Site Boundary
A well-marked boundary within which the owner and operator can exercise control without the aid of outside authorities. A public road or waterway traversing a DOE site is considered to be within the DOE site boundary if, when necessary DOE or the site contractor has the…
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 151.1-1 V4-1Consequence Assessment
- FAQs - DOE-STD-3009-2014
- DOE-STD-3009-2014 Frequently Asked Questions (Updated 2019)
- DOE-STD-3009-2014 Frequently Asked Questions Updated August 2022
- DOE G 151.1-1 V2Hazards Survey and Hazards Assessments
- DOE-STD-3009-2014 Frequently Asked Questions Updated January 2024
- Frequently Asked Questions DOE-STD-3009-2014
- Frequently Asked Questions on DOE-STD-3009-2014 (updated November 2025)
- DOE-STD-3009-2014 Roll-Out Part III
- DOE G 420.1-1Nonreactor Nuclear Safety Design Criteria and Explosive Safety Criteria Guide for Use with DOE O 420.1, Facility Safety
- DOE P 420.1Department of Energy Nuclear Safety Policy
- DOE-STD-3014-2006 (Reaffirmed 2006)Accident Analysis for Aircraft Crash into Hazardous Facilities
- DOE-STD-1228-2019Preparation of Documented Safety Analysis for Hazard Category 3 DOE Nuclear Facilities
- DOE-HDBK-1129-99Tritium Handling and Safe Storage
- SEN-35-91Nuclear Safety Policy
- DOE-STD-3009-2014Preparation of Nonreactor Nuclear Facility Documented Safety Analysis (Invoked)
- DOE-STD-3009-2014 Requirements Table
- DOE-STD-3009-94 Chg Notice 1Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports
- DOE O 140.1Interface with the Defense Nuclear Facilities Safety Board
- DOE-STD-3009-94Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports