Assumptions
Factors used for planning purposes that are considered true, real or certain. Assumptions affect all aspects of the planning process and of the progression of the project activities. (Generally, the assumptions will contain an element of risk.)
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE-STD-5002-2017Disposal Authorization Statement and Tank Closure Documentation
- DOE G 413.3-22Analysis of Alternatives Guide
- DOE G 413.3-21ACost Estimating Guide
- BOP 413.3, Independent Cost Estimates Procedure (Redline)
- BOP-06.03Independent Cost Estimates Procedure
- BOP 413.3Independent Cost Estimates Procedure
- BOP 413.9, Cost Analysis Requirements Description (Redline)
- BOP-06.08Cost Analysis Requirements Description
- BOP 413.9Cost Analysis Requirements Description
- BOP 413.6, Analysis of Alternatives (Redline)
- BOP-03.07Analysis of Alternatives
- BOP 413.6Analysis of Alternatives
- SD 413.3-4Program Requirements Document
- DOE G 413.3-7Risk Management Guide
- DOE G 413.3-21Cost Estimating Guide
- NAP-14.10Secret Restricted Data, Sigmas 1 Through 13 Information Group Protection Profile
- NAP-14.7AConfidential/Secret Non-Nuclear Weapons Data Information Group Protection
- DOE-STD-3009-2014 Requirements Table
- DOE-HDBK-1163-2003Integration of Multiple Hazard Analysis Requirements and Activities
- NAP-14.10ASecret Restricted Data, Sigmas 1-13 and 15 Information Group Protection Profile