Uncertainty
A term used to describe the inherent unknowns and inaccuracies related to costs and schedule estimates, as differentiated from risks.
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE-STD-1024-92 Chg Notice 1Guidelines for Use of Probabilistic Seismic Hazard Curves at Department of Energy Sites for Department of Energy Facilities
- DOE-STD-1023-95 Chg Notice 1Natural Phenomena Hazards Assessment Criteria
- DOE-STD-1628-2013Development of Probabilistic Risk Assessments for Nuclear Safety Applications
- DOE G 413.3-7ARisk Management Guide
- DOE G 413.3-7A Chg 1 (AdminChg)Risk Management Guide
- DOE G 413.3-21ACost Estimating Guide
- DOE-HDBK-1220-2017Natural Phenomena Hazards Analysis and Design Handbook for DOE Facilities
- DOE G 413.3-7A Chg 2 (LtdChg)Risk Management Guide
- NAP-28AResponsibilities for Independent Cost Estimates
- DOE-STD-1112-2019Department of Energy Laboratory Accreditation Program for Radiobioassay
- NAP 413.3Responsibilities for Independent Cost Estimates
- DOE G 413.3-21Cost Estimating Guide
- BOP 413.3, Independent Cost Estimates Procedure (Redline)
- BOP-06.03Independent Cost Estimates Procedure
- BOP 413.3Independent Cost Estimates Procedure
- DOE G 413.3-21 Chg 1 (Admin Chg)Cost Estimating Guide
- BOP 413.9, Cost Analysis Requirements Description (Redline)
- BOP-06.08Cost Analysis Requirements Description
- BOP 413.9Cost Analysis Requirements Description
- DOE-STD-5506-2007Preparation of Safety Basis Documents for Transuranic (TRU) Waste Facilities