts the
analysis in the FHA;
2 a modification to an associated facility or process adds a
significant new fire safety risk; or,
3 the periodic (three-year) review identifies the need for
changes;
(d) integrated into safety basis documentation.
(2) Facility Assessments. Fire protection assessments must be conducted:
(a) annually, or at a frequency with appropriate justification approved
by the DOE head of field element, for facilities with a replacement
value in excess of $100 million (in 2012 dollars), facilities
considered a high hazard, or those in which vital programs are
involved, as defined by the responsible DOE authority; and,
(b) at least every three years, or at a frequency with appropriate
Section 13
justification approved by the DOE head of field element, for
remaining low and ordinary hazard facilities.
g. Wildland Fire. An integrated site-wide wildland fire management plan, consistent
with the Federal Wildland Fire Management Policy, must be developed and
implemented in accordance with the relevant portions of the NFPA 1143,
Standard for Wildland Fire Management, 2014.
h. Specific Fire Protection Program Criteria. DOE-STD-1066-2012 provides
acceptable methods for implementing the requirements in DOE O 420.1C; other
methods may be acceptable. Any alternate approach must provide an equivalent
level of safety.
DOE O 420.1C Attachment 2
12-4-2012 Page III-1
CHAPTER III. NUCLEAR CRITICALITY SAFETY
1. OBJECTIVE. To establish requirements for developing and implementing nuclear
criticality safety programs (CSPs) for nuclear facilities and activities, including materials
transportation activities, which provide adequate protection to the public, workers, and
the environment.
2. APPLICABILITY. This chapter is applicable to DOE elements and DOE contractors
with responsibility for nuclear facilities and activities that involve or will potentially
involve radionuclides in such quantities that are equal to or greater than the single
parameter limits for fissionable materials listed in ANSI/ANS-8.1-2014, Nuclear
Criticality Safety in Operations with Fissionable Materials Outside Reactors, and
ANSI/ANS-8.15-1981, Nuclear Criticality Control of Special Actinide Elements. These
limits must be adjusted where process conditions could credibly involve moderators or
reflectors that are more effective than light water.
3. REQUIREMENTS.
a. A CSP document must be developed and maintained that describes how the
contractor will implement the requirements in this chapter, including the standards
invoked by this chapter.
b. The CSP document must describe how the contractor will satisfy the requirements
of the ANSI/ANS-8 series of nuclear criticality safety standards that are in effect
as of the date this Order, unless otherwise modified or approved by DOE. The
CSP document must include an explanation as to why any recommendation in
applicable ANSI/ANS-8 standards is not implemented.
c. The CSP document must be submitted to and approved by DOE.
d. Criticality safety evaluations must be conducted in accordance with
DOE-STD-3007-2007, Guidelines for Preparing Criticality Safety Evaluations at
Department of Energy Non-Reactor Nuclear Facilities, or by other documented
methods approved by DOE.
e. Fissile Material Accumulation Control. Facilities that conduct operations using
fissionable material in a form that could inadvertently accumulate in significant
quantities must include procedures for detecting and characterizing
accumulations. The following national standards provide relevant guidance for
procedure development: ASTM C1455, Standard Test Method for Nondestructive
Assay of Special Nuclear Material Holdup Using Gamma-Ray Spectroscopic
Methods; and any other nondestructive assay consensus or DOE standards
applicable to the measurement technique selected.
f. Criticality safety evaluations must show that entire processes involving
fissionable materials will remain subcritical under normal and credible abnormal
conditions, including those initiated by design basis events.
Attachment 2 DOE O 420.1C
Page III-2 12-4-2012
g. The criteria and process for developing the guidelines for fire fighting in areas
Section 14
within or adjacent to moderator-controlled areas must be coordinated with fire
fighting pre-incident plans and procedures.
DOE O 420.1C Attachment 2
12-4-2012 Page IV-1
CHAPTER IV. NATURAL PHENOMENA HAZARDS MITIGATION
1. OBJECTIVE. To establish requirements for DOE facility design, construction, and
operations to protect the public, workers, and the environment from the impact of natural
phenomena hazards (NPH) events (e.g., earthquake, wind, flood, lightning, snow and
volcanic eruption).
2. APPLICABILITY. Requirements in this chapter apply to all government-owned and
government-leased nuclear and nonnuclear facilities and sites. Design requirements
(Sections 3.a, 3.b, and 3.c, below) apply to new facilities, major modifications, and
modifications that may be warranted based on periodic NPH assessment and upgrade
requirements.
3. REQUIREMENTS.
a. General. Facilities must be designed, constructed, maintained, and operated to
ensure that SSCs will be able to perform their intended safety functions
effectively under the combined effects of NPH and normal loads defined in the
applicable building codes contained in facilities’ CORs. Nuclear facility safety
functions that the SSCs must perform during an NPH must be defined in the
facility’s safety basis documentation. Safety functions include:
(1) confinement/containment of hazardous materials;
(2) protection of occupants and co-located workers of the facility and the
public;
(3) continued operation of essential facilities and equipment;
(4) safe shutdown of hazardous facilities and equipment; and,
(5) maintenance of personnel access to areas needed for responding to
accidents during NPH events.
b. NPH Design Criteria. All new facilities and major modifications must satisfy the
applicable requirements and criteria contained in DOE-STD-1020-2012, Natural
Phenomena Hazards Analysis and Design Criteria for DOE Facilities. (Note:
Requirements for non-nuclear facilities are described in Section 2.1 of
DOE-STD-1020-2012.)
c. NPH Accident Analysis. The NPH analysis supporting design and construction of
facilities and safety-SSCs must be documented and include evaluation of:
(1) potential damage to and failure of safety-SSCs resulting from both direct
and indirect NPH events; and,
Attachment 2 DOE O 420.1C
Page IV-2 12-4-2012
(2) common cause/effect and interactions resulting from failures of other
nearby facilities or other SSCs in the same facility caused by or induced
by an NPH event.
d. Review and Upgrade Requirements for Existing DOE Nuclear Facilities (Hazard
Category 1, 2 and 3).
(1) Existing facility or site NPH assessments must be reviewed at least every
10 years for any significant changes in data, criteria, and assessment
methods that would warrant updating the assessments. Sections 9.0 and
9.2 of DOE-STD-1020-2012 contain criteria and guidance for performing
these reviews. The review results, along with any recommended update
actions, must be submitted to the head of the field element for approval. If
no update is necessary, this result must be documented following the
review.
(2) If a new assessment of NPH indicates deficiencies in existing SSC design,
a plan for upgrades must be developed and implemented on a prioritized
schedule, based on the safety significance of the upgrades, time or funding
constraints, and mission requirements. The upgrade plans must also be
submitted to the head of the field element for approval. Section 9.3 of
Section 15
DOE-STD-1020-2012 contains guidance on performing upgrade
evaluations.
e. Seismic Detection. DOE sites with nuclear or hazardous materials must have
instrumentation or other means to detect and record the occurrence and severity of
seismic events.
f. Post-Natural Phenomena Procedures. Facilities or sites with hazardous materials
must have procedures for inspecting facilities for damage from severe NPH
events and placing a facility into a safe configuration when damage has occurred.
DOE O 420.1C Attachment 2
12-4-2012 Page V-1
CHAPTER V. COGNIZANT SYSTEM ENGINEER PROGRAM
1. OBJECTIVE. To establish requirements for a cognizant system engineer (CSE) program
for hazard category 1, 2, and 3 nuclear facilities and to ensure continued operational
readiness of the systems within its scope.
A key element of the CSE program is the designation of CSEs who are responsible for
maintaining overall cognizance of assigned systems, providing systems engineering
support for operations and maintenance, and technical support of line management safety
responsibilities for ensuring continued system operational readiness.
2. APPLICABILITY. Requirements of this chapter apply to all hazard category 1, 2, and 3
nuclear facilities that have attained operational status (such as achieving Critical
Decision 4 (CD-4) per DOE O 413.3B, Program and Project Management for the
Acquisition of Capital Assets, dated 11-29-10) and have:
a. Active safety-class or safety-significant SSCs, as defined in the facility’s
DOE-approved safety basis documentation; or,
b. Other active systems that perform important defense-in-depth functions, as
designated by facility line management.
Note: This chapter does not apply to passive systems or design features. Facility
management should consider establishing CSE programs before CD-4 to ensure their
stability and operation at CD-4. CSE programs should remain in place as long as the
covered systems are credited in the safety basis or designated by facility line
management.
3. REQUIREMENTS.
a. General. The protocols for implementing the site or facility CSE program must be
documented, must include the functions, responsibilities and authorities of CSEs,
and must address the following elements:
(1) Identification of systems covered by the CSE program and identification
of systems assigned for coverage;
(2) Configuration management;
(3) Support for operations and maintenance; and,
(4) Training and qualifications of CSEs.
b. CSE Program Coverage.
(1) The CSE program must be applied to active safety-class and
safety-significant systems, as defined in the facility’s DOE-approved
safety basis, as well as to other active systems that perform important
Attachment 2 DOE O 420.1C
Page V-2 12-4-2012
defense-in-depth functions, as designated by facility line management. The
designated systems and the rationale for assignment of CSEs in a graded
approach (see below) must be documented.
(2) A graded approach must be used in applying the requirements of the CSE
program. The program must be tailored to facility hazards and the systems
relied upon to prevent or mitigate those hazards, considering:
(a) Remaining Facility Lifetime and the Safety Significance of
Remaining Operations. Facilities undergoing deactivation or
decontamination/decommissioning may undergo frequent changes,
modifications, or removal of systems no longer needed to support
the safety basis of those operations. CSE programs may require
Section 16
more CSE attention in these operations than during normal
operations. After deactivation, or when a facility is in long-term
surveillance and maintenance, there may be less need for CSE
attention.
(b) Safety Importance of the System. Not all systems are equal as
measured by the likelihood and consequences of the hazard and the
accidents that they prevent or mitigate. The level of system
documentation detail in configuration management should be
tailored to the importance of the system.
(3) A qualified CSE must be assigned to each active system within the scope
of the program. Consistent with the graded approach, large, complex, or
very important systems may require assignment of more than one CSE.
Conversely, a single individual may be assigned to be the CSE for more
than one system.
c. Configuration Management.
(1) A documented configuration management program must be established
and implemented that ensures consistency among system requirements and
performance criteria, system documentation, and physical configuration of
the systems within the scope of the program. DOE-STD-1073-2003,
Configuration Management Program, describes an acceptable
methodology for establishing configuration management programs. The
configuration management program must address:
(a) system design documentation;
(b) system assessments;
(c) control of maintenance;
DOE O 420.1C Attachment 2
12-4-2012 Page V-3
(d) change control; and,
(e) obsolescence.
(2) System design documents and supporting documents must be identified
and kept current using formal change control and work control processes.
DOE-STD-3024-2011, Content of System Design Descriptions, describes
an acceptable methodology to achieve this function. Design
documentation must include:
(a) system requirements and performance criteria essential to
performance of the system’s safety functions;
(b) the basis for system requirements; and,
(c) a description of how the current system configuration satisfies the
requirements and performance criteria.
(3) System assessments must include periodic reviews of system operability,
reliability, and material condition. Reviews must assess the system for:
(a) the ability to perform design and safety functions;
(b) physical configuration as compared to system documentation; and,
(c) system and component performance in comparison to established
performance criteria.
(4) System maintenance and repair and modification must be controlled
through a formal change control process to ensure that changes are not
inadvertently introduced and that required system performance is not
compromised. Post maintenance or modification testing must be
conducted to confirm continued capability to fulfill system requirements.
d. CSE Support for Operations and Maintenance. The CSE must:
(1) ensure that system configuration is being managed effectively (see
Section 3.c of this chapter);
(2) remain apprised of operational status and ongoing modification activities;
(3) assist operations review of key system parameters and evaluate system
performance;
(4) initiate actions to correct problems;
(5) remain cognizant of system-specific maintenance and operations history
and industry operating experience, as well as manufacturer and vendor
Attachment 2 DOE O 420.1C
Page V-4 12-4-2012
recommendations and any product warnings regarding their assigned
systems;
(6) identify trends from operations and maintenance;
Section 17
(7) provide assistance in determining operability, correcting
out-of-specification conditions, and evaluating questionable data;
(8) provide or support analysis when the system is suspected of inoperability
or degradation;
(9) review and concur with design changes, use-as-is, equivalency, and
commercial grade dedication determinations; and,
(10) review, and provide input into the development of, and concur on
operating, maintenance, and test procedures related to their assigned
systems.
e. CSE Qualification Requirements. Qualification requirements for CSEs must be
consistent with those defined for Technical Support personnel in DOE O 426.2,
Personnel Selection, Training, Qualification, and Certification Requirements for
DOE Nuclear Facilities, dated 04-21-10 (see associated CRD), as applicable.
Qualification requirements must include knowledge of:
(1) related facility safety bases including safety system functions, safety
system performance criteria, and any relationship to specific
administrative controls;
(2) system functional classification and bases;
(3) codes and standards applicable to assigned systems;
(4) system design, procurement, replacement, and related quality assurance
requirements;
(5) the existing condition of the systems;
(6) related facility operations; and,
(7) vendor manuals, product warnings, and updates related to assigned
systems, available (in print or online).
DOE O 420.1C Attachment 3
12-4-2012 Page 1
DESIGN CRITERIA FOR
SAFETY STRUCTURES, SYSTEMS, AND COMPONENTS
This attachment provides requirements for the design and construction of safety structures,
systems and components (SSCs).
1. OBJECTIVE. To establish requirements for the design and construction of safety-SSCs,
both safety-class and safety-significant, by identifying an applicable set of industry codes
and standards, as well as Department of Energy (DOE) design criteria, standards and
directives (listed in Attachment 4 of DOE Order (O) 420.1C, Facility Safety).
Compliance with these requirements will ensure reliable performance of the safety
function of safety-SSCs under those conditions and events for which they are intended.
2. APPLICABILITY.
a. This attachment applies to the design and construction of:
(1) new hazard category 1, 2, and 3 nuclear facilities as defined by 10 Code of
Federal Regulations (C.F.R.) Part 830, Nuclear Safety Management; and,
(2) major modifications to hazard category 1, 2, and 3 nuclear facilities, as
defined in 10 C.F.R. Part 830, that substantially change the facility safety
basis.
b. This attachment does not impose requirements on existing facilities, except for
major modifications to those facilities. The requirements of this attachment may
be used to develop comparisons of existing facilities to the requirements for new
facilities.
c. This attachment does not apply to nuclear deactivation or decontamination and
decommissioning activities at end-of-facility-life, if the safety analysis
demonstrates that adequate protection is provided consistent with the
requirements of 10 C.F.R. Part 830 through alternate means and it is not
cost-beneficial to apply the provisions of this attachment for the limited remaining
life of the activity.
3. REQUIREMENTS. Safety-SSCs must be designed, commensurate with the importance
of the safety functions performed, to perform their safety functions when called upon, as
determined by the safety analysis.
a. General Design Criteria.
Section 18
(1) Conservative Design Margin. Safety-SSCs must be designed with
appropriate margins of safety, as defined in applicable DOE or industry
codes and standards.
(2) System Reliability.
Attachment 3 DOE O 420.1C
Page 2 12-4-2012
(a) The single failure criterion, requirements, and design analysis
identified in Institute of Electrical and Electronics Engineers
(IEEE) standard (Std) 379-2000, IEEE Standard Application of the
Single-Failure Criterion to Nuclear Power Generating Station
Safety Systems, must be applied to safety-class SSCs during the
design process as the primary method of achieving reliability.
American National Standards Institute (ANSI)/American Nuclear
Society (ANS) 58.9, Single Failure Criteria for Light Water
Reactor Safety-Related Fluid Systems, may be used in defining the
scope of active safety-class mechanical SSCs.
(b) Safety-significant SSCs must be designed to reliably perform all
their safety functions. This can be achieved through a number of
means, including use of redundant systems/components, increased
testing frequency, high reliability components, and diagnostic
coverage (e.g., on-line testing, monitoring of component and
system performance, and monitoring of various failure modes).
DOE STD-1195-2011, Design of Safety Significant Safety
Instrumented Systems Used at DOE Nonreactor Nuclear Facilities,
provides an acceptable method for achieving high reliability of
safety-significant safety instrumented systems.
(3) Environmental Qualification.
(a) Safety-class SSCs must be designed to perform all safety functions
with no failure mechanism that could lead to common cause
failures under postulated service conditions. The requirements of
IEEE Std 323-2003, IEEE Standard Criteria for Qualifying Class
IE Equipment for Nuclear Power Generating Stations, or other
applicable standards, must be used to ensure environmental
qualifications of safety-class SSCs.
(b) Safety-significant SSCs located in a harsh environment must be
evaluated to establish qualified life. This may be accomplished
using manufacturers’ recommendations or other appropriate
methods.
(4) Safe Failure Modes. The facility design must provide reliable safe
conditions and sufficient confinement of hazardous material during and
after all design basis accidents. At both the facility- and SSC-level, the
design must ensure that most probable modes of failure (e.g., failure to
open versus failure to close) will increase the likelihood of a safe
condition.
(5) Support System and Interface Design.
DOE O 420.1C Attachment 3
12-4-2012 Page 3
(a) Support SSCs must be designed as safety-class or safety-significant
SSCs if their failures prevent safety-SSCs or specific administrative
controls from performing their safety functions.
(b) Interfaces, such as pressure retention boundaries, electrical supply,
instrumentation, cooling water, and other support systems may exist
between safety-SSCs and non-safety-SSCs. These interfaces must
be evaluated to identify SSC failures that would prevent
safety-SSCs from performing their intended safety function. IEEE
Std 384-2008, IEEE Standard Criteria for Independence of Class
IE Equipment and Circuits, or other applicable standards must be
used for physical and electrical separation methods including the
use of separation distance, barriers, electrical isolation devices, or
any combination thereof. This includes a design to ensure that both
Section 19
direct and indirect impacts of design basis accidents (e.g., fire,
seismic) will not cause failure of safety functions.
(6) Protection Against Fire. Safety-class systems must be designed with
redundancy or other means, such that safety function is maintained for any
postulated fire events that credit the safety-class systems.
(7) Quality Assurance. A quality assurance program must be established that
satisfies 10 C.F.R. Part 830, Subpart A, Quality Assurance Requirements,
and DOE O 414.1D, Quality Assurance, dated 04-25-11, early in the
project, such that safety-SSCs and their associated support systems are
designed, procured, fabricated, erected, and tested to standards and quality
requirements commensurate with their importance to safety.
b. Specific Design Criteria and Use of National Codes and Standards. The selection
and use of an appropriate set of applicable codes and standards establishes design
criteria to provide assurance that the SSCs are designed to reliably perform their
intended functions. The DOE technical standards and industry codes and
standards identified in the following sections must be evaluated for applicability.
DOE technical standards and industry codes and standards are considered
applicable when they provide relevant design requirements for the safety-SSCs
that are being designed (i.e., they provide design requirements that are needed to
ensure that desired SSC functions are achieved, and these requirements are
appropriate for the design materials, configuration, and service conditions).
Further, the use of specific codes and standards may be directed by the DOE field
element. (Note: The stated applicability of industry codes and standards (e.g., for
nuclear reactors) should not be used to narrowly interpret relevancy for SSC
design.)
Before using these codes and standards, their application to specific DOE
design(s) must be reviewed. Once a code or standard is identified as applicable,
the applicable requirements (i.e., mandatory statements) must be applied in the
Attachment 3 DOE O 420.1C
Page 4 12-4-2012
design. The process for obtaining relief (i.e., equivalencies or exemptions) from
applicable requirements in applicable DOE technical standards and industry codes
and standards is described in Attachment 1 of DOE O 420.1C. (Note: Relief is not
necessary for requirements within an applicable industry code or standard where
the requirements are not relevant to the design or construction.)
The set of codes and standards identified below is not meant to be all-inclusive. It
is expected that design of SSCs will require selection of additional codes and
standards beyond those identified below. For example, unique design features,
detailed design considerations, and release of advancements may drive selection
of additional codes and standards. Facility designers must identify the complete
set of codes and standards necessary to meet the general design criteria identified
above (see also Attachment 4 of DOE O 420.1C for additional codes and
standards).
(1) Structural. Table 1 provides relevant codes and standards. Attachment 2,
Chapter IV of DOE O 420.1C provides additional natural phenomena
hazards design requirements.
Table 1: Codes for Safety-Significant and Safety-Class Structures
Structures Safety-Significant Safety-Class
Concrete ACI-318; ACI-349 ACI-349
Steel AISC-360; AISC-325; AISC-N690 AISC-N690
(2)
Note: See DOE-STD-1020-2012 for further discussion on selection and
Section 20
use of codes for structural design of SSCs.
(3) Mechanical and Process Equipment. Table 2 provides relevant codes and
standards.
Table 2: Codes for Safety-Significant and Safety-Class Process Equipment
Process
Equipment
Safety-Significant Safety-Class
Pressure vessels
ASME Boiler and Pressure Vessel
Code, Section VIII, Division 1 or 2
ASME Boiler and Pressure Vessel
Code, Section VIII, Division 1
or 2
Tanks (0-15
psig)
API-620; ASME Boiler and Pressure
Vessel Code Section VIII, Division 1
or 2
API-620; ASME Boiler and
Pressure Vessel Code, Section
VIII, Division 1 or 2
Tanks
(containing
flammable
liquids)
API-620; API-650; Applicable
NFPA codes and standards
API-620; API-650; Applicable
NFPA codes and standards
DOE O 420.1C Attachment 3
12-4-2012 Page 5
Process
Equipment
Safety-Significant Safety-Class
Tanks
(atmospheric
pressure)
API-650; AWWA-D100 API-650; AWWA-D100
Pumps
ASME B73.1, B73.2; ASME Boiler
and Pressure Vessel Code, Section
VIII; AWWA; Hydraulic Institute
Standards
ASME B73.1, B73.2; ASME
Boiler and Pressure Vessel Code,
Section VIII; AWWA; Hydraulic
Institute Standards
Piping ASME B31.3 ASME B31.3
Valves ASME B16.5, B31.3; ANSI N278.1
ASME B16.5, B31.3; ANSI
N278.1
Heat exchangers
ASHRAE Handbook; ASME Boiler
and Pressure Vessel Code, Section
VIII, Division 1; TEMA B, C, or R
ASHRAE Handbook; ASME
Boiler and Pressure Vessel Code,
Section VIII, Division 1; TEMA
B, C, or R
Gloveboxes ASTM C852, AGS-G006 ASTM C852, AGS-G006
(4) Ventilation. Table 3 provides relevant codes and standards.
Appendix A of DOE Guide (G) 420.1-1A, Nonreactor Nuclear Safety
Design Criteria for use with DOE O 420.1C, Facility Safety, and DOE
Handbook-1169-2003, Nuclear Air Cleaning Handbook, provide guidance
for confinement ventilation systems design and performance criteria.
Alternate methods must be approved by DOE field elements.
Table 3: Codes for Safety-Significant and Safety-Class Ventilation System Components
Ventilation Safety-Significant Safety-Class
Ducts ASME AG-1 ASME AG-1
Fans ASHRAE Handbook, ASME AG-1
ASHRAE Handbook; ASME
AG-1
Filtration
ASME AG-1;
DOE-STD-3020-2005
ASME AG-1;
DOE-STD-3020-2005
Balance of
system for
confinement
ventilation
ASME AG-1 ASME AG-1
Off-gas
treatment
ASME AG-1 ASME AG-1
(5) Mechanical Handling Equipment. Table 4 provides relevant codes and
standards.
Attachment 3 DOE O 420.1C
Page 6 12-4-2012
Table 4: Codes for Safety-Significant and Safety-Class Handling Equipment
Handling
Equipment
Safety-Significant Safety-Class
Cranes
Applicable CMAA standards;
ASME NOG-1, ASME NUM-1,
ASME B30.2;
DOE-STD-1090-2011
Applicable CMAA standards;
ASME NOG-1, ASME NUM-1,
ASME B30.2;
DOE-STD-1090-2011
Other
equipment
ASME B30 Series:
DOE-STD-1090-2011
ASME B30 Series;
DOE-STD-1090-2011
(6) Electrical. Tables 5 and 6 provide relevant codes and standards.
Note: ANSI/IEEE standards, below, define requirements for the
manufacturing, installation, and testing of commercial reactor
Safety-Class 1E electrical systems and components. While these
requirements may not be directly applicable to nonreactor nuclear
facilities, these standards contain useful and significant information that
should be considered.
Table 5: Codes for Safety-Significant and Safety-Class Electrical Systems
Electri
cal
Safety-Significant Safety-Class
Hardw
are
Applicable NFPA codes and
standards; IES Lighting Handbook;
IEEE C2, C37;
Section 21
IEEE-80, -141, -142, -242, -399, -4
46 -493, -577
Applicable NFPA codes and standards; IES
Lighting Handbook; IEEE C2, C37;
IEEE-80, -141, -142, -242, -308, -338, -379, -384
, -399, -493, -577
DOE O 420.1C Attachment 3
12-4-2012 Page 7
Table 6: IEEE Standards used for Both Safety-Significant
and Safety-Class Electrical Systems, as appropriate
Electrical Safety-Significant and Safety-Class
Guidance standards for use as applicable for
specific hardware
IEEE-279, -323, -334, -336, -344, -352 -382, -38
3, -387, -420, -450, -484, -493, -535, -603, -627,
-628, -649, -650, -833, -946
(7) Instrumentation, Control, and Alarm Systems. The design of safety-class
instrumentation and control systems must incorporate sufficient
independence, redundancy, diversity, and separation to ensure that
allsafety-related functions associated with such equipment can be
performed. Safety-significant components must be evaluated as to the
need for redundancy on a case-by-case basis. DOE-STD-1195-2011
provides an acceptable method for achieving high reliability of
safety-significant safety instrumented systems.
Table 7 provides relevant codes and standards. The codes and standards
for electrical systems (in Tables 5 and 6) may also be applicable to design
of instrumentation and control systems and need to be evaluated in this
context.
Table 7: Codes for Safety-Significant and Safety-Class
Instrumentation, Control, and Alarm Components.
Instruments,
Controls,
and Alarms
Safety-Significant Safety-Class
Hardware
Applicable NFPA codes and standards;
ANSI/ANS-8.3, -58.8, -59.3, -N13.1, -N323D;
ANSI/ISA-Series including ISA 67.04.01 and
ISA TR 84.00.06; IEEE-C2, -N42.18, -
1023, -1050; -7-4.3.2; and
DOE-STD-1195-2011
Applicable NFPA codes
and standards;
ANSI/ANS-8.3, 58.8,
59.3, -N13.1,
ANSI-N323D;
ANSI/ISA-Series including
ISA 67.04.01 and ISA TR
84.00.06; IEEE-C2, -
N42.18, -603, -1023, -
1050, -7-4.3.2
Attachment 3 DOE O 420.1C
Page 8 12-4-2012
(8) Fire Protection Systems. DOE-STD-1066-2012, Fire Protection, provides
acceptable methods for the design of fire protection systems, including
safety-class and safety-significant fire barriers, water supplies, and wet
pipe sprinkler systems (see Appendix A of DOE-STD- 1066-2012). Fire
protection system designs are also required to address the applicable
design requirements for similar safety systems provided in this attachment.
DOE O 420.1C Attachment 4
12-4-2012 Page 1
REFERENCES AND ACRONYMS
1. REFERENCES. The following reference documents and a few additional information
sources are cited to assist in implementing this Directive.
a. Public Law (P.L.).
(1) P.L. 106-65, National Defense Authorization Act for Fiscal Year 2000,
Title XXXII, National Nuclear Security Administration, as amended.
(2) P.L. 94-580, as amended, Resource Conservation and Recovery Act of
1976 (RCRA), (42 U.S.C., Sec. 6901, et seq.).
(3) P.L. 83-703, Atomic Energy Act of 1954.
b. Executive Orders (E.O.) and Federal Policies.
(1) E.O. 12344, Naval Nuclear Propulsion Program.
(2) Federal Wildland Fire Management Policy and Implementing Actions.
(Available from National Interagency Fire Center)
(3) Secretarial Delegation Order Number 00-033.00B, dated 07-20-09.
c. Code of Federal Regulations (C.F.R.).
(1) 10 C.F.R. Part 830, Nuclear Safety Management.
(2) 10 C.F.R. Part 835, Occupational Radiation Protection.
(3) 10 C.F.R. Part 851, Worker Safety and Health Program.
Section 22
(4) 29 C.F.R. Part 1910, Occupational Safety and Health Standards.
(5) 29 C.F.R. Part 1910, Subpart G, Section 1910.94, Occupational Health
and Environmental Control.
(6) 29 C.F.R. Part 1910, Subpart Z, Section 1910.100, Toxic and Hazardous
Substances.
(7) 29 C.F.R. Part 1910, Subpart H, Section 1910.101, Hazardous Materials.
(8) 29 C.F.R. Part 1910, Section 1910.134, Respiratory Protection.
(9) 29 C.F.R. Part 1926, Safety and Health Regulations for Construction.
(10) 48 C.F.R. Part 970, Section 970.5223-1, Integration of Environment,
Safety, and Health into Work Planning and Execution.
Attachment 4 DOE O 420.1C
Page 2 12-4-2012
d. DOE Directives.
(1) DOE P 420.1, Department of Energy Nuclear Safety Policy, dated
02-08-11.
(2) DOE O 151.1C, Comprehensive Emergency Management System, dated
11-02-05.
(3) DOE O 226.1B, Implementation of Department of Energy Oversight
Policy, dated 04-25-11.
(4) DOE O 227.1, Independent Oversight Program, dated 08-30-11.
(5) DOE O 251.1C, Departmental Directives Program, dated 01-15-09.
(6) DOE O 410.1, Central Technical Authority Responsibilities Regarding
Nuclear Safety Requirements, dated 08-28-07.
(7) DOE O 413.3B, Program and Project Management for the Acquisition of
Capital Assets, dated 11-29-10.
(8) DOE O 414.1D, Quality Assurance, dated 04-25-11.
(9) DOE O 420.2C, Safety of Accelerator Facilities, dated 07-21-11.
(10) DOE O 426.1 Chg 1, Federal Technical Capability, dated 11-19-09.
(11) DOE O 426.2, Personnel Selection, Training, Qualification, and
Certification Requirements for DOE Nuclear Facilities, dated 04-21-10.
(12) DOE O 433.1B, Maintenance Management Program for DOE Nuclear
Facilities, dated 04-21-10.
(13) DOE O 435.1 Chg 1, Radioactive Waste Management, dated 07-09-99.
(14) DOE O 452.1D, Nuclear Explosive and Weapon Surety Program,
dated 04-14-09.
(15) DOE O 452.2D, Nuclear Explosive Safety, dated 04-14-09.
(16) DOE O 5480.30 Chg 1, Nuclear Reactor Safety Design Criteria, dated
01-19-93.
(17) DOE M 435.1-1 Chg 2, Radioactive Waste Management Manual,
dated 07-09-99.
(18) DOE G 413.3-21, Cost Estimating Guide, dated 05-09-11.
DOE O 420.1C Attachment 4
12-4-2012 Page 3
(19) DOE G 414.1-2B Chg 1, Quality Assurance Program Guide, dated
08-16-11.
(20) DOE G 414.1-4, Safety Software Guide for use with 10 C.F.R 830 Subpart
A, Quality Assurance Requirements, and DOE O 414.1C, Quality
Assurance, dated 06-17-05.
(21) DOE G 420.1-1A, Nonreactor Nuclear Safety Design Criteria for Use
with DOE O 420.1C, Facility Safety, dated 12-04-12.
e. DOE Technical Standards (STDs).
(1) DOE-STD-1020-2012, Natural Phenomena Hazards Analysis and Design
Criteria for DOE Facilities.
(2) DOE-STD-1027-1992, Chg 1, Hazard Categorization and Accident
Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear
Safety Analysis Reports, September 1997.
(3) DOE-STD-1066-2012, Fire Protection.
(4) DOE-STD-1073-2003, Configuration Management Program.
(5) DOE-STD-1090-2011, Hoisting and Rigging (Formerly Hoisting and
Rigging Manual).
(6) DOE-STD-1098-2008, Radiological Control.
(7) DOE-STD-1104-2014, Review and Approval of Nuclear Facility Safety
Basis and Safety Design Basis Documents.
(8) DOE-STD-1128-2008, Guide of Good Practices for Occupational
Radiological Protection in Plutonium Facilities.
(9) DOE-STD-1158-2010, Self-Assessment Standard for DOE Contractor
Criticality Safety Programs.
(10) DOE-STD-1186-2004, Specific Administrative Controls.
Section 23
(11) DOE-STD-1189-2008, Integration of Safety into the Design Process.
(12) DOE-STD-1195-2011, Design of Safety Significant Safety Instrumented
Systems Used at DOE Nonreactor Nuclear Facilities.
(13) DOE-STD-1212-2012, Explosives Safety.
(14) DOE-STD-1628-2013, Development of Probabilistic Risk Assessments for
Nuclear Safety Applications.
Attachment 4 DOE O 420.1C
Page 4 12-4-2012
(15) DOE-STD-3007-2007, Guidelines for Preparing Criticality Safety
Evaluations at Department of Energy Nonreactor Nuclear Facilities.
(16) DOE-STD-3009-94, Preparation Guide for U.S. Department of Energy
Nonreactor Nuclear Facility Documented Safety Analyses, Change Notice
3, March 2006.
(17) DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility
Documented Safety Analyses.
(18) DOE-STD-3020-2005, Specifications for HEPA Filters Used by DOE
Contractors.
(19) DOE-STD-3024-2011, Content of System Design Descriptions.
f. DOE Handbooks (HDBKs).
(1) DOE-HDBK-1132-1999, Design Considerations.
(2) DOE-HDBK-1163-2003, Integration of Multiple Hazard Analysis
Requirements and Activities.
(3) DOE-HDBK-1169-2003, Nuclear Air Cleaning Handbook.
g. Department of Defense.
MIL-STD-1472F, Department of Defense Design Criteria Standard: Human
Engineering, August 1999.
h. American National Standards Institute/American Concrete Institute (ANSI/ACI).
(1) ACI 349-06, Code Requirements for Nuclear Safety-Related Concrete
Structures (ACI 349-06) and Commentary, 2006.
i. American Conference of Governmental Industrial Hygienists (ACGIH).
(1) ACGIH 2096, Industrial Ventilation: A Manual of Recommended
Practices for Design, January 2010.
j. American Glovebox Society (AGS).
(1) AGS-G006-2005, Standard of Practice for the Design and Fabrication of
Nuclear Application Gloveboxes, 2005.
k. American National Standards Institute/American Institute of Steel Construction
(AISC).
(1) AISC 325-11A, Steel Construction Manual, 2011.
DOE O 420.1C Attachment 4
12-4-2012 Page 5
(2) AISC 360-10, Specification for Structural Steel Buildings, 2010.
(3) AISC N690-2012, Specification for Safety-Related Steel Structures for
Nuclear Facilities, 2012.
l. American National Standards Institute (ANSI).
(1) ANSI N13.1-2011, Guide to Sampling and Monitoring Releases of
Airborne Radioactive Substances from the Stacks and Ducts of Nuclear
Facilities, 2011.
(2) ANSI N43.2-2001 (R2010), Radiation Safety for X-ray Diffraction and
Fluorescence Analysis Equipment, 2001.
(3) ANSI N278.1-1975 (R1992), Self-Operated and Power-Operated
Safety-Related Valves Functional Specification Standard, 1975.
(4) ANSI N323D-2002, American National Standard for Installed Radiation
Protection Instrumentation, 2003.
(5) ANSI/AIHA Z9.2-2012, Fundamentals Governing the Design and
Operation of Local Exhaust Ventilation Systems, 2012.
(6) ANSI Z358.1-2009, American National Standard for Emergency Eyewash
and Shower Equipment, 2009.
m. American National Standards Institute/American Nuclear Society (ANS).
(1) ANSI/ANS-1-2000 (R2007), Conduct of Critical Experiments, 2000.
(2) ANSI/ANS-6.4.2-2006, Specification for Radiation Shielding Materials,
2006.
(3) ANSI/ANS 8 series standards.
(4) ANSI/ANS-8.1-2014, Nuclear Criticality Safety in Operations with
Fissionable Materials Outside Reactors, 2014.
(5) ANSI/ANS-8.3-1997 (R2003), Criticality Accident Alarm Systems, 1997.
(6) ANSI/ANS-8.15-1981 (R2005), Nuclear Criticality Control of Special
Actinide Elements, 1981.
Section 24
(7) ANSI/ ANS-14.1-2004 (R2009), Operation of Fast Pulse Reactors, 2004.
(8) ANSI/ANS-58.8-1994 (R2008), Time Response Design Criteria for
Safety-Related Operator Actions, 1994.
Attachment 4 DOE O 420.1C
Page 6 12-4-2012
(9) ANSI/ANS-58.9-2002 (R2009), Single Failure Criteria for Light Water
Reactor Safety-Related Fluid Systems, 1981.
(10) ANSI/ANS-59.3-1992 (withdrawn), Nuclear Safety Criteria for Control
Air Systems, 1992.
n. American Petroleum Institute (API).
(1) API-Std 620, Design and Construction of Large, Welded, Low-Pressure
Storage Tanks, 2008.
(2) API-Std 650, Welded Tanks for Oil Storage, 2007.
o. American Society of Mechanical Engineers (ASME).
(1) ASME AG-1-2009, Code on Nuclear Air and Gas Treatment, 2009.
(2) ASME BPVC, ASME 2013 Boiler and Pressure Vessel Code, 2013.
(3) ASME B16.5-2009, Pipe Flanges and Flanged Fittings: NPS ½ through
NPS 24 Metric/Inch Standard, 2009.
(4) ASME B30.2-2011, Overhead and Gantry Cranes (Top Running Bridge,
Single or Multiple Girder, Top Running Trolley Hoist), 2011.
(5) ASME B31.3-2012, Process Piping, 2012.
(6) ASME B73.1-2001 (R2007), Specifications for Horizontal End Suction
Centrifugal Pumps for Chemical Process, 2002.
(7) ASME B73.2-2003 (R2009), Specifications for Vertical In-Line
Centrifugal Pumps for Chemical Process, 2005.
(8) ASME NOG-1-2010. Rules for Construction of Overhead and Gantry
Cranes (Top Running Bridge, Multiple Girder), 2010.
(9) ASME NUM-1-2009, Rules for Construction of Cranes, Monorails, and
Hoists (with Bridge or Trolley or Hoist of the Underhung Type), 2010.
(10) ASME NQA-1-2012, Quality Assurance Requirements for Nuclear
Facility Applications, 2013.
p. American Society for Testing and Materials (ASTM).
(1) ASTM C852-09, Standard Guide for Design Criteria for Plutonium
Gloveboxes, 2009.
DOE O 420.1C Attachment 4
12-4-2012 Page 7
(2) ASTM C1455-07, Standard Test Method for Nondestructive Assay of
Special Nuclear Material Holdup Using Gamma-Ray Spectroscopic
Methods, 2007
q. American National Standards Institute/International Society of Automation (ISA).
(1) ANSI/ISA 7.0.01-1996, Quality Standard for Instrument Air, 1996.
(2) ANSI/ISA 18.1-1979 (R2004), Annunciator Sequences and Specifications,
1979.
(3) ANSI/ISA 67.01.01-2002 (R2007), Transducer and Transmitter
Installation for Nuclear Safety Applications, 2002.
(4) ANSI/ISA S67.02.01-1999, Nuclear-Safety-Related Instrument Sensing
Line Piping and Tubing Standard for Use in Nuclear Power Plants, 1999.
(5) ANSI/ISA 67.04.01-2006 (R2011), Setpoints for Nuclear Safety-Related
Instrumentation, 2006.
r. American Society of Heating, Refrigerating and Air Conditioning Engineers
(ASHRAE).
(1) ASHRAE Handbook, Fundamentals (Inch-Pound Edition), 2009.
(2) ASHRAE Standard 62.1-2010, Ventilation for Acceptable Indoor Air
Quality, 2010.
s. American Water Works Association (AWWA).
(1) AWWA D100-11, Welded Carbon Steel Tanks for Water Storage, 2011.
t. Crane Manufacturers Association of America (CMAA).
(1) CMAA Crane Manufacturers Association of America, standards as
applicable.
u. Defense Nuclear Facilities Safety Board (DNFSB).
(1) DNFSB Recommendation 2004-2, Active Confinement Systems.
v. Hydraulic Institute Standards.
(1) Hydraulic Institute Standards, standards as applicable.
w. Institute of Electrical and Electronics Engineers (IEEE).
(1) IEEE Std C2-2012, National Electrical Safety Code, 2012.
Attachment 4 DOE O 420.1C
Page 8 12-4-2012
Section 25
(2) IEEE Std C37 Series, Power Switchgears, Substations, and Relays,
(standards on switchgear as applicable), 2010.
(3) IEEE Std N42.18-2004, American National Standard Specification and
Performance of On-Site Instrumentation for Continuously Monitoring
Radioactivity in Effluents, 2004.
(4) IEEE Std N323D-2002, American National Standard to Installed
Radiation Protection Instrumentation, 2003.
(5) IEEE Std 7-4.3.2-2010, IEEE Standard Criteria for Digital Computers in
Safety Systems of Nuclear Power Generating Stations, 2010.
(6) IEEE Std 80-2000, IEEE Guide for Safety in AC Substation Grounding,
2000.
(7) IEEE Std 141-1993, IEEE Recommended Practice for Electric Power
Distribution for Industrial Plants, 1994.
(8) IEEE Std 142-2007, IEEE Recommended Practice for Grounding of
Industrial and Commercial Power Systems (Redline), 2007.
(9) IEEE Std 242-2001, IEEE Recommended Practice for Protection and
Coordination of Industrial and Commercial Power Systems (IEEE Buff
Book), 2001.
(10) IEEE Std. 279-1971 (withdrawn), IEEE Standard: Criteria for Protection
Systems for Nuclear Power Generating Stations, 1971.
(11) IEEE Std 308-2001, IEEE Standard Criteria for Class 1E Power Systems
for Nuclear Power Generating Stations, 2002.
(12) IEEE Std 323-2003, IEEE Standard for Qualifying Class 1E Equipment
for Nuclear Power Generating Stations, 2004.
(13) IEEE Std 334-2006, IEEE Standard for Qualifying Continuous Duty Class
1E Motors for Nuclear Power Generating Stations, 2007.
(14) IEEE Std 336-2010, IEEE Recommended Practice for Installation,
Inspection, and Testing for Class 1E Power, Instrumentation, and Control
Equipment at Nuclear Facilities, 2010.
(15) IEEE Std 338-2012, IEEE Standard for Criteria for Periodic Surveillance
Testing of Nuclear Power Generating Station Safety Systems, 2012.
(16) IEEE Std 344-2004, IEEE Recommended Practice for Seismic
Qualification of Class 1E Equipment for Nuclear Power Generating
Stations, 2004.
DOE O 420.1C Attachment 4
12-4-2012 Page 9
(17) IEEE Std 352-1987, IEEE Guide for General Principles of Reliability
Analysis of Nuclear Power Generating Station Safety Systems, 1987.
(18) IEEE Std 379-2000, IEEE Standard Application of the Single-Failure
Criterion to Nuclear Power Generating Station Safety Systems, 2001.
(19) IEEE Std 382-2006, IEEE Standard for Qualification of Safety-Related
Actuators for Nuclear Generating Stations, 2006.
(20) IEEE Std 383-2003, IEEE Standard for Qualifying Class 1E Electric
Cables and Field Splices for Nuclear Power Generating Stations, 2003.
(21) IEEE Std 384-2008, IEEE Standard Criteria for Independence of Class 1E
Equipment and Circuits, 2008.
(22) IEEE Std 387-1995, Standard Criteria for Diesel Generator Units Applied
as Standby Power Supplies for Nuclear Power Generation Stations, 1995.
(23) IEEE Std 399-1997, IEEE Recommended Practice for Industrial and
Commercial Power Systems Analysis (IEEE Brown Book), 1998.
(24) IEEE Std 420-2001, Standard for the Design and Qualification of Class 1E
Control Boards, Panels, and Racks Used in Nuclear Power Generating
Stations, 2002.
(25) IEEE Std 446-1995, Recommended Practice for Emergency and Standby
Power Systems for Industrial and Commercial Applications, 1995.
(26) IEEE Std 450-2010, IEEE Recommended Practice for Maintenance,
Testing, and Replacement of Vented Lead-Acid Batteries for Stationary
Applications, 2010.
(27) IEEE Std 484-2002, IEEE Recommended Practice for Installation Design
Section 26
and Installation of Vented Lead-Acid Batteries for Stationary
Applications, 2002.
(28) IEEE Std 493-2007, IEEE Recommended Practice for the Design of
Reliable Industrial and Commercial Power Systems, 2007.
(29) IEEE Std 535-2006, IEEE Standard for Qualification of Class 1E Lead
Storage Batteries for Nuclear Power Generating Stations, 2006.
(30) IEEE Std 577-2012, IEEE Standard Requirements for Reliability Analysis
in the Design and Operation of Safety Systems for Nuclear Facilities,
2012.
(31) IEEE Std 603-2009, IEEE Standard Criteria for Safety Systems for
Nuclear Power Generating Stations, 2009.
http://webstore.ansi.org/RecordDetail.aspx?sku=IEEE+420-2001
http://webstore.ansi.org/RecordDetail.aspx?sku=IEEE+420-2001
http://webstore.ansi.org/RecordDetail.aspx?sku=IEEE+420-2001
Attachment 4 DOE O 420.1C
Page 10 12-4-2012
(32) IEEE Std 627-2010, IEEE Standard for Qualification of Equipment Used
in Nuclear Facilities, 2010.
(33) IEEE Std 628-2011, IEEE Standard Criteria for the Design, Installation,
and Qualification of Raceway Systems for Class 1E Circuits for Nuclear
Power Generating Stations, 2011.
(34) IEEE Std 649-2006, IEEE Standard for Qualifying Class 1E Motor
Control Centers for Nuclear Power Generating Stations, 2006.
(35) IEEE Std 650-2006, IEEE Standard for Qualification of Class 1E Static
Battery Chargers and Inverters for Nuclear Power Generating Stations,
2006.
(36) IEEE Std 833-2005, IEEE Recommended Practice for the Protection of
Electric Equipment in Nuclear Power Generating Stations from Water
Hazards, 2005.
(37) IEEE Std 946-2004, IEEE Recommended Practice for the Design of DC
Auxiliary Power Systems for Generating Systems, 2005.
(38) IEEE Std 1023-2004, IEEE Recommended Practice for the Application of
Human Factors Engineering to Systems, Equipment, and Facilities of
Nuclear Power Generating Stations and other Nuclear Facilities, 2004.
(39) IEEE Std 1050-2004, IEEE Guide for Instrumentation and Control
Equipment Grounding in Generating Stations, 2004.
x. International Code Council.
(1) International Code Council, International Building Code.
y. Illuminating Engineering Society (IES).
(1) IES HB-10-11, IES Lighting Handbook, 2011.
z. International Society of Automation (ISA).
(1) ISA-TR84.00.06, Safety Field bus Design Considerations for Process
Industry Sector Applications, 2009.
aa. National Council on Radiation Protection and Measurements (NCRP).
(1) NCRP Report 49, Structural Shielding Design and Evaluation for Medical
Use of X Rays and Gamma Rays of Energies Up to 10 MeV, 1976.
DOE O 420.1C Attachment 4
12-4-2012 Page 11
bb. National Fire Protection Association (NFPA).
(1) NFPA 30, Flammable and Combustible Liquids Code, 2012.
(2) NFPA 70, National Electric Code, 2014.
(3) NFPA 72, National Fire Alarm and Signaling Code, 2013.
(4) NFPA 101, Life Safety Code, 2012.
(5) NFPA 110, Standard for Emergency and Standby Power Systems, 2013.
(6) NFPA 780, Standard for the Installation of Lightning Protection Systems,
2014.
(7) NFPA 1143, Standard for Wildland Fire Management, 2014.
cc. Nuclear Regulatory Commission (NRC).
NUREG-0700, Human-System Interface Design Review Guidelines, 2002.
dd. Tubular Exchanger Manufacturers Association (TEMA).
(1) TEMA, 9
th
Edition TEMA Standards, standards on heat exchangers
Classes B, C, and R. Appendix F, Concluding Material.
2. ACRONYMS.
ACI American Concrete Institute
AHJ authority having jurisdiction
Section 27
AISC American Institute of Steel Construction
ANS American Nuclear Society
ANSI American National Standards Institute
API American Petroleum Institute
ASME American Society of Mechanical Engineers
ASHRAE American Society of Heating, Refrigerating and Air Conditioning
Engineers
ASTM American Society for Testing and Materials
AWWA American Water Works Association
BNA baseline needs assessment
CD critical decision
C.F.R. Code of Federal Regulations
CMAA Crane Manufacturers Association of America
COR Code of Record
CRD contractor requirements document
CSE cognizant system engineer
CSP criticality safety program
DOE Department of Energy
Attachment 4 DOE O 420.1C
Page 12 12-4-2012
E.O. Executive Order
FHA fire hazards analysis
FPE fire protection engineer
G Guide (DOE directive)
IBC International Building Code
IEEE Institute of Electrical and Electronics Engineers
IES Illuminating Engineering Society
ISA International Society of Automation
M Manual (DOE directive)
MPFL maximum possible fire loss
NFPA National Fire Protection Association
NNSA National Nuclear Security Administration
NPH natural phenomena hazards
NRC Nuclear Regulatory Commission
O Order (DOE directive)
P Policy (DOE directive)
P.L. Public Law
SAC specific administrative controls
SSC structures, systems, and components
STD Standard (DOE technical standard)
TEMA Tubular Exchanger Manufacturers Association
U.S.C. United States Code
AVAILABLE ONLINE AT: INITIATED BY:
www.directives.doe.gov Office of Environment, Health, Safety and Security
U.S. Department of Energy PAGE CHANGE
Washington, D.C.
Approved: 12-4-2012
Chg 1: 2-27-2015
SUBJECT: PAGE CHANGE TO DOE O 420.1C, FACILITY SAFETY
1. EXPLANATION OF CHANGE. To invoke revised DOE-STD- 1104-2014, Review and
Approval of Nuclear Facility Safety Basis and Safety Design Basis Document, and
revised DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility Documented
Safety Analysis as required methods.
2. LOCATIONS OF CHANGES.
Pages Paragraphs
Throughout
Reference citations and organization codes
Miscellaneous technical editing and punctuation
2 3.c.(4)
3 3.c.(9)
4 4.f – 4.i
5 5.a.(3)
6 5.d.(8) and 5.d.(13)
CRD
Page 1 1.c and 1.e
Page 2 1.f and 2.a
Attachment 2
I-4 Footnote 4
II-1 3.a.(2)
II-2 3.c.(2)(b) – 3.c.(2)(e); 3.f.(1); and 3.f.(2)(a)
II-6 Footnote 5
IV-1 3.b
IV-2 3.d.(1) and 3.d.(2)
Attachment 3
4 3.b
BY ORDER OF THE SECRETARY OF ENERGY:
ELIZABETH SHERWOOD-RANDALL
Deputy Secretary
DOE O 420.1C Chg 1
http://www.directives.doe.gov/
Section 28
Untitled
1. OBJECTIVE. To establish facility and programmatic safety requirements for the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), for:
a. Nuclear safety design criteria;
b. Fire protection;
c. Criticality safety;
d. Natural phenomena hazards (NPH) mitigation; and,
e. Cognizant system engineer (CSE) program.
Facility safety requirements for explosive, chemical, and industrial hazards are contained in other DOE rules and directives.
2. CANCELLATIONS. This Order (O) cancels: DOE O 420.1B, Chg 1, Facility Safety, dated 04-19-10; DOE Guide (G) 420.1-2, Guide for the Mitigation of Natural Phenomena Hazards for DOE Nuclear Facilities and Nonnuclear Facilities, dated 03-28-00; and, DOE G 420.1-3, Implementation Guide for DOE Fire Protection and Emergency Services Programs for Use with DOE O 420.1B, Facility Safety, dated 09-27-07. Cancellation of a directive does not, by itself, modify, or otherwise, affect any contractual or regulatory obli
3. APPLICABILITY.
a. Departmental Applicability. This Order applies to all DOE elements with responsibility for design, construction, management, operation, decontamination, decommissioning, or demolition of government-owned or government-leased facilities and onsite contractor-leased facilities used for DOE mission purposes.
The NNSA Administrator will ensure that NNSA employees comply with their respective responsibilities under this directive. Nothing in this Order will be construed to interfere with the NNSA Administrator’s authority under section 3212(d) of Public Law (P.L.) 106-65, National Defense Authorization Act for Fiscal Year 2000, to establish Administration-specific policies, unless disapproved by the Secretary.
b. DOE Contractors. Except for the equivalencies and exemptions in Section 3.c, the CRD (see Attachment 1 of this Order) sets forth requirements of this Order that will apply to contracts that include the CRD. The CRD, or its requirements, must be inserted into all contracts that require design, construction, management, operation, decontamination, decommissioning, or demolition of government-owned and government-leased facilities.
c. Equivalencies and Exemptions.
(1) Requests for equivalencies and exemptions to the requirements of this Order are processed in accordance with DOE O 251.1C, Departmental Directives Program, dated 01-15-09. Central Technical Authority (or designee) concurrence is required for both exemptions and equivalencies to this Order for nuclear facilities. (Note: This includes exemptions to DOE technical standards and industry codes, and standards required by this Order.)
(2) Equivalencies to DOE technical standards, as well as industry codes, and standards, determined to be applicable to the facility design or operations must demonstrate an equivalent level of safety (i.e., meets or exceeds the level of protection) and must be approved by the DOE field element. The DOE field element must follow provisions for relief if specified in DOE technical standards and industry codes and standards. (Note: Different codes and standards may use different terminology for relief; e.g., f
(3) Equivalency. In accordance with the responsibilities and authorities assigned by Executive Order 12344, codified in 50 U.S.C. sections 2406 and 2511, and to ensure consistency through the joint Navy/DOE Naval Nuclear Propulsion Program, the Deputy Administrator for Naval Reactors (Director) will implement and oversee requirements and practices pertaining to this Directive for activities under the Director’s cognizance, as deemed appropriate.
Section 29
(4) Exemption. This Order does not apply to activities that are regulated by the Nuclear Regulatory Commission (NRC) or a state under an agreement with the NRC, including activities certified by the NRC under Section 1701 of the Atomic Energy Act. DOE orders, regulations, technical standards, and/or guidelines will apply to activities where the NRC does not exercise regulatory authority or by agreement with NRC.
(5) Exemption. This Order does not apply to transportation activities that are regulated by the Department of Transportation.
(6) Exemption. The following portions of this Order do not apply to accelerator facilities that are covered by DOE O 420.2C, Safety of Accelerator Facilities, dated 07-21-11: (1) nuclear safety design requirements, and (2) system engineer program requirements.
(7) Exemption. Specific, individual requirements of this Order do not apply to Nuclear Explosive and Weapons Surety Program activities for the prevention of nuclear detonations if application of such specific requirements would compromise the safety and effectiveness of these activities. In the event of such conflicts between specific requirements of this Order and those of DOE O 452.1D, Nuclear Explosive and Weapon Surety Program, dated 04-14-09 or DOE O 452.2D, Nuclear Explosive Safety, dated 04-14-09, th
(8) Exemption. This Order does not apply to the Bonneville Power Administration, in accordance with Secretarial Delegation Order Number 00-033.00B to the Bonneville Power Administrator and Chief Executive Officer, dated 07-20-09.
(9) Exemption. The design requirements in this Order do not apply to projects that have reached a high level of design maturity, as determined by the appropriate Secretarial Offices, as of the issuance date of this Order. Examples of projects that have reached a high level of design maturity include projects that have completed the critical decision (CD)-2 milestone or those projects that have completed the CD-1 milestone with a high level of design maturity. This exemption is provided to control project co
(10) Exemption. This Order does not apply to off-site office facilities that are owned or leased by the General Services Administration.
d. Government-Owned, Government-Operated Facilities. The CRD (see Attachment 1 of this Order) sets forth requirements that must also be applied to DOE government-owned, government-operated facilities. Government operators must comply with the requirements in the CRD, as set forth in Attachment 1 of this Order.
4. REQUIREMENTS. DOE must:
a. Approve and oversee contractor programs, as specified in Section 5 of this Order;
b. Implement the requirements in Attachment 1 of this Order for government-owned government-operated facilities;
c. Provide oversight of the contractor CSE program and the operability of safety systems under the purview of the CSE program;
d. Document any operational responsibilities that are assigned to the contractor regarding the authority having jurisdiction (AHJ) for matters involving fire protection as defined by the National Fire Protection Association (NFPA) codes;
e. Document any authorities associated with the building code official, as defined in DOE Standard (STD)-1066-2012, Fire Protection, that are assigned to the contractor;
f. Establish an integrated site-wide wildland fire management plan, consistent with the relevant portions of the Federal Wildland Fire Management Policy;
Section 30
g. Direct its contractors, as applicable, to use DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility Documented Safety Analysis, for preparing documented safety analyses, when the DOE-STD-3009 method is used to satisfy 10 Code of Federal Regulations (C.F.R.) Part 830, Nuclear Safety Management, requirements for new DOE non-reactor nuclear facilities and major modifications to existing DOE non-reactor nuclear facilities [note: for such major modifications to existing non-reactor nuclear facilities,
h. Direct its contractors, as applicable, to use DOE-STD-3009-2014, for reviewing and revising applicable documented safety analyses, when the DOE-STD-3009 method is used to satisfy 10 C.F.R. Part 830 requirements for existing DOE non-reactor nuclear facilities that have mitigated off-site dose estimates greater than 25 rem; and,
i. Review and approve safety basis and safety design basis documents in accordance with DOE-STD-1104-2014, Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Documents.
5. RESPONSIBILITIES.
a. Secretarial Officers.
(1) Ensure that the requirements of this Order and the CRD are implemented for facilities, activities, or programs under their cognizance. Review, and where justified, approve requests for equivalencies and exemptions to the requirements of this Order, processed in accordance with DOE O 251.1C.
(2) In accordance with Section 3.c.(1) of this Order, approve the basis for not including multiple physical barriers to prevent or mitigate the unintended release of radioactive materials to the environment, as part of the hazard
category 1, 2 and 3 nuclear facility designs, where justified by sound technical basis.
(3) Review and approve safety basis and safety design basis documents in accordance with DOE-STD-1104-2014.
b. Associate Under Secretary, Office of Environment, Health, Safety and Security.
(1) Develop and maintain policy, requirements, guidance, and technical standards relating to this Order and the CRD.
(2) Provide technical advice and assistance on the implementation of policy, requirements, guidance, and technical standards related to this Order and the CRD.
(3) Provide comments on requests for exemptions from requirements of this Order.
c. Director, Office of Independent Enterprise Assessments.
(1) Plan and conduct independent oversight reviews of implementation of the requirements of this Order and the CRD (see DOE O 226.1B, Implementation of Department of Energy Oversight Policy, dated 04-25-11, and DOE O 227.1, Independent Oversight Program, dated 08-30-11, for details).
d. Heads of Field Elements.
(1) Ensure that the facilities, activities, and programs under their purview operate in compliance with the requirements of this Order and the CRD.
(2) Identify contracts to which the CRD applies and notify contracting officers when contracts are affected by this Order.
(3) Review and, where justified, approve equivalencies to DOE technical standards and industry codes and standards determined to be applicable to the facility design or operations.
(4) Approve contractors’ emergency services organization baseline needs assessments (BNAs) that meet the requirements in Attachment 2, Chapter II, Section 3.e.(1) of this Order.
(5) Approve contractors’ fire protection program (this may be accomplished in conjunction with 10 C.F.R. Part 851, Worker Health and Safety Program).
Section 31
(6) Fulfill the roles and responsibilities for the AHJ for matters involving fire protection, as defined by the NFPA, including documentation of any delegation or assignment of related responsibilities.
(7) Fulfill the roles and responsibilities for the building code official, as defined in DOE-STD-1066-2012, including documentation of any delegation or assignment of related responsibilities.
(8) Perform responsibilities of ‘owner,’ or other equivalent term in the application of DOE technical standards or industry codes and standards, including documentation of any delegation or assignment of related responsibilities. .
(9) Approve the contractors’ criticality safety program documentation, ensure that it meets requirements in Chapter III of Attachment 2 of this Order. (This may be accomplished through the safety basis documentation approval process.)
(10) Approve periodic NPH assessment evaluations, any recommended update actions, and any recommended upgrade plans, in accordance with Chapter IV of Attachment 2 of this Order.
(11) Provide oversight for contractor CSE programs and the operability of associated safety systems.
(12) Consistent with DOE O 226.1B, establish and implement an appropriate self-assessment and oversight program for the elements of this Order.
(13) In accordance with DOE-STD-1104-2014, review and approve safety basis and safety design basis documents.
e. Contracting Officers. Incorporate the CRD, or its requirements, into affected contracts and procurement requests in a timely manner when notified.
f. Central Technical Authorities.
(1) Review and, where justified, concur on requests for equivalencies and exemptions to the requirements of this Order, processed in accordance with DOE O 251.1C.
(2) Provide support, as requested by the DOE field element, on review of equivalencies to DOE technical standards and industry codes and standards determined to be applicable to the facility design or operations.
6. REFERENCES AND ACRONYMS. References and acronyms can be found in Attachment 4 of this Order.
7. CONTACT. Address inquiries to the Office of Environment, Health, Safety and Security; Office of Nuclear Safety, 301-903-3331.
CONTRACTOR REQUIREMENTS DOCUMENT DOE O 420.1C, FACILITY SAFETY
1. GENERAL REQUIREMENTS.
a. This CRD establishes facility safety requirements for design, construction, operation, management, decontamination, decommissioning and demolition of DOE sites or facilities. Regardless of the performer of the work, the contractors are responsible for complying with the requirements of this CRD. The contractors are responsible for flowing down the requirements of this CRD to subcontractors at any tier, to the extent necessary, to ensure the contractors’ compliance with the requirements.
b. Contractors must satisfy the requirements set forth in Attachments 2 and 3 of DOE O 420.1C.
c. For design and construction activities, contractors must identify the applicable industry codes and standards, including the International Building Code (IBC), and the applicable DOE requirements and technical standards. If approved by the responsible field element manager, state, regional, and local building codes may be used in lieu of the IBC upon contractor submission of a report that demonstrates that implementation of the substituted code for the specific application will meet or exceed the level o
Section 32
d. Contractors must satisfy the requirements (i.e., mandatory statements) in DOE technical standards and industry codes and standards that are identified as applicable in accordance with Section 1.c above, unless relief is approved in accordance with Section 2, below.
e. When the DOE-STD-3009 methodology is used to satisfy 10 Code of Federal Regulations (C.F.R.) Part 830, Nuclear Safety Management, safety basis requirements, DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility Documented Safety Analysis, must be used for new DOE non-reactor nuclear facilities and major modifications to existing DOE non-reactor nuclear facilities. Note: for such major modifications to existing non-reactor nuclear facilities, the appropriate Secretarial Officer, with concurrence b
f. DOE-STD-3009-2014 must be used for existing DOE non-reactor nuclear facilities that use the DOE-STD-3009 method to satisfy 10 C.F.R. 830 requirements when those facilities have mitigated off-site dose estimates greater than 25 rem.
2. RELIEF FROM REQUIREMENTS, CODES AND STANDARDS.
a. Requests for equivalencies and exemptions to the requirements of this attachment are processed in accordance with DOE O 251.1C, Departmental Directives Program, dated 01-15-09. For such equivalencies and exemptions, DOE O 251.1C requires approval, in consultation with the Office of Primary Interest, by the program secretarial officer or designee, or in the case of NNSA, by the administrator or designee. Requests for equivalencies and exemptions must be provided to the responsible contracting officer for
b. Equivalencies to DOE technical standards and industry codes and standards determined to be applicable to the facility design or operations must demonstrate an equivalent level of safety (i.e., meets or exceeds the level of protection) and be approved by the DOE field element.
3. REFERENCES. Attachment 4 of DOE O 420.1C provides a list of reference documents: rules, directives, guidance, DOE technical standards, and industry codes and standards.
ATTACHMENT 2. FACILITY SAFETY REQUIREMENTS
CHAPTER I. NUCLEAR SAFETY DESIGN CRITERIA
1. OBJECTIVE. To establish requirements for safety design of DOE hazard category 1, 2, and 3 nuclear facilities to support implementation of DOE Policy (P) 420.1, Department of Energy Nuclear Safety Policy, dated 02-08-111.
2. APPLICABILITY.
a. This chapter applies to the design and construction of:
(1) New hazard category 1, 2, and 3 nuclear facilities, as defined by 10 C.F.R. Part 830; and,
(2) Major modifications to hazard category 1, 2, and 3 nuclear facilities, as defined in 10 C.F.R. Part 830, that could substantially change the facility safety basis (Note: See DOE Standard (STD)-1189-2008, Integration of Safety into the Design Process, for criteria and discussion on major modifications).
b. This chapter does not impose requirements on existing facilities, except for major modifications2 to those facilities. The requirements of this chapter may be used to develop comparisons of existing facilities to the requirements for new facilities, as one aide to judgment when evaluating the costs and benefits of non-mandatory upgrades to existing facilities.
c. Except for the requirements of Section 3.b.(3), this chapter does not apply to nuclear deactivation or decontamination and decommissioning activities at end-of-facility-life if the safety analysis demonstrates that adequate protection is provided consistent with the requirements of 10 C.F.R. Part 830 through alternate means and it is not cost beneficial to apply the provisions of this chapter for the limited remaining life of the activity.
Section 33
3. REQUIREMENTS.
a. Integration of Safety with Design.
(1) Safety must be integrated into the design early in, and throughout, the design process through use of DOE-STD-1189-2008.
(2) Safety analyses must be used to:
(a) identify safety-class and safety-significant structures, systems and components (SSCs) needed to fulfill the safety functions in order to prevent and/or mitigate design basis accidents, including natural and man-induced hazards and events;
(b) identify the safety functional requirements of the safety-class and safety-significant SSCs; and,
(c) identify specific administrative controls (SACs) needed to fulfill safety functions. (Note: See DOE-STD-1186-2004, Specific Administrative Controls, for details on specific administrative controls.)
b. Nuclear Facility Design.
(1) The nuclear facility design must include multiple layers of protection (as part of the design defense-in-depth) to prevent or mitigate the unintended release of radioactive materials into the environment.
(2) Defense-in-depth must include all of the following:
(a) choosing an appropriate site;
(b) minimizing the quantity of material-at-risk;
(c) applying conservative design margins;
(d) applying quality assurance;
(e) using successive/multiple physical barriers for protection against radioactive releases (Note: If an exemption to having multiple barriers is required, it is the Secretarial Officer’s responsibility to approve, or disapprove, the exemption for not including multiple physical barriers);
(f) using multiple means to ensure safety functions are met by—
1 controlling processes;
2 maintaining processes in safe status;
3 providing preventive and/or mitigative controls for accidents with the potential for radiological releases; and,
4 providing means for monitoring facility conditions to support recovery from upset or accident conditions;
(g) using equipment in combination with administrative controls that—
1 restrict deviation from normal operations;
2 monitor facility conditions during and after an event; and,
3 provide for response to accidents to achieve a safe condition;
(h) providing means to monitor accident releases as required for emergency response (see DOE O 151.1C, Comprehensive Emergency Management System, dated 11-02-05, for detailed requirements); and,
(i) establishing emergency plans for minimizing the effects of an accident (see DOE O 151.1C for detailed requirements).
(3) Hazard category 1, 2, and 3 nuclear facilities with uncontained radioactive materials (as opposed to materials determined by safety analyses to be adequately contained within qualified drums, grout, or vitrified materials) must have the means to confine the uncontained radioactive materials to minimize their potential release in facility effluents during normal operations and during and following accidents, up to and including design basis accidents (DBAs). Confinement design must include the following:
(a) For a specific nuclear facility, the number, arrangement, and characteristics of confinement barriers as determined on a case-by case basis.
(b) The type, quantity, form, and conditions for dispersing the radioactive material in the confinement system design.
(c) An active confinement ventilation system as the preferred design approach for nuclear facilities with potential for radiological release.3 Alternate confinement approaches may be acceptable if a technical evaluation demonstrates that the alternate confinement approach results in very high assurance of the confinement of radioactive materials.
Section 34
(d) Documentation of the adequacy of confinement systems consistent with the safety in design process as described in DOE-STD-1189-2008.
(4) Hazard category 1, 2, and 3 nuclear facilities must be designed to:
(a) facilitate safe deactivation, decommissioning, decontamination, and demolition at the end of facility life, including incorporation of design considerations during the operational period that facilitate future decontamination and decommissioning;
(b) facilitate inspections, testing, maintenance, repair, and replacement of safety-SSCs as part of a reliability, maintainability, and availability program with the objective of maintaining the facility in a safe state;
(c) keep occupational radiation exposures within regulatory limits, and as low as reasonably achievable;
(d) provide controls consistent with the hierarchy described in DOE-STD-1189-2008; and,
(e) protect against chemical hazards and toxicological hazards consistent with DOE-STD-1189-2008 and direction from the responsible program office. Appendix B of DOE-STD-1189-2008 provides additional guidance for protection against chemical hazards and toxicological hazards.
(5) Facility process systems must be designed to minimize waste production and mixing of radioactive and non-radioactive wastes.
(6) Safety-SSCs and safety software must be designed to perform their safety functions when called upon.
(7) Active safety-class systems must be designed to meet single failure4 criterion.
(8) DOE G 420.1-1A provides an acceptable method to meet the requirements stated in this chapter. DOE O 251.1C requires that any implementation selected must be justified to ensure that an adequate level of safety commensurate with the identified hazards is achieved.
(9) New DOE nuclear reactors must comply with the requirements of this attachment, as well as the design requirements of DOE O 5480.30 Chg 1, Nuclear Reactor Safety Design Criteria, dated 01-19-93.
(10) Critical experiments facilities must be designed and operated in accordance with American National Standards Institute (ANSI) and the American Nuclear Society (ANS) standards, ANSI/ANS-1-2000, Conduct of Critical Experiments, or ANSI/ANS-14.1-2004, Operation of Fast Pulse Reactors.
(11) Facility design must also be integrated with other design requirements, as applicable, including explosive safety, industrial safety, and nuclear explosive safety (if applicable).
CHAPTER II. FIRE PROTECTION
1. OBJECTIVE. To establish requirements for comprehensive fire protection programs for DOE facilities and emergency response organizations to:
a. Minimize the likelihood of occurrence of a fire-related event;
b. Minimize the consequence of a fire-related event affecting the public, workers, environment, property and missions; and,
c. Provide a level of safety protection consistent with the “highly protected risk” class of industrial risks.
2. APPLICABILITY. This chapter applies to organizations that have responsibility for the design, construction, maintenance, or operation of government-owned or government-leased facilities and on-site contractor-leased facilities used for DOE mission purposes. For leased facilities that are not nuclear hazard category 1, 2, or 3 facilities, the design requirements of Section 3.c of this chapter apply to the extent determined by the field element. (Note: DOE-STD-1066-2012, Fire Protection, provides guidance
3. REQUIREMENTS.
a. General Fire Protection Program Requirements.
Section 35
(1) Policy Statement. A policy must be established that affirms the contractor’s commitment to provide a comprehensive fire protection and emergency response program that meets the requirements of this chapter, related DOE directives, and other applicable requirements.
(2) Codes and Standards. The applicable building code and National Fire Protection Association (NFPA) codes and standards must be identified in the fire protection and emergency response programs. (Note: see Attachment 1, Section 2 for obtaining equivalencies and exemptions to the applicable codes and standards).
(a) Facilities and major modifications thereto, must be constructed to meet applicable codes and standards that are in effect when design criteria are approved (otherwise known as the code of record, or COR). Other facility changes must meet the most recent applicable codes and standards to the extent determined by the authority having jurisdiction (AHJ).
(b) Provisions of subsequent editions of codes or standards (promulgated after the COR is established) are mandatory only to the extent that they are explicitly stated to be applicable to existing facilities.
(c) Conflicts between DOE O 420.1C, NFPA codes and standards, and --the applicable building code must be resolved as follows:
1 Requirements of DOE O 420.1C take precedence over all NFPA and building code requirements and are subject to the relief requirements of DOE O 420.1C.
2 Conflicts between NFPA requirements and the applicable building code requirements are resolved by the head of the field element following consultation with designated building code and fire protection subject matter experts.
b. Fire Protection Program Administration.
(1) Documentation. A documented fire protection program that includes the elements and requirements identified in this chapter for design, operations, emergency response, fire analysis and assessments, wildland fire, and specific fire protection program criteria must be developed, implemented, and maintained by the contractor. Contractor must submit this documented fire protection program to the DOE field element for review and approval (note: this may be accomplished in conjunction with submittals required
(2) Self-Assessments. A documented comprehensive self-assessment of the fire protection program must be performed at least every three years, or at a frequency with appropriate justification approved by the DOE head of field element.
c. Design.
(1) Design Process. A process must be established to ensure that fire protection program requirements are documented and incorporated into plans and specifications for design of new facilities and modifications to existing facilities.
(2) Protection Thresholds.
(a) New facilities (non-relocatable) exceeding 5,000 sq. ft. of floor area must be of Type I or Type II construction, as defined in the applicable building codes.
(b) Automatic fire suppression systems must be provided throughout new facilities exceeding 5,000 sq. ft. of floor area or where a maximum possible fire loss exceeds $5 million (in 2012 dollars), unless the NFPA code(s) allow for specific relief within the facility.
(c) Automatic fire suppression systems must be provided throughout facilities in which any of the following conditions exist:
1 where required by safety basis document (for example, to prevent loss of safety functions or provide defense-in-depth);
2 significant life safety hazards;
Section 36
3 where fire may cause unacceptable mission or program interruption if automatic fire suppression systems are not provided;
4 where a modification to an existing facility would cause the maximum possible fire loss (MPFL) to exceed $5 million (in 2012 dollars) for the facility; or,
5 where a modification to an existing facility results in facility floor area that exceeds 5,000 sq. ft.
(d) For property protection, multiple fire protection approaches, such as a fire suppression system and a fire detection and alarm system, must be provided in areas where the MPFL exceeds $150 million (in 2012 dollars) (refer to DOE-STD-1066-2012).
(e) For property protection, fire areas must be established such that the MPFL for each fire area does not exceed $350 million (in 2012 dollars). Fire area walls or other separation approaches may be used to meet this requirement.
(3) Fire Protection and Life Safety Systems.
(a) Fire Suppression. The inadvertent operation or failure of fire suppression systems must not result in the loss of function of safety-class or safety-significant systems. (Note: This requirement addresses proper design of the fire suppression system to ensure it does not impact safety systems and is not intended to drive need for redundancy in safety-significant system design.)
(b) Fire Barriers. Complete fire-rated construction and barriers, commensurate with the applicable codes and/or safety basis requirements, must be provided to isolate hazardous areas and minimize fire spread and loss potential consistent with limits as established in this chapter. Fire barrier locations and construction must be documented.
(c) Fire Detection. Automatic fire detection must be provided to the extent required by applicable industry codes and standards.
(d) Life Safety. Requirements for life safety and means of egress are provided in 10 C.F.R. Part 851, Worker Health and Safety
Program. Other codes and standards, such as the International Building Code, and NFPA 101, Life Safety Code, may also be applicable.
(e) Water Supply and Distribution. A reliable and adequate water supply and distribution system must be provided for fire suppression, as documented through appropriate analysis.
(f) Emergency Notification. A means to notify responders and building occupants of a fire must be provided (e.g., fire alarm signaling system and/or site-wide mass notification capabilities for major incidents affecting the site).
(4) Special Hazards. Fire protection systems or features, and appropriate procedures to address fire and related hazards, that are special or unique to DOE and not addressed by industry codes and standards, must be established.
d. Operations.
(1) Criteria and Procedures. Comprehensive, written fire protection criteria and procedures must be established to implement the fire protection program requirements that include:
(a) site-specific requirements;
(b) staff organization, resources, training, roles and responsibilities;
(c) inspection, testing, and maintenance of fire protection systems;
(d) use and storage of combustible, flammable, radioactive, and hazardous materials;
(e) a “hot-work” control program;
(f) identification and tracking of fire protection system impairments;
(g) fire prevention measures (e.g., combustible loading, hot-work, and ignition source controls);
(h) facility and fire hazard analysis (FHA) assessment programs;
(i) design and construction oversight; and,
(j) equivalencies, exemptions, modifications, and variances processes.
Section 37
(2) Implementation. To ensure effective implementation of these requirements, the following elements must be addressed.
(a) Staffing. The contractor must ensure it has access to qualified, trained fire protection staff (that includes fire protection engineers, technicians, and fire fighting personnel) needed to implement the requirements of this chapter.
(b) Design Review. Documented review of plans, specifications, procedures, and acceptance tests must be conducted by a fire protection engineer (FPE) (Note: A definition for FPE is provided in DOE-STD-1066-2012). A process must be established to oversee fire protection-related activities from conceptual design to final acceptance.
(c) Equivalencies and Exemptions. A process must be established for developing and requesting DOE AHJ approval of fire protection equivalencies and exemptions to fire protection requirements. Records of technical justification must be maintained and reevaluated for appropriateness as activities or operations change.
(d) Assigned Authority. If assigned, the contractor must document the level of authority to execute the duties and responsibilities of the AHJ, in accordance with the contractor’s overall fire protection and emergency response programs.
e. Emergency Response. Provide emergency response capabilities, as necessary, to meet site needs as established by the baseline needs assessment (BNA), safety basis requirements, and applicable regulations, codes and standards.
(1) Baseline Needs Assessment. A BNA of the fire protection and emergency response organization must be conducted and the BNA must:
(a) establish capabilities to provide:
1 effective response to extinguish fires;
2 emergency medical, rescue and hazardous materials response; and,
3 staffing, apparatus, facilities, equipment, training, pre-incident plans, mutual aid, and procedures.
(b) reflect applicable requirements of NFPA codes and standards, and DOE direction;
(c) be submitted to the DOE field element for approval;
(d) be reviewed at least every three years, or whenever a significant new hazard that is not covered by the current BNA is introduced,
and be updated as appropriate (Note: If no update is necessary, this result must be documented following the review); and,
(e) be incorporated into site emergency plans, FHAs, and safety basis documentation.
(2) Pre-Incident Plans. Pre-incident strategies, plans, and standard operating procedures must be established to enhance the effectiveness of manual fire suppression activities, including areas within or adjacent to, moderator-controlled areas. The criticality safety staff must review pre-incident plans and procedures related to moderator-controlled areas.
(3) Manual Fire Suppression Activities.
(a) Physical access and appropriate equipment that is accessible for effective manual fire fighting intervention must be provided.
(b) Procedures governing the use of fire fighting water or other neutron moderating materials to suppress fire within, or adjacent to, moderation controlled areas must be established and reviewed by a criticality subject matter expert prior to release.
(c) Procedures governing fire fighting techniques to be used during deactivation, decontamination, and demolition phases, must be established, when applicable.
(d) Where no alternative exists to criticality safety restrictions on the use of water for fire suppression, the need for such restrictions must be fully documented with written technical justification.
Section 38
f. Fire Hazard Analyses and Facility Assessments.
(1) Fire Hazards Analyses. FHAs, using a graded approach, must be conducted for the following cases: (1) all hazard category 1, 2, and 3 nuclear facilities and major modifications thereto; (2) facilities that represent unique fire safety risks; (3) new facilities or modifications to existing facilities with value greater than $150 million (in 2012 dollars5); and (4) when directed by the responsible DOE authority. The FHAs must be:
(a) performed under the direction of an FPE;
(b) reviewed every three years by an FPE and revised as appropriate (Note: If no revision is necessary, this result must be documented following the review);
(c) revised when
1 changes to the facility structure or layout, processes, occupancy, safety basis documentation or BNA impacts the analysis in the FHA;
2 a modification to an associated facility or process adds a significant new fire safety risk; or,
3 the periodic (three-year) review identifies the need for changes;
(d) integrated into safety basis documentation.
(2) Facility Assessments. Fire protection assessments must be conducted:
(a) annually, or at a frequency with appropriate justification approved by the DOE head of field element, for facilities with a replacement value in excess of $100 million (in 2012 dollars), facilities considered a high hazard, or those in which vital programs are involved, as defined by the responsible DOE authority; and,
(b) at least every three years, or at a frequency with appropriate justification approved by the DOE head of field element, for remaining low and ordinary hazard facilities.
g. Wildland Fire. An integrated site-wide wildland fire management plan, consistent with the Federal Wildland Fire Management Policy, must be developed and implemented in accordance with the relevant portions of the NFPA 1143, Standard for Wildland Fire Management, 2014.
h. Specific Fire Protection Program Criteria. DOE-STD-1066-2012 provides acceptable methods for implementing the requirements in DOE O 420.1C; other methods may be acceptable. Any alternate approach must provide an equivalent level of safety.
CHAPTER III. NUCLEAR CRITICALITY SAFETY
1. OBJECTIVE. To establish requirements for developing and implementing nuclear criticality safety programs (CSPs) for nuclear facilities and activities, including materials transportation activities, which provide adequate protection to the public, workers, and the environment.
2. APPLICABILITY. This chapter is applicable to DOE elements and DOE contractors with responsibility for nuclear facilities and activities that involve or will potentially involve radionuclides in such quantities that are equal to or greater than the single parameter limits for fissionable materials listed in ANSI/ANS-8.1-2014, Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors, and ANSI/ANS-8.15-1981, Nuclear Criticality Control of Special Actinide Elements. These limits m
3. REQUIREMENTS.
a. A CSP document must be developed and maintained that describes how the contractor will implement the requirements in this chapter, including the standards invoked by this chapter.
b. The CSP document must describe how the contractor will satisfy the requirements of the ANSI/ANS-8 series of nuclear criticality safety standards that are in effect as of the date this Order, unless otherwise modified or approved by DOE. The CSP document must include an explanation as to why any recommendation in applicable ANSI/ANS-8 standards is not implemented.
Section 39
c. The CSP document must be submitted to and approved by DOE.
d. Criticality safety evaluations must be conducted in accordance with DOE-STD-3007-2007, Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Non-Reactor Nuclear Facilities, or by other documented methods approved by DOE.
e. Fissile Material Accumulation Control. Facilities that conduct operations using fissionable material in a form that could inadvertently accumulate in significant quantities must include procedures for detecting and characterizing accumulations. The following national standards provide relevant guidance for procedure development: ASTM C1455, Standard Test Method for Nondestructive Assay of Special Nuclear Material Holdup Using Gamma-Ray Spectroscopic Methods; and any other nondestructive assay consensus o
f. Criticality safety evaluations must show that entire processes involving fissionable materials will remain subcritical under normal and credible abnormal conditions, including those initiated by design basis events.
g. The criteria and process for developing the guidelines for fire fighting in areas within or adjacent to moderator-controlled areas must be coordinated with fire fighting pre-incident plans and procedures.
CHAPTER IV. NATURAL PHENOMENA HAZARDS MITIGATION
1. OBJECTIVE. To establish requirements for DOE facility design, construction, and operations to protect the public, workers, and the environment from the impact of natural phenomena hazards (NPH) events (e.g., earthquake, wind, flood, lightning, snow and volcanic eruption).
2. APPLICABILITY. Requirements in this chapter apply to all government-owned and government-leased nuclear and nonnuclear facilities and sites. Design requirements (Sections 3.a, 3.b, and 3.c, below) apply to new facilities, major modifications, and modifications that may be warranted based on periodic NPH assessment and upgrade requirements.
3. REQUIREMENTS.
a. General. Facilities must be designed, constructed, maintained, and operated to ensure that SSCs will be able to perform their intended safety functions effectively under the combined effects of NPH and normal loads defined in the applicable building codes contained in facilities’ CORs. Nuclear facility safety functions that the SSCs must perform during an NPH must be defined in the facility’s safety basis documentation. Safety functions include:
(1) confinement/containment of hazardous materials;
(2) protection of occupants and co-located workers of the facility and the public;
(3) continued operation of essential facilities and equipment;
(4) safe shutdown of hazardous facilities and equipment; and,
(5) maintenance of personnel access to areas needed for responding to accidents during NPH events.
b. NPH Design Criteria. All new facilities and major modifications must satisfy the applicable requirements and criteria contained in DOE-STD-1020-2012, Natural Phenomena Hazards Analysis and Design Criteria for DOE Facilities. (Note: Requirements for non-nuclear facilities are described in Section 2.1 of DOE-STD-1020-2012.)
c. NPH Accident Analysis. The NPH analysis supporting design and construction of facilities and safety-SSCs must be documented and include evaluation of:
(1) potential damage to and failure of safety-SSCs resulting from both direct and indirect NPH events; and,
(2) common cause/effect and interactions resulting from failures of other nearby facilities or other SSCs in the same facility caused by or induced by an NPH event.
Section 40
d. Review and Upgrade Requirements for Existing DOE Nuclear Facilities (Hazard Category 1, 2 and 3).
(1) Existing facility or site NPH assessments must be reviewed at least every 10 years for any significant changes in data, criteria, and assessment methods that would warrant updating the assessments. Sections 9.0 and 9.2 of DOE-STD-1020-2012 contain criteria and guidance for performing these reviews. The review results, along with any recommended update actions, must be submitted to the head of the field element for approval. If no update is necessary, this result must be documented following the review.
(2) If a new assessment of NPH indicates deficiencies in existing SSC design, a plan for upgrades must be developed and implemented on a prioritized schedule, based on the safety significance of the upgrades, time or funding constraints, and mission requirements. The upgrade plans must also be submitted to the head of the field element for approval. Section 9.3 of DOE-STD-1020-2012 contains guidance on performing upgrade evaluations.
e. Seismic Detection. DOE sites with nuclear or hazardous materials must have instrumentation or other means to detect and record the occurrence and severity of seismic events.
f. Post-Natural Phenomena Procedures. Facilities or sites with hazardous materials must have procedures for inspecting facilities for damage from severe NPH events and placing a facility into a safe configuration when damage has occurred.
CHAPTER V. COGNIZANT SYSTEM ENGINEER PROGRAM
1. OBJECTIVE. To establish requirements for a cognizant system engineer (CSE) program for hazard category 1, 2, and 3 nuclear facilities and to ensure continued operational readiness of the systems within its scope.
2. APPLICABILITY. Requirements of this chapter apply to all hazard category 1, 2, and 3 nuclear facilities that have attained operational status (such as achieving Critical Decision 4 (CD-4) per DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, dated 11-29-10) and have:
a. Active safety-class or safety-significant SSCs, as defined in the facility’s DOE-approved safety basis documentation; or,
b. Other active systems that perform important defense-in-depth functions, as designated by facility line management.
3. REQUIREMENTS.
a. General. The protocols for implementing the site or facility CSE program must be documented, must include the functions, responsibilities and authorities of CSEs, and must address the following elements:
(1) Identification of systems covered by the CSE program and identification of systems assigned for coverage;
(2) Configuration management;
(3) Support for operations and maintenance; and,
(4) Training and qualifications of CSEs.
b. CSE Program Coverage.
(1) The CSE program must be applied to active safety-class and safety-significant systems, as defined in the facility’s DOE-approved safety basis, as well as to other active systems that perform important
defense-in-depth functions, as designated by facility line management. The designated systems and the rationale for assignment of CSEs in a graded approach (see below) must be documented.
(2) A graded approach must be used in applying the requirements of the CSE program. The program must be tailored to facility hazards and the systems relied upon to prevent or mitigate those hazards, considering:
Section 41
(a) Remaining Facility Lifetime and the Safety Significance of Remaining Operations. Facilities undergoing deactivation or decontamination/decommissioning may undergo frequent changes, modifications, or removal of systems no longer needed to support the safety basis of those operations. CSE programs may require more CSE attention in these operations than during normal operations. After deactivation, or when a facility is in long-term surveillance and maintenance, there may be less need for CSE attention.
(b) Safety Importance of the System. Not all systems are equal as measured by the likelihood and consequences of the hazard and the accidents that they prevent or mitigate. The level of system documentation detail in configuration management should be tailored to the importance of the system.
(3) A qualified CSE must be assigned to each active system within the scope of the program. Consistent with the graded approach, large, complex, or very important systems may require assignment of more than one CSE. Conversely, a single individual may be assigned to be the CSE for more than one system.
c. Configuration Management.
(1) A documented configuration management program must be established and implemented that ensures consistency among system requirements and performance criteria, system documentation, and physical configuration of the systems within the scope of the program. DOE-STD-1073-2003, Configuration Management Program, describes an acceptable methodology for establishing configuration management programs. The configuration management program must address:
(a) system design documentation;
(b) system assessments;
(c) control of maintenance;
(d) change control; and,
(e) obsolescence.
(2) System design documents and supporting documents must be identified and kept current using formal change control and work control processes. DOE-STD-3024-2011, Content of System Design Descriptions, describes an acceptable methodology to achieve this function. Design documentation must include:
(a) system requirements and performance criteria essential to performance of the system’s safety functions;
(b) the basis for system requirements; and,
(c) a description of how the current system configuration satisfies the requirements and performance criteria.
(3) System assessments must include periodic reviews of system operability, reliability, and material condition. Reviews must assess the system for:
(a) the ability to perform design and safety functions;
(b) physical configuration as compared to system documentation; and,
(c) system and component performance in comparison to established performance criteria.
(4) System maintenance and repair and modification must be controlled through a formal change control process to ensure that changes are not inadvertently introduced and that required system performance is not compromised. Post maintenance or modification testing must be conducted to confirm continued capability to fulfill system requirements.
d. CSE Support for Operations and Maintenance. The CSE must:
(1) ensure that system configuration is being managed effectively (see Section 3.c of this chapter);
(2) remain apprised of operational status and ongoing modification activities;
(3) assist operations review of key system parameters and evaluate system performance;
(4) initiate actions to correct problems;
(5) remain cognizant of system-specific maintenance and operations history and industry operating experience, as well as manufacturer and vendor
Section 42
recommendations and any product warnings regarding their assigned systems;
(6) identify trends from operations and maintenance;
(7) provide assistance in determining operability, correcting out-of-specification conditions, and evaluating questionable data;
(8) provide or support analysis when the system is suspected of inoperability or degradation;
(9) review and concur with design changes, use-as-is, equivalency, and commercial grade dedication determinations; and,
(10) review, and provide input into the development of, and concur on operating, maintenance, and test procedures related to their assigned systems.
e. CSE Qualification Requirements. Qualification requirements for CSEs must be consistent with those defined for Technical Support personnel in DOE O 426.2, Personnel Selection, Training, Qualification, and Certification Requirements for DOE Nuclear Facilities, dated 04-21-10 (see associated CRD), as applicable. Qualification requirements must include knowledge of:
(1) related facility safety bases including safety system functions, safety system performance criteria, and any relationship to specific administrative controls;
(2) system functional classification and bases;
(3) codes and standards applicable to assigned systems;
(4) system design, procurement, replacement, and related quality assurance requirements;
(5) the existing condition of the systems;
(6) related facility operations; and,
(7) vendor manuals, product warnings, and updates related to assigned systems, available (in print or online).
DESIGN CRITERIA FOR SAFETY STRUCTURES, SYSTEMS, AND COMPONENTS
1. OBJECTIVE. To establish requirements for the design and construction of safety-SSCs, both safety-class and safety-significant, by identifying an applicable set of industry codes and standards, as well as Department of Energy (DOE) design criteria, standards and directives (listed in Attachment 4 of DOE Order (O) 420.1C, Facility Safety). Compliance with these requirements will ensure reliable performance of the safety function of safety-SSCs under those conditions and events for which they are intended.
2. APPLICABILITY.
a. This attachment applies to the design and construction of:
(1) new hazard category 1, 2, and 3 nuclear facilities as defined by 10 Code of Federal Regulations (C.F.R.) Part 830, Nuclear Safety Management; and,
(2) major modifications to hazard category 1, 2, and 3 nuclear facilities, as defined in 10 C.F.R. Part 830, that substantially change the facility safety basis.
b. This attachment does not impose requirements on existing facilities, except for major modifications to those facilities. The requirements of this attachment may be used to develop comparisons of existing facilities to the requirements for new facilities.
c. This attachment does not apply to nuclear deactivation or decontamination and decommissioning activities at end-of-facility-life, if the safety analysis demonstrates that adequate protection is provided consistent with the requirements of 10 C.F.R. Part 830 through alternate means and it is not cost-beneficial to apply the provisions of this attachment for the limited remaining life of the activity.
3. REQUIREMENTS. Safety-SSCs must be designed, commensurate with the importance of the safety functions performed, to perform their safety functions when called upon, as determined by the safety analysis.
a. General Design Criteria.
Section 43
(1) Conservative Design Margin. Safety-SSCs must be designed with appropriate margins of safety, as defined in applicable DOE or industry codes and standards.
(2) System Reliability.
(a) The single failure criterion, requirements, and design analysis identified in Institute of Electrical and Electronics Engineers (IEEE) standard (Std) 379-2000, IEEE Standard Application of the Single-Failure Criterion to Nuclear Power Generating Station Safety Systems, must be applied to safety-class SSCs during the design process as the primary method of achieving reliability. American National Standards Institute (ANSI)/American Nuclear Society (ANS) 58.9, Single Failure Criteria for Light Water React
(b) Safety-significant SSCs must be designed to reliably perform all their safety functions. This can be achieved through a number of means, including use of redundant systems/components, increased testing frequency, high reliability components, and diagnostic coverage (e.g., on-line testing, monitoring of component and system performance, and monitoring of various failure modes). DOE STD-1195-2011, Design of Safety Significant Safety Instrumented Systems Used at DOE Nonreactor Nuclear Facilities, provides
(3) Environmental Qualification.
(a) Safety-class SSCs must be designed to perform all safety functions with no failure mechanism that could lead to common cause failures under postulated service conditions. The requirements of IEEE Std 323-2003, IEEE Standard Criteria for Qualifying Class IE Equipment for Nuclear Power Generating Stations, or other applicable standards, must be used to ensure environmental qualifications of safety-class SSCs.
(b) Safety-significant SSCs located in a harsh environment must be evaluated to establish qualified life. This may be accomplished using manufacturers’ recommendations or other appropriate methods.
(4) Safe Failure Modes. The facility design must provide reliable safe conditions and sufficient confinement of hazardous material during and after all design basis accidents. At both the facility- and SSC-level, the design must ensure that most probable modes of failure (e.g., failure to open versus failure to close) will increase the likelihood of a safe condition.
(5) Support System and Interface Design.
(a) Support SSCs must be designed as safety-class or safety-significant SSCs if their failures prevent safety-SSCs or specific administrative controls from performing their safety functions.
(b) Interfaces, such as pressure retention boundaries, electrical supply, instrumentation, cooling water, and other support systems may exist between safety-SSCs and non-safety-SSCs. These interfaces must be evaluated to identify SSC failures that would prevent safety-SSCs from performing their intended safety function. IEEE Std 384-2008, IEEE Standard Criteria for Independence of Class IE Equipment and Circuits, or other applicable standards must be used for physical and electrical separation methods inclu
(6) Protection Against Fire. Safety-class systems must be designed with redundancy or other means, such that safety function is maintained for any postulated fire events that credit the safety-class systems.
(7) Quality Assurance. A quality assurance program must be established that satisfies 10 C.F.R. Part 830, Subpart A, Quality Assurance Requirements, and DOE O 414.1D, Quality Assurance, dated 04-25-11, early in the project, such that safety-SSCs and their associated support systems are designed, procured, fabricated, erected, and tested to standards and quality requirements commensurate with their importance to safety.
Section 44
b. Specific Design Criteria and Use of National Codes and Standards. The selection and use of an appropriate set of applicable codes and standards establishes design criteria to provide assurance that the SSCs are designed to reliably perform their intended functions. The DOE technical standards and industry codes and standards identified in the following sections must be evaluated for applicability.
(1) Structural. Table 1 provides relevant codes and standards. Attachment 2, Chapter IV of DOE O 420.1C provides additional natural phenomena hazards design requirements.
(2)
(3) Mechanical and Process Equipment. Table 2 provides relevant codes and standards.
(4) Ventilation. Table 3 provides relevant codes and standards.
(5) Mechanical Handling Equipment. Table 4 provides relevant codes and standards.
(6) Electrical. Tables 5 and 6 provide relevant codes and standards.
(7) Instrumentation, Control, and Alarm Systems. The design of safety-class instrumentation and control systems must incorporate sufficient independence, redundancy, diversity, and separation to ensure that allsafety-related functions associated with such equipment can be performed. Safety-significant components must be evaluated as to the need for redundancy on a case-by-case basis. DOE-STD-1195-2011 provides an acceptable method for achieving high reliability of safety-significant safety instrumented syst
(8) Fire Protection Systems. DOE-STD-1066-2012, Fire Protection, provides acceptable methods for the design of fire protection systems, including safety-class and safety-significant fire barriers, water supplies, and wet pipe sprinkler systems (see Appendix A of DOE-STD- 1066-2012). Fire protection system designs are also required to address the applicable design requirements for similar safety systems provided in this attachment.
ATTACHMENT 4. REFERENCES AND ACRONYMS
1. REFERENCES. The following reference documents and a few additional information sources are cited to assist in implementing this Directive.
a. Public Law (P.L.).
(1) P.L. 106-65, National Defense Authorization Act for Fiscal Year 2000, Title XXXII, National Nuclear Security Administration, as amended.
(2) P.L. 94-580, as amended, Resource Conservation and Recovery Act of 1976 (RCRA), (42 U.S.C., Sec. 6901, et seq.).
(3) P.L. 83-703, Atomic Energy Act of 1954.
b. Executive Orders (E.O.) and Federal Policies.
(1) E.O. 12344, Naval Nuclear Propulsion Program.
(2) Federal Wildland Fire Management Policy and Implementing Actions. (Available from National Interagency Fire Center)
(3) Secretarial Delegation Order Number 00-033.00B, dated 07-20-09.
c. Code of Federal Regulations (C.F.R.).
(1) 10 C.F.R. Part 830, Nuclear Safety Management.
(2) 10 C.F.R. Part 835, Occupational Radiation Protection.
(3) 10 C.F.R. Part 851, Worker Safety and Health Program.
(4) 29 C.F.R. Part 1910, Occupational Safety and Health Standards.
(5) 29 C.F.R. Part 1910, Subpart G, Section 1910.94, Occupational Health and Environmental Control.
(6) 29 C.F.R. Part 1910, Subpart Z, Section 1910.100, Toxic and Hazardous Substances.
(7) 29 C.F.R. Part 1910, Subpart H, Section 1910.101, Hazardous Materials.
(8) 29 C.F.R. Part 1910, Section 1910.134, Respiratory Protection.
(9) 29 C.F.R. Part 1926, Safety and Health Regulations for Construction.
(10) 48 C.F.R. Part 970, Section 970.5223-1, Integration of Environment, Safety, and Health into Work Planning and Execution.
d. DOE Directives.
Section 45
(1) DOE P 420.1, Department of Energy Nuclear Safety Policy, dated 02-08-11.
(2) DOE O 151.1C, Comprehensive Emergency Management System, dated 11-02-05.
(3) DOE O 226.1B, Implementation of Department of Energy Oversight Policy, dated 04-25-11.
(4) DOE O 227.1, Independent Oversight Program, dated 08-30-11.
(5) DOE O 251.1C, Departmental Directives Program, dated 01-15-09.
(6) DOE O 410.1, Central Technical Authority Responsibilities Regarding Nuclear Safety Requirements, dated 08-28-07.
(7) DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, dated 11-29-10.
(8) DOE O 414.1D, Quality Assurance, dated 04-25-11.
(9) DOE O 420.2C, Safety of Accelerator Facilities, dated 07-21-11.
(10) DOE O 426.1 Chg 1, Federal Technical Capability, dated 11-19-09.
(11) DOE O 426.2, Personnel Selection, Training, Qualification, and Certification Requirements for DOE Nuclear Facilities, dated 04-21-10.
(12) DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities, dated 04-21-10.
(13) DOE O 435.1 Chg 1, Radioactive Waste Management, dated 07-09-99.
(14) DOE O 452.1D, Nuclear Explosive and Weapon Surety Program, dated 04-14-09.
(15) DOE O 452.2D, Nuclear Explosive Safety, dated 04-14-09.
(16) DOE O 5480.30 Chg 1, Nuclear Reactor Safety Design Criteria, dated 01-19-93.
(17) DOE M 435.1-1 Chg 2, Radioactive Waste Management Manual, dated 07-09-99.
(18) DOE G 413.3-21, Cost Estimating Guide, dated 05-09-11.
(19) DOE G 414.1-2B Chg 1, Quality Assurance Program Guide, dated 08-16-11.
(20) DOE G 414.1-4, Safety Software Guide for use with 10 C.F.R 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance, dated 06-17-05.
(21) DOE G 420.1-1A, Nonreactor Nuclear Safety Design Criteria for Use with DOE O 420.1C, Facility Safety, dated 12-04-12.
e. DOE Technical Standards (STDs).
(1) DOE-STD-1020-2012, Natural Phenomena Hazards Analysis and Design Criteria for DOE Facilities.
(2) DOE-STD-1027-1992, Chg 1, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports, September 1997.
(3) DOE-STD-1066-2012, Fire Protection.
(4) DOE-STD-1073-2003, Configuration Management Program.
(5) DOE-STD-1090-2011, Hoisting and Rigging (Formerly Hoisting and Rigging Manual).
(6) DOE-STD-1098-2008, Radiological Control.
(7) DOE-STD-1104-2014, Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Documents.
(8) DOE-STD-1128-2008, Guide of Good Practices for Occupational Radiological Protection in Plutonium Facilities.
(9) DOE-STD-1158-2010, Self-Assessment Standard for DOE Contractor Criticality Safety Programs.
(10) DOE-STD-1186-2004, Specific Administrative Controls.
(11) DOE-STD-1189-2008, Integration of Safety into the Design Process.
(12) DOE-STD-1195-2011, Design of Safety Significant Safety Instrumented Systems Used at DOE Nonreactor Nuclear Facilities.
(13) DOE-STD-1212-2012, Explosives Safety.
(14) DOE-STD-1628-2013, Development of Probabilistic Risk Assessments for Nuclear Safety Applications.
(15) DOE-STD-3007-2007, Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Nonreactor Nuclear Facilities.
(16) DOE-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses, Change Notice 3, March 2006.
(17) DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility Documented Safety Analyses.
Section 46
(18) DOE-STD-3020-2005, Specifications for HEPA Filters Used by DOE Contractors.
(19) DOE-STD-3024-2011, Content of System Design Descriptions.
f. DOE Handbooks (HDBKs).
(1) DOE-HDBK-1132-1999, Design Considerations.
(2) DOE-HDBK-1163-2003, Integration of Multiple Hazard Analysis Requirements and Activities.
(3) DOE-HDBK-1169-2003, Nuclear Air Cleaning Handbook.
g. Department of Defense.
MIL-STD-1472F, Department of Defense Design Criteria Standard: Human Engineering, August 1999.
h. American National Standards Institute/American Concrete Institute (ANSI/ACI).
(1) ACI 349-06, Code Requirements for Nuclear Safety-Related Concrete Structures (ACI 349-06) and Commentary, 2006.
i. American Conference of Governmental Industrial Hygienists (ACGIH).
(1) ACGIH 2096, Industrial Ventilation: A Manual of Recommended Practices for Design, January 2010.
j. American Glovebox Society (AGS).
(1) AGS-G006-2005, Standard of Practice for the Design and Fabrication of Nuclear Application Gloveboxes, 2005.
k. American National Standards Institute/American Institute of Steel Construction (AISC).
(1) AISC 325-11A, Steel Construction Manual, 2011.
(2) AISC 360-10, Specification for Structural Steel Buildings, 2010.
(3) AISC N690-2012, Specification for Safety-Related Steel Structures for Nuclear Facilities, 2012.
l. American National Standards Institute (ANSI).
(1) ANSI N13.1-2011, Guide to Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stacks and Ducts of Nuclear Facilities, 2011.
(2) ANSI N43.2-2001 (R2010), Radiation Safety for X-ray Diffraction and Fluorescence Analysis Equipment, 2001.
(3) ANSI N278.1-1975 (R1992), Self-Operated and Power-Operated Safety-Related Valves Functional Specification Standard, 1975.
(4) ANSI N323D-2002, American National Standard for Installed Radiation Protection Instrumentation, 2003.
(5) ANSI/AIHA Z9.2-2012, Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems, 2012.
(6) ANSI Z358.1-2009, American National Standard for Emergency Eyewash and Shower Equipment, 2009.
m. American National Standards Institute/American Nuclear Society (ANS).
(1) ANSI/ANS-1-2000 (R2007), Conduct of Critical Experiments, 2000.
(2) ANSI/ANS-6.4.2-2006, Specification for Radiation Shielding Materials, 2006.
(3) ANSI/ANS 8 series standards.
(4) ANSI/ANS-8.1-2014, Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors, 2014.
(5) ANSI/ANS-8.3-1997 (R2003), Criticality Accident Alarm Systems, 1997.
(6) ANSI/ANS-8.15-1981 (R2005), Nuclear Criticality Control of Special Actinide Elements, 1981.
(7) ANSI/ ANS-14.1-2004 (R2009), Operation of Fast Pulse Reactors, 2004.
(8) ANSI/ANS-58.8-1994 (R2008), Time Response Design Criteria for Safety-Related Operator Actions, 1994.
(9) ANSI/ANS-58.9-2002 (R2009), Single Failure Criteria for Light Water Reactor Safety-Related Fluid Systems, 1981.
(10) ANSI/ANS-59.3-1992 (withdrawn), Nuclear Safety Criteria for Control Air Systems, 1992.
n. American Petroleum Institute (API).
(1) API-Std 620, Design and Construction of Large, Welded, Low-Pressure Storage Tanks, 2008.
(2) API-Std 650, Welded Tanks for Oil Storage, 2007.
o. American Society of Mechanical Engineers (ASME).
(1) ASME AG-1-2009, Code on Nuclear Air and Gas Treatment, 2009.
(2) ASME BPVC, ASME 2013 Boiler and Pressure Vessel Code, 2013.
(3) ASME B16.5-2009, Pipe Flanges and Flanged Fittings: NPS ½ through NPS 24 Metric/Inch Standard, 2009.
Section 47
(4) ASME B30.2-2011, Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist), 2011.
(5) ASME B31.3-2012, Process Piping, 2012.
(6) ASME B73.1-2001 (R2007), Specifications for Horizontal End Suction Centrifugal Pumps for Chemical Process, 2002.
(7) ASME B73.2-2003 (R2009), Specifications for Vertical In-Line Centrifugal Pumps for Chemical Process, 2005.
(8) ASME NOG-1-2010. Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder), 2010.
(9) ASME NUM-1-2009, Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type), 2010.
(10) ASME NQA-1-2012, Quality Assurance Requirements for Nuclear Facility Applications, 2013.
p. American Society for Testing and Materials (ASTM).
(1) ASTM C852-09, Standard Guide for Design Criteria for Plutonium Gloveboxes, 2009.
(2) ASTM C1455-07, Standard Test Method for Nondestructive Assay of Special Nuclear Material Holdup Using Gamma-Ray Spectroscopic Methods, 2007
q. American National Standards Institute/International Society of Automation (ISA).
(1) ANSI/ISA 7.0.01-1996, Quality Standard for Instrument Air, 1996.
(2) ANSI/ISA 18.1-1979 (R2004), Annunciator Sequences and Specifications, 1979.
(3) ANSI/ISA 67.01.01-2002 (R2007), Transducer and Transmitter Installation for Nuclear Safety Applications, 2002.
(4) ANSI/ISA S67.02.01-1999, Nuclear-Safety-Related Instrument Sensing Line Piping and Tubing Standard for Use in Nuclear Power Plants, 1999.
(5) ANSI/ISA 67.04.01-2006 (R2011), Setpoints for Nuclear Safety-Related Instrumentation, 2006.
r. American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE).
(1) ASHRAE Handbook, Fundamentals (Inch-Pound Edition), 2009.
(2) ASHRAE Standard 62.1-2010, Ventilation for Acceptable Indoor Air Quality, 2010.
s. American Water Works Association (AWWA).
(1) AWWA D100-11, Welded Carbon Steel Tanks for Water Storage, 2011.
t. Crane Manufacturers Association of America (CMAA).
(1) CMAA Crane Manufacturers Association of America, standards as applicable.
u. Defense Nuclear Facilities Safety Board (DNFSB).
(1) DNFSB Recommendation 2004-2, Active Confinement Systems.
v. Hydraulic Institute Standards.
(1) Hydraulic Institute Standards, standards as applicable.
w. Institute of Electrical and Electronics Engineers (IEEE).
(1) IEEE Std C2-2012, National Electrical Safety Code, 2012.
(2) IEEE Std C37 Series, Power Switchgears, Substations, and Relays, (standards on switchgear as applicable), 2010.
(3) IEEE Std N42.18-2004, American National Standard Specification and Performance of On-Site Instrumentation for Continuously Monitoring Radioactivity in Effluents, 2004.
(4) IEEE Std N323D-2002, American National Standard to Installed Radiation Protection Instrumentation, 2003.
(5) IEEE Std 7-4.3.2-2010, IEEE Standard Criteria for Digital Computers in Safety Systems of Nuclear Power Generating Stations, 2010.
(6) IEEE Std 80-2000, IEEE Guide for Safety in AC Substation Grounding, 2000.
(7) IEEE Std 141-1993, IEEE Recommended Practice for Electric Power Distribution for Industrial Plants, 1994.
(8) IEEE Std 142-2007, IEEE Recommended Practice for Grounding of Industrial and Commercial Power Systems (Redline), 2007.
(9) IEEE Std 242-2001, IEEE Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems (IEEE Buff Book), 2001.
Section 48
(10) IEEE Std. 279-1971 (withdrawn), IEEE Standard: Criteria for Protection Systems for Nuclear Power Generating Stations, 1971.
(11) IEEE Std 308-2001, IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations, 2002.
(12) IEEE Std 323-2003, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, 2004.
(13) IEEE Std 334-2006, IEEE Standard for Qualifying Continuous Duty Class 1E Motors for Nuclear Power Generating Stations, 2007.
(14) IEEE Std 336-2010, IEEE Recommended Practice for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities, 2010.
(15) IEEE Std 338-2012, IEEE Standard for Criteria for Periodic Surveillance Testing of Nuclear Power Generating Station Safety Systems, 2012.
(16) IEEE Std 344-2004, IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations, 2004.
(17) IEEE Std 352-1987, IEEE Guide for General Principles of Reliability Analysis of Nuclear Power Generating Station Safety Systems, 1987.
(18) IEEE Std 379-2000, IEEE Standard Application of the Single-Failure Criterion to Nuclear Power Generating Station Safety Systems, 2001.
(19) IEEE Std 382-2006, IEEE Standard for Qualification of Safety-Related Actuators for Nuclear Generating Stations, 2006.
(20) IEEE Std 383-2003, IEEE Standard for Qualifying Class 1E Electric Cables and Field Splices for Nuclear Power Generating Stations, 2003.
(21) IEEE Std 384-2008, IEEE Standard Criteria for Independence of Class 1E Equipment and Circuits, 2008.
(22) IEEE Std 387-1995, Standard Criteria for Diesel Generator Units Applied as Standby Power Supplies for Nuclear Power Generation Stations, 1995.
(23) IEEE Std 399-1997, IEEE Recommended Practice for Industrial and Commercial Power Systems Analysis (IEEE Brown Book), 1998.
(24) IEEE Std 420-2001,
(25) IEEE Std 446-1995, Recommended Practice for Emergency and Standby Power Systems for Industrial and Commercial Applications, 1995.
(26) IEEE Std 450-2010, IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications, 2010.
(27) IEEE Std 484-2002, IEEE Recommended Practice for Installation Design and Installation of Vented Lead-Acid Batteries for Stationary Applications, 2002.
(28) IEEE Std 493-2007, IEEE Recommended Practice for the Design of Reliable Industrial and Commercial Power Systems, 2007.
(29) IEEE Std 535-2006, IEEE Standard for Qualification of Class 1E Lead Storage Batteries for Nuclear Power Generating Stations, 2006.
(30) IEEE Std 577-2012, IEEE Standard Requirements for Reliability Analysis in the Design and Operation of Safety Systems for Nuclear Facilities, 2012.
(31) IEEE Std 603-2009, IEEE Standard Criteria for Safety Systems for Nuclear Power Generating Stations, 2009.
(32) IEEE Std 627-2010, IEEE Standard for Qualification of Equipment Used in Nuclear Facilities, 2010.
(33) IEEE Std 628-2011, IEEE Standard Criteria for the Design, Installation, and Qualification of Raceway Systems for Class 1E Circuits for Nuclear Power Generating Stations, 2011.
(34) IEEE Std 649-2006, IEEE Standard for Qualifying Class 1E Motor Control Centers for Nuclear Power Generating Stations, 2006.
(35) IEEE Std 650-2006, IEEE Standard for Qualification of Class 1E Static Battery Chargers and Inverters for Nuclear Power Generating Stations, 2006.
Section 49
(36) IEEE Std 833-2005, IEEE Recommended Practice for the Protection of Electric Equipment in Nuclear Power Generating Stations from Water Hazards, 2005.
(37) IEEE Std 946-2004, IEEE Recommended Practice for the Design of DC Auxiliary Power Systems for Generating Systems, 2005.
(38) IEEE Std 1023-2004, IEEE Recommended Practice for the Application of Human Factors Engineering to Systems, Equipment, and Facilities of Nuclear Power Generating Stations and other Nuclear Facilities, 2004.
(39) IEEE Std 1050-2004, IEEE Guide for Instrumentation and Control Equipment Grounding in Generating Stations, 2004.
x. International Code Council.
(1) International Code Council, International Building Code.
y. Illuminating Engineering Society (IES).
(1) IES HB-10-11, IES Lighting Handbook, 2011.
z. International Society of Automation (ISA).
(1) ISA-TR84.00.06, Safety Field bus Design Considerations for Process Industry Sector Applications, 2009.
aa. National Council on Radiation Protection and Measurements (NCRP).
(1) NCRP Report 49, Structural Shielding Design and Evaluation for Medical Use of X Rays and Gamma Rays of Energies Up to 10 MeV, 1976.
bb. National Fire Protection Association (NFPA).
(1) NFPA 30, Flammable and Combustible Liquids Code, 2012.
(2) NFPA 70, National Electric Code, 2014.
(3) NFPA 72, National Fire Alarm and Signaling Code, 2013.
(4) NFPA 101, Life Safety Code, 2012.
(5) NFPA 110, Standard for Emergency and Standby Power Systems, 2013.
(6) NFPA 780, Standard for the Installation of Lightning Protection Systems, 2014.
(7) NFPA 1143, Standard for Wildland Fire Management, 2014.
cc. Nuclear Regulatory Commission (NRC).
NUREG-0700, Human-System Interface Design Review Guidelines, 2002.
dd. Tubular Exchanger Manufacturers Association (TEMA).
(1) TEMA, 9th Edition TEMA Standards, standards on heat exchangers Classes B, C, and R. Appendix F, Concluding Material.
2. ACRONYMS.
PAGE CHANGE TO DOE O 420.1C, FACILITY SAFETY
1. EXPLANATION OF CHANGE. To invoke revised DOE-STD- 1104-2014, Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Document, and revised DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility Documented Safety Analysis as required methods.
2. LOCATIONS OF CHANGES.