Estimate-At-Completion
Actual cost of work completed to date plus the predicted costs and schedule for finishing the remaining work.
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 413.3-10Earned Value Management System (EVMS)
- DOE G 413.3-10A Chg 1 (Admin Chg)Earned Value Management System (EVMS)
- NAP 413.1Data Collection for Cost Estimating
- NAP 413.1 (Recertified)Data Collection for Cost Estimating
- DOE G 413.3-10AEarned Value Management System (EVMS)
- DOE N 4700.5Project Control Systems Guidelines
- FTCP-PSQS-1178-2020Technical Program Manager/Program Liaison Program Specific Qualification Standard
- DOE G 413.3-10BIntegrated Project Management Using the Earned Value Management System
- BOP 413.9, Cost Analysis Requirements Description (Redline)
- BOP-06.08Cost Analysis Requirements Description
- BOP 413.9Cost Analysis Requirements Description
- BOP 413.3, Independent Cost Estimates Procedure (Redline)
- BOP-06.03Independent Cost Estimates Procedure
- BOP 413.3Independent Cost Estimates Procedure
- DOE-STD-1178-2004Technical Program Manager Functional Area Qualification Standard
- DOE-STD-1170-2003Electrical Systems Functional Area Qualification Standard
- DOE-STD-1181-2004Facility Maintenance Management Functional Area Qualification Standard
- DOE G 413.3-21ACost Estimating Guide
- BOP-50.004Program Requirements Document (PRD) for Construction Projects
- BOP 413.2 Admin Chg 1, Program Requirements Document for Construction Projects (Redline)