Section 1
DOE 5700.7C
5-18-92
THIS PAGE MUST BE KEPT WITH DOE 5700.7C, WORK
AUTHORIZATION SYSTEM.
DOE 5700.7C, WORK AUTHORIZATION SYSTEM, HAS REVISED
DOE 5700.713 TO REFLECT ORGANIZATIONAL TITLE, ROUTING
SYMBOL, AND OTHER EDITORIAL REVISIONS TO INCORPORATE
CHANGES REQUIRED BY SEN-6. NO SUBSTANTIVE CHANGES HAVE
BEEN MADE. DUE TO THE NUMBER OF PAGES AFFECTED BY THE
REVISIONS, THE ORDER HAS BEEN ISSUED AS A REVISION.
U.S. Department of Energy
Washington, DC.
SUBJECT: WORK AUTHORIZATION SYSTEM
ORDER
D O E 5 7 0 0 . 7 C
5-18-92
1.
2.
3.
4.
PURPOSE. To establish a work authorization and control process for work
performed by designated management and operating (M&O) contractors.
CANCELLATION. DOE 5700.76, WORK AUTHORIZATION SYSTEM, of 9-24-86.
SCOPE. The provisions of this Order apply to all Departmental Elements
and designated M&O contractors performing work for the Department as
provided by law and as implemented by the appropriate contracting
officer.
REFERENCES.
a.
b.
c.
d.
e.
f.
DOE 1332.1A, UNIFORM REPORTING SYSTEM, of 10-15-85, which
describes the content and format of plans and reports to be
obtained from Department of Energy (DOE) contractors as required
by contract.
DOE 1360.46, SCIENTIFIC AND TECHNICAL COMPUTER SOFTWARE, of
12-31-91, which gives the policies and procedures for providing
and sharing software developed by the Department for scientific
and technical applications.
DOE 1430.1C, MANAGEMENT OF SCIENTIFIC AND TECHNICAL INFORMATION,
of 2-27-92, which provides detailed information concerning the
reporting and dissemination Of technical information.
DOE 1430.2A, SCIENTIFIC AND TECHNICAL INFORMATION PROGRAM, of
12-14-87, which establishes implementation procedures for the,
technical information policy as set forth in DOE 1430.1C.
DOE 2200.6, FINANCIAL ACCOUNTING, of 10-24-88, which establishes
policy and general procedures for the financial management of
cash, advances, receivables, inventories, and investment of funds;
accountability for plant and capital equipment; current and long-
term liabilities; and accounting for equity revenues, collections,
expenses, and reimbursable work performed by DOE on behalf of
Federal agencies and non-Federal entities.
DOE 4200.1C, COMPETITION IN CONTRACTING, of 1-9-87, which
implements the provisions of the Competition in Contracting Act.
DISTRIBUTION: INITIATED BY:
All Departmental Elements Office of Procurement, Assistance
and Program Management
2 DOE 5700.7C
5-18-92
g. DOE 4200.3C, MANAGEMENT OF SUPPORT SERVICES CONTRACT ACTIVITY, of
5-17-91, which provides the policy, procedures, and responsibility
for the management of support service contracts with the
Department of Energy.
h. DOE 4700.1, PROJECT MANAGEMENT SYSTEM, of 3-6-87, which provides
for implementing instructions, formats, and procedures for the
project management system.
i. DOE 5000.1B, INSTITUTIONAL PLANNING BY MULTIPROGRAM
LABORATORIES, of 4-9-92, which establishes the institutional
planning process for DOE multiprogram laboratories.
5. APPLICABILITY. The Work Authorization System applies to work that is
performed by the designated M&O contractors, except work involving
services, products, or materials regularly produced for sale at
scheduled rates under Departmental programs (e.g., routine irradiation
services, radioisotopes, heavy water, enriched uranium, production or
transmission of electricity), plant and capital equipment expenditures
including line item construction projects, and projects designated as
DOE major projects or major system acquisitions pursuant to DOE 4700.1,
PROJECT MANAGEMENT SYSTEM.
Section 2
6. DEFINITIONS.
a.
b.
c.
d.
e.
M&O Contractor is a contractor that has been formally designated
by the Secretary as an M&O contractor in accordance with DOE
policies. (See Attachment 1.)
Institutional Plan is a document prepared annually by each
multiprogram laboratory which describes the results of the
laboratory’s annual institutional planning and the general
agreement reached on the types and levels of activities to be
conducted.
Multiprogram laboratory is a Government-owned facility
specifically designated in DOE 5000.1B.
Program Secretarial Officer, is a senior outlay program official
and includes the Assistant Secretaries for Conservation and
Renewable Energy, Defense Programs, Environmental Restoration and
Waste Management, Fossil Energy, and Nuclear Energy; and the
Directors of Energy Research, Civilian Radioactive Waste
Management, and New Production Reactors; and who is responsible for
the assignment of work to the M&O contractor.
Lead Program Secretarial Officer is the Program Secretarial
Officer who is responsible for the institutional overview of the
activities of one or more M&O contractors.
DOE 5700.7C
5-18-92
f. Work Assignment
performed by an
work assignment
should identify
mark progress.
3
is a group of related tasks or activities to be
M&O contractor. Where possible and appropriate, a
should be measurable in terms of performance and
verifiable events, outcomes, or deliverables that
g. Work Authorization Form (DOE F 5700.2) is a document that
authorizes the performance of work by a specific M&O contractor
(for an example, see Attachment 2.) It must contain, directly or
by reference to other documentation (such as program letters,
program plans, or project plans), the following elements as a
minimum:
(1) A brief narrative description of what is to be done;
(2) A statement of current fiscal year funds to be provided and
a citation of the funding source;
(3) For work assignments that have defined completion points,
the total required funding estimate;
(4) The expected period of
(5) The schedule, results,
(6) The specific reporting
performance;
or product expected; and
requirements.
h. Field Work Proposal Format is a standard format that may be used
by a program office to secure information for program planning or
budget formulation. It may be used as all or part of the docu-
mentation for work authorization. The format may also be used by
an M&O contractor to describe work proposed by the contractor.
(For an example, see Attachment 3.) At the discretion of the
Program Secretarial Officer, the Field Work Proposal Format may be
used for non-M&O contractors for budget and financial planning
purposes.
7. POLICY. It is Departmental policy to have a uniform process for
assigning controlling work performed by the designated M&O contractors
that:
a. Requires work assignments to be aggregated at the estimate of cost
and obligations requirement level unless otherwise approved by the
Program Secretarial Officer and the DOE Field Office Manager.
b. Establishes the relative responsibilities of the program office
and the DOE Field Office for determining the appropriateness of
work assignments and for monitoring work performance
4
c.
d.
e.
f.
g.
h.
DOE 5700.7C
5-18-92
Assigns to the Program Secretarial Officers the responsibility for
assuring the technical and programmatic adequacy of the
documentation and requirements of their program work
authorizations.
Section 3
Assures work assigned to the multiprogram laboratories is
consistent with the program mix approved in the institutional
plan.
Recognizes and accommodates the delegation of various program
responsibilities to a DOE Field Office including responsibility
for M&O assignment decisions when so delegated by a Program Office
or by other DOE procedures (e.g., for non-DOE funded work).
Provides a basis for monitoring contractor performance in terms of
work accomplishment.
Recognizes, is compatible with, and where appropriate, is
integrated with the other Departmental systems related to the
planning, budgeting, direction, control, and reporting of work
assigned to M&Os.
Includes a standard numbering system for all work authorizations
for reporting and accountability purposes.
8. RESPONSIBILITIES AND AUTHORITIES.
a. The Under Secretary shall establish Departmental policies for the
assignment and control of work authorization to the designated M&O
contractors.
b. Lead Program Secretarial Officers shall:
(1)
(2)
(3)
Inform other DOE Elements of any restrictions or constraints
on the use of a contractor facility under their cognizance.
For M&O contractors under their cognizance that use the
institutional planning process, provide guidelines under
which approval of new work, as defined in DOE 5000.1B, may
be delegated to a DOE Field Office.
Recommend to the Under Secretary appropriate changes in the
policies for work authorization for the designated M&O
contractors.
DOE 5700.7C 5
5-18-92
c. Program Secretarial Officers shall:
(1) Provide general approval of work to be accomplished under
the provisions of this Order, normally as part of the
institutional planning, budget formulation, or similar
processes. Approval of specific work authorizations and
associated documentation may be delegated.
(2) Prepare work authorizations, aggregate activities into
related work assignments at the highest appropriate level,
and defend the level of aggregation selected.
(3) For work authorizations they initiate, ensure that:
(a)
(b)
(c)
(d)
(e)
The authorized work is appropriate for performance by
an M&O contractor.
Adequate consideration has been given to the
alternative use of non-DOE resources.
The work is not inappropriately duplicative of other
ongoing work.
The work is within the mission of the M&O contractor
and otherwise appropriate for performance by the
selected M&O contractor.
The documentation provided with the work authorization
and the requirements that it stipulates are both
technically and programmatically adequate for their
purpose.
(4) As needed, issue and revise work authorizations to the DOE
Field Offices and request necessary financial plan changes
through the Chief Financial Officer (CR-1) for all approved
work assignments. Authorizations for work planned in the
current fiscal year are to be issued by the beginning of the
fiscal year to the maximum extent possible.
(5) Notify CR-1 when requesting periodic financial reports,
except those provided for by the DOE Financial Information
System.
(6) Ensure that formal agreement is reached with the DOE Field
Office in any instance in which the DOE Field Office is
delegated technical assessment of work assignments or
technical oversight and control of assigned work.
(7) Monitor reports submitted to ensure that work performed and
costs incurred conform to work authorizations which it
issues.
6 DOE 5700.7C
5-18-92
d. Managers of DOE Field Offices shall:
(1)
(2)
(3)
(4)
(5)
Section 4
(6)
(7)
(8)
(9)
(l0)
Ensure that work performed by an M&O contractor does not
violate any restrictions or constraints on the use of DOE
controlled facilities.
Ensure that the work authorization requirements have been
satisfied prior to granting authorization to proceed and
that the M&O contractor has no significant disagreement
with the assignment before work commences.
Review all proposed work authorizations to M&O contractors
under their cognizance to ensure that they are appropriate
for performance by an M&O, that they are within the mission
of the M&O selected, and for M&O’s with institutional
plans, are within the scope and general levels of effort
agreed upon.
Issue and revise work authorizations for work assigned by
the DOE Field Office, as in the case of non-DOE funded work,
or when the assignment decision has been delegated.
Monitor reports submitted to ensure that work performed and
cost incurred conform to work authorizations which it
issues.
Authorizations for work planned in the current fiscal year
are to be issued by the beginning of the fiscal year to the
maximum extent possible.
Authorize work in accordance with the approved funding
program, programmatic guidance, and established procedures
for administrative control of funds.
Review field work proposals prepared by contractors for
consistency with program and other guidance, and transmit
the proposals with any comments and recommendations to
Headquarters program offices within the timeframes estab-
lished in the budget call issued by the Chief Financial
Officer and program guidance issued by the Headquarters
program offices.
Ensure that M&O contractors provide technical information to
the Director of Scientific and Technical Information (AD-21)
in accordance with the requirements of DOE 1430.1C.
Ensure that at least one copy of all approved Work
Authorization Forms (DOE F 5700.2) is sent to the Office of
Scientific and Technical Information (AD-21).
DOE 5700.7C
5-18-92
e. Chief Financial Officer (CR-1) , shall:
(1) Review all requests for periodic
not provided for by the Financial
(2) Perform other tasks of an account
associated with the process descri
issuing financial plans.
f. Director of Procurement, Assistance and
financial reports which are
Information System; and
ing and budgetary nature
bed in this Order, such as
Program Management (PR-1)
shall:
(1) Coordinate and secure Secretarial approval of any changes to
the list of designated M&O contractors and issue update
lists as necessary.
(2) Develop work authorization system procedures in coordination
with Departmental Elements.
9. REQUIREMENTS AND PROCEDURES.
a. As a minimum, each work authorization will require one technical
progress report each fiscal year, a final technical report at the
termination of the work assignment, and an annual report, of costs
incurred in relation to authorization funding. These minimum
requirements shall be met as described in the work authorization
form and shall comply with the requirements of DOE 1332.1A,
UNIFORM REPORTING SYSTEM.”
b. Each work authorization shall have a unique identifying number
which shall remain unchanged for the total life of the work
assignment. Each number shall conform to an 11 digit alphanumeric
format as described in Attachment 2, page 2. Any exceptions to
this format shall be clearly described in block 13 of the work
authorization form (Attachment 2, page 1).
Section 5
c. Work authorizations may authorize work for the current year or for
subsequent years, subject to the availability of appropriated
funds. A work authorization needs to be revised during the
current year only to the extent necessary to reflect changes in
funding or program guidance related to the current year. A
multiyear work authorization need not be revised in the current
year to reflect changes contemplated in subsequent years, but must
be revised at the beginning of each fiscal year to reflect changes
in funding, schedule, or scope originally authorized for that
year.
7
8 DOE 5700.7C
5-18-92
BY
d. DOE Field Offices shall obtain a signed copy of each work
authorization accepted by the M&O contractor as evidence of
acceptance of the work authorization. Initiation of work on the
work authorization by the M&O contractor constitutes acceptance of
work authorization.
e. Program Offices may transfer funds to a DOE Field Office and
formally delegate certain responsibilities and authorities of the
program manager such as the assignment of tasks and/or distribu-
tion of such funds to two or more M&Os under their cognizance. In
such circumstances, the DOE Field Office shall be responsible for
the preparation and issuance of the work authorization.
f. Use of DOE F 5120.1, “Field Work Proposal,” may be required by a
Program Office in any specific program area to provide information
for program planning or budget formulation, be used as part or all
of the documentation of a work assignment, and by an M&O
contractor to describe prospective work proposed by the
contractor.
g. Funds necessary to support work authorizations will be provided
through the existing financial plan process. The M&O contractor
will have the flexibility to manage individual tasks within the
work assignment. Manpower and dollars may be shifted, as
necessary, subject to DOE or congressionally imposed constraints
and, if required, program office concurrence.
ORDER OF THE SECRETARY OF ENERGY:
DONALD W. PEARMAN, JR.
Acting Director
Administration and Human
Resource Management
Attachment 1
DOE
5700.7C
5-18-92
Page 2
MANAGEMENT AND OPERATING CONTRACTS
DOE 5700.7C Attachment 2
5-18-92 Page I
1.
2.
3.
4.
5.
6.
8.
13.
14.
15.
16.
EXAMPLE OF WORK AUTHORIZATION FORM
Work Authorization
U.S. DEPARTMENT OF ENERGY
MANAGEMENT & OPERATING (M&O) CONTRACT WORK AUTHORIZATION
INITIATOR: George Simpson ER-10
NAME & SIGNATURE ORGANIZATION CODE TELEPHONE NO.
PROJECT TITLE: Characterization of Organics in Solid and Sludge
Waste from Emerging Energy Technologies
RESPONSIBLE ASSISTANT SECRETARY: Director of Energy Research
RESPONSIBLE DOE FIELD OFFICE: DOE CHICAGO FIELD OFFICE
M&O CONTRACTOR NAME: University of Chicago
WORK AUTHORIZATION NO.:
FUNDS HEREBY AUTHORIZED
B&R NO. $000
100 9. PERFORMANCE PERIOD COVERED BY
FUNDS FROM: 10-1-86 TO: 9-30-87
10. WORK START DATE: 10-1-86
11. EXPECTED COMPLETION DATE: 9-30-87
12. FUTURE FUNDING
PLANNED ($000) : $30
WORK AUTHORIZED: (Brief description, schedule, results or products and
reporting requirements, and any shifting or funds permitted within the
work authorization):
NAME & SIGNATURE DATE
WORK AUTHORIZATION OFFICIAL: James Harp 9-24-86
DOE FIELD OFFICE OFFICIAL: Robert Jones 9-24-86
M&O CONTRACTOR OFFICIAL: Harley Doe 9-24-86
HA/ 00 /01
Attachment 2
Page 2
DOE 5700.7C
5-18-92
DOE WORK AUTHORIZATION SYSTEM (WAS) WORK AUTHORIZATION FORM INSTRUCTIONS
A. The Work Authorization Form is a
document which authorizes the performance
of work by a specific M&O contractor.
Section 6
Item 1. Enter the name, signature, organi-
zation code, and telephone number of
Individual initiating the authorization.
Item 2. When the work authorized relates
to a specific project, enter the title of
the project.
Item 3. Enter the title of the Assistant
Secretary responsible for the authorized
work.
Item 4. Enter the title of the DOE FIELD
Office responsible for the authorized
work.
Item 5. Enter the name of the M&O
contractor responsible for the authorized
work.
Item 6. Each work authorization number
will remain the same for the life of the
work assignment. Each number shall conform
to the following alphanumeric format: “
--/-----/--/--
AA/11111/AA/11
a. The first two positions: The first two
letters of the B&R code.
b. The next two positions: The next two
digits of the B&R code.
c. The next two positions: A two digit
sequential number for each authorization
(01 to 99).
d. The next one position: The last digit
of the fiscal Year to which the authorization
applies. -
e. The next two posi
office alpha code.
f. The next two posi
numeric code.
tion: The DOE field
tions: The M&O contractor
Item 7. If the Initial authori-
zation is changed, enter the
appropriate revision number.
Item 8. Enter the amount of funds
authorized under each B&R code.
Item 9. Use a two digit numeric
format (MO-DA-YR) to indicate the
performance period of the authori-
zation; for example, 10-01-85
TO: 09-30-86.
Item 10. Enter the estimated
work start date; for example
09-25-06.
Item 11. Enter the estimated work
completion date; for example
09-05-86.
Item 12. Enter the estimated fund-
ing which will be required above
the funds provided in the work
authorization.
Item 13. Enter a brief description
of work authorized. schedule, results
or products, and reporting require-
ments.
Item 140 Enter the name and
signature of the work authorizing
official, and the date of his/her
signature.
Item 15. Enter the name and signature
of the DOE Field Office Official, and the
date of his/her signature.
Item 16. Enter the name and
signature of the M&O official,
and the date of his/her signature.
DOE 5700.7C
5-18-92
Attachment 3
Page 1
FIELD WORK PROPOSAL
(Format)
U.S. DEPARTMENT OF ENERGY
FIELD WORK PROPOSAL
1. WORK PACKAGE NUMBER 2.REVISION 3 DATE PREPAREDNO. .
ERW0001 o 9-1-85
3. WORK PACKAGE TITLE 5. BUDGET AND REPORTING CODE
Organics in Solid and Sludge Waste .
from Emergency Energy Technologies AA-05-15
6. WORK PROPOSAL TERM 7. IS THIS WORK PACKAGE INCLUDED
. Begin: (mm dd yy) End: (mm dd yy ) IN THEINSTITUTIONAL PLAN
10 01 85 09 30 86 Yes
8 . NAME: (Last, First. MI) (FTS Number) 11 . HEADQUARTERS 14 DOE ORGANIZATION
HEADQUARTERS/DOE FIELD ORGANIZATION: . CODE:
OFC PROGRAM MANAGER
George Simpson Energy Research ER
9. DOE FIELD OFFICE WORK PROPOSAL 12. DOE FIELD 15. DOE ORGANIZATION
REVIEWER
Bob Johnson
OFFICE: CODE
DOE Chicago
Field Office CH
1O. CONTRACT OR WORK PROPOSAL MANAGER 13. CONTRACTOR NAME: 16. CODE:
John Smith Univ. of Chicago 12
17. PROPOSAL DESCRIPTION (Approach, anticipated benefit in 200 words or less:)
In processes such as coal gasification, coal liquefaction, and the extraction of oil from
oil shale, wastes are generated that are normally biologically or chemically treated
before disposal. To assist in determining the best treatment for obtaining material
suitable for disposal, a knowledge of the chemical composition of the wastes is required.
Section 7
The primary objective of this interlaboratory study is to characterize, by narrow-bore
capillary column gas chromatography/mass spectrometry, the organics in solid and sludge
wastes from the processes of emerging energy technologies and determine their potential
for leaching after solid waste disposal.
18. CONTRACTOR WORK PROPOSAL MANAGER: 19 . DOE FIELD OFFICE OFFICIAL
(Signature) (Date)
(Signature)
20 DETAIL ATTACHMENTS:
(Date)
. (see Attachments)
a. Facility Requirements e. Approach i. Environmental Assessment
b. Publications f. Technical progress j. Explanation of Milestones
c. Purpose g. Future Accomplishments k. Other (Specify)
d. Background h. Relationships to Other Projects
Attachment 3
Page 2 DOE 5700.7C
5-18-92
WORK PROPOSAL REQUIREMENTS FOR OPERATING/EQUIPMENT
OBLIGATIONS AND COSTS
DATE PREPAREDCONTRACTOR NAME WORK PROPOSAL NO. REV. NO.
University of Chicago ERWOOO1 o 9-1-85
21 . STAFFI NG (in staff years) PRIOR I BY
AUTHOR-
BY+l BY+2 TOTAL TO
COMPETE
0.2
0.7
0.9
YEARS BY-1 REQUEST
0.2
$100
30
$ 0
$ 0
IZED
0
0.2
0.2
$100
30
a. SCIENTIFIC
b. OTHER DIRECT . . . . . . . . . . . .
c. TOTAL DIRECT . . . . . . . . . . . .
22. OPERATING EXPENSE (in
Thousands)
s 30
100
a. TOTAL OBLIGATIONS
b. TOTAL COSTS
23. EQUIPMENT (in Thousands)
a. EQUIPMENT OBLIGATIONS
b. EQUIPMENT COSTS
24. MILESTONE SCHEDULE (Tasks)
BY SCHEDULE
PROPOSED
Develop procedures for
analysis
Extraction of Samples
Analysis Setup
Extract Analysis
Leaching & Analysis
Leachate
Reporting of Results
10/85-12/85
01/86-02/86
02/86
03/86-08/86
03/86-08/86
09/86
25. REPORTING REQUIREMENTS
(DESCRIPTION)
Milestone Status Report - Monthly
Analysis Findings - AS produced
Final Report - At close of project
000
0
0.2
DOE 5700.7C
5-18-92
Attachment
3
Page 3
DOE WAS FIELD WORK PROPOSAL INSTRUCTIONS
Attachment
3
Page 4
DOE
5700.7C
5-18-92
DOE WAS FIELD WORK PROPOSAL INSTRUCTIONS (CONTINUED)
DOE
5700.7C
Attachment
3
5-18-92
Page 5 (and 6)
DOE
WAS
FIELD
WORK
PROPOSAL
INSTRUCTIONS
(CONTINUED)