Accuracy
Ensuring, within sufficient tolerance for error, the quality of the record in terms of its use in making a determination.
Mentioned in (auto-detected)
Automatically detected by searching the text of documents in this archive for this term. Not reviewed by an editor.
- DOE G 413.3-12AFront-End Planning and Project Definition Rating Index for Nuclear and Non-Nuclear Constructions Projects
- DOE-STD-1054-96Guideline to Good Practices for Control and Calibration of Measuring and Test Equipment (M&TE) at DOE Nuclear Facilities
- DOE-STD-1112-2019Department of Energy Laboratory Accreditation Program for Radiobioassay
- DOE O 470.2BIndependent Oversight and Performance Assurance Program
- DOE O 470.2ASecurity and Emergency Management Independent Oversight and Performance Assurance Program
- DOE G 430.1-1Cost Estimating Guide
- DOE O 227.1AIndependent Oversight Program
- DOE O 227.1A Chg. 2 (AdminChg)Independent Oversight Program
- DOE O 227.1Independent Oversight Program
- DOE O 227.1BIndependent Oversight Program
- DOE-STD-1095-2018Department of Energy Laboratory Accreditation Program for Personnel Dosimetry
- DOE O 227.1Independent Oversight Program
- BOP 413.3Independent Cost Estimates Procedure
- DOE O 1360.6AAutomatic Data Processing Equipment/Data
- DOE-HDBK-1013/1-92Instrumentation and Control, Volume 1 of 2
- DOE O 227.1A Chg 1 (AdminChg)Independent Oversight Program
- DOE-STD-1095-2025Department of Energy Laboratory Accreditation Program for Personnel Dosimetry
- DOE O 580.1A Final
- DOE G 225.1-1Accident Investigations
- BOP 413.3, Independent Cost Estimates Procedure (Redline)