Identification of Long Lead Procurements
The identification of those items of equipment and/or construction materials that must be ordered prior to the estimated physical construction start to ensure availability at the time needed so as not to delay construction performance.
Source 1:
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.