Identification of Long Lead Procurements
The identification of those items of equipment and/or construction materials that must be ordered prior to the estimated physical construction start to ensure availability at the time needed so as not to delay construction performance.
Follow changes to Identification of Long Lead Procurements and its other editions: RSS feed
Source 1:
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.