DOE O 473.2, Protective Force Program
Functional areas: Physical Protection, Protective Force, Safeguards, Security, and Emergency Management, Work Processes
Establishes policy, requirements, responsibilities, and authorities, for the management and operation of the Department of Energy (DOE) Protective Force (PF) Program. Extended until 7-7-06 by DOE N 251.64, dated 7-7-05
Cancels: DOE 5632.7A
Supersedes:
DOE O 5632.7A Chg 1, Protective Force Program on Jun 30, 2000
Superseded By:
DOE N 251.36, Cancellation of Directives on Aug 03, 2000
DOE O 470.4, Safeguards and Security Program on Aug 26, 2005
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE N 251.36Cancellation of Directives (Aug 03, 2000)
- DOE O 470.4Safeguards and Security Program (Aug 26, 2005)
Supersedes
Earlier documents this one replaced.
- DOE O 5632.7A Chg 1Protective Force Program (Jun 30, 2000)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DISTRIBUTION: INITIATED BY:
All Departmental Elements Office of Safeguards and Security
U.S. Department of Energy ORDER
Washington, D.C.
Approved: 6-30-00
Sunset Review: 6-30-02
Expiration: 6-30-04
SUBJECT: PROTECTIVE FORCE PROGRAM
1. OBJECTIVES. To establish policy, requirements, responsibilities, and authorities, for the
management and operation of the Department of Energy (DOE) Protective Force (PF)
Program.
2. CANCELLATIONS. Publication of this Order cancels DOE 5632.7A, PROTECTIVE
FORCE PROGRAM, dated 2-13-95. Cancellation of an Order does not, by itself, modify or
otherwise affect any contractual obligations to comply with the Order. Canceled Orders that
are incorporated by reference into a contract must remain in effect until the contract is modified
to delete the reference to the requirements in the canceled Order.
3. APPLICABILITY.
a. DOE Elements. This Order applies to DOE Elements and those organizations under
the cognizance of the Administrator, National Nuclear Security Administration
(NNSA); responsible for management and operation of PFs to ensure the protection of
classified matter, nuclear materials, and other safeguards and security (S&S) interests,
from theft, diversion, industrial sabotage, radiological sabotage, toxicological sabotage,
espionage, unauthorized access and control, compromise, and other acts that may
cause unacceptable adverse impacts on national security, the health and safety of DOE
and contractor employees, the public, or the environment.
b. Contractors. Except for the exclusions in paragraph 3c, the Contractor Requirements
Document (CRD), Attachment 1, sets forth requirements that are to be applied to
contractors awarded contracts requiring PFs to provide physical protection of DOE
S&S interests. Contractor compliance with the CRD will be required to the extent set
forth in a contract or other agreement.
c. Exclusions. Requirements in this Order that overlap or duplicate requirements of the
Nuclear Regulatory Commission related to the S&S of nuclear material do not apply to
the design, construction, operation, and decommissioning of Office of Civilian Waste
Management facilities.
DOE O 473.2
CANCELE
D
2 DOE O 473.2
6-30-00
d. Deviations. Deviations (i.e., variances, waivers, and exceptions) from the requirements
prescribed in this Order and DOE M 473.2-2, PROTECTIVE FORCE PROGRAM
MANUAL, must be processed in accordance with DOE O 470.1, SAFEGUARDS
AND SECURITY PROGRAM.
4. REQUIREMENTS.
a. S&S interests must be protected from theft, diversion, industrial sabotage, radiological
sabotage, toxicological sabotage, espionage, unauthorized access and control,
compromise, and other hostile acts that may cause unacceptable adverse impacts on
national security or the health and safety of DOE and contractor employees, the public,
or the environment.
b. PFs must be provided training, equipment, and resources to ensure effective
performance of assigned functions and tasks under both normal and emergency
conditions.
c. PF personnel must comply with DOE policy on the use of force as established in 10
CFR 1047, Limited Arrest Authority and Use of Force by PF Officers, and 10 CFR
1049, Limited Arrest Authority and Use of Force by Strategic Petroleum Reserve PF
Officers, as applicable.
d. PF personnel must comply with Departmental medical, physical fitness, and firearms
qualifications and training requirements as established in 10 CFR 1046, Physical
Protection of Security Interests.
Section 2
e. PFs are used to protect the Department's S&S interests from theft, diversion, industrial
sabotage, radiological sabotage, toxicological sabotage, espionage, unauthorized
access, loss, compromise, and other hostile acts that may cause unacceptable adverse
impacts on national security, program continuity, the health and safety of Departmental
and contractor employees, the public, or the environment; and to protect life and
property as defined in 10 CFR 1047 and 1049. Armed Security Police Officers must
be assigned to protect security areas that—
(1) receive, use, process, or store Category I or II quantities of special nuclear
material (SNM) (see DOE O 474.1, CONTROL AND
ACCOUNTABILITY OF NUCLEAR MATERIALS);
(2) manufacture, store, or test nuclear weapons, nuclear test devices, or complete
nuclear assemblies;
(3) represent a significant target for radiological or toxicological sabotage; or
CANCELE
D
DOE O 473.2 3
6-30-00
(4) contain a unique capability in DOE that must be protected for purposes of
program continuity or to preclude an unacceptable adverse impact to national
security, the health and safety of DOE and contractor employees, the public, or
the environment when the need has been so designated by the head of the Field
Element, with concurrences from the Director, Office of Security Affairs (OSA)
and the cognizant Secretarial Officer.
f. Armed DOE PF personnel designated as Special Agents under the cognizant authority
of the DOE Albuquerque Operations Office, Transportation Safeguards Division, must
provide for the safe, secure, off-site domestic transportation of—
(1) DOE-owned or -controlled nuclear explosives and nuclear devices;
(2) Category II or greater quantities of SNM, excluding naval reactor core
shipments;
(3) any form of plutonium-238 in excess of 5 grams;
(4) limited-life components of nuclear weapons; or
(5) other materials as specified by statute, directive, or competent authority.
g. Special response teams (SRTs) or SRT capabilities must be available at DOE sites or
facilities containing Category I quantities of SNM.
h. Credentials and shields are issued to qualified DOE employees, Federal Officers/
Special Agents, and contractor PF personnel to provide official identification and to
indicate that the bearer has the authority to perform assigned official duties. Credentials
and shields must be used only during the performance of official duties. The design of
credentials and shields must be approved by OSS, and where applicable, the cognizant
local DOE/NNSA authority for S&S, as applicable.
i. Unarmed Security Officers may be used to enforce the protection requirements of S&S
directives where armed PF personnel are not required.
j. Written plans, post orders (POs), general orders (GOs), and procedures covering PF
routine, emergency, and administrative duties; tactical deployment; and other
operational requirements must be developed.
CANCELE
D
4 DOE O 473.2
6-30-00
k. DOE security helicopter operations must provide timely and effective response to
security emergencies. DOE security helicopters may be used for PF transport,
command, control, communications, and surveillance and as a firing platform, when
required.
l. PFs must be equipped to effectively, efficiently, and safely perform both routine and
emergency duties. Equipment must be tailored to counter adversaries identified in
Design Basis Threat for Department of Energy (DOE) Programs and Facilities
(U), site-specific threat guidance, or the Site Safeguards and Security Plan. PF
equipment must be available in sufficient quantities and properly maintained to support
the PF mission.
Section 3
m. Permanent PF posts that control access to areas containing nuclear weapons, test
devices, complete nuclear assemblies, or Category I or II quantities of SNM must meet
the location, human factors, construction, lighting, and vehicular access control
requirements of DOE M 473.2-2, Chapter VI.
n. Performance tests must be used to realistically evaluate and verify the effectiveness of
PF programs, identify and provide training for personnel, identify areas requiring system
improvements, validate implemented improvements, and motivate PF personnel.
Performance tests must adhere to the requirements found in DOE M 473.2-2, Chapter
VII, and DOE 470.1, Chapter III. All major functions of the PF must be tested.
o. Protection measures, including the use of armed personnel, may be provided for the
protection of the Secretary of Energy and/or Deputy Secretary within or outside the
United States. The Secretary must determine the extent and nature of any protection
measures to be performed.
5. RESPONSIBILITIES.
a. Lead Program Secretarial Offices (LPSOs).
(1) Ensure management oversight of field PF operations in terms of: performance-
based management; implementation of cross-cutting policies and requirements;
and institutional health, integration of operations and programs, and long-term
planning.
(2) Ensure that PFs under their cognizance are managed, trained, equipped, and
provided facilities and logistical, intelligence, communications, and other support
services to maintain adequate protection of S&S interests, as required by this
and other S&S and related directives.
CANCELE
D
DOE O 473.2 5
6-30-00
(3) Ensure that this Order and the corresponding Manual are implemented in the
appropriate contracts and that, where implemented, contractors are instructed
to assist DOE Elements in fulfilling the requirements of this Order and its
corresponding Manual, as determined appropriate for each site.
b. Director, Office of Security and Emergency Operations. Through the Director, OSA,
provides guidance and coordination in the development, implementation, promulgation,
and clarification of PF policy.
c. Director, OSA.
(1) Promulgates and establishes S&S policies, standards, requirements, and
guidance for the PF Program.
(2) Authorizes, and may delegate authority to authorize, the carrying of firearms
and the making of arrests without warrant by DOE/NNSA and contractor PF
personnel, as necessary, in the performance of official duties, pursuant to
section 161k of the Atomic Energy Act of 1954, as amended (42 U.S.C.
2201k), or section 661 of the DOE Organization Act, as amended (42 U.S.C.
7270a), as applicable.
d. Director, OSS.
(1) Serves as the Departmental focal point for PF Program matters.
(a) Reviews, develops, and coordinates policy requirements and guidance
for the management, operation, training, equipping, and performance
testing of DOE PFs.
(b) For the Headquarters PF Program, assumes those responsibilities and
authorities prescribed for heads of DOE Elements and heads of Field
Elements in paragraphs 5a and 5g. Through the Director,
Headquarters Operations Division, provides management and direction
and establishes policies, procedures, and plans for maintenance and
operation of the Headquarters PF and Executive Protection Programs.
(c) Maintains national level liaison with civilian and military law enforcement
agencies and serves as the DOE focal point for such liaison.
(d) Manages and operates the DOE Headquarters Federal Officer
Program.
Section 4
CANCELE
D
6 DOE 473.2
6-30-00
(e) Coordinate field requirements with procurement offices to consolidate
PF firearms, chemical/biological personal protective equipment, and
other applicable PF equipment procurement requirements, facilitate
identification of procurement contracts, and develop interagency
agreements.
e. Assistant Secretary for Environment, Safety and Health. Assists in the development of
PF policy issues to ensure safety, medical, and health considerations are properly
integrated.
f. Director, Office Independent Oversight and Performance Assurance. Through the
Director, Office of Security Evaluations, provides independent inspection and
evaluation to assess the effectiveness of S&S programs implemented under this Order
and DOE M 473.2-2.
g. Director, Naval Nuclear Propulsion Program. In accordance with the responsibilities
and authorities assigned by Executive Order 12344 [statutorily prescribed by Public
Law 98-525 (42 U.S.C. 7158, note)] and to ensure consistency throughout the joint
Navy/DOE organization of the Naval Nuclear Propulsion Program, implements and
oversees all pertinent requirements for activities under the Director’s cognizance.
h. Heads of Field Elements.
(1) In addition to the responsibilities in paragraph 5a, oversee PFs to ensure DOE
S&S interests are adequately protected.
(2) Ensure the development and maintenance of directives, plans, POs, GOs, and
procedures for the direction of PF personnel in both normal and emergency
duties.
(3) Oversee contractor development, implementation, and management of PF
programs in accordance with this Order.
(4) As delegated by the Director, OSA, authorize DOE/NNSA and contractor PF
employees to carry firearms and make arrests without warrant.
(5) Ensure that PF personnel under their authority meet mandatory training and
qualification requirements as delineated by this Order and 10 CFR 1046.
(a) Ensure resources are provided to train and equip PFs and to maintain
associated equipment, facilities, and supplies.
CANCELE
D
DOE 473.2 7
6-30-00
(b) Approve site- and facility-specific training programs for Federal
Officers, Security Police Officers, Security Officers, and PF special
skills positions.
(6) Ensure liaison is maintained with the Federal Bureau of Investigation and other
Federal, State, and local law enforcement agencies that may be required to
supplement DOE/NNSA and contractor PF personnel for response to S&S
incidents.
(7) Ensure the development and annual review/verification of memorandums of
understanding/agreement with local, State, and Federal law enforcement
agencies to document expected support during site S&S incidents.
(8) Ensure each procurement requiring the application of this Order includes
Attachment 1 of this Order or identification of the specific requirements
applicable to the contractor or other awardee and impose a requirement to
include Attachment 1 or such specific requirements in any subcontract or
subaward.
(9) Ensure PF programs are managed and implemented consistent with the
cognizant LPSO guidance.
i. Manager, Albuquerque Operations Office. In addition to the responsibilities listed in
paragraph 5g, ensures the development of medical, physical fitness, and training
program requirements and operating procedures for Transportation Safeguards Division
Special Agents.
j. Administrator, NNSA. Through the Chief, Defense Nuclear Security, NNSA; ensures
the development and implementation of security programs, including the protection,
control, and accounting of materials, and for physical and cyber security of all facilities
of the NNSA.
Section 5
6. REFERENCES. See DOE M 473.2-2, PROTECTIVE FORCE PROGRAM MANUAL.
7. CONTACT. Questions concerning the requirements in this Order should be directed to the
Program Manager, Protection Program Operations, OSS, at (301) 903-5693.
8. IMPLEMENTATION. These requirements must be implemented as soon as possible,
consistent with collective bargaining and similar agreements and contractual requirements.
Implementation plans for any requirements that cannot be implemented within 6 months of the
effective date of this Order or within existing resources must be developed by heads of Field
CANCELE
D
8 DOE 473.2
6-30-00
Elements and submitted to the respective LPSO. Copies of these plans must be
forwarded to the Office of Security and Emergency Operations, through the OSS.
BY ORDER OF THE SECRETARY OF ENERGY:
T.J. GLAUTHIER
Deputy Secretary
CANCELE
D
DOE O 473.2 Attachment 1
6-30-00 Page 1
CONTRACTOR REQUIREMENTS DOCUMENT
CONTRACTOR PROTECTIVE FORCE PROGRAM REQUIREMENTS
DOE contractors must adhere to the same Protective Force (PF) Program standards for protecting
safeguards and security (S&S) interests, including but not limited to, nuclear weapons, explosives, and
components; special nuclear material (SNM); vital equipment; classified matter; assets; facilities; and
other property of interest to the S&S Program as Department of Energy (DOE) Elements and their
personnel.
1. REQUIREMENTS.
a. Contractors must protect S&S interests from theft, diversion, industrial sabotage,
radiological sabotage, toxicological sabotage, espionage, unauthorized access and
control, loss, compromise, and other hostile acts that may cause unacceptable adverse
impacts on national security, the health and safety of DOE and contractor employees, the
public, or the environment.
b. PFs must be provided training, equipment, and resources to ensure effective performance
of assigned functions and tasks under both normal and emergency conditions.
c. PF personnel must comply with medical, physical fitness, and firearms qualifications and
training criteria established by regulation [see Title 10, Code of Federal Regulations, Part
1046 (10 CFR 1046), Physical Protection of Security Interests].
d. PF personnel must comply with DOE policy on the use of force as established in 10 CFR
1047, Limited Arrest Authority and Use of Force by PF Officers, and 10 CFR 1049,
Limited Arrest Authority and Use of Force by Strategic Petroleum Reserve PF Officers,
as applicable.
e. Contractors must assign armed Security Police Officers to protect security areas that—
(1) receive, use, process, or store Category I or II quantities of SNM (see DOE O
474.1, CONTROL AND ACCOUNTABILITY OF NUCLEAR
MATERIALS);
(2) manufacture, store, or test nuclear weapons, nuclear test devices, or complete
nuclear assemblies;
(3) represent a target for radiological or toxicological sabotage; or
CANCELE
D
Attachment 1 DOE O 473.2
Page 2 6-30-00
(4) contain a unique capability in DOE that must be protected for purposes of
program continuity or to preclude an unacceptable adverse impact to national
security; program continuity; the health and safety of DOE and contractor
employees, the public, or the environment when the need has been so
designated by the head of the Field Element, with concurrences from the
Director of Security Affairs and the cognizant Secretarial Officer.
f. Special Response Teams (SRTs) or SRT capabilities must available at DOE sites or
facilities containing Category I quantities of SNM.
Section 6
g. Credentials and shields are issued to qualified contractor PF personnel to provide official
identification and to indicate that the bearer has the authority to perform assigned official
duties. Credentials and shields must be used only during the performance of official
duties. The design of S&S credentials and shields must be approved by the Office of
Safeguards and Security (OSS) and, where applicable, the cognizant local DOE/NNSA
authority for S&S, as applicable.
h. Unarmed Security Officers may be used to enforce the protection requirements of S&S
directives where armed personnel are not required.
i. Contractors must develop and maintain written plans, post orders, general orders, and
procedures covering PF routine, emergency, and administrative duties; tactical
deployment; and other operational requirements.
j. DOE security helicopter operations must provide timely and effective response to security
emergencies. DOE security helicopters may be used for PF transport, command,
control, communications, and surveillance and as a firing platform, when required.
k. PFs must be equipped to effectively, efficiently, and safely perform routine and
emergency duties. Equipment must be tailored to counter adversaries identified in the
Design Basis Threat for Department of Energy (DOE) Programs and Facilities (U),
site-specific threat guidance, and/or the Site Safeguards and Security Plan. PF equipment
must be available in required quantities and properly maintained to support the PF
mission.
l. Permanent PF posts that control access to areas containing nuclear weapons, nuclear test
devices, complete nuclear assemblies, and/or Category I or II quantities of SNM must
meet the location, human factors, construction, lighting, and vehicular access control
requirements in Chapter VI of DOE M 473.2-2, Protective Force Program Manual.
CANCELE
D
DOE O 473.2 Attachment 1
6-30-00 Page 3 (and 4)
m. Performance tests must be used to realistically evaluate and verify the effectiveness of PF
programs, identify needed training and provide training for personnel, identify areas
requiring system improvements, validate implemented improvements, and motivate PF
personnel. Performance tests must adhere to the requirements found in DOE O 470.1,
Safeguards And Security Program; DOE O 473.2, and DOE M 473.2-2. All major
functions of the PF must be tested.
n. Protection measures, including the use of armed personnel, may be provided to protect
the Secretary of Energy and/or Deputy Secretary within or outside the United States.
The Secretary must determine the extent and nature of any protection measures to be
performed.
2. REFERENCES. See DOE M 473.2-2 for references.
3. CONTACT. Questions concerning these requirements should be directed to the Program
Manager, Protection Program Operations, OSS, at (301) 903-5693.
4. IMPLEMENTATION. These requirements must be implemented as soon as possible,
consistent with collective bargaining and similar agreements and contractual requirements.
Implementation plans for any requirements that cannot be implemented within 6 months of the
effective date of this Order or within existing resources must be developed by heads of Field
Elements and submitted to the respective Lead Program Secretarial Officer. Copies of these
plans must be forwarded to the Office of Security and Emergency Operations, through the
OSS.
CANCELE
D
DOE O 473.2
Objectives, Cancellation, Applicability
Requirements
Responsibilities
Contractor Requirements Document