DOE G 441.1-1B, Radiation Protection Programs Guide
Functional areas: Defense Nuclear Facility Safety and Health Requirement, Work Processes
This Guide amplifies the regulatory requirements of 10 CFR 835 and provides explanations and examples of the basic requirements for
implementing the requirements of 10 CFR 835.
Cancels DOE G 441.1-1A, DOE G 441.1-2, DOE G 441.1-3A, DOE G 441.1-4A, DOE G 441.1-5, DOE G 441.1-6, DOE G 441.1-7, DOE G 441.1-8, DOE G 441.1-9, DOE G 441.1-10, DOE G 441.1-11, DOE G 441.1-12, DOE G 441.1-13. Canceled by DOE G 441.1-1C.
Supersedes:
DOE G 441.1-12, Radiation Safety Training Guide for Use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection on Mar 01, 2007
DOE G 441.1-8, Radiation Safety Training Guide for Use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection on Mar 01, 2007
DOE G 441.1-4A, External Dosimetry Program Guide for Use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection on Mar 01, 2007
DOE G 441.1-3A, Internal Dosimetry Program Guide for Use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection on Mar 01, 2007
Version history and related documents
Superseded by
A newer version replaces this document.
Supersedes
Earlier documents this one replaced.
- DOE G 441.1-12Radiation Safety Training Guide for Use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection (Mar 01, 2007)
- DOE G 441.1-8Radiation Safety Training Guide for Use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection (Mar 01, 2007)
- DOE G 441.1-13Sealed Radioactive Source Accountability and Control Guide (Mar 01, 2007)
- DOE G 441.1-10Posting and Labeling for Radiological Control Guide for use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection (Mar 01, 2007)
- DOE G 441.1-4AExternal Dosimetry Program Guide for Use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection (Mar 01, 2007)
- DOE G 441.1-11Occupational Radiation Protection Record-Keeping and Reporting Guide for use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection (Mar 01, 2007)
- DOE G 441.1-3AInternal Dosimetry Program Guide for Use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection (Mar 01, 2007)
- DOE G 441.1-9Sealed Radioactive Source Accountability and Control Guide (Mar 01, 2007)
- DOE G 441.1-5Radiation-Generating Devices Guide for Use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection (Mar 01, 2007)
- DOE G 441.1-2Occupational ALARA Program Guide for Use with Title 10, CFR, Part 835, Occupational Radiation Protection (Mar 01, 2007)
- DOE G 441.1-7Occupational Radiation Protection Record-Keeping and Reporting Guide for use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection (Mar 01, 2007)
- DOE G 441.1-1AManagement and Administration of Radiation Protection Programs Guide for use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection (Mar 01, 2007)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DOE G 441.1-1B
3-1-07
RADIATION PROTECTION PROGRAMS GUIDE
for Use with
Title 10, Code of Federal Regulations, Part 835,
Occupational Radiation Protection
[This Guide describes nonmandatory approaches for meeting requirements. Guides are not
requirements documents and are not to be construed as requirements in any audit or appraisal for
compliance with the parent Rule, Policy, Order, Notice, or Manual.]
Department of Energy
Office of Health, Safety and Security
NOT
MEASUREMENT
SENSITIVE
DOE G 441.1-1B i
3-1-07
TABLE OF CONTENTS
RADIATION PROTECTION PROGRAMS.................................................................... 1
1.0 PURPOSE AND APPLICABILITY ...................................................................... 1
1.1 USE OF CONSENSUS STANDARDS................................................................... 2
1.2 ACRONYMS............................................................................................................ 4
2.0 DEFINITIONS ......................................................................................................... 7
3.0 RADIATION PROTECTION PROGRAMS...................................................... 17
3.1 Implementation Guidance......................................................................... 18
3.2 Organization and Administration.............................................................. 20
3.2.0 Administrative Processes .............................................................. 20
3.2.1 Radiological Control Organization ............................................... 21
3.2.2 Education, Training, and Skills..................................................... 22
3.2.3 Internal Audit and Self Assessment.............................................. 24
3.3 RPP Functional Elements ......................................................................... 25
4.0 ALARA ................................................................................................................... 41
4.1 Implementation Guidance..................................................................................... 41
4.2 ALARA Programs ................................................................................................. 42
4.2.0 Formal Plans and Measures .......................................................... 42
4.2.1 Policy and Management Commitment.......................................... 43
4.2.2 ALARA Training .......................................................................... 44
4.2.3 Plans and Procedures .................................................................. 44
4.2.4 Internal Assessments/Audits........................................................ 44
4.2.5 ALARA Design Review ............................................................. 45
4.2.6 Radiological Work/Experiment Administration and Planning ... 48
4.2.6.0 Job/Task/Experiment Reviews....................................... 49
4.2.6.1 Consideration of Non-radiological Hazards .................. 50
4.3 Records ................................................................................................... 51
5.0 INTERNAL DOSIMETRY PROGRAM............................................................ 53
5.1 Implementation Guidance....................................................................... 53
5.2 Program Management and Administration............................................. 54
Section 2
5.2.0 General Requirements................................................................. 54
5.2.1 Organization, Staffing, and Facilities.......................................... 55
5.2.1.0 Organization................................................................... 55
5.2.1.1 Staffing........................................................................... 55
5.2.1.2 Facilities and Resources................................................. 56
5.2.2 Technical Basis Document........................................................... 56
5.2.3 Internal Dosimetry Procedures Manual ....................................... 57
5.2.4 Quality Assurance ....................................................................... 57
5.3 Air Monitoring and Contamination Control Programs ............................ 57
5.3.0 Air Monitoring When There Is No Practical Radiobioassay
Method .......................................................................................... 58
5.3.1 Recourse for Technology Shortfall (DIL<MDA) ........................ 58
5.4 Individual Monitoring Program ............................................................... 59
5.4.0 Establishing the Need for Individual Monitoring ........................ 59
ii DOE G 441.1-1B
3-1-07
5.4.1 Investigation Levels/Derived Investigation Levels ..................... 60
5.4.2 Minimum Detectable Amount (MDA)......................................... 60
5.4.3 Frequency of Measurement.......................................................... 61
5.4.4 Detection and Confirmation of Intakes........................................ 61
5.4.5 Internal Dose Management .......................................................... 63
5.4.6 Planned Special Exposures .......................................................... 63
5.4.7 Medical Response ........................................................................ 63
5.5 Internal Dose Evaluation.......................................................................... 63
5.5.0 Required Dose Calculations......................................................... 63
5.5.1 Interpretation of Radiobioassay Data........................................... 64
5.5.2 Evaluation of Internal Dose from Radiobioassay and Air
Monitoring Data............................................................................ 64
5.5.3 Periodic Reevaluation of Internal Dose ....................................... 65
5.6 Recordkeeping and Reporting................................................................. 65
6.0 EXTERNAL DOSIMETRY PROGRAM........................................................... 67
6.1 Implementation Guidance........................................................................ 67
6.2 Program Management and Administration .............................................. 68
6.2.0 General Requirements.................................................................. 68
6.2.1 Organization, Staffing, And Facilities ......................................... 69
6.2.1.0 Organization................................................................... 69
6.2.1.1 Staffing........................................................................... 69
6.2.1.2 Facilities and Resources................................................. 69
6.2.2 Technical Basis Document........................................................... 69
6.2.3 Procedures.................................................................................... 70
6.2.4 Quality Assurance ........................................................................ 71
Section 3
6.3 Area Monitoring Program........................................................................ 71
6.3.0 Monitoring Instruments and Devices........................................... 71
6.3.1 Performance of Area Radiation Monitoring ................................ 72
6.3.2 Allowance for Physical Characteristics ....................................... 73
6.3.3 Recourse for Technology Shortfall .............................................. 73
6.4 Individual Monitoring Program ............................................................... 73
6.4.0 Establishing the Need for Individual Monitoring ........................ 73
6.4.1 Routine Monitoring of Individual External Doses....................... 75
6.4.1.0 Deep Dose Monitoring................................................... 75
6.4.1.1 Lens of the Eye Monitoring ............................................. 75
6.4.1.2 Skin and Extremity Monitoring ..................................... 76
6.4.1.3 Embryo/Fetal Monitoring ................................................ 77
6.4.1.4 Non-Uniform Radiation Fields ......................................... 77
6.4.1.5 Supplemental Dosimeters ................................................ 78
6.4.2 Lost, Damaged, or Contaminated Dosimeters ............................. 78
6.4.3 Nuclear Accident Dosimetry....................................................... 78
6.4.4 Planned Special Exposures .......................................................... 79
6.4.5 Personal Protective Equipment .................................................... 79
6.5 External Dose Evaluation ........................................................................ 80
6.5.0 Required Dose Calculations......................................................... 80
DOE G 441.1-1B iii
3-1-07
6.5.1 Special Considerations................................................................. 81
6.6 Recordkeeping and Reporting.................................................................. 83
7.0 RADIATION GENERATING DEVICES .......................................................... 85
7.1 Implementation Guidance........................................................................ 85
7.2 Administrative Organization and Controls .............................................. 86
7.2.0 Contractor Management............................................................... 86
7.2.1 RGD Custodian............................................................................ 86
7.2.2 RGD Operator.............................................................................. 87
7.2.3 Qualified Expert........................................................................... 88
7.2.4 Radiological Control Manager..................................................... 88
7.2.5 Radiological Control Organization .............................................. 88
7.3 Development of Site-Specific Documents............................................... 89
7.3.0 Radiological Monitoring............................................................. 89
7.3.1 Sealed Radioactive Source Leak Testing..................................... 91
7.3.2 Area Posting................................................................................ 91
7.3.2.0 Radiological Conditions................................................. 91
7.3.2.1 Operational Status.......................................................... 91
7.3.2.2 Maintenance Status .......................................................... 91
Section 4
7.3.3 Training........................................................................................ 92
7.3.4 Records ........................................................................................ 92
7.4 Engineered Safety Controls ..................................................................... 92
7.4.0 Shielding, Controls, & Safety Devices ........................................ 93
7.4.0.0 Shielding .......................................................................... 93
7.4.0.1 Access Control and Safety Devices ............................... 93
7.4.0.2 Interlocks......................................................................... 93
7.4.0.3 Device Controls .............................................................. 94
7.4.0.4 Run-Safe and Emergency Shutdown Devices ............... 94
7.4.0.5 Monitoring Instruments .................................................. 95
7.4.1 Guidance for Specific RGD Installations .................................... 95
7.4.1.0 Accelerators ................................................................... 95
7.4.1.1 Electron Devices that Generate X-Rays Incidentally ..... 96
7.4.1.2 Cabinet X-Ray Systems ................................................. 96
8.1 Implementation Guidance....................................................................... 97
8.2 Declaration of Pregnancy/Withdrawal of Declaration............................ 97
8.3 Work Restrictions Following Declarations of Pregnancy ...................... 99
8.4 Counseling ............................................................................................ 100
8.5 Dose Determination and Monitoring Methods ..................................... 101
8.5.0 Dose Determination ................................................................... 101
8.5.1 Monitoring Methods .................................................................. 102
8.6 Training................................................................................................. 102
8.7 Record -Keeping and Reporting ........................................................... 102
Appendix 8.B ......................................................................................................... 105
Withdrawal of Pregnancy Declaration Form ......................................................... 105
Appendix 8.C ......................................................................................................... 107
Embryo/Fetal Dose Equivalent Record Form........................................................ 107
iv DOE G 441.1-1B
3-1-07
9.0 PORTABLE MONITORING INSTRUMENT CALIBRATION .................. 109
9.1 Implementation Guidance...................................................................... 110
9.2 Instrument Selection .............................................................................. 111
9.2.0 Type Testing .............................................................................. 111
9.2.1 Acceptance Testing.................................................................... 111
9.3 Instrument Calibration ........................................................................... 111
9.4 Operability Tests.................................................................................... 112
9.5 Maintenance........................................................................................... 112
9.6 Calibration Equipment/Calibration Quality........................................... 112
9.7 Laboratory Documentation .................................................................... 113
Section 5
9.7.0 Laboratory Protocol ................................................................... 113
9.7.1 Laboratory Records.................................................................... 113
9.7.2 Instrument Calibration Records ................................................. 113
9.7.3 Instrument Location ................................................................... 113
9.8 Laboratory and Staff ............................................................................. 114
9.8.0 Laboratory.................................................................................. 114
98.1 Calibration Staff Qualifications ................................................ 114
9.8.2 Calibration Staff Training .......................................................... 115
9.9 Assessments .......................................................................................... 115
10.0 AIR MONITORING........................................................................................... 117
10.1 Implementation Guidance..................................................................... 117
10.2 Determining the Needs for Air Monitoring ........................................... 119
10.2.0 Exposure Assessment.................................................................. 119
10.2.0.0 Type and Frequency of Bioassay............................. 119
10.2.0.1 Estimation of Dose................................................... 120
10.2.1 Personnel Protection .................................................................. 121
10.2.1.0 Need for Posting .......................................................... 121
10.2.1.1 Effectiveness of Physical Design Features and
Engineering Controls ................................................... 121
10.2.1.2 Proper Respiratory Protective Equipment ............... 122
10.2.2 Early Warning............................................................................ 122
10.3 Placement of Air Sampling and Real-Time Air Monitoring Equipment
................................................................................................................. 123
10.3.0 Locations of Release Points and Individuals ............................. 124
10.3.1 Purpose of Sample ..................................................................... 124
10.3.2 Room Air Flow Patterns ............................................................ 125
10.4.0 Breathing Zone Air Monitoring ................................................. 125
10.4.1 Source-Specific Air Sampling .................................................... 126
10.4.2 Grab Sampling ........................................................................... 126
10.4.3 Operability Checks..................................................................... 126
10.5 Real-Time Air Monitoring Equipment .................................................. 127
10.5.0 Instrument Selection .................................................................. 127
10.5.1 Alarm Set Points ........................................................................ 127
10.5.2 Alarm Capabilities ..................................................................... 127
10.5.3 Operability Checks..................................................................... 128
DOE G 441.1-1B v
3-1-07
10.6 Sample Analysis and Data Review....................................................... 128
10.7 Quality Control and Quality Assurance................................................ 129
Section 6
10.7.0 Sample Identification, Handling, and Storage ........................... 129
10.7.1 Air Sampling and Real-Time Air Monitoring Equipment ......... 130
10.7.2 Counting Room Equipment ....................................................... 130
10.7.3 Audits......................................................................................... 131
10.7.4 Recordkeeping ........................................................................... 131
10.8 Administrative Controls........................................................................ 131
10.8.0 Technical Basis Document ........................................................ 131
10.8.1 Written Procedures..................................................................... 132
11.0 RADIOACTIVE CONTAMINATION CONTROL........................................ 133
11.1 Implementation Guidance...................................................................... 134
11.2 Contamination Control Program Management...................................... 135
11.3 Physical Design Features ...................................................................... 135
11.4 Administrative Control .......................................................................... 138
11.4.0 Work Authorizations.................................................................. 138
11.4.1 Access Control ........................................................................... 138
11.4.1.0 Entry Controls.......................................................... 138
11.4.1.1 Egress Controls ........................................................ 139
11.4.1.2 Posting and Labeling................................................ 141
11.4.2 Areas of Fixed Contamination ................................................... 141
11.4.3 Conduct of Radiological Work .................................................. 141
11.4.4 Personnel and Material Decontamination.................................. 142
11.4.4.0 Skin and Clothing Contamination............................ 142
11.4.4.1 Wound Contamination ............................................. 143
11.4.4.2 Material and Area Decontamination........................ 143
11.5 Contamination Monitoring ................................................................... 143
11.5.0 Contamination Control Values .................................................. 143
11.5.1 Monitoring ................................................................................. 145
11.5.2 Control of Material and Equipment ........................................... 147
11.5.3 Portal Monitors, Laundry Monitors, and Tool Monitors ........... 149
12.0 POSTING AND LABELING FOR RADIOLOGICAL CONTROL............. 151
12.1 Implementation Guidance...................................................................... 151
12.2 General.................................................................................................. 151
12.2.0 Design ........................................................................................ 152
12.2.1 Content....................................................................................... 153
12.2.2 Visibility .................................................................................... 154
12.2.3 Conditions .................................................................................. 155
12.2.4 Accessibility............................................................................... 155
12.2.5 Boundaries and Barriers............................................................. 156
Section 7
12.3 Controlled Areas ................................................................................... 157
12.4 Posting for Control of Exposure to External Radiation ......................... 157
12.5 Posting for Control of Contamination................................................... 158
12.5.0 Removable and Airborne Radioactive Contamination .............. 158
12.5.1 Areas of Fixed Contamination ................................................... 159
vi DOE G 441.1-1B
3-1-07
12.6 Radioactive Material Posting................................................................. 159
12.7 Exceptions from Posting Requirements................................................ 161
12.8 Radioactive Material Labeling............................................................... 162
12.8.0 Radioactive Material Labeling................................................... 162
12.8.1 Exceptions from Labeling Requirements................................... 163
Appendix 12.A – Standard Radiation Warning Trefoil ......................................... 165
13.0 OCCUPATIONAL RADIATION PROTECTION RECORD-
KEEPING AND REPORTING ......................................................................... 167
13.1 Implementation Guidance..................................................................... 167
13.2 Records to be Generated and Maintained .............................................. 168
13.2.0 Individual Monitoring and Dose Records.................................. 168
13.2.0.0 Internal Doses .......................................................... 169
13.2.0.1 External Doses ......................................................... 170
13.2.0.2 Summation of Internal and External Doses ............. 171
13.2.0.3 Lifetime Occupational Dose .................................... 171
13.2.0.4 Non-Uniform Exposure to the Skin ......................... 172
13.2.0.5 Planned Special Exposures (PSEs) .......................... 172
13.2.0.6 Doses Resulting from Emergency or
Accidental Exposures................................................... 172
13.2.0.7 Records of Embryo/Fetus Dose and Declared Pregnant
Workers........................................................................ 172
13.2.0.8 Individual Monitoring Program Records ................. 173
13.2.0.9 Equipment Capabilities............................................ 174
13.2.1 Monitoring and Workplace Records.......................................... 174
13.2.1.1 Work Authorizations................................................ 175
13.2.1.2 Area and Material/Equipment Monitoring Records 176
13.2.1.3 Airborne Radioactivity Monitoring Records ........... 177
13.2.1.4 Records of Releases of Materials and
Equipment from Radiological Areas ........................... 178
13.2.2 Administrative Records ............................................................. 178
13.2.2.0 Radiation Safety Training ........................................ 179
13.2.2.1 ALARA Records...................................................... 180
13.2.2.2 Facility Design ......................................................... 181
13.2.2.3 Entry and Access Control Records .......................... 181
13.2.2.4 Sealed Radioactive Sources ..................................... 182
13.2.2.5 Radiation Protection Program,
Section 8
Policies and Procedures .............................................. 182
13.2.2.6 Audits and Programmatic Reviews.......................... 183
13.2.2.7 Posting and Labeling................................................ 183
13.2.2.8 Calibration, Functional Tests, and Maintenance
Records ........................................................................ 183
13.3 Reports .................................................................................................. 184
13.3.0 Reports to Individuals ................................................................ 184
DOE G 441.1-1B vii (and viii)
3-1-07
13.3.0.0 Records Requested by Monitored Individuals......... 184
13.3.0.1 Termination Dose Reports ....................................... 185
13.3.0.2 Reports to DOE........................................................ 185
13.3.1 Reports of Planned Special Exposures ...................................... 185
13.4 Privacy Act Considerations................................................................... 186
13.4.0 Informing Individuals ................................................................ 186
13.4.1 Identifying Individuals............................................................... 186
13.4.2 Requesting Correction or Amendment of a Record................... 187
13.4.3 Responding to Requests............................................................. 187
13.4.4 Accounting for Disclosures........................................................ 187
13.5 Record – Keeping Standards................................................................. 187
14.0 RADIATION SAFETY TRAINING................................................................. 189
14.1 Implementation Guidance..................................................................... 189
14.1.0 General Information................................................................... 189
14.2 Determination of Required Training....................................................... 190
14.3 Training Course Content..................................................................... 192
14.4 Facility-Specific Materials.................................................................. 193
14.5 Conduct of Radiation Safety Training ................................................ 194
14.6 Completion of Radiation Safety Training........................................... 195
14.7 Periodic Radiation Safety Training..................................................... 196
14.8 Use of Escorts in Lieu of Training.......................................................... 197
14.9 Refresher Training ................................................................................. 198
14.10 Other Training Programs ....................................................................... 198
14.11 Training Effectiveness Evaluations ....................................................... 198
15.0 SEALED RADIOACTIVE SOURCE ACCOUNTABILITY
AND CONTROL................................................................................................. 199
15.1 Implementation Guidance...................................................................... 199
15.2 Organization and Responsibilities ......................................................... 200
15.3 Receipt ................................................................................................... 201
15.4 Labeling and Storage ............................................................................. 201
15.5 Inventory ................................................................................................ 203
15.6 Leak Testing........................................................................................... 204
15.7 Handling and Disposal........................................................................... 206
Appendix 15.A Example Individual Accountable Sealed
Section 9
Radioactive Source Form........................................................................ 209
Appendix 15.B – Example Sealed Radioactive Source Accountability Form....... 210
DOE G 441.1-1B 1
3-1-07
RADIATION PROTECTION PROGRAMS
1.0 PURPOSE AND APPLICABILITY
In 1999 the U.S. Department of Energy (DOE) published a set of 13 Implementation
Guides for use with Title 10, Code of Federal Regulations (CFR), Part 835, Occupational
Radiation Protection (DOE 1998a), hereinafter referred to as 10 CFR 835. That series of
guides discussed acceptable methods for ensuring that the functional elements of
radiological activities will be managed and administered in accordance with 10 CFR 835.
As part of DOE’s efforts to consolidate redundant requirements and guidance, this Guide
is a compilation of the guidance provided in the set of 13 Implementation Guides and
continues to provide cross-references to other Guides, DOE-STD-1098-99,
RADIOLOGICAL CONTROL (DOE 1999a), hereinafter referred to as the RCS, DOE
directives, and industry consensus standards that provide detailed guidance for
implementing specific requirements in 10 CFR 835. Accordingly, this Guide cancels
and supersedes the following guides:
• DOE G 441.1-1A, Management and Administration of Radiation Protection
Programs Guide, dated 10-20-03
• DOE G 441.1-2, Occupational ALARA Program Guide, dated 3-17-99
• DOE G 441.1-3A, Internal Dosimetry Program Guide, dated 6-11-05
• DOE G 441.1-4A, External Dosimetry Program Guide, dated 6-11-05
• DOE G 441.1-5, Radiation-Generating Devices Guide, dated 4-15-99
• DOE G 441.1-6, Evaluation and Control of Radiation Dose to the Embryo/Fetus
Guide, dated 4-29-99
• DOE G 441.1-7, Portable Monitoring Instrument Calibration Guide, dated
6-17-99
• DOE G 441.1-8, Air Monitoring Guide, dated 3-17-99
• DOE G 441.1-9, Radioactive Contamination Control Guide, 6-17-99
• DOE G 441.1-10, Posting and Labeling for Radiological Control Guide, dated
5-24-99
• DOE G 441.1-11, Occupational Radiation Protection Record-Keeping and
Reporting Guide, dated 5-20-99
• DOE G 441.1-12, Radiation Safety Training Guide, dated 3-17-99
• DOE G 441.1-13, Radioactive Sealed Source Accountability Guide, dated 4-15-99
2 DOE G 441.1-1B
3-1-07
This Guide provides guidance with respect to implementing the provisions of all the
functional areas contained in 10 CFR 835. These are listed in Chapter 3 of this Guide.
Specific regulatory citations are provided in the body of the Guide.
This Guide amplifies the regulatory requirements of 10 CFR 835 and provides
explanations and examples of the basic requirements for implementing the requirements
of 10 CFR 835. The requirements of 10 CFR 835 are enforceable under the provisions of
Sections 223(c) and 234A of the Atomic Energy Act of 1954, as amended (AEC 1954).
This Guide was developed consistent with DOE M 251.1-1B, Departmental Directives
Program Manual, (DOE 2006a) which states that guides: (1) Provide preferred,
nonmandatory, supplemental information about acceptable methods for implementing
requirements, including lessons learned, suggested practices, instructions, and suggested
performance measures; (2) Do not impose requirements but may quote requirements if
the sources are adequately cited; and (3) Provide alternate methods that may be used if it
can be demonstrated that they provide an equivalent or better level of performance.
Section 10
Except for requirements established by a regulation, contract, or administrative means,
the provisions in this Guide are DOE's views on acceptable methods of program
implementation and are not mandatory. Conformance with this Guide will, however,
create an inference of compliance with the related regulatory requirements. Alternate
methods that are demonstrated to provide an equivalent or better level of protection are
acceptable. DOE encourages its contractors to go beyond the minimum regulatory
requirements and to pursue excellence in their programs.
The word "shall" is used in this Guide in reference to requirements from 10 CFR 835.
Compliance with 10 CFR 835 is mandatory except to the extent an exemption has been
granted pursuant to 10 CFR 820, Procedural Rules for DOE Nuclear Activities (DOE
1997a). The words "should" and "may" are used to denote optional program
recommendations and allowable alternatives, respectively.
This Guide may be used by all DOE activities that are subject to the requirements of
10 CFR 835. The Administrator of the National Nuclear Security Administration
(NNSA) will assure that NNSA employees and contractors comply with their respective
responsibilities under this Guide.
1.1 USE OF CONSENSUS STANDARDS
As discussed in the Department of Energy's Radiological Health and Safety Policy DOE
P 441.1, (DOE 1996), DOE has established a system of regulatory policy and guidance
reflective of national and international radiation protection standards and
recommendations. Consistent with this policy, this Guide endorses the use of several
national and international recommendations and standards, including several from the
International Commission on Radiological Protection, the National Council on Radiation
Protection and Measurements, the American National Standards Institute. In regards to
national consensus standards, to the extent possible, this guidance document endorses and
DOE G 441.1-1B 3
3-1-07
is written to be consistent with following non-governmental national consensus standard
standards for radiation protection:
• ANSI N13.3, Dosimetry for Criticality Accidents
• ANSI N43.3-1993, General Radiation Safety -Installations Using Non-Medical
X-Ray and Sealed Gamma-Ray Sources, Energies up to 10 MeV
• ANSI N323A-1997, American National Standard Radiation Protection
Instrumentation Test and Calibration, Portable Survey Instruments
• ANSI N13.5-R1989, American National Standard Performance Specifications for
Direct Reading and Indirect Reading Pocket Dosimeters
• ANSI N42.17A-1989, Performance Specifications for Health Physics
Instrumentation - Portable Instrumentation for Use in Normal Environmental
Conditions
• ANSI N42.17C-1989, Performance Specifications for Health Physics
Instrumentation - Portable Instrumentation for Use in Extreme Environmental
Conditions
• ANSI N42.17B, Performance Specifications for Health Physics Instrumentation -
Occupational Airborne Radioactivity Monitoring Instrumentation
• ANSI N2.1-1971(R1989), Radiation Symbol
• ANSI N13.27, Performance Specifications for Pocket-sized Alarming
Dosimeter/Ratemeters
• ANSI Z88.2-1992, Practices for Respiratory Protection
• ANSI/HPS N13.30-1996, Performance Criteria for Radiobioassay
• ANSI/HPS N13.41-1997, Criteria for Performing Multiple Dosimetry
• ANSI/HPS N43.6-1997, Sealed Radioactive Sources Classification
• ANSI /HPS N13.6-1999, Practice for Occupational Radiation Exposure Records
Systems
Section 11
• ANSI/HPS N43.2-2001, Radiation Safety for X-Ray Diffraction and Fluorescence
Analysis Equipment
• ANSI/HPS N13.49-2001, Performance and Documentation of Radiological
Surveys
4 DOE G 441.1-1B
3-1-07
• ANSI/HPS N43.5-2005, Radiological Safety Standard for the Design of
Radiographic and Fluoroscopic Industrial X-Ray Equipment
• ANSI/NCSL Z540-1-1994, American National Standard for Calibration -
Calibration Laboratories and Measuring and Test Equipment -General
Requirements
• ANSI N322, American National Standard Inspection, Test, Construction, and
Performance Requirements for Direct Reading Electrostatic/Electroscope Type
Dosimeters
• ANSI N320, American National Standard Performance Specifications for Reactor
Emergency Radiological Monitoring Instrumentation
1.2 ACRONYMS
AEC U.S. Atomic Energy Commission
ALARA Low As Is Reasonably Achievable
AL Annual Limit on Intake
ANS American Nuclear Society
ANSI American National Standards Institute
BEIR Biological Effects of Ionizing Radiations
BRH Bureau of Radiological Health
BZ Breathing Zone
CAM Continuous Air Monitor
CEDE Committed Effective Dose Equivalent
CFR Code of Federal Regulations
CSO Cognizant Secretarial Officer
CTEDE Cumulative Total Effective Dose Equivalent
DAC Derived Air Concentration
DIL Derived Investigation Level
DL Decision Level
DOE Department of Energy
DOE G DOE Guide
DOE O DOE Order
DOE P DOE Policy
DOELAP Department of Energy Laboratory Accreditation Program
DOE-STD DOE Standard
DPM Disintegrations per Minute
EPA Environmental Protection Agency
FOIA Freedom of Information Act
DOE G 441.1-1B 5 (and 6)
3-1-07
FR Federal Register
GERT General Employee Radiological Training
HEPA High Efficiency Particulate Air (filter)
HPS Health Physics Society
ICRP International Commission on Radiological Protection
ICRU International Commission on Radiation Units and Measurements
IL Investigation Level
ISO International Organization for Standardization
MDA Minimum Detectable Amount/Activity
NCRP National Council on Radiation Protection and Measurements
NCSL National Conference of Standards Laboratories
NIST National Institute of Standards and Technologies
NRC Nuclear Regulatory Commission
PNL Pacific Northwest Laboratory
PSE Planned Special Exposure
PSO Program Secretarial Office
RCO Radiological Control Organization
RCS DOE-STD-1098-99, RADIOLOGICAL CONTROL
RCT Radiological Control Technician
RGD Radiation-Generating Device
RMA Radioactive Material Area
RPP Radiation Protection Program
RWP Radiological Work Permit
RWT Radiological Worker Training
SLAC Stanford Linear Accelerator Center
TEDE Total Effective Dose Equivalent
TLD Thermo Luminescent Dosimeter
TWD Technical Work Document
UNSCEAR United Nations Scientific Committee on the Effects of Atomic Radiation
USLW United States Law Week
DOE G 441.1-1B 7
3-1-07
2.0 DEFINITIONS
Acceptance testing: Evaluation or measurement of performance characteristics to verify
that certain stated specifications and contractual requirements are met.
Air monitoring: Actions to detect and quantify airborne radiological conditions by the
collection of an air sample and the subsequent analysis, either in real-time or offline
laboratory analysis, of the amount and type of radioactive material present in the
atmosphere.
Air sampling: A form of air monitoring in which an air sample is collected and analyzed
at a later time, sometimes referred to as retrospective air monitoring.
Section 12
ALARA committee: The multi-disciplined forum that reviews and advises management
on improving progress towards minimizing radiation dose and radiological releases.
ALARA design review: A systematic review to ensure that ALARA considerations are
evaluated, incorporated if reasonable, and documented for the design of new facilities and
modifications to existing facilities that involve the potential for exposure to ionizing
radiation.
ALARA job/task/experiment review: A systematic pre- and post-job review of
high-dose and potentially high-dose activities to ensure that ALARA controls are
planned, evaluated, implemented where reasonable, and documented.
Alarm set point: The count rate or concentration at which a real-time air monitor will
alarm, usually set to correspond to a specific airborne radioactive material concentration
averaged over time (e.g., DAC-hour alarm equivalent) by calculating the sample buildup
rate on the collection medium.
Alpha (α): The probability (not to be confused with an alpha particle) of a Type I error
or false positive. Also called the false positive probability.
Analyte: The particular radionuclide to be determined in a sample of interest.
Baseline bioassay: An appropriate bioassay measurement obtained from a radiobioassay
program participant prior to beginning or resuming work with radioactive material.
Beta (β): The probability (not to be confused with a beta particle) of a Type II error or
false negative. Also called the non-detection probability.
Boundary identifier: A hazard identifier that is used to define the boundary of an area.
Boundary: The line that defines the transition from one specified area to another.
Breathing zone air monitoring: A form of air monitoring that is used to detect and
quantify the radiological conditions of air from the general volume of air breathed by the
individual, usually at a height of 1 to 2 meters. See "personal air monitoring."
8 DOE G 441.1-1B
3-1-07
Cabinet X-ray system: An X-ray system with the X-ray tube installed in an enclosure
(hereinafter termed "cabinet") which, independently of existing architectural structures
except the floor on which it may be placed, is intended to contain at least that portion of a
material being irradiated, provide radiation attenuation, and exclude individuals from its
interior during generation of X-radiation. Included are all the X-ray systems designed
primarily for inspection of carry-on baggage at airline, railroad, and bus terminals, and in
similar facilities. An X-ray tube used within a shielded part of a building or X-ray
equipment which may temporarily or occasionally incorporate portable shielding is not
considered a cabinet X-ray system.
Challenge examination: An examination administered to ascertain the knowledge of a
worker with respect to radiation safety and provide an exception to the required training.
Check source: A radioactive source, not necessarily calibrated, that is used to confirm
the continuing satisfactory operation of an instrument.
Confirmed intake: An intake confirmed by follow-up radiobioassay, by association with
a known incident, or by investigation.
Contaminated area: Any area meeting the definition of “contamination area,” “high
contamination area,” or “airborne radioactivity area” provided in 10 CFR 835.2(a).
Continuous air monitor (CAM): An instrument that continuously samples and
measures the levels of airborne radioactive material on a "real-time" basis and has alarm
capabilities at preset alarm set points.
Section 13
Decision level (Lc): The amount of a count (Lc or L′c) as final instrument measurement of
a quantity of analyte (Dc or D′c) at or above which a decision is made that the analyte is
definitely present.
Derived investigation level (DIL): A value of a radiobioassay or air monitoring
measurement that indicates an intake resulting in a dose exceeding an Investigation Level
(IL).
Detector: A device or component designed to produce a quantifiable response to
ionizing radiation, normally measured electronically.
Direct (in vivo) radiobioassay: The measurement of radioactive material in the human
body utilizing instrumentation that detects radiation emitted from the radioactive material
in the body.
DOELAP: The Department of Energy Laboratory Accreditation Program. This program
defines a set of reference performance tests and provides a description of the minimum
levels of acceptable performance for personnel dosimetry systems and radiobioassay
programs under either DOE STD-1111-98, THE DEPARTMENT OF ENERGY
LABORATORY ACCREDITATION PROGRAM ADMINISTRATION (DOE 1998b), or
DOE G 441.1-1B 9
3-1-07
DOE STD-1112-98, THE DEPARTMENT OF ENERGY LABORATORY
ACCREDITATION PROGRAM FOR RADIOBIOASSAY (DOE 1998c).
Dose assessment: The process of determining radiological dose and uncertainty
included in the dose estimate, through the use of exposure scenarios, bioassay results,
monitoring data, source term information, and pathway analysis.
Elimination: The biological removal of a radionuclide from the body by excretion,
perspiration, exhalation, secretion (e.g., breast milk), exfoliation (sloughing of dead
tissue), or excision.
Embryo/fetus: A developing human organism from conception until birth.
Escort: An individual with the prerequisite training necessary for unescorted access to
the area(s) where the escort activities will be performed and who is authorized to
accompany and ensure the safety of individuals who lack such training.
Evaluation: The process of arriving at a value for intake or dose that uses, among other
inputs, measurement results.
Excretion: The biological removal of a radionuclide from the body via one or more
excretion pathways: urine and feces.
Exempt sealed radioactive source: A sealed radioactive source that does not meet the
accountability criteria established in the definition of the term “accountable sealed
radioactive source” provided in 10 CFR 835.2(a).
Exposure: The general condition of being subjected to ionizing radiation, such as by
proximity to external sources of ionizing radiation or through intake of radioactive
material into the body. In this document, exposure does not refer to the radiological
physics concept of charge liberated per unit mass of air.
False negative: A Type II (β) error, that is, concluding that analyte is not present when in
fact it is.
False positive: A Type I (α) error, that is, concluding that there is analyte present when it
is not.
Fixed contamination: Radioactive material that cannot be readily removed from
surfaces by nondestructive means, such as casual contact, wiping, or brushing.
Fixed-location sampler: An air sampler located at a fixed location in the workplace.
Frisk or frisking: Process of monitoring individuals or surfaces for contamination by
directly scanning the surface with a suitable radiation detector.
10 DOE G 441.1-1B
3-1-07
Functional tests: Tests (often qualitative) to determine that an instrument is operational
and capable of performing its intended function. Such tests may include, for example,
battery check, zero setting, or source response checks.
Section 14
Geotropism: A change in an instrument's reading as its orientation changes, due to
gravitational effects.
Gestation period: The time from conception to birth; usually 40 weeks or
approximately 9 months.
Grab sampling: A single sample removed from the air over a short time interval,
typically a few minutes for high volume air samplers and less than one hour for low
volume air samplers.
Hot particles: Small, discrete, highly radioactive particles that can cause extremely high
dose rates to a localized area.
Indirect (in vitro) radiobioassay: The measurement or analysis of radionuclides in
excreta or other biological samples removed from the body.
Instrument (radiation detection): A complete system consisting of one or more
subassemblies (e.g., detector, readout, etc.) designed to quantify one or more
characteristics of ionizing radiation or radioactive material.
Intake: The amount of radionuclide taken into the body by inhalation, absorption
through intact skin, injection, ingestion, or through wounds. Depending on the
radionuclide involved, intakes may be reported in mass (e.g., μg, mg), activity (e.g., μCi,
Bq), or potential alpha energy (e.g., MeV, J) units.
Interlock: A device for precluding access to an area of radiation hazard by either
preventing entry or by automatically removing the hazard. One example is an
electro-mechanical control mechanism that interrupts the beam of ionizing radiation or
shuts down the radiation installation whenever the interlock is challenged.
Internal audits: Reviews and evaluations of the content and implementation of the
documented radiation protection program conducted by an organization neither
responsible nor accountable for developing program content or implementing the
program.
Investigation level (IL): The value of the committed effective dose equivalent from an
intake(s) of a radioactive material by a worker at or above which, for regulatory purposes,
is regarded as sufficiently important to justify further investigation
Irradiator: Any gamma- or neutron-emitting sealed radioactive material that has the
potential to create a radiation level exceeding 500 rads (5 grays) in 1 hour at 1 meter and
is operated within the requirements of an RGD installation.
DOE G 441.1-1B 11
3-1-07
Minimum detectable amount (MDA): The smallest amount (activity or mass) of an
analyte in a sample that will be detected with a probability, β, of non-detection (Type II
error) while accepting a probability, α, of erroneously deciding that a positive (non-zero)
quantity of analyte is present in an appropriate blank sample (Type I error). The MDA is
computed using the same value of α as used for the Lc. The MDA depends on both α and
β. Measurement results are compared to the Lc, not the MDA; the MDA is used to
determine whether a program has adequate detection capability. The MDA will be greater
than or equal to the Lc.
Modification: Any alteration of the shielding configuration, device or installation
operating practices, or the replacement of the original RGD (or component part thereof)
with another that has not been previously evaluated, inspected, monitored, and
documented by the radiological control organization. This definition also includes the
collocation of additional or multiple unevaluated RGDs within a previously evaluated
installation.
Normal operation: Operation under conditions as recommended by the manufacturer of
the RGD with recommended shielding and barriers in place, and as specified in the
operating procedures and requirements for the RGD installation.
Section 15
Occupied (occupiable) area: An area or location that may be physically accessible by
individuals (or body parts thereof) while a radiation-generating device is in operation.
Off-normal operation: An event or condition that adversely affects, potentially affects,
or indicates degradation in the safety, security, environmental, or health-protection
performance or operation of an RGD installation.
Optimization methodology: A documented methodology which describes how the
factors affecting a protection decision, i.e., social, technical, economic, practical, and
public policy, are assigned values to compare detriment and benefits.
Performance demonstration: A demonstration by a student of the skills required to
perform certain designated activities.
Performance tests: Tests performed periodically over the life of an instrument to verify
that it continues to meet operational requirements. Examples of performance tests are
response time and geotropism.
Personal air monitoring: A form of breathing zone air monitoring that involves the
sampling of air in the immediate vicinity (typically within one foot) of an individual’s
nose and mouth, usually by a portable sampling pump and collection tube (e.g., a lapel
sampler) worn on the body.
Physical barrier: A bounding physical obstruction that prevents unimpeded access to an
area.
Portable air sampler: An air sampler designed to be moved from area to area.
12 DOE G 441.1-1B
3-1-07
Portable monitoring instrument: An instrument intended to be operated while being
carried by an individual.
Qualified expert: An individual having the knowledge, training, and recognition of such
by management to measure ionizing radiation, to evaluate safety techniques, to design
RGD installations, and to provide advice on radiation protection requirements.
Radiation protection program (RPP): The documented program, approved by DOE,
including, but not limited to, the plans, schedules, and other measures developed and
implemented to achieve and ensure continuing compliance with 10 CFR 835 and to apply
the as low as is reasonably achievable (ALARA) process to occupational dose.
Radiation-generating device (RGD): Collective term for devices which produce
ionizing radiation, including, certain sealed radioactive sources, small particle
accelerators used for single purpose applications which produce ionizing radiation (e.g.,
radiography), and electron generating devices that produce X-rays incidentally.
Radiography: Examination of the structure of materials by nondestructive methods,
using a RGD.
Radiological control organization (RCO): An organization responsible for radiation
protection activities.
Radiological engineer: An individual who is responsible for providing technical support
and assistance to supervisors, planners, schedulers, principal investigators, and design
engineers to reduce occupational doses and the spread of radioactive materials.
Radiological work permit (RWP): The document that identifies radiological
conditions, establishes worker protection and monitoring requirements, and contains
specific approvals for radiological work activities. The RWP serves as an administrative
process for planning and controlling radiological work and informing the worker of the
radiological conditions.
Radon: Unless otherwise specified, the isotope 222Rn.
Real time air monitor: An instrument that measures the levels of airborne radioactive
material on a "real-time" basis.
Section 16
Refresher training: Periodic (usually annual) training that provides current information
on changes to radiation protection policies and procedures or changes in facility
conditions, or to promote awareness of infrequently encountered radiological safety
matters.
Removable contamination: Radioactive material that can be removed from surfaces by
nondestructive means, such as casual contact, wiping, or brushing.
Representative air sampling: The sampling of airborne radioactive material in a
manner such that the sample collected closely approximates both the amount of activity
DOE G 441.1-1B 13
3-1-07
and the physical and chemical properties (e.g., particle size and solubility) of the
contaminant to which the individuals may be exposed.
Retention: The amount of material which, after being taken into the body by inhalation,
ingestion, entry through an open wound, or absorption through the skin, exists in the
whole body, a compartment, an organ, or a tissue at a specified time.
RGD Custodian: An individual who is trained and designated to maintain cognizance
over accountability control of radiation-generating devices assigned to him or her.
RGD installation: The sum of the radiation source (e.g., sealed radioactive material or
x-ray tube), the associated equipment and component items, and the space in which they
are operated.
Five types of installations are defined as follows:
(1) Shielded installations are those designed to use the room-within-a-room concept
to limit access to the RGD beam and to place more emphasis on distance as
opposed to shielding for radiation protection and include shielded, exempt
shielded, and cabinet x-ray installations;
(2) Unattended installations are those designed for a specific purpose and that do
not require personnel in attendance for operation and include unattended gauge
and other unattended installations;
(3) Open installations are those designed to accommodate a specimen that is so large
as to make an exempt shielded installation impractical;
(4) X-ray diffraction & fluorescence analysis equipment, including both open and
closed beam installations; and
(5) Incidental, including devices that emit low levels of ionizing radiation as a
byproduct of their normal function, such as electron beam welders, electronic
microscopes, and pulse generators.
RGD Operator: An individual who is trained and deemed qualified to use a
radiation-generating device.
Routine radiobioassay monitoring: Any radiobioassay measurement made on a
predetermined, periodic schedule, to establish whether a worker has had any intake of
radioactive material since previous radiobioassay measurements.
Source custodian: An individual who is trained and designated to maintain cognizance
over accountability and control of assigned sealed radioactive sources.
Source response check: A functional test that includes the observation of the response
of an instrument to a check source.
14 DOE G 441.1-1B
3-1-07
Source user: An individual who is trained and authorized to use sealed radioactive
sources.
Source-specific air sampling: Collection of an air sample near an actual or likely
release point.
Special radiobioassay monitoring: Any radiobioassay measurement that is required for
confirmation of a suspected intake of radionuclides, or is required for follow-up
evaluation of confirmed intakes.
State-of-the-art: The most advanced technology that is commercially available and
successfully field tested.
Section 17
Technical work document (TWD): A term used to generically identify formally
approved documents that direct work, such as procedures, work packages, or job or
research plans. TWDs provide radiological and ALARA controls applicable to the task.
Technology shortfall: A technology shortfall for routine radiobioassay exists when the
derived investigation level (DIL) for a well-designed and appropriate routine
radiobioassay program, using current or state-of-the-art methods and equipment, is less
than the minimum detectable amount/activity of the routine monitoring method (e.g., the
DIL is less than the MDA).
Termination radiobioassay: A radiobioassay measurement performed for the purpose of
documenting the retention of radioactive materials in the body due to occupational
exposure either upon termination of employment or upon the cessation of potential
exposure to a specific nuclide.
Test: A procedure whereby an instrument, component, or circuit is evaluated against
certain criteria for satisfactory operation.
Thoron: Unless otherwise specified, the isotope 220Rn.
Traceability: The ability to show, through documentation, that a particular instrument or
radiation source has been calibrated using either the national standard or a transfer
standard in a chain or echelon of calibrations, ultimately leading to a comparison with the
national standard.
Type test: An initial test of one or more production instruments made to a specific
design to show that the design meets certain specifications.
Type I error: Incorrectly concluding from a result that there is analyte present; the
probability (α) of a Type I error is usually taken as 0.05. The decision level is determined
on the basis of an acceptable level of Type I errors.
Type II error: Incorrectly concluding from a result that there is no analyte present; its
probability (β) is usually taken as 0.05.
DOE G 441.1-1B 15 (and 16)
3-1-07
Uniform exposure: Hypothetical radiation field in which the fluence and its angular and
energy distributions are the same throughout the volume of interest.
Useful beam: That part of the primary and secondary radiation beam that passes through
the aperture, cone, or other device used for collimation.
DOE G 441.1-1B 17
3-1-07
3.0 RADIATION PROTECTION PROGRAMS
10 CFR 835 establishes specific requirements for the development, content, revision, and
approval of the documented RPP for a DOE activity. These requirements include
identifying existing and/or anticipated operational tasks and formal plans and measures
for maintaining occupational radiation doses ALARA. Guidance provided in this Guide,
in combination with the provisions of site radiological control manuals developed and
implemented consistent with guidance provided by the RCS for those regulatory
provisions not addressed by the this Guide, provide reasonable assurance that a site RPP
will meet the requirements of 10 CFR 835.
The RPP for a specific DOE activity is approved by the cognizant DOE Headquarters
Program Office. The RPP is intended to provide DOE reasonable assurance that the
DOE activity will be conducted in compliance with the provisions of 10 CFR 835. The
RPP also satisfies the requirement for an Implementation Plan found in other DOE
directives. Guidance concerning the specific documentation required for DOE approval
of RPPs as required in 10 CFR 835.101(f), (g), and (h) is provided in Appendix 3.A,
PREPARATION, REVIEW AND APPROVAL OF RADIATION PROTECTION
PROGRAMS. Appendix 3.A is based on guidance which previously was provided in
DOE-STD-1082-94, PREPARATION, REVIEW, AND APPROVAL OF
IMPLEMENTATION PLANS FOR NUCLEAR SAFETY REQUIREMENTS.
Guidance is also provided by the cognizant DOE Headquarters Program Office.
Section 18
Program Offices will also provide guidance should DOE need to direct or make
modifications to an RPP as provided under 10 CFR 835.101(b). 10 CFR 835 permits
changes, additions, or updates to an RPP to become effective without prior DOE approval
only if the changes do not decrease the effectiveness of the RPP and the RPP, as changed,
continues to meet the requirements of the rule. Proposed changes that decrease the
effectiveness of the RPP shall not be implemented without submittal to and approval by
DOE [10 CFR 835.101(h)]. Guidance regarding the process for submitting and
approving changes will be provided by the appropriate DOE Headquarters Program
Office.
The RPP is the basis for implementing operational radiation protection program
requirements for a DOE activity. A combination of various methods which can be used
to achieve regulatory compliance is discussed in this Guide. DOE recognizes that many
of the requirements of 10 CFR 835 are not new. Equivalent requirements were
previously promulgated in DOE Orders and the DOE Radiological Control Manual,
which were implemented under contractual obligations for most DOE activities.
Therefore, much of the RPP documentation required to ensure compliance with
10 CFR 835 has already been developed to ensure compliance with
contractually-imposed radiation protection standards. DOE recognizes that significant
effort was expended in upgrading radiation protection of the work force and does not
intend for its contractors to expend significant additional effort to develop and implement
a separate, redundant program to satisfy the RPP requirements of 10 CFR 835. The RPP
should rely on existing documents, such as the site radiological control manual,
contractual agreements, procedures, and memoranda, to effectively administer and
18 DOE G 441.1-1B
3-1-07
manage regulatory commitments. However, the completeness of these existing
documents should be verified to ensure that all 10 CFR 835 requirements are satisfied.
This chapter of this Guide provides guidance on the management and administrative
aspects of the RPP to achieve and maintain compliance with specific requirements in
10 CFR 835.
Internal audits of the radiation protection program, including examination of program
content and implementation, shall be conducted through a process that ensures that all
functional elements of the program are reviewed no less frequently than every 36 months
(10 CFR 835.102). This Guide discusses the role of an internal audit program in
effectively managing and administering an RPP that complies with 10 CFR 835. These
internal audits may also be incorporated into quality assurance programs developed under
10 CFR 830 Subpart A, Quality Assurance Requirements (DOE 2001a) and/or DOE
Order 414.1C, Quality Assurance (DOE 2005a). Functional elements of a comprehensive
RPP are identified and discussed throughout Section 3.2 of this Guide. The specific
functional elements for a DOE activity will depend upon the types of radiological work
being performed and the radiological hazards present. Other functional elements
necessary for an integrated worker health and safety program are not addressed in this
Guide, but should be integrated with a radiological control program. These other
functional elements include: respiratory protection, radioactive material shipment and
receipt, radioactive waste management, and emergency response.
3.1 Implementation Guidance
Section 19
The approved RPP details how a DOE activity shall be in compliance with 10 CFR 835
and should identify the functional elements appropriate for that activity. Additional
documentation should be developed and maintained to supplement the approved RPP to
demonstrate that an RPP can be effectively managed and administered to achieve
compliance with 10 CFR 835. This documentation typically includes a site radiological
control manual developed to the guidance contained in the RCS, as well as detailed
implementing procedures, appropriate management policy statements, and technical basis
documentation. While this documentation need not be part of the RPP, it should be
clearly linked to the compliance commitments contained in the RPP.
DOE has developed technical guidance to support effective implementation of programs
to ensure compliance with 10 CFR 835. The RCS was developed to provide detailed
guidance on and best practices for line management implementation of DOE's radiation
protection requirements. DOE has also developed a set of technical standards and
handbooks addressing radiation protection issues, such as training, internal dosimetry, or
plutonium operations. Additionally, DOE has developed a set of Radiological Control
Technical Positions (RCTPs). The RCTPs provide acceptable approaches to
implementing specific provisions, or otherwise address specific issues, of the Rule
(available at http://www.hss.energy.gov/radiation). In addition, this Guide provides
acceptable methods for achieving compliance with a variety of technical and
administrative requirements.
DOE G 441.1-1B 19
3-1-07
RPP changes may be implemented without prior DOE approval only if the RPP continues
to meet 10 CFR 835 requirements and the changes do not reduce program effectiveness
[10 CFR 835.101(h)]. Due to the wide range of activities subject to 10 CFR 835 and the
variety of methods used by these activities to ensure compliance, no specific criteria exist
by which DOE may predetermine whether an RPP change results in a reduction in
program effectiveness. Factors that should be considered include the impact of the
proposed change(s) on:
• radiological conditions in occupied areas;
• individual and collective doses;
• worker awareness of radiological conditions and controls;
• management oversight and control of routine and non-routine radiological work
activities;
• sufficiency of area and personnel monitoring programs;
• completeness and irretrievability of records;
• radiological control performance indicators;
• adherence to consensus standards; and
• other factors that ensure full implementation of the RPP.
Documentation of the rationale applied to RPP changes implemented without prior DOE
approval should be retained for future reference and demonstration of compliance.
The terms "likely" and "potential" have been used judiciously throughout the rule to
allow the use of professional judgment and experience in making decisions in specific
circumstances and provide the flexibility necessary to implement the regulatory
requirements under a broad range of activities. The technical bases and other
considerations should be documented when professional judgment is exercised. This
documentation should provide sufficient detail to permit individuals who are
responsible for implementing and assessing the RPP to clearly understand how
regulatory compliance is achieved and maintained. The RCS, Guides, and other DOE
technical standards and handbooks are designed to facilitate development and
implementation of a comprehensive RPP commensurate with the radiological hazards
associated with the DOE activity. In addition, consensus standards, such as those
developed by the American National Standards Institute (ANSI) and the Health
Physics Society (HPS), may provide additional guidance concerning technical issues
not specifically addressed by the Guides, RCS, DOE technical standards, or other
DOE guidance documents.
Section 20
20 DOE G 441.1-1B
3-1-07
3.2 Organization and Administration
The RPP shall include plans, schedules, and other measures for achieving compliance
with 10 CFR 835 [10 CFR 835.101(f)]. Plans should include establishing the
organization and administration of the RPP to ensure that the program is effectively
implementing appropriate measures that ensure regulatory compliance can be achieved
and sustained. The authority and responsibility for radiation protection should originate
at the highest levels of line management and should be emphasized throughout the
organization. Ultimately, workers should be aware of their individual responsibilities for
radiation protection. Programmatic documentation should be developed to document the
organizational and administrative aspects of the RPP.
3.2.0 Administrative Processes
The degree of formality and scope of the associated administrative processes should be
commensurate with the radiological hazards encountered and complexity of the
associated control measures. More rigorous administrative processes should be
implemented for more complex or hazardous DOE activities. Administrative processes
should include a hierarchy of documents that clearly and unambiguously delineate
management policies, requirements, expectations, and objectives for the RPP. This
documentation should typically include the following:
• Policy statement: The policy statement should articulate management’s
commitment to conduct radiological operations in a manner that will ensure the
health and safety of all its employees, contractors, and the general public. This
policy statement should be patterned after DOE P 441.1, Department of Energy
Radiological Health and Safety Policy.
• Site-specific radiological control manual or handbook: This document should be
issued and endorsed by senior management for a DOE activity. This manual or
handbook should address all functional elements of the RPP for the DOE activity.
• Procedures: These documents should provide detailed instructions for
implementing various functional elements of the RPP. Responsibilities and
actions required of management and workers should be clearly and
unambiguously stated. Written procedures shall be developed and implemented
as necessary to ensure compliance with 10 CFR 835, commensurate with the
radiological hazards created by the activity and consistent with the education,
training, and skills of the individuals exposed to those hazards (10 CFR 835.104).
It is not necessary for written procedures to be developed and implemented for all
of the requirements of 10 CFR 835. Written procedures should be developed and
employed under the following circumstances:
– Worker health and safety are directly affected;
DOE G 441.1-1B 21
3-1-07
– the expected outcome for the process or operation requires that a specific
method be followed;
– the process or operation is infrequently used and competence training
cannot assure adequate implementation; or
– to document the approved method to implement specific processes or
operations. In evaluating the need for written procedures, consideration
shall be given to the level and extent of the radiological hazards, the
complexity of the measures required to achieve compliance, and the
education, training and skills of the individuals who must implement those
measures (10 CFR 835.104). Under such a regimen, a low hazard activity
employing a stable staff of highly educated and skilled workers having
demonstrated an advanced knowledge of radiation protection principles
and practices could have fewer and less detailed procedures than a higher
hazard activity employing a transient workforce with less knowledge of
radiation protection practices and principles. This Guide provides
additional guidance regarding specific procedural aspects of the RPP.
Section 21
• Technical basis documents: Document decisions and approaches used to achieve
regulatory compliance, such as those decisions where professional judgment has
been exercised. The document should include supporting analyses and
justifications sufficient to demonstrate that regulatory compliance can be achieved
and maintained. This Guide contains specific recommendations for documenting
the technical basis for various RPP functional elements.
10 CFR 835 specifies the frequency for performing certain activities. Internal audits shall
be conducted on a 36 month cycle (10 CFR 835.102); radiation safety training shall be
conducted every twenty four months [10 CFR 835.901(e)]; and accountable sealed
radioactive sources shall be inventoried and leak tested every six months
[10 CFR 835.1202(a) and (b)]. DOE expects that those entities responsible for ensuring
compliance with the rule will undertake those measures necessary to perform the required
activities within the prescribed time frame (e.g., if a sealed radioactive source is leak
tested on January 15, DOE would expect the subsequent leak test to be performed on or
before July 15 of the same year). 10 CFR 835.3(e) allows a grace period of up to 30 days
when operational or scheduling considerations preclude adherence to the required
schedule (e.g., the leak test could be performed no later than August 14 of the same year).
If the provisions of 10 CFR 835.3(e) are exercised, documentation of the schedule
deviation should be developed and include a discussion of the specific activity involved
and the reason for the schedule deviation. Schedule extensions beyond the 30 day grace
period can only be granted through the regulatory exemption process under
10 CFR 820.62.
3.2.1 Radiological Control Organization
A radiological control organization should be established to support line managers and
workers. To function effectively and be consistent, as necessary, with the requirements
22 DOE G 441.1-1B
3-1-07
in DOE Order 226.1, Implementation of Department of Energy Oversight Policy (DOE
2005b) the radiological control organization should be independent of the line
organizational element responsible for production, operation, or research activities, and
should have an equivalent reporting level. Radiological control organization function is
discussed in detail in the RCS. Other organizational schemes that allow effective
compliance with the standards set forth in 10 CFR 835 should be considered to address
site- or facility-specific needs.
3.2.2 Education, Training, and Skills
Individuals responsible for developing and implementing measures necessary for
ensuring compliance with the requirements of 10 CFR 835 shall have the appropriate
education, training and skills to discharge these responsibilities (10 CFR 835.103). These
individuals can include technical and management personnel within the radiological
control organization, independent assessors, and line managers responsible for
radiological work activities. In addition, 10 CFR 830.122(b), Quality Assurance Criteria,
specifies that nuclear facility personnel shall be trained and qualified to ensure they are
capable of performing their assigned work.
Section 22
DOE previously issued requirements and guidance with regard to education, training, and
skills for many categories of personnel, including individuals responsible for developing
and implementing measures necessary for ensuring compliance with the requirements of
10 CFR 835. Some of these requirements are addressed in DOE 5480.20A, Ch. 1,
Personnel Selection, Qualification, and Training Requirements for DOE Nuclear
Facilities (DOE 2001b). This order establishes training and qualification requirements
for technical professionals and management personnel operating defense nuclear
facilities. While these requirements are not mandatory for all DOE facilities, this
information may be useful for all DOE facilities in developing training programs and
standards for the education, training, and skills appropriate for personnel to achieve
compliance with the requirements of 10 CFR 835.103 and 10 CFR 830.122(b).
Key radiation protection positions are identified in DOE STD-1107-97, KNOWLEDGE,
SKILLS AND ABILITIES FOR KEY RADIATION POSITIONS AT DOE FACILITIES
(DOE 1997b). This document supplements the requirements discussed above by
synthesizing guidance from several source documents into a single reference. DOE
STD-1107-97 describes the level of knowledge, skills, and abilities for personnel in key
radiation protection involved with DOE activities. The approach taken in DOE
STD-1107-97 reinforces the DOE’s emphasis on establishing a system of criteria for key
radiation protection positions that reflects the increasing levels of education, training, and
skills needed for positions of increasing responsibility. The information contained in this
standard should be strongly considered when evaluating the education, training, and skills
of personnel in key radiation protection positions.
The standards in DOE 5480.20A and DOE STD-1107-97 are based on DOE, Nuclear
Regulatory Commission, and related industry standards and provide an acceptable
method for achieving compliance with the requirements of 10 CFR 835.103.
DOE G 441.1-1B 23
3-1-07
DOE STD-1107-97 includes radiological control technicians (RCTs) in the list of key
radiation protection positions. While 10 CFR 835 does not establish specific
requirements for RCT training, DOE considers the typical job functions associated with
RCTs to be critical in implementing an acceptable RPP. These typical job functions
include: prescribing and implementing radiological work controls, performing
radiological monitoring, responding to radiological incidents, or evaluating radiological
conditions in the workplace. Individuals performing these functions shall meet the
provisions of 10 CFR 835.103. Chapter 6, Part 4, of the RCS discusses the essential
elements of RCT training and qualification, including qualification standards, oral
examination boards, and continuing training. In support of these elements, DOE has
developed and maintains the core course for RCTs. DOE considers the DOE-developed
core course for RCTs, augmented with site specific training, an acceptable level of
training for individuals performing the typical job functions associated with RCTs. As is
the case with using any of the DOE-developed training courses, sites need to evaluate the
individual’s job functions and ensure the adequacy of the training provided.
Section 23
To ensure that the work performed by RCTs receives the appropriate level of review and
evaluation, it is important that RCT Supervisors receive a higher level of training and
maintain a higher level of knowledge than those expected of RCTs. Chapter 6, Part 4 of
the RCS also provides guidance on the essential elements of RCT Supervisor training and
qualification, including continuing training and oral examination boards.
DOE developed and implemented core courses to enhance the content of training
provided to general employees, radiological workers, and radiological control technicians
across the DOE complex and bring these core training programs up to a standard
consistent with the commercial industry. The use of the core courses is not mandatory.
However, these courses should strongly be considered as a basis for developing and
implementing radiation safety and radiological control technician training programs.
Additional guidance regarding compliance with the Subpart J requirements is provided in
Chapter 14 of this Guide.
DOE has also sponsored development of additional training courses and guidance. DOE
strongly encourages its operating entities to implement these courses and guidance.
These courses and guidance, when augmented with site specific information and
appropriately revised to reflect the most current regulatory requirements, provide
acceptable approaches for providing radiation safety training or training for individuals
responsible for developing and implementing measures necessary for ensuring
compliance with the rule. These courses include:
• DOE-HDBK-1143-2001; RADIOLOGICAL CONTROL TRAINING FOR
SUPERVISORS (DOE 2001c)
• DOE-HDBK-1145-2001; RADIOLOGICAL SAFETY TRAINING FOR
PLUTONIUM FACILITIES (DOE 2001d)
• DOE-HDBK-1141-2001;RADIOLOGICAL ASSESSOR TRAINING (DOE
2001e)
24 DOE G 441.1-1B
3-1-07
• DOE-HDBK-1105-2002; RADIOLOGICAL SAFETY TRAINING FOR
TRITIUM FACILITIES (DOE 2002a)
• DOE-HDBK-1106-97; RADIOLOGICAL CONTAMINATION CONTROL
TRAINING FOR LABORATORY RESEARCH (DOE 1997c)
• DOE-HDBK-1108-2002; RADIOLOGICAL SAFETY TRAINING FOR
ACCELERATOR FACILITIES (DOE 2002b)
• DOE-HDBK-1109-97; RADIOLOGICAL SAFETY TRAINING FOR
RADIATION-PRODUCING (X-RAY) DEVICES (DOE 1997d)
• DOE-HDBK 1110-97; ALARA TRAINING FOR TECHNICAL SUPPORT
PERSONNEL (DOE 1997e)
• DOE-HDBK-1113-98 RADIOLOGICAL SAFETY TRAINING FOR
URANIUM FACILITIES (DOE 1998d)
• DOE-HDBK-1122-99 Radiological Control Technician Training (DOE 1999b)
3.2.3 Internal Audit and Self Assessment
Internal audits and self assessments are two of the numerous checks and balances needed
in an effective RPP. Internal audits of the RPP, including examination of program
content and implementation, shall be conducted through a process that ensures that all
functional elements of the program are reviewed no less frequently than every 36 months
(10 CFR 835.102). The RCS discusses how assessments, including internal audits,
provide independent feedback to senior line managers concerning the implementation of
the RPP.
An audit plan should be developed that identifies the functional elements of the RPP and
the schedule for review to ensure that over a 36 month period, all of the functional
elements are reviewed. Internal audits should be conducted on a continuing basis. DOE
cautions against conducting a single comprehensive internal audit of the entire RPP once
every three years. DOE does not believe that such an approach is effective in assuring
that a DOE activity will be conducted in conformance with its approved RPP. DOE
recommends that, at a minimum, an annual, broad scope audit of the program be
conducted. Under this approach, the audit plan would identify each functional element to
be reviewed during the annual audit and ensure that all functional elements would be
reviewed during a 36 month cycle. Thus, the RPP is under continuing review and
deficiencies can be identified and corrected in a timely manner.
Section 24
The functional elements of a comprehensive RPP are discussed in this Guide. All of
these functional elements may not be applicable to a specific DOE activity, but should be
selected based upon the type of radiological work being performed and the radiological
hazards encountered.
DOE G 441.1-1B 25 (and 26)
3-1-07
Internal audits should be conducted by individuals who are organizationally independent
from the organizations responsible for developing and implementing the RPP.
3.3 RPP Functional Elements
This section identifies the programmatic functional elements of a comprehensive RPP.
For each element, the table below identifies the applicable regulatory provisions,
contractual requirements, and recommended guidance document(s) which are useful in
achieving compliance with these provisions.
Functional Element Regulatory Provision Contractual/Guidance
Document
1. Organization and Administration 10 CFR 835, Subpart B Chapter 3.0 of this Guide
2. ALARA Program 10 CFR 835.101(c), Subpart K Chapter 4.0 of this Guide.
3. External Dosimetry Program 10 CFR 835.401 (a), 402(a), (b) Chapter 6.0 of this Guide.
4. Internal Dosimetry Program 10 CFR 835.401(a), 402(c), (d) Chapter 5.0 of this Guide.
5. Area Monitoring and Control
a. Area Radiation Monitoring 10 CFR 835.401(a) Chapter 6.0 of this Guide.
b. Airborne Radioactivity Monitoring 10 CFR 835.209, 401(a), 403 Chapter 10.0 of this Guide.
c. Contamination Monitoring and
Control
10 CFR 835.401(a), Subpart L Chapter 11.0 of this Guide.
d. Instrument Calibration and
Maintenance
10 CFR 835.401(b) Chapter 9.0 of this Guide.
6. Radiological Controls
a. Radiological Work Planning 10 CFR 835.501(d), 1001(b), 1003 DOE-STD-1098-99,
RADIOLOGICAL CONTROL
b. Entry and Exit Controls 10 CFR 835, Subpart F Chapter 7.0 of this Guide.
c. Radiological Work Controls 10 CFR 835, Subpart F, 1003 Chapter 7.0 of this Guide.
d. Posting and Labeling 10 CFR 835, Subpart G Chapter 12.0 of this Guide.
e. Release of Materials and
Equipment
10 CFR 835.1101 Chapter 11.0 of this Guide.
f. Sealed Radioactive Source
Accountability and Control
10 CFR 835, Subpart M Chapter 15.0 of this Guide.
7. Emergency Exposure Situations 10 CFR 835.1301, 1302 DOE O 151.1-1, Comprehensive
Emergency Management System
(DOE 2005c)
8. Nuclear Accident Dosimetry 10 CFR 835.1304 Chapter 6.0 of this Guide.
9. Records 10 CFR 835, Subpart H Chapter 13.0 of this Guide.
10. Reports to Individuals 10 CFR 835, Subpart I Chapter 13.0 of this Guide.
11. Radiation Safety Training 10 CFR 835, Subpart J Chapter 14.0 of this Guide.
12. Limits for the Embryo/Fetus 10 CFR 835, Subpart C Chapter 8.0 of this Guide.
DOE G 441.1-1B 27
3-1-07
Appendix 3.A
PREPARATION, REVIEW, AND APPROVAL OF
RADIATION PROTECTION PROGRAMS
3.A 1. PREPARATION OF RPPs
The RPPs detail how the site, facility, or activity has met or will meet the requirements of
10 CFR Part 835. The format for the RPP is not specified. This flexibility will permit
the RPP submitting organizations to take advantage of pre-existing documents. The
following sections describe the minimum content expected in RPPs.
Note: The term “Operations Office” is used throughout this
document. Where it is used, the term “Field Office” or the term
“Area Office,” as appropriate, should be substituted where there is
no Operations Office.
3.A 1.1 RPP SUMMARY
Each RPP should contain a summary section in the front to allow DOE management and
reviewers to quickly assess the more significant information contained in the RPP. The
summary should identify the following minimum information:
Section 25
(1) Any requests for exemptions contained in the RPP;
(2) The total additional funding required to meet the commitments of the RPP and the
expected sources of funding by fiscal year;
(3) Any significant new programs or activities needed to meet the requirements;
(4) Any significant impacts to other programs or activities not included in the RPP;
(5) Any constraints to implementing the RPP;
(6) Those areas where there is currently full compliance with the requirements.
3.A 1.2 GENERAL INFORMATION
The RPP should include general information which: (1) identifies that the RPP addresses
the requirements of 10 CFR Part 835; (2) identifies whether the RPP is the initial
submittal or a revision; (3) identifies the facilities or activities, missions, and
organizations involved; and (4) briefly discusses the content and format of the RPP.
3.A 1.3 APPLICABILITY OF REGULATORY REQUIREMENTS
The RPP should identify the specific facilities or activities covered by the RPP. Any
determination that a specific requirement is not applicable to the facilities or activities
addressed in the RPP should be documented in the RPP to ensure that the determination
28 DOE G 441.1-1B
3-1-07
is clearly communicated. DOE approval of the RPP will constitute agreement with
applicability statements contained therein.
Applicability statements may not be used to provide relief where the requirements are
clearly stated to be applicable in 10 CFR Part 835. Relief from 10 CFR Part 835 can only
be granted by an approved exemption granted in accordance with 10 CFR Part 820,
Subpart E as discussed in Section 3.A 1.8 of this technical document.
The information provided in the plan should clearly identify which of the following three
categories applies to each requirement for a given facility, site, or activity:
(1) The requirement is applicable and the RPP defines the actions and schedules for
compliance;
(2) The requirement is applicable and an exemption is being requested; or
(3) The requirement is not applicable for the reasons documented in the RPP.
The RPP should also identify any requirements that are only partially applicable, the
limits of the applicability, and the reasons for the limitation.
Individuals should contact the appropriate Operations Office to assist with any needed
clarification of applicability statements. The Operations Office should contact the Office
of Health and Safety for any needed technical clarifications or the Office of the General
Counsel for legal interpretations of 10 CFR Part 835.
3.A 1.4 GUIDES AND TECHNICAL STANDARDS
The RPP should identify the guides and technical standards that are to be adopted as the
means to meet 10 CFR Part 835. The use of guides and technical standards is not
required; however, it is encouraged for the following reasons:
(1) The use of previously approved methodologies will streamline the review and
approval process; and
(2) The use of guides and technical standards will enhance the consistent and
successful implementation of requirements across the DOE complex.
The implementing organization should consider methods and guidance from guides and
technical standards when developing the RPPs; however, alternative methods that
achieve equivalent or better results are acceptable. When an implementing organization
identifies an alternate way to implement the requirements, a reasonable opportunity will
always be provided to demonstrate compliance with the requirements using the alternate
method. Demonstration of compliance does not require an organization to address the
differences between the alternate method and the method in the guide or technical
standard unless the comparison is necessary to demonstrate acceptability.
Section 26
DOE G 441.1-1B 29
3-1-07
When guides or technical standards are used, the RPP should indicate if they are adopted
in their entirety or adopted with exceptions. The exceptions, if any, should be
specifically noted. Methodologies and guidance that are adopted with exceptions will be
reviewed on a case-by-case basis.
The adopted guides and technical standards should be listed either by:
(1) Including a list of applicable guides and technical standards in the RPP, or
(2) Incorporating a list of guides and technical standards by reference.
Commitments in an RPP to meet all or parts of guides and technical standards are
enforceable as part of the RPP.
3.A 1.5 RESOURCE ASSESSMENT
New RPPs should contain an estimate of the additional life cycle costs to implement
10 CFR Part 835. Revised RPPs may contain an estimate of the change in life cycle costs
associated with the revision, if the change in life cycle cost is significant. The goals of
this element of the RPP are as follows: (1) to communicate the expected new costs of
implementation to DOE management for the purposes of budget planning and
prioritization; (2) to identify the need to explore more cost effective means of achieving
compliance; and (3) to identify cases where exemptions should be requested on the basis
of insufficient benefit versus the expected implementation costs. Identification of
required resources should also serve to open a dialogue between DOE and the RPP
submitting organization on adjusting costs and activities to the available resources.
When performing the assessments, the estimator should consider monetary costs, as well
as non-monetary resource considerations such as the limited availability of special job
capabilities (e.g., health physicists). The assessment should (1) be guided by available
quantitative and qualitative information; (2) reflect the current status of plant conditions,
configurations, and processes; (3) consider the availability of materials and resources;
and (4) consider any other information that is relevant to the radiation protection
requirements.
RPP submitting organizations should seek to achieve the broadest consistency in the
methods used to evaluate the resource requirements so that the assumptions, evaluations,
and results of the assessment can be objectively compared with the equivalent parameters
of other resource assessments. This will assist DOE and RPP activity management to
determine priorities for the use of funding. All assumptions and estimates should be
made using the best available knowledge and information.
After evaluating the resource impacts, consideration should be given if a more
cost-effective means of achieving the intent of the requirement is available. As a
minimum, the use of more cost-effective methods of compliance, or exemptions (see
30 DOE G 441.1-1B
3-1-07
section 3.A 3.1.6.7 of this attachment), should be considered whenever the resource
expenditures necessary to meet a requirement are not commensurate with the expected
safety improvements. One of the criteria for granting an exemption to a nuclear safety
requirements is that the requirement results in resource impacts which are not justified by
safety improvements. In the past DOE has granted exemptions on this basis for such
topics as radiological postings and recording tritium intakes, see
http://www.eh.doe.gov/whs/rhmwp/exemption.html.
There should be limited effort used to develop the resource assessments to only that level
of detail necessary to achieve the goals of the assessment as stated above.
Section 27
3.A 1.6 PRIORITIZATION
The RPP should include a discussion of the prioritization process used to integrate the
proposed activities into a facility or site schedule of activities. The prioritization process
is to be used to develop the proposed schedules and should be sufficiently flexible to
accommodate changes at later dates.
The prioritization process should consider available information from safety analyses and
other sources and give primary attention to controlling and reducing risks to the public;
the environment, and the workers to an acceptable level. It should also consider other
factors such as mission needs, outage schedules, and external regulations.
The prioritization process should be selected in consultation with the applicable DOE
Operations Office and Program Offices to ensure that the prioritization of efforts meets
DOE expectations. The prioritization schedule should tie budgets to schedules.
3.A 1.7 MILESTONES AND SCHEDULES
Per 10 CFR 835.101(f), the RPP must identify proposed milestones with achievable
schedules developed in accordance with the prioritization process identified in the RPP
(see Section 3.A 1.6 above). In developing the schedules, consider the resources
available to support the work, as well as any major work reductions or schedule changes
in other areas that will be required in order to meet the proposed schedules. The RPP
should identify major impacts to activities or commitments outside the scope of the RPP
that will be caused by the proposed additional activities.
Schedules should be developed using the best information available with any
assumptions on availability of resources (monetary or non-monetary) clearly stated. The
milestones and schedules will be enforceable commitments upon approval of the RPP.
Schedule commitments should be firm commitments and consequently, should not be
listed as contingent on funding. Thus, it is essential that line program representatives
participate in the review and approval of RPPs that involve additional funding needs.
Following approval of the RPPs, DOE has a responsibility to provide appropriate funding
to support the RPP schedules, the RPPs should be revised to reflect the new schedules
DOE G 441.1-1B 31
3-1-07
supported by funding (provided any schedules specifically prescribed in the DOE
requirements documents are met or schedule exemptions are approved). Such revisions
should be submitted to DOE for review and approval.
Alternatively, RPP developers may consider requesting an exemption for unfunded
activities, if the criteria for granting an exemption are met (see Section 3.A 1.8 of this
attachment).
3A 1.8 EXEMPTIONS
Exemptions are to be requested whenever relief is sought from applicable DOE
requirement. The RPP should clearly identify any exemptions that have been approved
or are being requested from the subject requirements. The organization conducting RPP
activities may submit requests for exemptions as part of the RPP provided that they relate
to the same requirements. Requests for exemption that are submitted as part of the RPP
should be identified in the RPP summary for early recognition. Early identification of
exemption requests is important because they may need to follow a separate review and
approval process.
The provisions for requesting and granting exemptions to rules are stated in 10 CFR Part
820, Subpart E, Exemption-Relief.
3.A 2 SUBMITTAL OF RPPS
Section 28
Per 10 CFR 835.101, RPPs must be submitted to the designated DOE point-of-contact
within the schedule specified in 10 CFR Part 835.
Normally, the RPP is submitted to a point-of-contact located in a DOE Operations Office.
The Operations Office point-of-contact should date stamp the receipt of the RPP.
Contact the Operations Office point-of-contact in advance of the submittal date to
determine the number of copies to be submitted. Documents that are incorporated by
reference should be submitted with the RPP unless other arrangements are made with the
Operations Office point-of-contact. In addition, if the RPP is not a stand-alone document
(able to be reviewed independent of other documents), contact the Operations Office
point-of-contact prior to submittal of the RPP to discuss which supporting documents are
to be transmitted with the RPP or made available for onsite review.
Also see section 3.4 below for additional submittal requirements for final RPPs.
3.A 3. REVIEW AND APPROVAL OF RPPs
3.A 3.1 REVIEW AND APPROVAL PROTOCOL
The Department’s protocol for review and approval of RPPs is described below. The
protocol defines the roles, interfaces, and responsibilities of Department organizations
32 DOE G 441.1-1B
3-1-07
with respect to review and approval of RPPs. Organizations who prepare the RPPs and
the DOE organizations responsible for review and approval of the RPPs should have a
shared vision of what should be in the completed RPPs before submission f the RPP to
DOE. In order to ensure this shared vision and the development of successful RPPs,
early and continual dialogue between the RPP submitting organization and the Review
Team is essential. This dialogue should begin well before the RPP is submitted to DOE.
The process described below was built on the lessons learned in similar efforts and was
designed to facilitate that dialogue.
Because review and approval of the RPPs will often involve multiple Departmental
organizations, the review and approval process should provide for coordination,
consistency of review, and resolution of issues among those offices. In addition, the
review and approval process should address both the technical adequacy of the proposed
RPPs and the programmatic responsibilities (i.e., funding and mission). These
responsibilities will require additional coordination within the Department as they may
reside in different organizations.
The review and approval process should be sufficiently flexible to accommodate the
subjects addressed by 10 CFR Part 835 and adequately structured to permit efficient
completion of the review and approval within the 180 days [See 10 CFR 835.101.(i)].
Table 1, at the end of this attachment, provides recommended time periods to meet this
180-day requirement.
In the review and approval process, the Operations Office should be responsible for
coordination between the RPP submitting organization and the Department’s
Headquarters staff. This focused interface will ensure consistency in the information
provided to the RPP submitting organization and allow interaction with a single
point-of-contact. In addition, the Operations Office should be responsible for
coordinating PSO (Program Secretarial Officer) approvals. It should be noted that this
attachment contains a detailed protocol. However, individual steps may be modified to
or eliminated, based on local conditions, as long as the process involves appropriate
review and approval. For example, approval authority may have been delegated to the
Manager of the Field Element (or lower), which would obviate the need for specific PSO
approval
Section 29
A RPP Review Team should be formed for each RPP to conduct the review of the RPP.
The Review Team members should include DOE Headquarters and Field Operations
personnel with technical expertise and coordinating responsibility for program decisions
(e.g., funding, schedule). Operations Office personnel should serve as points-of-contact
and Review Team Leaders for RPP reviews applicable to their sites. Individual
participation in Review Team activities will vary in level of effort and time frame based
on review and approval needs.
The Operations Office point-of-contact plays a key role in coordinating all RPP review
and approval activities between DOE Headquarters and the RPP submitting organization.
DOE G 441.1-1B 33
3-1-07
The process for the development, review, and approval of RPPs is discussed below. The
provisions of 10 CFR 835.101(i) state that “an initial RPP or an update shall be
considered approved 180 days after its submission unless rejected by DOE at an earlier
date.” See Table 1 for a typical schedule of activities to meet this provision.
3.A 3.1.1 Identifications of Responsible Review Staff
3.A 3.1.1.1 Points-of-Contact
Each Operations Office Manager should identify a point-of-contact for the RPP. The
Operations Office point-of-contact should be the primary interface for all activities
associated with the development, submittal, review, and approval of the RPPs. The
Operations Office point-of-contact should also be the Review Team Leader.
The Review Team Leader should coordinate assignment of Review Team members with
the PSOs and the Operations Office.
3.A 3.1.1.2 RPP Review Teams
As discussed in the previous paragraph, the Operations Office point-of-contact should
normally be the Review Team Leader. The Operations Office Manager may provide
additional team members and technical assistance as necessary. In addition, each
affected PSO should identify the Program Office representatives for each Review Team
to the Review Team Leaders. The PSO may assign multiple reviewers to a single site or
a single reviewer.
3.A 3.1.2. Review Planning
3.A 3.1.2.1 RPP Guide
Each responsible PSO should prepare an RPP Guide that defines DOE’s specific
technical and programmatic expectations for the RPPs internal to their organization. The
guide should include the following types of information: (1) criteria and/or checklists of
items to be considered during the review, (2) approaches to key issues, (3) direction on
use of existing RPPs and approvals, (4) review and approval authorities, and (5) specific
issues relating to Headquarters or Operations Office review responsibilities. The guide
should be as brief as possible, should be user friendly, and should not repeat general
guidance available in other guidance documents such as this attachment. The PSO
should provide assistance and/or training to the Review Teams on the use of the guide.
3.A 3.1.2.2 Implementation Action Plan
For each RPP, the Review Team Group should prepare an Implementation Action Plan
that defines the Review Team activities, priorities, and schedule. A copy of the plan
should be provided for information.
34 DOE G 441.1-1B
3-1-07
3.A 3.1.2.3 Responsibility and Interface Matrix
The PSO should prepare and maintain a matrix that identifies the Review Team Leader,
Review Team members, and DOE programmatic and technical contacts for each RPP.
3.A 3.1.3 Meetings, Conference Calls, and Status Reports
3.A3.1.3.1 Initial Site Meeting
Section 30
The Review Team should meet with the RPP submitting organization at the earliest
feasible date to discuss the basic expectations for implementation of the DOE
requirements document and to discuss any issues that might impact the timely and
acceptable completion of the RPP. Issues to be discussed should include (1) how to best
use existing plans or other information in developing the RPP; (2) potential exemptions;
(3) plans and schedules for ongoing interactions; and (4) funding sources for new
activities identified as necessary to come into compliance. The Operations Office
point-of-contact has primary responsibility for planning and coordinating this meeting.
3.A 3.1.3.2 Status Meetings
Periodic status meetings should be held with the RPP submitting organization to fully
discuss all elements of the proposed RPPs that could affect the acceptability of the RPPs.
3.A3.1.3.3 Periodic Conference Calls
The Operations Office point-of-contact should coordinate regular conference calls with
the RPP submitting organization and the Program Offices to address and resolve issues as
they arise. As necessary, site or headquarters meetings should be held to resolve difficult
issues. The Operations Office point-of-contact has primary responsibility for
coordinating phone conferences, as well as necessary meetings to resolve issues.
3.A 3.1.4 Submittal and Distribution of RPPs
As discussed in Section3.A 2 of this attachment, RPPs should be submitted directly to the
Operation Office point-of-contact. The Operations Office point-of-contact should
transmit a copy of the RPP to the Review Team members and a copy of the transmittal
memorandum to the affected PSOs within four working days of the receipt of the RPP.
The transmittal memorandum should identify the required date for completing the review.
3.A 3.1.5 Review
3.A 3.1.5.1 Review to Review Teams
RPPs should be reviewed by an integrated Review Team with Program and Operations
Office representatives, as discussed in Section3.A 3.1.1.2 above. Program Office team
members and their contacts should, as a minimum, participate in the review of issues
involving funding, missions, schedules, priorities, and exemptions. The Review Team
DOE G 441.1-1B 35
3-1-07
Leader should facilitate resolution of unique or difficult issues not addressed in the RPP
Guide.
Review Team members should assist the RPP submitting organization in clearly
understanding what actions or changes are necessary to result in an acceptable RPP.
DOE comments and feedback should be routed through the Review Team Leader to
ensure consistent feedback. The Review Team Leader should also be responsible for
resolving conflicts prior to communication with the RPP submitter.
All reviewers should expedite their reviews to allow closure on an acceptable RPP as
early as possible.
3.A 3.1.5.2 Delegated Approval Authority for RPPs
The PSO may delegate the authority to approve specific RPPs. Any such delegation
should be provided in writing to the designee and documented in the Functions,
Responsibilities, and Authorities (FRA) document for that organization.
Wherever the authority to approve an RPP has been delegated to the Operations Office by
all of the affected PSOs, the Operations Office may choose to have the Review Team
consist entirely of Operations Office personnel provided any technical and programmatic
requirements can be handled by the designated team.
Per 10 CFR Part 820, Subpart E, the authority to approve exemptions to 10 CFR Part 835
cannot be delegated.
Section 31
3.A 3.1.6 Approval
3.A 3.1.6.1 Approval Recommendations by the Review Team
The Review Team Leader is responsible for ensuring that the Operation’s Office
Manager receives the Review Team’s final recommendation for approval within 145 days
after receipt of the RPP. That recommendation should either endorse acceptance of the
RPP as submitted (or changed through negotiations during the review process) or, if
issues cannot be resolved, provide recommendations regarding specific additional
commitments or changes to be incorporated in the RPP.
3.A 3.1.6.2 Operations Office Review of the Review Team Recommendations
The Operations Office Manager, or equivalent, should review the recommendation of the
Review Team and either endorse the recommendation or provide specific
recommendations for an acceptable RPP. The Operations Office Manager is responsible
for ensuring that the PSO receives the recommendations of the Review Team along with
any recommendations from the Operations Office no later than 159 days after receipt of
the RPP [with information copy to the affected CSOs [Cognizant Secretarial Officer)].
36 DOE G 441.1-1B
3-1-07
In some cases involving multiple PSOs, approval authority may be delegated by one or
more PSOs, but not all PSOs. In such cases, the Operations Office Manager should
coordinate the remaining approvals with the PSOs.
For cases in which the approval authority has been delegated by all affected PSOs to the
Operations Office Manager, the Operations Office Manager should skip to step 3.A
3.1.6.4 Approval Letter, below.
3.A 3.1.6.3 PSO Approval Memorandum
In order to ensure the Operations Office has a week to transmit the approval or
disapproval of the RPP before it becomes automatically effective 180 days after receipt
of the RPP by DOE, each affected PSO should indicate approval or disapproval of the
RPP in a memorandum to the Operations Office within 173 days of receipt of the RPP by
DOE.
3.A 3.1.6.4 Approval Letter
The Operations Office Manager should transmit the approval memorandum by letter to
the RPP submitting organization no later than 180 days after receipt of the RPP by DOE.
3.A 3.1.6.5 Imposition of RPPs
The Review Team will endeavor to resolve any issues identified during the review
process. If conflicts exist which cannot be resolved, the Department may exercise its
authority [see 10 CFR Part 835.101(b)] to modify proposed RPPs to include those actions
and schedules that the Department finds appropriate for achieving full compliance in a
reasonable and timely manner. In such cases, the PSO approval memorandum should be
replaced with a memorandum imposing a revised RPP. The revised RPP should be
transmitted to the RPP submitting organization by the Operations Office Manager. The
RPPs may be renegotiated at a later date, but until it is replaced by another approved
RPP, it will be the enforceable basis for implementation of 10 CFR Part 835.
3.A 3.1.6.6 RPPs which are not Approved by Final Date
Per 10 CFR Part 835.101(I), RPPs which are not approved within the approval period
specified in the DOE requirements document should be considered to be approved unless
another RPP is imposed by the Department. These RPPs may be renegotiated at a later
date, but until they are replaced by another approved RPP, they will be the enforceable
basis for implement of 10 CFR Part 835.
3.A3.1.6.7 Approval of RPPs Containing Exemption Requests
Section 32
RPPs may contain requests for exemptions. When they do, the requests may be granted
in the approval memorandum for the RPP, provided that all of the requirements for
processing exemptions are met, including the approval of the DOE Headquarters official
DOE G 441.1-1B 37
3-1-07
designated by 10 CFR Part 820 Subpart E. When exemptions are approved as part of an
RPP, the approval document should state how the provisions of 10 CFR Part 820, Subpart
E were met. Alternatively, exemptions may be approved separately and referenced in the
RPP approval letter.
Upon submittal of the RPPs, the Review Team Leader should determine if any exemption
requests submitted in the RPPs need to be reviewed and approved separate from the
RPPs. Where separate review and approval is necessary, the Review Team Leader
should alert the PSO Review Team representatives to initiate a separate and expeditious
review of the exemption requests.
The provision in 10 CFR 835.101(i) that states that RPPs are considered approved 180
days after submission, does not apply to exemptions.
Approval of an RPP pending granting of an exemption does not constitute or imply
approval of the exemptions contained therein.
3.A 3.2 DISTRIBUTION OF COPIES OF THE FINAL RPP
The Operations Office Manager should be responsible for distributing approved RPPs (if
changed from the originally submitted RPP), the Office of the Docketing Clerk (in the
Office of Price Anderson Enforcement), and to the affected PSOs. Copies of approved
RPPs transmitted to the Office of Docketing Clerk should include both a hard copy and
an electronic copy. As required by 10 CFR Part 820, the Office of Docketing Clerk will
maintain a file of enforceable actions based upon rule violations and noncompliance with
RPPs.
3.A 3.3 REVIEW RESPONSIBILITIES
The Review Team should determine if the RPP provides an acceptable method to meet
10 CFR Part 835. The Review Team should also determine if the RPP adequately
addresses the elements discussed in Section 3.A 1 of this attachment (Preparation of
RPPs). RPP submitting organizations are encouraged to use the methodologies contained
in this Guide for implementation of 10 CFR Part 835 where they are reasonable and
economical; however, one may elect to propose an alternate way to meet the
requirements. In cases where an alternate method is proposed, the Review Team should
evaluate the proposed method to ensure that it will be adequate to meet the requirements
and provide a comparable level of safety.
The Review Team should verify that the RPP provides sufficient detail to permit DOE to
measure the progress towards meeting the DOE requirements.
The Review Team should also ensure that (1) the projected budget and schedule
information contained in the RPP is reasonable and consistent with the funding projects,
(2) the prioritization of efforts meets the DOE expectations, (3) the proposed milestones
38 DOE G 441.1-1B
3-1-07
and schedules will meet DOE needs, (4) the applicability of the requirements is correctly
identified, and (5) the compensatory actions are acceptable.
The Review Team should expect to see significant variations in the level of detail and
size of individual RPPs because of the diversity of types, sizes, and missions of DOE
facilities. In order to facilitate timely reviews and agreements on complex RPPs, the
members of the Review Team should visit the site and/or facility and have frequent
communication during both the preparation and the review of the RPP.
Section 33
3.A 3.4 APPROVAL RESPONSIBILITIES
DOE approval of the RPP constitutes acceptance by the PSO that:
(1) The proposed activities represent an acceptable method to meet the requirements;
(2) The resources identified in the RPP are necessary and sufficient to ensure
completion of the activities contained in the RPP and are expected to be available
to support the proposed schedules;
(3) The proposed milestones and schedules are acceptable;
(4) The applicability of the requirements is correctly identified; and
(5) The identified compensatory actions are acceptable.
3A 4. REVISIONS TO RPPs
The RPPs will probably need to be revised and updated during the life cycle of the site,
facility, or activity. Approved RPPs should be revised as needed to reflect the addition or
deletion of other work at a facility or other factors that affect the ability to meet the
approved schedule, such as prospective changes in the level of funding or assumptions
regarding the availability of materials and other resources. The provisions in
10 CFR 835.101(h) contain conditions under which RPPs may be revised without prior
approval from DOE. In such cases, submit the revised RPP to DOE within 30 days of the
effective date of the RPP. All other changes to RPPs should be reviewed and approved
by DOE prior to the effective date of the change. Revised RPPs should be submitted in a
timely manner for DOE approval (at least 180 days before the change is to be effective),
along with justification for the revision. As noted previously, proposed revisions will be
considered approved 180 days after submittal to DOE, unless they are approved or
rejected by DOE.
The changes to the RPP should be clearly indicated (e.g., sidebars) to facilitate timely
review. Revised RPPs are to be submitted to DOE in the manner described in this section
and reviewed and approved in the manner described in section 3.A.3 above.
DOE G 441.1-1B 39 (and 40)
3-1-07
Any changes to RPPs which will result in a requirement not being met, require an
approved exemption.
3.A 5. EXTENSIONS TO THE SUBMITTAL SCHEDULE FOR RPPS
Extensions to the schedule for submitting an RPP will generally require an exemption
processed in accordance with 10 CFR Part 820, Subpart E, and approved by the
Secretarial Officer responsible for environment, safety and health matters (i.e., the Chief
Health, Safety and Security Officer).
3.A 6. IMPLEMENTATION TRACKING
Following approval of the RPP and during the implementation process, the DOE
Operations Office should oversee progress in meeting the commitments in the RPP (for
example, schedules, milestones, and costs) and maintain a dialogue on any problems that
arise.
3.A 7. INCORPORATION BY REFERENCE
The RPP submitting organization may choose to incorporate information into the RPP by
referencing all or selected portions of other documents. In such cases, the portions of the
referenced documents that are incorporated into the RPP are also subject to the provisions
of this Guide and attachment.
However there are situations when a citation or reference is used to indicate the origin of
some of the text in a document. For example, in this Guide, 10 CFR Part 835 is cited to
indicate the basis for statements containing word “should” or “shall” (i.e., requirements).
Consequently, the RPP submitting organization should clearly indicate which documents
(or portions of documents) are considered part of the RPP commitments. The RPP
submittal should maintain a file of all documents incorporated by reference and should
make non-DOE documents available to DOE upon their request. See also section 3.A
1.2 above for submittal criteria.
Section 34
Table 1. TYPICAL SCHEDULE FOR REVIEW AND APPROVAL OF RPPS
Submittal of RPP to Operations Office
0 days
Operations Office send RPP to Review Team/PSOs/Environment, Safety and Health
4 days
Review Team sends recommendation to Operations Office Manager
145 days
Operations Office Manager sends recommendation to PSO*
159 days
PSO Approval to Operations Office*
173 days
Operations Office Manager issues approval/disapproval to RPP submitting organization
180 days
*If approval authority not delegated to the Operations Office by the PSO.
DOE G 441.1-1B 41
3-1-07
4.0 ALARA
In promulgating 10 CFR 835, DOE considered alternatives to reduce the risk from
radiation exposure to workers that included retaining the current occupational dose limits,
reducing these limits, and emphasizing efforts to maintain occupational doses As Low As
is Reasonably Achievable (ALARA). After considering public comments on this issue,
DOE elected to emphasize the ALARA process to maintain occupational dose for DOE
and contractor employees well below the current regulatory occupational dose limits.
Adopting the ALARA process in DOE occupational radiation protection regulations also
provides consistency with recommendations provided in the President’s Radiation
Protection Guidance to Federal Agencies For Occupational Exposure (EPA 1987), which
endorsed the ALARA process.
The importance of the ALARA concept was further stressed in DOE P 441.1, DOE
Radiological Health -and Safety Policy (DOE 1996), which states:
It is the policy of the Department of Energy to conduct its radiological
operations in a manner that ensures the health and safety of all its employees,
contractors, and the general public. In achieving this objective, the
Department shall ensure that radiation exposures to its workers and the
public and releases of radioactivity to the environment are maintained below
regulatory limits and deliberate efforts are taken to further reduce exposures
and releases as low as reasonably achievable. The Department is fully
committed to implementing a radiological control program of the highest
quality that consistently reflects this policy.
10 CFR 835 requires formal plans and measures for maintaining occupational exposures
ALARA as part of the documented radiation protection program (RPP). Measures
include incorporating ALARA considerations into the design of new facilities and
modifications of existing facilities, as well as activities that pose the potential for
significant occupational dose. Additionally, administrative controls are addressed as
measures which supplement physical design features and controls and are integrated into
the work planning process. Record keeping and training requirements related to ALARA
are also specified. This chapter of this Guide discusses acceptable methods for
implementing the ALARA process provisions in 10 CFR 835.
Due to the complex nature of many DOE activities, a combination of radiological and
non-radiological hazards may be encountered. Identification of non-radiological hazards
is critical to the ALARA process, because efforts to apply the ALARA process may
inadvertently increase risks from non-radiological hazards. An integrated safety
management approach that optimizes worker protection from all hazards should be
considered in the ALARA process for a given DOE activity.
4.1 Implementation Guidance
Subpart B of 10 CFR 835 requires that a DOE activity shall be conducted in compliance
with an RPP approved by DOE [10 CFR 835.101(a)]. The content of the RPP shall be
Section 35
42 DOE G 441.1-1B
3-1-07
commensurate with the nature of the activities performed and shall include formal plans
and measures for applying the ALARA process to occupational exposure
[10 CFR 835.101(c)]. Subpart K of the rule provides requirements for design and control
for maintaining radiation exposures ALARA. The primary methods used for maintaining
radiation exposures ALARA in controlled areas shall be physical design features;
administrative controls may be used as supplemental features and for specific activities
where physical design features are impractical [10 CFR 835.1001(a) and (b)]. The rule
specifies objectives for design of new facilities or modifications to existing facilities
(10 CFR 835.1002) and the integration of work controls during routine operations
(10 CFR 835.1003). Additionally, the rule requires documentation of the actions taken
to maintain occupational exposures ALARA, including actions required by the RPP, as
well as facility design and control actions [10 CFR 835.704(b)].
Guidance on complying with the training requirements of 10 CFR 835.103 and 835.901
is provided in Chapters 3 and 14 of this Guide.
This chapter provides the basic guidelines for conducting an occupational ALARA
program. It includes the requirements and guidance for developing, implementing,
documenting, and providing feedback and lessons learned for improving the program to
reduce individual doses to levels that are ALARA.
4.2 ALARA Programs
4.2.0 Formal Plans and Measures
The method of implementing an ALARA program is highly dependent on the complexity
and magnitude of potential radiological hazards associated with the DOE activity. The
elements of an effective ALARA program should be identified in a formal ALARA plan
or procedure. The RPP shall clearly identify the ALARA plans and measures employed
by the DOE activity [10 CFR 835.101(c)]. The degree of formality and the level of detail
contained in these plans and measures and other pertinent documentation should be
commensurate with the magnitude of the radiological hazard associated with the DOE
activity. A DOE activity with higher collective dose and/or potential for significant
occupational doses should have more detailed ALARA documentation than an activity
with low collective doses and/or potential for significant occupational doses. ALARA
plans and measures should address the following elements at a level commensurate with
the radiological hazards associated with the DOE activity:
• Policy and Management Commitment: Establish commitment and participation
of all line management and all levels of the work force;
• ALARA Training: Require ALARA training for all employees, including
managers involved with any aspect of radiological operations. Guidance is
provided in Chapters 4 and 14 of this Guide and the RCS;
• Plans and Procedures: Consider administrative and engineering controls and
optimization methods during work procedure development to assure that the
DOE G 441.1-1B 43
3-1-07
ALARA process is fully integrated into the development of
operational/experimental plans, procedures, and protocols. Document formal
plans and measures for applying the ALARA process to occupational doses;
• Internal Assessments/Audits: Conduct comprehensive internal reviews, audits,
and evaluations periodically and report the results to the highest levels of site
management. Guidance is provided in Chapter 3;
Section 36
• ALARA Design Review: Ensure the integration of appropriate methods and
considerations during the design phase to maintain occupational exposures
ALARA during subsequent construction, modification, and operation of the
equipment or facility;
• Radiological Work/Experiment Administration and Planning: Implement controls
and use optimization methods to assure that occupational dose is maintained
ALARA for routine and special operations or experiments; and
• Records: Maintain documents that demonstrate compliance and that the program
is adequately carried out. Guidance is provided in Chapter 13.
4.2.1 Policy and Management Commitment
Management commitment to ALARA, consistent with the DOE Radiological Health and
Safety Policy, is a critical element in ensuring a successful ALARA program. This
commitment should take the form of a formal, written, policy statement from a high level
of corporate management, generally the senior site executive or company officer
responsible for radiological activities that cause the exposures. This commitment should
hold all levels of management and individual workers responsible for adhering to the
company's ALARA policy. If appropriate, union leadership endorsement of the ALARA
policy should be considered.
Senior site and line management should demonstrate their support of the ALARA
program through direct communication, instruction, inspection of the workplace, and
actions including:
• management decisions that place ALARA considerations before cost or schedule
considerations (in accordance with numerical criteria; see section 4.2.5 below);
• encouragement of and praise for workers who identify ALARA solutions;
• support of the ALARA Committee; and
• publication of ALARA success stories.
All site personnel should be made aware of management's commitment to ALARA and
radiological workers should be instructed on their responsibility to comply.
44 DOE G 441.1-1B
3-1-07
Management’s ALARA commitment statement should be periodically updated and
reaffirmed.
4.2.2 ALARA Training
Specialized ALARA training should be developed for personnel who plan, prepare,
schedule, estimate, or engineer jobs that have the potential for significant radiological
consequences. The purpose of training these personnel in ALARA concepts and
techniques is to empower them to include ALARA considerations in the early phases of
job planning and engineering. This training should provide the basics of ALARA
concepts and the use of ALARA related equipment such as containment devices,
shielding, ventilation, and special tools. Topics such as radiological waste minimization,
application of decontamination efforts, and basic contingency planning for mitigation of
accidental spills and releases may also be appropriate. DOE has developed specialized
training material for these types of positions in DOE HDBK 1110-97, ALARA
TRAINING FOR TECHNICAL SUPPORT PERSONNEL (DOE 1997e).
Discipline-specific ALARA training may be appropriate for some organizations
including: operations, maintenance, engineering, production, and construction (craft
workers). Chapter 3 provides additional guidance with respect to training for such
individuals under 10 CFR 835.103. Mock-up training may be appropriate for craft
workers and others to prepare them for unique and/or high dose jobs.
4.2.3 Plans and Procedures
Section 37
10 CFR 835.101(c) requires that the content of each RPP be commensurate with the
nature of the activities performed and include formal plans and measures for applying the
ALARA process to occupational exposures. The RPP (approved by facility management
and DOE) and supporting procedures (approved by facility management) should describe
the organization, responsibilities, and method of operation of the ALARA program.
These documents should be reviewed and updated according to an established schedule.
Chapter 3 provides additional guidance with respect to procedures required under
10 CFR 835.104.
4.2.4 Internal Assessments/Audits
10 CFR 835.102 requires that internal audits of the RPP be conducted such that all
functional elements are reviewed no less frequently than every 36 months and shall
include program content and implementation. The ALARA program is one of these
functional elements. Chapter 3 provides detailed guidance concerning internal audits.
Management's responsibilities for reviewing, auditing, and evaluating the ALARA
program should be clearly documented. The occupational ALARA program should be
evaluated by an individual(s) or members of the ALARA Committee with no direct
responsibility for implementing the program.
DOE G 441.1-1B 45
3-1-07
4.2.5 ALARA Design Review
10 CFR 835.1001 requires that measures be taken to maintain radiation exposures in
controlled areas ALARA. The primary method used shall be physical design features
(e.g., confinement, ventilation, remote handling, and shielding); administrative controls
shall be incorporated only as supplemental methods and for specific activities where
physical design features are demonstrated to be impractical (10 CFR 835.1001).
10 CFR 835.1003 further requires that during routine operations, the combination of
design features and administrative controls shall provide that the anticipated occupational
dose to general employees does not exceed regulatory limits and that the ALARA process
is utilized for personnel exposures to ionizing radiation. Physical design features
typically include features that are used to control the work environment, such as
permanent structures, systems, and controls, including shielding, filtered ventilation
systems, remote controls, containment devices, and the use of designs and materials that
facilitate operations, maintenance, and other activities. Physical design features may also
include engineering controls (e.g., temporary shielding, confinement and ventilation
systems) that are typically used to facilitate short-term or emergent operations when the
installed physical design features do not provide the desired level of protection. In
addition to the physical design features, initial consideration should be given to
elimination or substitution of the hazards where feasible and appropriate. This could
include use of non-radioactive material or sources. Administrative controls typically
include controls that are implemented by the individual at the work site, including written
procedures, technical work documents, work authorizations, and other controls that are
used to guide individual actions in a manner that will facilitate implementation of the
ALARA process.
Section 38
DOE has an approved set of directives concerning radiological design criteria for the
design, construction, operation, and decommissioning phases of its nuclear facilities.
(See list below.) The appropriate ALARA design features should be incorporated into
modifications of existing facilities and/or equipment and designs of new facilities and/or
equipment as early as possible in the engineering and design process. From early in the
design phase and throughout the project, a radiological engineer or representative of the
radiation protection staff should be assigned to the design team. This individual should
ensure that reasonable radiological considerations have been integrated into the design,
construction procedures, proposed operating procedures, and plans for decommissioning.
Numerical criteria (e.g., dollars per rem avoided) developed for site ALARA decisions
should be used to determine those design features that are reasonable. An individual with
expertise in radiation protection, preferably from the site staff, but at least familiar with
the site program, should perform an independent ALARA design review that includes the
following elements:
• review the general configuration of the facility and/or equipment, considering
traffic patterns, location of radiation areas, location and size of changing rooms,
adequacy of personnel decontamination facilities, location of fixed monitoring
46 DOE G 441.1-1B
3-1-07
equipment, and adequacy of space for anticipated operations, maintenance,
production, research, and decommissioning. Facility design and selection of
materials shall include features that facilitate operations, maintenance,
decontamination, and decommissioning [10 CFR 835.1002(d)]. The RCS
provides additional guidance;
• verify that radiological design criteria are consistent with applicable federal/state
regulations, recognized standards and guides, and with the following DOE
directives relating to radiological safety in design:
– 10 CFR 835;
– DOE 5400.5; Radiation Protection of the Public and the Environment
(DOE 1993a);
– DOE P 441.1; Department of Energy Radiological Health and Safety
Policy
– DOE O 420.2B, Safety of Accelerator Facilities (DOE 2004a);
– DOE 5480.30, Nuclear Reactor Safety Design Criteria (DOE 1993b);
– DOE O 420.1B, Facility Safety (DOE 2005d);
– DOE O 413.3A, Program and Project Management for the Acquisition of
Capital Assets (DOE 2006b);
– DOE 435.1, Radioactive Waste Management (DOE 2001f); and
– the RCS.
• verify that the design of the confinement and ventilation systems provides the
required level of protection from airborne contamination, giving particular
attention to patterns of air flow and to the locations of air inlets, penetrations, and
exhausts. Releases of radioactive material to the workplace atmosphere should be
avoided under normal operating conditions and inhalation of such materials by
workers should be controlled to the extent reasonably achievable;
• evaluate and confirm the adequacy of specific control devices for reducing
occupational doses, including shielding, hoods, glove boxes, containments,
interlocks, barricades, shielded cells, decontamination features, and remote
operations. External sources of radiation in areas of continuous occupational
occupancy (2,000 hours/year) shall be maintained below an average of 0.5
millirem (0.005 mSv) per hour and as far below this average as is reasonably
achievable. For areas where occupancy differs from the above, external dose
Section 39
DOE G 441.1-1B 47
3-1-07
rates should be ALARA and should be maintained at a rate so as not to exceed
20% of the limits in 10 CFR 835.202;
• verify that the design will be able to maintain personnel entry control for each
radiological area, commensurate with existing or potential radiological
hazards within the area, by using one or more of the methods listed in
10 CFR 835.501;
• verify that each entrance or each access point to high and very high radiation
areas will have the control features required by 10 CFR 835.502; and
• assess the adequacy of planned radiological monitoring and nuclear criticality
safety instrumentation and determine whether the proposed instrumentation is
appropriate for the expected types, levels, and energies of the radiation(s) to be
encountered, and whether it has sufficient redundancy and capability for operation
under normal operating conditions and during emergencies [10 CFR 835.401(b)].
The ALARA design review should have six discrete phases:
• dose assessment;
• review of projected radiological conditions against the trigger points or numerical
criteria established by management to initiate a review (e.g., creation of a new
radiation source or an increase in the dose rates from an existing source that
causes increased projected facility lifetime collective dose of greater than 5,000
millirem (50 mSv) or annual collective dose of 1,000 millirem (10 mSv), from
operations, maintenance, production, research, inspection and decommissioning
activities);
• identification of the applicable radiological design criteria;
• review of similar facilities, designs, and processes to assist in the selection of
optimum ALARA design features and less costly alternatives using approved
numerical criteria; and,
• incorporation and documentation in the design package of features to reduce the:
exposure of personnel; spread of radioactive contamination; release of radioactive
effluent; and creation of radioactive waste; and
• post-construction review of effectiveness of ALARA engineering features to
provide feedback to the design engineers and help refine the design process. The
ALARA design review should be conducted and documented in accordance with
an approved procedure and the design review package should be readily
retrievable. Detailed radiological design considerations are discussed in
48 DOE G 441.1-1B
3-1-07
PNL-6577, Health Physics Good Practices for Reducing Radiation Exposures to
as Low as Reasonably Achievable (ALARA) (PNL 1988a).
Optimization Methodology
Optimization methods are required to assure that occupational exposure is maintained
ALARA in developing and justifying facility designs or modifications and physical
controls. Optimization methodology provides the technical and managerial basis for
setting numerical criteria for ALARA decisions in the design of facilities, development or
review of work processes, and the design/purchase of special tools and equipment.
Selection of an appropriate cost benefit factor for reducing occupational dose involves a
judgment of the relative value of dose, normally in terms of dollars per rem avoided.
Additionally, guidance on optimization methodology will also provide the basis for
selection of trigger points or collective dose values (facility lifetime, facility annual, job
lifetime, one time job, etc.) above which an ALARA design review or job review is
appropriate. Numerical criteria for ALARA decision making should include radioactive
waste volume, radioactive effluent, contamination levels, and airborne radioactivity
levels. Optimization methodology has led to a multi-attribute analysis technique which
discussed extensively in ICRP Publication 37, Cost-Benefit Analysis in Optimization of
Radiation Protection (ICRP 1982) and ICRP Publication 55, Optimization and
Decision-making in Radiological Protection (ICRP 1990).
Section 40
At sites with significant collective dose, formally documented optimization
methodologies should be developed for ALARA reviews and decisions on
implementation of ALARA efforts should be developed. This may be on a site- or
facility-specific basis. Application of optimization methodologies to the ALARA process
should lead to consistent, rational, repeatable decisions as to which ALARA efforts are
justifiable. The level of effort involved in documenting ALARA decisions should be
commensurate with the potential dose savings to be realized. A detailed evaluation need
not be made if its cost, including the cost of documentation, outweighs the potential value
of the benefits. The procedure used to evaluate the "appropriateness" of dose-reduction
and contamination minimization decisions should be maintained. The RCS and
PNL-6577 provide additional guidance on optimization methodologies.
4.2.6 Radiological Work/Experiment Administration and Planning
10 CFR 835.1003 requires that during routine operations, the combination of design and
administrative controls shall provide that the anticipated occupational dose to general
employees shall not exceed the limits established in 10 CFR 835.202 and that the
ALARA process is utilized for personnel exposures to ionizing radiation. Additionally,
10 CFR 835.501(d) requires written authorizations to control entry into and perform work
within radiological areas. Often, these written authorizations take the form of
radiological work permits (RWP) or technical work documents (TWD) associated with
jobs or experiments. These written authorizations provide a convenient mechanism to
integrate ALARA review of work tasks if the requirement for ALARA review is
embodied in the written authorization. Optimization methodologies should be used to
develop trigger points or numerical criteria be developed for conducting ALARA reviews
DOE G 441.1-1B 49
3-1-07
of job tasks. These criteria should be incorporated into the written authorization to
require ALARA review when appropriate. The RCS provides detailed guidance on the
development and use of RWPs and TWDs.
4.2.6.0 Job/Task/Experiment Reviews
A formal ALARA job/task/experiment review should be performed for work or
experiments with the potential to exceed the established numerical radiological criteria.
The following are examples of criteria that should trigger a formal ALARA review.
• the estimated individual or collective dose is greater than pre-established criteria.
• the predicted concentrations of airborne radioactivity could exceed
pre-established criteria (such as 100 times the DAC values provided in
10 CFR 835 Appendices A and C).
• there is potential for significant radiological exposures.
• the removable contamination in work areas could exceed pre-established criteria
(such as 100 times the values provided in 10 CFR 835 Appendix D).
• individuals will enter areas where exposure rates could exceed pre-established
criteria [such as 1 rem/hour (0.01 Sv/hr)].
The ALARA job/task/experiment review should encompass three discrete phases: (1)
pre-job planning and dose assessment; (2) specification and implementation of ALARA
controls and dose tracking; and (3) post-job review.
Pre-job Planning and Dose Assessment
Pre-job planning should include an estimate of the collective dose resulting from the
job/task/experiment and a determination regarding whether the numerical criteria for an
ALARA job/task/experiment review will be exceeded. The estimates may be based on
actual or historical radiological monitoring results. If a review is required, the next
Section 41
step is to identify appropriate ALARA controls and alternatives. This should include an
assessment of the cost of controls against numerical criteria.
ALARA Controls
During the work or experiment, periodic inspections should be made to ensure that
ALARA controls are being implemented and are effective. Typical ALARA controls
implemented in the field include: appropriate use of shielding and personal protective
equipment (including respiratory protection devices), monitoring of stay times,
minimization of time in radiological areas, maximizing distances from radioactive
sources, and effective use of mock-up training and pre-job briefings. In addition,
50 DOE G 441.1-1B
3-1-07
individual and collective doses should be tracked and periodically compared to the dose
estimates to determine if intervention is needed.
Post-Job Review
Criteria should be established to trigger a formal post-job review. Examples include:
• an actual collective dose equivalent of 5 person-rem or greater,
• actual doses outside the range of 25% of pre-job estimates,
• use of the stop radiological work authority,
• issuance of a radiological occurrence/deficiency report, or
• identification of significant lessons learned.
The post-job review should compare the actual person-hours and person-rem with the
estimates, evaluate the effectiveness and cost of the ALARA controls, document the
lessons learned, and make recommendations on ways to control dose and contamination
for similar activities. The ALARA review should be documented and records should be
readily retrievable.
In the special case of an ALARA review for a planned special exposure, additional
requirements are described under 10 CFR 835.204.
4.2.6.1 Consideration of Non-radiological Hazards
The work planning process should integrate the consideration of other industrial,
physical, and chemical hazards that an individual may encounter. Efforts to maintain
worker doses ALARA should ensure that the risk of personnel injury from other hazards
is not disproportionately increased. The ALARA process must consider the impact of
other occupational hazards when optimizing worker radiation dose. For example:
• excessive protective clothing to control personnel contamination events may lead
to heat stress situations.
• respiratory protective devices used to reduce intakes of radionuclides may impair
visual acuity and communications capabilities between workers.
• protective clothing to protect workers from chemical hazards may slow work
down leading to increased worker dose.
An integrated approach during the work planning process will ensure that all
occupational hazards are appropriately considered and the ALARA process is followed.
10 CFR 851, Worker Safety and Health Program (DOE 2006c) provides requirements for
worker safety and health. The worker safety and health program must integrate the
DOE G 441.1-1B 51 (and 52)
3-1-07
Rule’s requirements with other site worker protection activities and the integrated safety
management system (ISMS) [851.11(a)(3)(ii)]. Coordination should be established,
maintained, and documented among worker safety and health technical disciplines and
other safety and health organizations (e.g., radiation control) at a site to ensure successful
implementation of the worker safety and health program.
Section 42
Additional information concerning DOE expectations for integrating safety management
can be found in Department of Energy Acquisition Regulations (DEAR) clause
48 CFR 970.5223-1, Integration of Environment, Safety and Health into Work Planning
and Execution. This states that “the contractor will manage and perform work in
accordance with a documented Safety Management System (System).”
DOE G 440.1-8, Implementation Guide for Use with Title 10 code of Federal Regulations
Part 851 (DOE 2006d) provides guidance for establishing and implementing an ISMS
program.
4.3 Records
Actions taken to maintain occupational exposures ALARA shall be documented and
retained [10 CFR 835.701(a) and 835.704(b)]. Administrative controls discussed in this
Guide should include the systematic generation and retention of those auditable records
and reports that document major actions considered or taken to attain and maintain
occupational doses and the spread of radioactive contamination ALARA. The RCS and
Chapter 13 provide detailed guidance on record-keeping.
All documents and legal records used to demonstrate compliance with ALARA program
requirements should be reviewed and approved by supervisory or line management.
DOE G 441.1-1B 53
3-1-07
5.0 INTERNAL DOSIMETRY PROGRAM
Radiation protection programs for limiting intakes of radioactive material are based on
the DOE policy of controlling radioactive material at the source. It is nonetheless
recognized that low-level, chronic, or intermittent occupational exposures to some
materials may be difficult to avoid due to the types of material handled or processed, their
chemical or physical forms, and the nature of operations, and that incidents may cause
unplanned releases of radioactive material. 10 CFR 835.402(c) requires internal
dosimetry programs (including routine radiobioassay programs) be conducted for
radiological workers, declared pregnant workers, occupationally exposed minors, and
members of the public entering controlled areas who are likely to receive intakes that
exceed specified levels for committed effective dose equivalent in a year. An internal
dosimetry program generally consists of three elements:
• An air monitoring program, using a combination of real-time, fixed, and portable
devices, as appropriate;
• an individual monitoring program, using direct and/or indirect radiobioassay, and
personal breathing zone (BZ) air monitoring, as appropriate;
• a dose evaluation program that evaluates the data collected by the air and
individual monitoring programs to determine the magnitude of individual doses.
5.1 Implementation Guidance
This section provides guidance for establishing and conducting internal dosimetry
programs for individuals who have the potential for intakes of radioactive materials. It
includes guidance for design and implementation of the radiobioassay program, and
guidance for evaluating, recording, reporting, and managing internal doses. Additional
technical guidance is provided in DOE-STD-1121-2003, INTERNAL DOSIMETRY
(DOE 2003) and the National Council on Radiation Protection and Measurements
(NCRP) Report No. 87, Use of Radiobioassay Procedures for Assessment of Internal
Radionuclide Deposition (NCRP 1987a).
An acceptable internal dosimetry program includes the following features:
• adequate staff with appropriate technical training;
• internal dosimetry technical basis documentation providing scientific information
and other rationale explaining essential elements of the internal dosimetry
program to support dose evaluation methods;
Section 43
• written policies and procedures covering essential steps in the activities used to
determine worker internal dose;
• criteria and methods for implementing an appropriate air monitoring program;
54 DOE G 441.1-1B
3-1-07
• defined criteria for identifying workers who need to participate in the individual
monitoring program;
• appropriate radiobioassay measurement methods and frequencies;
• methods for control, accountability, and safe handling of samples;
• appropriate dosimetric models and default parameters for evaluating internal
dose;
• timely analysis of radiobioassay samples and measurements, transmission of
results, dose evaluation, and recommendations to operations management;
• adequate detection capability and quality of radiobioassay measurements;
• defined criteria and actions for identifying individuals with suspected intakes,
based on workplace measurements and radiobioassay measurements;
• appropriate action level guidelines;
• defined program to report internal doses to workers, management, and DOE;
• historical records of radiobioassay measurement results and dose evaluations;
• historical records of the program, and changes in the program over time; and a
quality assurance program covering essential steps in the activities that determine
worker internal dose.
5.2 Program Management and Administration
5.2.0 General Requirements
The internal dosimetry program shall be adequate to demonstrate compliance with the
dose limits established in Subpart C of 10 CFR 835 [10 CFR 835.402(d)]. In addition,
radiobioassay programs implemented to demonstrate compliance with the requirements
in 10 CFR 835.402(c) (individual monitoring thresholds) shall be:
• accredited or excepted from accreditation in accordance with the DOELAP for
Radiobioassay [10 CFR 835.402(d)(1)]; or
• determined by the Secretarial Officer responsible for environment, safety and
health matters (i.e., the Chief Health, Safety and Security Officer) to have
performance substantially equivalent to that of programs accredited under
DOELAP for radiobioassay [10 CFR 835.402(d)(2)].
Guidance for achieving accreditation or exception from accreditation under DOELAP is
provided in DOE-STD-1111-98, DEPARTMENT OF ENERGY LABORATORY
DOE G 441.1-1B 55
3-1-07
ACCREDITATION PROGRAM ADMINISTRATION (DOE 1998b). Requests for other
program determinations will be considered by DOE on a case-by-case basis.
The provision requiring accreditation for radiobioassay programs implemented to
demonstrate compliance with 10 CFR 835.402(c) does not reflect an intent to provide a
lesser degree of protection to individuals unlikely to receive doses exceeding the
regulatory monitoring thresholds, nor does it express a desire to establish two separate
radiobioassay programs (i.e., an accredited program for individuals likely to exceed the
regulatory monitoring thresholds and a non-accredited program for individuals who are
unlikely to exceed these thresholds). Rather, those individuals who are unlikely to
exceed the regulatory monitoring thresholds are provided an adequate degree of
protection by the various engineering and administrative controls that limit their internal
doses. Implementation of a comprehensive air monitoring program in accordance with
10 CFR 835.401 and 403 verifies the effectiveness of these controls. When an accredited
radiobioassay program already exists and management of any given facility chooses to
provide monitoring for those individuals who are unlikely to exceed the regulatory
monitoring threshold, consideration should be given to using the accredited program.
This will obviate the need to implement two radiobioassay programs, one accredited and
the other not. In addition, it will avoid giving workers who are not required to be
monitored the impression that they are being provided a lesser degree of protection.
However, this does not imply that the monitoring program for those unlikely to exceed
the monitoring threshold must be accredited.
Section 44
Sections 401 through 403 of 10 CFR 835 establish specific monitoring requirements for
areas and individuals. 10 CFR 835 also establishes requirements for maintaining
individual monitoring records (10 CFR 835.702) and reporting radiation doses to
individuals (10 CFR 835.801).
5.2.1 Organization, Staffing, and Facilities
5.2.1.0 Organization
The internal dosimetry program should be administered by the radiological control
organization under the leadership of the radiological control manager. The internal
dosimetry program should have a designated leader with demonstrated expertise in
internal dose evaluation. When elements of the internal dosimetry program are
performed by one or more subcontractors, the radiological control organization should
establish an arrangement of contractual standards and assessments that ensure that
subcontractors meet all applicable requirements in 10 CFR 835, the documented
Radiation Protection Program (RPP), DOELAP standards, and the internal dosimetry
technical basis document.
5.2.1.1 Staffing
The radiological control organization management should ensure that the internal
dosimetry program is adequately staffed to carry out its functions. The analysis of
workplace and radiobioassay measurement data and the evaluation of internal dose
56 DOE G 441.1-1B
3-1-07
involve complex evaluation and professional judgment. Personnel with responsibility for
internal dose evaluation should have the necessary expertise and skill, based on
appropriate education and training in conjunction with practical experience, to perform
their assigned duties. Additional guidance on education, skills, and training is provided in
Chapter 3. It is important that internal dosimetry specialists be capable of recognizing
conditions warranting follow-up radiobioassay and dose evaluation. Personnel should be
familiar with the relevant internal dosimetry literature and the recommendations of
national and international scientific organizations with regard to internal dose evaluation.
Management of the radiological control organization should establish minimum
requirements for those staff who evaluate internal doses. These requirements should
include both experience and education requirements. Suggested educational background
and formal training needed for internal dosimetry program key positions are listed in
DOE-STD-1107-97, KNOWLEDGE, SKILLS, AND ABILITIES FOR KEY
RADIATION PROTECTION POSITIONS AT DOE FACILITIES (DOE 1997b).
Members of the internal dosimetry staff should meet these requirements, or the staff
should have access to individuals with the required background (perhaps through
interdepartmental agreements or contracted services). It is not necessary for all personnel
on the staff to have expertise in all of the listed subject areas.
5.2.1.2 Facilities and Resources
Computational facilities and software tools used by internal dosimetry personnel should
be adequate for performing calculations required for the evaluation of dose from
radionuclides in the body. A library of handbooks, reference materials, scientific
publications, and other resources pertaining to internal dosimetry should be readily
available. Suggested reference materials are included in the reference chapter of this
Guide. DOE O 414.1C, Quality Assurance (DOE 2005a), establishes quality process
requirements to be implemented under a QA program (QAP) for the control of
suspect/counterfeit items (S/CIs), safety issue corrective actions, and safety software.
Section 45
5.2.2 Technical Basis Document
Internal dosimetry technical basis documentation should be developed and should include
technical methods, supporting evidence, and reference information used to provide the
technical foundation for the internal Dosimetry program. The internal dosimetry
technical basis documentation should provide the approach to evaluating internal doses
from radiobioassay data, and for situations in which there is no practical radiobioassay,
from representative air monitoring or other appropriate data. The technical basis
documentation should address all of the topics listed under Section 3.1 of
DOE-STD-1121-2003. The technical basis documentation should be reviewed
periodically and updated as necessary to ensure that the scientific bases are appropriate
for current conditions. The technical basis documentation should be controlled and
retained as a radiation protection program record.
DOE G 441.1-1B 57
3-1-07
5.2.3 Internal Dosimetry Procedures Manual
10 CFR 835 requires that written procedures be developed and implemented as necessary
to ensure compliance, commensurate with the radiological hazards created by the activity
and consistent with the education, training, and skills of the individuals exposed to those
hazards (10 CFR 835.104). Essential elements of the internal dosimetry program should
be addressed in written procedures. These procedures should be consistent with
10 CFR 835, the DOELAP standard, and technical basis documentation.
Detailed guidance on topics that should be addressed in the internal dosimetry procedures
manual are discussed in Section 3.2 of DOE-STD-1121-2003. Additional guidance on
written procedures is provided in Chapter 3 of this Guide.
5.2.4 Quality Assurance
Quality Assurance for internal dosimetry programs is addressed in DOE-STD-1121-2003,
Section 11. Quality assurance in support of internal dosimetry programs should be
conducted in accordance with this DOE standard.
The internal dosimetry program should be included as a functional element subject to the
internal audit requirements of 10 CFR 835.102. Chapter 3 provides guidance on internal
audit programs. External peer-review by qualified individuals, on a periodic basis, is also
recommended.
5.3 Air Monitoring and Contamination Control Programs
The objectives of an air monitoring program are to verify the integrity of radioactive
material containment, detect the release of radioactive materials from some routine
operations, detect inadvertent releases of those materials in the workplace, evaluate and
provide the basis for modification to containment systems, provide a basis for the design
of radiobioassay programs, and verify that selected groups do not need to participate in a
radiobioassay program. Air monitoring programs and internal dosimetry programs are
complimentary. The air monitoring program provides an indication of the effectiveness
of engineering and administrative controls in preventing or minimizing worker intakes
and the internal dosimetry program provides verification of the adequacy of these
controls in preventing or minimizing worker intakes.
Section 46
The air monitoring and contamination control programs supplement the individual
monitoring program by providing a prospective assessment of radiological conditions,
facilitating decisions regarding postings, access controls, work authorizations, and
individual monitoring, and providing back-up data for use in individual dose evaluations.
Because of the need to evaluate individual internal doses from intakes of radioactive
material from uncontained sources, airborne radioactive material, and surface
contamination, the air monitoring and contamination control programs should include
methods for assessing the degree of hazard arising from each of these hazards to which
individuals may be exposed. Guidance for implementing contamination control and air
monitoring programs is provided in Chapters 10 and 11 of this Guide.
58 DOE G 441.1-1B
3-1-07
In most cases the air monitoring program is used to supplement and validate the
individual monitoring program. However, in the case when there is no practical
radiobioassay method or when there is a technology shortfall (e.g., the DIL is less than
the MDA) the air monitoring program may be the basis for the determination of internal
doses. These two cases are discussed below.
5.3.0 Air Monitoring When There Is No Practical Radiobioassay Method
In situations where no radiobioassay method is available for the radionuclides in
question, and no radiobioassay program, either routine or special, can show compliance
with 10 CFR 835, personal (BZ) air monitoring may be used for demonstrating
compliance with 10 CFR 835. BZ air monitoring is part of the Individual Monitoring
Program which is detailed below. However, other fixed or portable monitoring
instruments that provide either real-time (such as continuous air monitors) or
retrospective (such as grab sampling which is analyzed at some time after the sample is
collected) may be required when BZ monitoring data is not available or to supplement or
validate the BZ data if it is available. Radionuclides with short half-lives, including the
short-lived decay products of 222Rn (“radon” decay products 218Po, 214Pb, 214Bi, and
214Po) and 220Rn (“thoron” primary decay products 212Pb and 212Bi) are examples of
radionuclides where intakes cannot be determined through radiobioassay and must be
determined from personal air monitoring. For detailed information on non-background
exposures to radon and thoron, see DOE-STD-1121-2003, Section 4.5. Monitoring
programs for Radon and Thoron should be in accordance with the DOE standard.
5.3.1 Recourse for Technology Shortfall (DIL<MDA)
DILs for reasonable and practical routine radiobioassay programs may be significantly
less than the achievable MDA for certain radionuclides, such as plutonium. Since a
technology shortfall for routine radiobioassay exists, the facility should consider the
following actions (note that some of these suggested actions fall under the category of
individual as opposed to area monitoring, but for completeness they are all listed below):
• enhance contamination and air monitoring and the use of indicators (e.g.,
unexpected glove or surface contamination, increase in airborne radioactive
material contamination) to trigger early special radiobioassay monitoring;
• enhance personal contamination monitoring (e.g., clothing, skin, nasal smears) to
trigger special radiobioassay monitoring;
• use the best practicable radiobioassay monitoring methods;
Section 47
• implement enhanced design, operation, controls, and personnel protection
equipment and procedures to minimize intakes;
• implement supplementary air monitoring; and
DOE G 441.1-1B 59
3-1-07
• document and justify the planned supplementary approach in the facility's internal
dosimetry technical basis documentation.
When air monitoring data are used, each worker's stay times (in hours) and the average
concentration (in DACs) to which the worker is exposed should be multiplied to yield
exposures to airborne radioactive materials in units of DAC-hours. Forty (40)
DAC-hours corresponds to 0.1 rem (0.001 Sv) committed effective dose equivalent for
radionuclides with stochastic Annual Limits on Intake.
A technology shortfall for routine radiobioassay should not be sufficient cause for failing
to place individuals on a minimum or best-available radiobioassay program. Refer to
DOE-STD-1121-2003, Section 4.4.4, for a discussion and examples of technology
shortfalls and suggested methods to handle such situations.
5.4 Individual Monitoring Program
Individual monitoring programs should be designed in accordance with Section 4 of
DOE-STD-1121-2003 and should:
• provide for investigation of suspected intakes;
• provide data for evaluating internal dose; and
• provide results that are adequate to demonstrate compliance with the radiation
dose limits given in 10 CFR 835. The primary methods of routine and special
worker radiobioassay are direct (in vivo) radiobioassay and indirect (in vitro)
radiobioassay.
International Commission on Radiological Protection (ICRP) Publication 54, Individual
Monitoring for Intakes of Radionuclides by Workers: Design and Interpretation (ICRP
1989) as well as the previously referenced NCRP Report No. 87 are suggested
supplementary references for individual monitoring program design. In situations where
there is no practical radiobioassay, representative air monitoring (e.g. breathing zone
(BZ) air monitoring) is the preferred measurement method on which to base dose
evaluations. Additional guidance on air monitoring programs may be found in Chapter
10 of this Guide.
5.4.0 Establishing the Need for Individual Monitoring
Radiological workers who could likely receive intakes resulting in 0.1 rem (0.001 Sv) or
more committed effective dose equivalent in a year shall participate in an internal dose
evaluation program [10CFR 835.402(c)(1)]. Declared pregnant workers, occupationally
exposed minors, and members of the public are also required, under specific conditions
[see 10 CFR 835.402(c)] to participate in internal dosimetry programs. Criteria for
participation in individual monitoring programs which include baseline radiobioassay,
routine radiobioassay and/or air sampling, Radon and thoron monitoring, special
radiobioassay, and termination or task-ending radiobioassay, radiobioassay for declared
60 DOE G 441.1-1B
3-1-07
pregnant women, and confirmatory radiobioassay are covered in DOE-STD-1121-2003,
Section 5. This section of the technical standard also discusses timely receipt of
radiobioassay results. Participation in individual monitoring programs for internal
dosimetry should be in accordance with the DOE technical standard. ICRP Publication
54 is also a recommended reference.
Section 48
Situations may arise where a decision is made to monitor radiological workers who are
not likely to receive intakes that exceed 0.1 rem (0.001 Sv) committed effective dose
equivalent in a year. Such monitoring may be useful for demonstrating compliance with
10 CFR 835.401(a) or established for other purposes. The internal dosimetry program
documentation should clearly identify those individuals or groups of individuals being
monitored for such purposes.
5.4.1 Investigation Levels/Derived Investigation Levels
Refer to DOE-STD-1121-2003, Sections 4.3 and 4.4 for a discussion of and reference
levels for Investigation Levels (ILs) and Derived Investigation Levels (DILs). Programs
should be designed in accordance with this technical standard.
Refer to DOE-STD-1121-2003, Section 4.4.1 for a discussion of factors affecting the
DIL. Additionally, section 4.4.2 provides guidance for calculating the DIL for a given
sample frequency, Section 4.4.3 discusses factors affecting the DIL for air sampling, and
Section 4.4.4 deals with supplementing routine radiobioassay programs when DIL<
MDA (technology shortfall). Programs should be designed in accordance with this
technical standard.
5.4.2 Minimum Detectable Amount (MDA)
The internal dosimetry program staff should determine the minimum detectable amount
(MDA) for each radiobioassay and BZ air monitoring method for each radionuclide
present. The MDAs should be documented in procedures and their statistical bases given
in the internal dosimetry technical basis documentation. ANSI Standard N13.30-1996,
Performance Criteria for Radiobioassay, (ANSI/HPS 1996) provides extensive guidance
on the calculation of MDAs.
As MDAs are affected by various aspects involved with individual monitoring methods,
procedures should contain descriptions of the method(s) of individual monitoring
measurements (e.g., urinalysis, fecal analysis, in vivo counting, BZ air monitoring),
analytical methodology (e.g., chemical separation followed by alpha counting), and
measurement parameters (e.g., counting time or instrument efficiency) to be used in each
component of the individual monitoring program.
Several other factors affect the method of radiobioassay used and its associated MDA.
They include:
• the possible need for improved detection capability to assess individual dose
during the special radiobioassay following an intake requiring internal dose
DOE G 441.1-1B 61
3-1-07
evaluation, due to diminishing amounts of material in compartments as time goes
on;
• the need for improved precision and accuracy if residual retention and excretion
from prior intakes interferes with the detection of additional intakes in subsequent
years;
• timeliness of results needed to manage individuals and keep subsequent intakes
low enough to avoid exceeding dose limits;
• convenience to the affected individuals;
• costs, including lost production time while individuals are participating in the
radiobioassay program; and
• the impact of the method of radiobioassay on the frequency of radiobioassay
measurements.
Where practicable, the method of individual monitoring, analytical methodology, and
measurement parameters should result in an MDA less than the corresponding DIL for all
radionuclides to which an individual might be exposed.
The methods of radiobioassay and air monitoring measurements, their MDAs, and their
accuracies should be specified in the internal dosimetry technical basis documentation,
along with a rationale or justification for the methods chosen.
Section 49
5.4.3 Frequency of Measurement
The routine radiobioassay measurement frequency depends on the radiobioassay
measurement method and associated MDA. The frequency should be chosen so that it is
unlikely that intakes by an individual in a year will result in doses exceeding one IL
without detection.
5.4.4 Detection and Confirmation of Intakes
Section 6 of DOE-STD-1121-2003 provides acceptable methods for detecting and
confirming intakes through workplace monitoring and radiobioassay. Statistical methods
for confirming that an intake has occurred are also discussed. Decisions regarding the
detection and confirmation of suspected occupational intakes of radioactive material
should be based on answers to the following questions:
• Can it be concluded reliably that the analyte is present in the measured sample
(>Lc)?
• Is the measurement result unexpected? In other words, is the result beyond the
range of values that would be expected due to environmental “background”
sources or due to previously recognized intakes?
62 DOE G 441.1-1B
3-1-07
• Is the intake (and resulting dose) implied by the measurement significant
enough (e.g., greater than the IL) to warrant follow-up measurements or
investigation?
If the answer to all these questions is “yes”, then follow-up measurements or
investigation is warranted. Internal dosimetry programs should establish appropriate and
technically-based decision criteria to assist in answering these questions. Such decision
criteria should be included in the technical basis document for the site or facility.
The proper decision criteria for the first question is the Lc which is a purely statistical
concept based on an acceptable probability of “false positive” conclusions. The Lc for
radiobioassay and air sample measurements should be set by considering the acceptable
rate of false positives, the cost and consequences of false positives, and the dosimetric
consequences of false negatives. The analytical laboratory Lc should be based on a
reagent blank. Radiobioassay results above the Lc may be expected in the absence of a
new intake due to normal statistical fluctuations, non-occupational or environmental
sources, or prior confirmed intakes. In the case of environmental sources of interference
(e.g., uranium in urine) an “occupational decision level” should be established, above
which the measurement result is concluded to be statistically significant and above the
range of values that would normally be expected from environmental sources of the
radionuclide. In the case of prior confirmed intakes, an individual-specific “occupational
decision level” should be established, which takes into account the expected contribution
from the prior intakes. Finally, for each route of intake, measurement type, and
radioactive material of interest (taking into account particle size, inhalation class, etc.),
time-dependent DILs should be established. Such DILs are based solely on dosimetric
considerations, and typically correspond to an implied intake (and corresponding dose) of
1 investigation level, i.e., 0.1 rem. This Guide has adopted the value of 0.1 rem (0.001
Sv) CEDE as the value which, for regulatory purposes, is regarded as sufficiently
important to justify further investigation. However, a site or facility may wish to
establish lower follow-up levels for ALARA purposes.
Section 50
If the measurement result is statistically significant, unexpected, and dosimetrically
significant, then follow-up measurements and/or an investigation should be done to
attempt to confirm or rule out the intake. An intake should be considered to be confirmed
if the three criteria above are satisfied and the measurement result is associated with a
known incident, or appropriate follow-up measurements meet the three criteria above, or
follow-up investigation indicates that an intake has occurred.
Refer to DOE-STD-1121-2003, Section 6, for additional information on the detection and
confirmation of intakes. Table 3 addresses reference levels for interpreting or responding
to intake monitoring results. Program elements which address the detection and
confirmation of intakes of radionuclides should be in accordance with the DOE technical
standard. ANSI N13.30-1996 and ICRP Publication 54 are suggested references.
Additionally, NCRP Report No. 84, General Concepts for the Dosimetry of Internally
Deposited Radionuclides (NCRP 1985) and ICRP Publication 30, Limits for Intakes of
Radionuclides by Workers (ICRP 1979), may be useful references.
DOE G 441.1-1B 63
3-1-07
5.4.5 Internal Dose Management
Internal dose management, which includes routine radiological worker dose management,
management of dose from previous intakes (work restrictions), control of dose to the
embryo/fetus, control of dose to minors and students, dose limitation, interface with the
external dosimetry program, lifetime dose control, accidental dose control, and internal
dose control after an incident, is covered in DOE-STD-1121-2003, Section 8. Individual
programs should be in accordance with the DOE technical standard.
5.4.6 Planned Special Exposures
Planned special exposures are included in an individual’s occupational dose record, but
shall not be considered when determining compliance with the occupational dose limits
of 10 CFR 835 [10CFR 835.204(a)]. In order to maintain separate records of doses
resulting from planned special exposures and routine occupational exposures, dosimetry
adequate to measure the potential doses and appropriate for the work to be performed and
specific radiological circumstances should be provided for the planned special exposure.
5.4.7 Medical Response
Medical response is addressed in DOE-STD-1121-2003, Section 10. The standard
addresses situations where internal dosimetry actions and medical treatment occur
simultaneously, the role of the health physicist in medical treatment, when to treat, how
to treat, the impact of therapy on dosimetry, and the counseling of workers. Medical
response should be handled in accordance with the DOE technical standard.
5.5 Internal Dose Evaluation
10 CFR 835 requires internal dose evaluation programs for assessing intakes of
radionuclides and for maintaining adequate worker exposure records. Technical details
and extensive references for internal dose evaluation are given in DOE-STD-1121-2003.
ICRP Publications 30 and 54, NCRP Report No. 84, and ANSI N13.30 are additional
suggested references.
5.5.0 Required Dose Calculations
Internal doses should be evaluated for all confirmed intakes, as defined in Section 5.3.5
of this Guide. For intakes confirmed with radiobioassay results below the DIL, no further
investigation or follow-up radiobioassay are indicated. For intakes confirmed with
radiobioassay results above the DIL or exposures greater than 40 DAC-hours, follow-up
radiobioassay (if practical) and investigation should be performed.
Section 51
The extent of the investigation and the number and frequency of special radiobioassay
measurements following a suspected or confirmed intake should be determined and
documented on an individual, case-specific basis, taking into account the potential
magnitude of the intake, the effective clearance half-time, the health of the worker, and
the number of measurements needed to evaluate the internal dose.
64 DOE G 441.1-1B
3-1-07
The schedule and frequency of long-term special radiobioassay measurements to evaluate
the CEDE to an individual who has had an intake resulting in a dose in excess of one IL
should depend on the expected magnitude of the CEDE and the likelihood of the
individual receiving additional intakes.
While the investigation should be tailored to the specific individual and exposure
circumstances, the trigger levels and preliminary actions to be taken for exposures to the
different radionuclides encountered at the facility should be documented in the internal
dosimetry technical basis documentation and procedures.
5.5.1 Interpretation of Radiobioassay Data
Technical details on the interpretation of radiobioassay data including the use of
biokinetic models are given in DOE-STD-1121-2003, Section 7. Radiobioassay data
should be interpreted in accordance with the applicable portions of this DOE technical
standard.
Evaluations of CEDE from a specific intake should account for expected values of
radiobioassay measurements from prior confirmed intakes.
5.5.2 Evaluation of Internal Dose from Radiobioassay and Air Monitoring Data
Methods for evaluating the various doses from intakes should be specified in the internal
dosimetry technical basis documentation. The methods should be based on
recommendations, consistent with DOE requirements, given in ICRP Publications, NCRP
Reports, and ANSI standards which embody improvements and updates of the science of
internal dosimetry. Other methods may be used provided they are documented and
justified in the procedures and/or internal dosimetry technical basis documentation.
In the calculation of internal doses less than one IL, default parameters may be used.
These parameters (e.g., intake date, deposition fractions, retention functions, organ
masses, and absorption fractions) should be based on the recommendations of the ICRP,
NCRP, other relevant technical references, or facility-specific factors as documented in
the internal dosimetry technical basis documentation. If the initial evaluation of an intake
indicates a dose in excess of 10 times an IL, individual-specific and facility-specific
factors should be used when more appropriate parameters are expected to change the
dose calculations by a factor of 1.5 or more (ICRP Publication 54, paragraph 74).
Between 1 and 10 times the IL, either default parameters or individual- and
facility-specific parameters may be used, as deemed appropriate and documented by the
internal dosimetry staff. The basis for determining which individual-specific and
facility-specific factors are expected to change the dose calculations by a factor of 1.5 or
more should be documented in the internal dosimetry technical basis documentation.
Determination of individual retention patterns for a worker requires participation in the
special radiobioassay program and may require temporary work restriction or
reassignment to prevent subsequent intakes from confounding the dose evaluation.
DOE G 441.1-1B 65 (and 66)
3-1-07
5.5.3 Periodic Reevaluation of Internal Dose
Section 52
In the case of certain well-retained radionuclides (e.g., plutonium), long-term follow-up
and reevaluation of doses may be required. The internal contribution to lifetime
occupational dose should continue to be reevaluated as further radiobioassay results and
improved methods for evaluating internal dose become available.
Evaluations for general employees with prior confirmed intakes should be revised when
information demonstrates a change in the currently evaluated CEDE of 0.5 rem (0.005
Sv) or a factor of 1.5 of the previously assigned dose for that intake, whichever is higher.
In cases where intakes are detected or confirmed in a year subsequent to the year of the
intake, the CEDE should be attributed to the known or assumed year of the intake, and all
records and reports for that year should be amended as appropriate.
5.6 Recordkeeping and Reporting
Requirements and guidance for recording and reporting internal doses and related
information are provided in Chapter 14 and DOE-STD-1121-2003, Section 9.
Record-keeping and reporting of internal doses and related information should be in
accordance with these DOE documents.
DOE G 441.1-1B 67
3-1-07
6.0 EXTERNAL DOSIMETRY PROGRAM
Due to the types of material handled or processed, low-level, chronic occupational
exposures to external ionizing radiation are difficult to avoid, necessitating an external
dosimetry program at most DOE and DOE-contractor facilities that use, handle, or store
radioactive materials. An external dosimetry program generally consists of three
elements:
• an area monitoring program, using an array of fixed and portable devices, as
appropriate;
• an individual monitoring program, using personnel dosimeters; and
• a dose evaluation program that evaluates the data collected by the area and
individual monitoring programs to determine the magnitude of individual doses.
6.1 Implementation Guidance
This chapter provides guidance for establishing and conducting an external dosimetry
program for individuals who are likely to be exposed to external sources of ionizing
radiation. Conduct of an external dosimetry program involves determining area and
individual monitoring methods and frequencies, distributing and controlling monitoring
devices, and evaluating external doses. This chapter also addresses program
organization, administration, staffing, and training.
An external dosimetry program should include the following features:
• adequate staff provided with appropriate technical training;
• a technical basis document that explains each program element;
• procedures that address each step in the activities that determine external dose;
• criteria and methods for implementing the area monitoring program;
• criteria and methods for identifying individuals who require individual
monitoring;
• appropriate personnel dosimeter measurement methods and frequencies;
• methods for control, accountability, and safe handling of dosimeters;
• appropriate dosimetric models and default parameters for evaluating external
dose;
• timely analysis of personnel dosimeter measurements and transmission of results,
dose evaluation, and recommendations to monitored individuals, management,
and DOE, as appropriate;
68 DOE G 441.1-1B
3-1-07
• historical records of the external dosimetry program, procedures, and results; and
• a quality assurance (QA) program that covers all steps in the activities that
determine individual external dose.
6.2 Program Management and Administration
Section 53
6.2.0 General Requirements
The external dosimetry program implemented to demonstrate compliance with
10 CFR 835.402(a) shall be adequate to demonstrate compliance with the dose limits
established in Subpart C of 10 CFR 835 [10 CFR 835.402(b)] and shall be:
• accredited by the DOE Laboratory Accreditation Program (DOELAP); or
• excepted from DOELAP accreditation in accordance with the DOELAP
standards; or
• determined by the Secretarial Officer responsible for environment, safety and
health to have performance substantially equivalent to that of programs accredited
under the DOE Laboratory Accreditation Program for Personnel Dosimetry
[10 CFR 835.402(b)].
Guidance for achieving accreditation or exception from accreditation under the DOELAP
Program is provided in DOE-STD-1111-98. DOE will consider requests for other
program approvals on a case-by-case basis.
The specification of accreditation requirements only for programs implemented to
demonstrate compliance with 10 CFR 835.402(a) does not reflect an intent to provide a
lesser degree of protection to individuals unlikely to receive doses exceeding the
regulatory monitoring thresholds, nor does it reflect DOE’s intent for it’s contractors to
establish two separate individual monitoring programs (i.e., an accredited program for
individuals likely to exceed the regulatory monitoring thresholds and a non-accredited
programs for individuals who are unlikely to exceed these thresholds). Rather, those
individuals who are unlikely to exceed the regulatory monitoring thresholds are provided
an adequate degree of protection by the various engineering and administrative controls
that limit their doses. Implementation of a comprehensive area monitoring program
verifies the effectiveness of these controls. When an accredited dosimeter program
already exists and management of any given facility chooses to provide monitoring for
those individuals who are unlikely to exceed the regulatory monitoring threshold,
consideration should be given to using the accredited program. This will obviate the need
to implement two dosimeter programs, one accredited and the other not. In addition, it
will avoid giving workers who are not required to be monitored the impression that they
are being provided a lesser degree of protection. However, this does not imply that the
monitoring program for those unlikely to exceed the monitoring threshold must be
accredited.
DOE G 441.1-1B 69
3-1-07
Sections 401 - 403 of 10 CFR 835 establish specific monitoring requirements for areas
and individuals. 10 CFR 835 also establishes requirements for preserving dosimetric
records and reporting external radiation doses to individuals.
6.2.1 Organization, Staffing, And Facilities
6.2.1.0 Organization
The external dosimetry program should be administered by the radiological control
organization under the leadership of the radiological control manager. When elements of
the external dosimetry program are performed by a subcontractor, the radiological control
organization should establish contractual standards and assessments that ensure the
subcontractor meets all applicable requirements in 10 CFR 835, the documented radiation
protection program (RPP), DOELAP standards, and the technical basis document.
6.2.1.1 Staffing
Section 54
Management should maintain an adequate staff with the necessary expertise and skill to
implement the external dosimetry program. For staff members responsible for
evaluating external doses, management should establish minimum qualification standards
that include both experience and education requirements. Additional guidance on
education, skills, and training is provided in Chapter 3 and DOE STD-1107-97,
KNOWLEDGE, SKILLS, AND ABILITIES FOR KEY RADIATION PROTECTION
POSITIONS AT DOE FACILITIES (DOE 1997b). Personnel should be familiar, at a
level commensurate with their assigned responsibilities, with relevant external dosimetry
literature and related recommendations of national and international scientific
organizations.
6.2.1.2 Facilities and Resources
Computational facilities and software tools used by external dosimetry personnel should
be adequate for performing calculations required for dose evaluation. A library of
handbooks, reference materials, scientific publications, applicable regulations and
guidance documents should be readily available.
6.2.2 Technical Basis Document
A technical basis document should be developed for the external dosimetry program to
provide (or provide reference to) the regulatory, scientific, and technical foundation of the
program. The technical basis document should include:
• the methods used for evaluating external doses from workplace and individual
monitoring data and the technical basis for those methods;
• justification of categories selected for participation in and exception from
DOELAP personnel dosimeter performance testing;
70 DOE G 441.1-1B
3-1-07
• QA procedures for dosimeters that are outside of the DOELAP testing protocol, as
appropriate;
• the physical characteristics of external radiation to be monitored, methods for
calculating external doses, methods for documenting calculations, dose evaluation
quality assurance, and procedures for recording and reporting external dose
results;
• the methodology used in determining the dose of record when multiple dosimeters
are used and when dosimeters are relocated;
• individual monitoring methods, their lower limits of detectability, and monitoring
intervals, along with a rationale or justification for the methods and intervals
chosen;
• calibration models, parameters, assumptions, and default values used in
dosimetric modeling and evaluation; and
• statistical methods for evaluating dosimeter data, using appropriate controls,
identifying above-background values, and analyzing trends.
The technical basis document should be reviewed periodically and updated as necessary
to ensure that it remains appropriate for current conditions. The technical basis document
should be handled as a controlled document and retained as an RPP record.
6.2.3 Procedures
10 CFR 835 requires that written procedures be developed and implemented as necessary
to ensure compliance, commensurate with the radiological hazards created by the activity
and consistent with the education, training, and skills of the individuals exposed to those
hazards (10 CFR 835.104). All functions of the external dosimetry program should be
specified in written procedures that provide for appropriate quality control and QA
measures. The procedures should be consistent with 10 CFR 835, the DOELAP technical
standards, and the technical basis document. In summary, the procedures should provide
the following information:
• methods and requirements for measuring, evaluating, and recording external dose;
Section 55
• methods for consistent collection of workplace and personnel monitoring data, its
evaluation, documentation of results, and records maintenance;
• components and reporting structure of the external dosimetry program;
• responsibilities of line management and members of the dose evaluation group;
and
DOE G 441.1-1B 71
3-1-07
• elements of the area monitoring program that are germane to external dose
determination.
Additional guidance on written procedures is provided in Chapter 3.
6.2.4 Quality Assurance
Internal audits shall be conducted such that all functional elements are reviewed no less
frequently than every 36 months and shall include program content and implementation
(10 CFR 835.102). External peer-review by qualified individuals, on a periodic basis, is
also recommended. See Chapter 3 for further information on internal audits.
6.3 Area Monitoring Program
The area monitoring program supplements the individual monitoring program by
providing a prospective assessment of radiological conditions, thus facilitating decisions
regarding postings, access controls, work authorizations, and individual monitoring, and
providing back-up data for use in individual dose evaluations. Because of the need to
evaluate individual external doses (prospectively and retrospectively) from contained
sources, airborne radioactive material, and surface contamination, the area monitoring
program should include methods for assessing the degree of hazard arising from each of
these hazards to which individuals may be exposed. Guidance for implementing surface
contamination and airborne radioactivity monitoring programs is provided in Chapters 10
and 11. Guidance for implementing area monitoring for other external sources of
radiation is provided below. For each element of the area monitoring program, additional
guidance is provided in Chapter 5 of the RCS.
6.3.0 Monitoring Instruments and Devices
External radiation monitoring instruments and devices include both fixed and portable
instruments that provide real-time indication of radiation levels and passive monitoring
devices (such as TLDs and radio-sensitive film) that provide a retrospective indication of
radiological conditions. Guidance on portable instrument selection, calibration, and
checking for operability is provided in Chapter 9. While Chapter 9 addresses portable
instruments, many of the concepts and practices discussed in Chapter 9, and in the
referenced consensus standards, may be applicable to fixed instruments.
Although fixed instruments provide the advantage of continuous operation with little or
no attention, their application is limited by their lack of mobility. Fixed instruments
should be used to monitor areas and installations:
• having a known and relatively predictable operation where little variation in the
radiological hazards is expected;
• where monitoring of an access point (and possible provision of an alarm function)
is desirable to warn individuals of hazards in the area;
72 DOE G 441.1-1B
3-1-07
• where it is desirable to continuously monitor an area to detect changes in
radiological conditions, possibly as a result of an unplanned change in process
functions;
• where continuous monitoring and alarm functions are necessary to prevent
unplanned exposures; and
• as necessary to provide input into interlocks, control devices, and alarm systems
that are dependent upon or that control the operation being monitored
Section 56
Portable instruments are most appropriate for use in performing prospective monitoring
for the purposes of work planning, radiological condition verification, facility integrity
verification, and operational assessments. The quality and utility of the data provided by
portable instruments are highly dependent upon the knowledge and skills of the user.
Because of these important applications and significant vulnerabilities, portable
instruments should be used only by trained individuals (such as specifically-trained
radiological workers and radiological control technicians). Passive monitoring devices
(e.g., area monitoring TLDs) should be placed in areas surrounding radiological areas to
verify that doses in these areas do not exceed the individual monitoring threshold.
Passive monitoring devices should be placed where they will be exposed to radiation
fields similar to those affecting individuals frequenting the area, but should be protected
from loss or vandalism. The use of passive monitoring devices to characterize radiation
fields as a part of pre-job planning should also be considered.
6.3.1 Performance of Area Radiation Monitoring
10 CFR 835 defines radiation and high radiation areas in terms of the radiation levels at a
distance of 30 centimeters from the source or from any surface penetrated by the
radiation. Similarly, 10 CFR 835 defines very high radiation areas in terms of the
radiation levels at a distance of 100 centimeters. Therefore, area radiation monitoring
should be performed at th