Archives of Directives

Conceptual Design Estimate

A budget or conceptual design estimate is required to request congressional authorization for funding. This request is required for each line item construction project and each contingency-type project.
Mentioned in (auto-detected)

Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.

Something wrong with this record? Tell us