DOE O 426.1B, Department of Energy Federal Technical Capabilities
Functional areas: Work Processes
To define requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Supersedes DOE O 426.1A Chg1 (MinChg).
Version history and related documents
Supersedes
Earlier documents this one replaced.
Related documents
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
AVAILABLE ONLINE AT: INITIATED BY:
www.directives.doe.gov Office of Environment, Health, Safety and Security
U.S. Department of Energy ORDER
Washington, DC
Approved: 3-5-2020
SUBJECT: DEPARTMENT OF ENERGY FEDERAL TECHNICAL CAPABILITIES
1. PURPOSE. To define requirements and responsibilities for implementing the Department
of Energy (DOE) Technical Qualification Program (TQP). The TQP, in concert with
existing DOE Human Capital and Line Management processes, supports DOE’s
commitment to recruiting, deploying, developing, and retaining a technically competent
workforce that will accomplish DOE missions in a safe and efficient manner. The Federal
Technical Capabilities Panel (FTCP) provides support and strategic vision for
implementation of the TQP, and supports DOE Line Management in identifying and
addressing department-wide issues that may adversely impact the objectives of this
Order.
2. CANCELS/SUPERSEDES. DOE O 426.1A Chg 1, Federal Technical Capability
Program, dated 10-4-2019.
3. APPLICABILITY.
a. Departmental Applicability. This Order applies to any DOE organization,
including National Nuclear Security Administration (NNSA) that performs
functions related to the safe operation of defense nuclear facilities. This Order
does not apply to other DOE formal qualification program requirements, such as
the Project Management Career Development Program.DOE employees whose
duties and responsibilities could affect the safe operation of defense nuclear
facilities are required to participate in the DOE TQP.
(2) The Administrator of NNSA must assure that NNSA employees comply
with their respective responsibilities under this Order. Nothing in this
directive will be construed to interfere with the NNSA Administrator’s
authority under section 3212(d) of Public Law (P.L.) 106-65 to establish
Administration-specific policies, unless disapproved by the Secretary.
(3) Additional positions may be designated as TQP positions at the discretion
of the Headquarters (HQ) or Field Element Managers (FEM). This could
include positions that involve oversight of non-defense nuclear facilities,
other high hazard non-nuclear facilities, or other positions important to the
mission of DOE as determined by the HQ or FEM.
b. DOE Contractors. This Order does not apply to contractors.
c. Equivalencies/Exemptions for DOE O 426.1B.
(1) Equivalency. In accordance with the responsibilities and
authorities assigned by Executive Order 12344, codified at
DOE O 426.1B
http://www.directives.doe.gov/
2 DOE O 426.1B
3-5-2020
title 50, United States Code (U.S.C.), sections 2406 and 2511, and
to ensure consistency throughout the joint Navy/DOE Naval
Nuclear Propulsion Program, the Deputy Administrator for Naval
Reactors (Director) will implement and oversee requirements and
practices pertaining to this directive for activities under the
Director’s cognizance, as deemed appropriate.
(2) Exemption. This Order does not apply to DOE organizations,
including NNSA, that do not perform functions related to the safe
operation of defense nuclear facilities.
4. REQUIREMENTS.
a. DOE Federal Technical Capabilities Principles.
(1) Consistent with the Department’s Integrated Safety Management Guiding
Principles and safety culture attributes DOE Organizations and Line
Managers:
(a) Ensure Federal personnel possess the experience, knowledge,
skills, and abilities that are necessary to discharge their safety
responsibilities;
Section 2
(b) Value and practice continuous learning require employees to
participate in recurrent and relevant training and mandatory
performance activities and encourage educational experience,
training, and application to improve knowledge, skills, and abilities
and implementation of the TQP; and
(c) Have the responsibility and authority and are accountable to
achieve and maintain organizational technical excellence.
(2) The competence, rigor, and integrity of designated qualifying officials and
first line supervisors in carrying out their assigned roles and
responsibilities are foundational to the integrity and overall effectiveness
of the TQP.
(3) Supporting organizations recognize line managers as customers and
effectively support them in achieving and maintaining technical
capabilities.
(4) An integrated corporate approach is required to assure that necessary
technical capabilities and resources are available to meet the overall needs
of the Department's defense nuclear facility missions. An essential
element of this corporate approach is support from Human Capital
organizations in recruiting, hiring, and retaining critical technical
capabilities
DOE O 426.1B 3
3-5-2020
b. Federal Technical Capabilities Panel. The FTC Panel (referred to as the FTCP or
Panel) provides strategic vision and senior-level line management guidance to
implement and improve the DOE TQP. The Panel also supports HQ and FEM in
addressing DOE-wide issues related to the recruiting, hiring, and retaining the
necessary technical capabilities and resources to support the Department’s
defense nuclear facility missions
(1) The Panel is chaired by the Director of the DOE National Training Center
(NTC). Membership of the Panel consists of Agents who are senior-level
managers designated by each HQ and Field Element responsible for
defense nuclear facilities. The Chair of the Panel and the FTCP Agents
must be qualified Senior Technical Safety Managers (STSM).
(2) The Panel must develop and maintain a Charter that describes business
operations and processes.
(3) The Panel will document its processes on the FTCP website. Processes
will be approved by the FTCP and signed by the Panel Chair. FTCP
processes may be used by other DOE programs or elements to develop and
maintain qualification programs. The Panel may establish sub-groups to
facilitate these programs.
(4) The Panel will identify, track, and support the completion of major
initiatives to improve implementation of the DOE TQP, such as
management of Technical Qualification Standards and accreditation
reviews.
(5) The Charter and approved processes and additional information is located
on the FTCP website.
c. Technical Qualification Program (TQP). The primary purpose of a TQP is to
ensure employees have the technical competencies needed to support the mission
of the DOE. The TQP forms the basis for the development and assignment of
DOE personnel responsible for ensuring the safe operation of defense nuclear
facilities.
Each HQ and Field Element with defense nuclear facilities responsibility must
define and implement a TQP for its organization. The organization-specific TQP
must include the following elements:
(1) Plans and Procedures. Plans and procedures must be developed and
implemented to govern the administration of the program. The procedures
must include specific roles and responsibilities for line management,
qualifying officials, and participants. The FTCP Agent must be designated
as responsible for overall TQP guidance and performance monitoring.
Section 3
(2) Identification of Required Technical Capabilities. Senior managers with
support of the local FTCP Agent identify critical technical capabilities and
4 DOE O 426.1B
3-5-2020
positions that must be maintained to ensure safe operations of defense
nuclear facilities. The identified technical capabilities are incorporated
into organization-specific staffing plans that are used to inform and
support priority recruitment and hiring actions through established DOE
Human Capital and Line Management processes.
(3) Identify TQP Participants. The program must establish the process for
identifying positions required to participate in the TQP based on nuclear
safety responsibilities, which include DOE personnel who provide
assistance, direction, guidance, oversight, or evaluation of contractor
technical activities that could impact the safe operation of DOE’s defense
nuclear facilities. This typically includes personnel who provide oversight
and evaluation of contractor performance in nuclear facility core and
crosscutting performance areas.
(a) The requirement for TQP participation must be documented in the
participant’s Position Description.
(b) Any position that is technical in nature and includes duties and
responsibilities related to the safe operation of defense nuclear
facilities must be included in the TQP. This typically includes
positions that have duties and responsibilities that closely align
with the duties and responsibilities specified in a Functional Area
Qualification Standard (FAQS).
(c) A position is considered technical in nature if the competencies
associated with the position could not be obtained in 90 days using
formal training and the loss of the competencies associated with
the position could jeopardize the Department’s ability to meet
safety or regulatory requirements.
(d) Additional positions may be designated as TQP positions at the
discretion of the HQ or FEM. This could include positions that
involve oversight of non-defense nuclear facilities, other high
hazard non-nuclear facilities, or other positions important to the
mission of DOE as determined by the HQ or FEM. All TQP
requirements will apply to any additional designated positions.
(e) The program must identify roles and responsibilities for evaluating
the need for, and implementing as appropriate, compensatory
measures for personnel who are assigned details or temporary
assignments in a TQP- designated position.
(4) Qualification Process. The program must clearly identify and document
the organization’s process and specific roles and responsibilities for the
following:
DOE O 426.1B 5
3-5-2020
(a) Formal Assignment of required qualification standards (typically
within 90 days);
(b) Development and maintenance of organization-specific and any
job-specific qualification standards;
(c) Timelines for completion of qualification (typically 18 months)
and identification of any compensatory measures while completing
qualifications;
(d) Assignment of designated Qualifying Officials; and
(e) Designating Final Qualification upon completion of all Technical
Qualification Standards.
(5) Continuing Training Program Requirements. The program must describe
the organizations continuing training program (CTP) and include, as a
minimum, the following:
(a) Expectations for implementing the applicable elements and
requirements of a CTP included in section 4.f.(4) of this Order;
(b) Expectations for how required continuing training (CT) is
documented and how CT hours are tracked during the nominal five
(5) year CT cycle; and
Section 4
(c) Expectations for implementing compensatory measures or other
appropriate actions for personnel who do not maintain
qualifications by completing the required CT hours during the
nominal 5-year CT cycle.
(6) Periodic Evaluation. Headquarters and field elements must conduct a
periodic self-assessment of their TQP using, as a minimum, the FTCP-
approved TQP objectives and criteria posted on the FTCP website. The
program must establish expectations for the frequency of these self-
assessments.
d. DOE Technical Qualification Standards. The TQP includes three (3) levels of
qualification standards. The first level is the General Technical Base (GTB)
Qualification Standard. Completion of the GTB ensures that designated personnel
in the TQP have a base level of knowledge related to the unique hazards and
associated requirements for nuclear operations and the fundamental skills to
perform common oversight duties. The second level is completion of a functional
area, program-specific, or job-specific qualification standard. This ensures
personnel have the competencies to perform a set of functional, program, or job-
specific duties and responsibilities defined in the applicable technical
qualification standards. The third level is completion of an organization-specific
qualification standard (OSQS). This level defines any organization unique
6 DOE O 426.1B
3-5-2020
competencies (e.g., facility, office, site) associated with performing the duties and
responsibilities included in the second-level (functional, program, or job-specific)
qualification standard.
(1) General Technical Base Qualification Standard1.
(a) TQP participants who are assigned an FAQS or Job-Specific
Qualification Standard (JSQS) must complete the GTB
Qualification Standard (QS), including both Parts A, Knowledge
Base, and Part B, Oversight Performance.
(b) TQP participants who are assigned a Program-Specific
Qualification Standard (PSQS) must complete GTB Part B,
Oversight Performance.
(c) The determination as to whether GTB Part A is required for a
PSQS will be evaluated during the development of the PSQS. The
final determination as to whether GTB Part A is required will be
documented in the approved PSQS.
(2) Functional Area, Program-Specific, or Job-Specific Qualification
Standards.
(a) Functional Area Qualification Standards (FAQS). FAQS establish
common performance competencies in key nuclear facility
functional areas for DOE personnel who provide assistance,
direction, guidance, oversight, or evaluation of contractor technical
activities that could impact the safe operation of DOE’s defense
nuclear facilities. This typically includes personnel who provide
oversight and evaluation of contractor performance in nuclear
facility core and crosscutting performance areas2.
Satisfactory and documented attainment of the performance
competencies contained in an FAQS ensures personnel possess the
minimum requisite knowledge and skills to fulfill functional area
duties and responsibilities common across the DOE enterprise.
FAQS must be used without modification or addition to
performance competency knowledge requirements to promote
transportability of qualifications between DOE elements.
FAQS are developed by the FTCP as a tool to assist DOE HQ and
field elements in the development and implementation of their
TQP. A TQP participant should be assigned an FAQS if a majority
of the duties and responsibilities identified in the FAQS are
Section 5
1 The requirement for completing GTB (both Parts A and B) in this section applies only to new TQP participants.
2 See definition.
DOE O 426.1B 7
3-5-2020
assigned to the participant. FAQS are approved by the Panel and
signed by the FTCP Chair. Since an FAQS is transportable and
does not include program and site variations, an OSQS is required
for personnel assigned an FAQS.
Examples of functional areas that have associated FAQS include:
1 Senior Technical Safety Manager (STSM). An STSM must
integrate safety into management and work practices to
accomplish DOE mission objectives while ensuring worker
and public health and safety and the protection of the
environment. The STSM qualification requires a broad
range of knowledge related to ensuring the safety of
nuclear facility operations and sound decision making
related to nuclear safety.
All HQ elements with responsibility for defense nuclear
facilities must ensure that positions with decision authority
that could impact safety of defense nuclear facilities are
staffed by qualified STSMs. The positions that are typically
designated as requiring STSM qualification are in the line
management chain as a supervisor or manager, although
some may be advisors to line managers. Line management
must ensure that qualified STSMs are in place to maintain
adequate technical competence in the reporting structure of
positions of authority for defense nuclear facilities.
At a minimum, the following positions must be STSM
qualified:
a Central Technical Authorities (CTA).
b Field Element Manager or Deputy Field Element
Manager with oversight responsibilities of defense
nuclear facilities. Also, at least one of the
individuals in these positions should meet the
preferred education and experience identified in the
STSM FAQS.
c Any other positions required by DOE Orders.
2 Facility Representative (FR). An FR is responsible for
monitoring the safety performance of DOE defense nuclear
facilities and day-to-day operational status. The
background and experience criteria for entry into the FR
Program are found in DOE-Standard (STD)-1063.
8 DOE O 426.1B
3-5-2020
3 Safety System Oversight (SSO) Specialist.3 SSO personnel
oversee contractor management of safety systems at DOE
defense nuclear facilities. An SSO Specialist is responsible
for overseeing assigned systems to ensure they will perform
as required by the safety basis and other applicable
requirements.
4 Nuclear Safety Specialist (NSS). The NSS personnel
perform the technical reviews of DOE nuclear safety
documents and provide recommendations for approval or
disapproval to the designated safety-basis approval
authority.
5 Safety Management Program (SMP) and Safety
Management System Oversight. This includes oversight of
key nuclear facility SMPs and Safety Management
Systems, such as Radiation Protection, Fire Protection,
Emergency Management, Criticality Safety, Quality
Assurance, and others as designated by the Panel.
(b) Program-Specific Qualification Standards (PSQS). PSQS establish
common performance competencies in key programmatic areas for
DOE personnel who provide assistance, direction, guidance,
oversight, or evaluation of contractor technical activities that could
impact the safe operation of DOE’s defense nuclear facilities. A
PSQS may also be applied in areas where a defined and consistent
qualification program is needed to ensure personnel have the
technical competence commensurate with their oversight
responsibilities. This includes programs, such as Aviation Safety,
Safeguards and Security, Weapon Quality, Nuclear Explosive
Safety, and others as designated by the Panel.
Section 6
PSQS are developed by the respective program, reviewed by the
Panel, and signed by the program sponsor and FTCP Chair. For
ease of transportability of qualifications between DOE elements,
PSQS must be used without modification or addition to
performance competency knowledge requirements. Satisfactory
and documented attainment of the performance competencies
contained in a PSQS ensures personnel possess the minimum
requisite knowledge and skills to fulfill program area duties and
responsibilities.
3 The Panel has approved the development of a new SSO Specialist FAQS.
DOE O 426.1B 9
3-5-2020
The need for an organization-specific qualification standard should
be evaluated and assigned to supplement a PSQS if necessary to
define any organization unique performance competencies.
(c) Job-Specific Qualification Standards (JSQS). JSQS establish
performance competencies specific to a particular job function for
DOE personnel who provide assistance, direction, guidance,
oversight, or evaluation of contractor technical activities that could
impact the safe operation of DOE’s defense nuclear facilities. A
JSQS may also be assigned to personnel performing oversight of
multiple topical areas or job functions unique to a specific mission
at a particular site or office. A JSQS should only be assigned to
participants whose job functions do not closely align with the
duties and responsibilities and associated performance
competencies in any one FAQS or PSQS. When identifying
performance competencies for a JSQS, supervisors should consider
selecting appropriate performance competencies from existing
FAQS and/or PSQS that align to the specific job being evaluated to
further transferability of technical competencies.
JSQS are developed and approved by the respective organization
with review and comment by the local Agent. An organization-
specific qualification standard should be evaluated and assigned to
supplement a JSQS if necessary to define any organization unique
performance competencies.
(3) Organization-Specific Qualification Standards (OSQS). OSQS establish
common performance competencies in key areas at the office, site, and/or
facility level for DOE personnel who provide assistance, direction,
guidance, oversight, or evaluation of contractor technical activities that
could impact the safe operation of DOE’s defense nuclear facilities. OSQS
are developed and approved by the respective organization with review
and comment by the Agent.
An OSQS is required for personnel assigned an FAQS. For personnel
assigned a PSQS or JSQS, Line Management should evaluate the need for
and develop an OSQS, if necessary, to define any unique performance
competencies. The organization-specific TQP plan must include
expectations for evaluating the need for an OSQS.
e. Technical Qualification Standards Content, Development, and Maintenance.
(1) The Technical Qualification Standards Development and Maintenance
Process will be maintained on the FTCP website. The DOE NTC must
support the overall Technical Qualification Standards Development and
Maintenance Process by facilitating the development or update of job task
analyses and FAQS evaluation guides, which are maintained by the NTC
10 DOE O 426.1B
3-5-2020
and modified with subject-matter expert review. The NTC must also
ensure the development and maintenance of training that supports the
obtainment of FAQS performance competencies as determined by the
Panel. The NTC may support the development of other Technical
Qualification Standards and training as requested.
Section 7
(2) The FTCP Technical Qualification Standards Review Process will be
maintained on the FTCP website. FAQS and PSQS must be reviewed and
approved per this process. Updates to an FAQS or PSQS must include a
gap analysis, or a summary of changes to the Standard, to aid continuing
training and maintenance of the associated performance competencies as
applicable.
(3) The organization-specific TQP plan must include expectations for the
development, including format and content, and the approval and updating
of any JSQS and OSQS.
(4) Approved FAQS and PSQS, along with any gap analyses, will be
maintained on the FTCP website.
(5) At a minimum, FAQS and PSQS Technical Qualification Standards must
address the following:
(a) Duties and Responsibilities associated with the position;
(b) Preferred education and experience for the position;
(c) Technical performance competencies required to perform as a
qualified individual in the subject matter area;
(d) Knowledge requirements associated with the technical
performance competencies;
(e) Any mandatory performance activities (MPA) for tasks considered
as critical for demonstrating proficiency in a technical performance
competency; and
(f) Applicable continuing training and/or proficiency requirements.
f. Qualification. The purpose of qualification is to validate that a TQP participant
has attained the performance competencies in their assigned Technical
Qualification Standards. The qualification process must include the following
elements:
(1) Documentation. The Electronic Technical Qualification Program (eTQP)
is the current System of Record for TQP records as designated under
Federal Register, DOE-28, General Training Records. All records entered
into the eTQP are the responsibility of each HQ or Field Element.
DOE O 426.1B 11
3-5-2020
Hardcopies are maintained at the discretion of the organization. The NTC
must maintain the eTQP system and post a user guide on the FTCP
website.
At a minimum, the following must be included in eTQP for each TQP
participant:
(a) Supervisor;
(b) Qualifying Officials (QO);
(c) Technical Qualifications Standards assigned;
(d) Supporting Objective Evidence and Documentation for verification
or all performance competencies in assigned Technical
Qualification Standards and required final qualification activities;
(e) Completed qualification cards for all assigned Technical
Qualification Standards; and
(f) Designation of Final Qualification.
(2) Performance Competency Evaluations.
(a) Knowledge Requirements. Attainment of performance competency
knowledge requirements in assigned Technical Qualification
Standards must be evaluated and documented by a designated QO
using one or a combination of the following methods:
1 Satisfactory completion of a written examination.
2 Satisfactory completion of an oral evaluation.
3 Documented evaluation of equivalencies.
4 Completion of approved training courses that confirm
attainment of specific knowledge requirements.
(b) Mandatory Performance Activities (MPA). Satisfactory completion
of any MPAs associated with performance competencies must also
be evaluated and documented by a designated QO. The QO must
verify that the evaluation criteria specified in the Technical
Qualification Standard, including any organization-specific
requirements, are met based on objective evidence. This typically
includes direct observation of the activity such as during a facility
walkthrough and/or evaluation of completed work products.
Section 8
12 DOE O 426.1B
3-5-2020
(c) Equivalencies. Equivalencies may be granted to employees who
satisfy performance competencies indicated in Technical
Qualification Standards. Equivalencies must be based upon
objective evidence of previous education, training, certification, or
experience. Objective evidence includes any combination of
transcripts, certifications, or completed work products.
Equivalencies must be used with the utmost rigor and scrutiny to
maintain the spirit and intent of the TQP.
(3) Designation of Final Qualification.
(a) FEMs or designees must develop formal guidance and
expectations, as part of their documented TQP, for designating
Final Qualification of personnel completing assigned technical
qualification standards. This must include expectations for what
type of final qualification activity or activities should be selected
for the various types of technical qualification standards and the
roles and responsibilities for conducting the following types of
final qualification activities:
1 Verifying completion of technical qualification standard
knowledge requirements and any associated MPAs;
2 Developing and administering written examinations;
3 Conducting oral evaluations;
4 Conducting oral boards;
5 Conducting evaluated facility walkthroughs; and
6 Evaluation of completed work products.
(b) Designation of final qualification must include, as a minimum, the
activities listed for each of the following types of technical
qualification standards:
1 All TQP Qualification Standards:
a First level supervisor review and verification that
the participant has obtained all assigned technical
qualification standard performance competency
knowledge requirements, and that any MPAs have
been satisfactorily performed with appropriate
objective evidence signed by a designated QO.
Note: This review may also include a final
interview or review of completed work products to
DOE O 426.1B 13
3-5-2020
provide reasonable assurance that the TQP
participant can independently perform the duties
and responsibilities in the assigned technical
qualification standards.
2 Senior Technical Safety Manager (STSM):
a Satisfactory completion of a comprehensive written
examination with a minimum passing score of 80
percent; and
b Satisfactory completion of an oral evaluation
administered by a qualified STSM or satisfactory
completion of an oral board consisting of
technically qualified personnel that includes at least
one STSM.
Note: All or a portion of the oral evaluation may be
conducted during an evaluated facility walkthrough.
3 Facility Representative: Satisfactory completion of final
qualification activities identified in DOE STD-1063,
Facility Representatives.
4 Safety System Oversight Specialist: Satisfactory
completion of an evaluated facility walkthrough.
5 Nuclear Safety Specialist: First-level supervisor evaluation
of recently assigned safety basis review final work product
(e.g., safety evaluation report or review input).
(4) Maintenance of Qualifications.
(a) TQP participants who complete applicable qualification
requirements must maintain proficiency through participation in a
continuing training program (CTP).
(b) The CTP must be included in the organization's TQP implementing
procedures. The CTP should contain the following elements as
applicable:
1 Awareness and understanding of changes to applicable
directives;
2 Review of significant operating experience/lessons learned
in functional areas;
14 DOE O 426.1B
3-5-2020
Section 9
3 Completion of applicable Gap Cards for revisions to
FAQS, including any new MPAs;
4 Classroom or online course training covering the
knowledge and activities in the assigned technical
qualification standards (required for all TQP participants);
5 Organization-specific training related to assigned technical
qualification standard areas; and
6 Completion of selected performance activities included in
technical qualification standard areas.
(c) All TQP participants assigned one or more FAQS must complete a
minimum of 80 hours of continuing training activities in a nominal
5-year continuing training (CT) cycle. About 50 percent of the
required 80 hours should be selected from the recommended list of
CT activities included in the assigned FAQS. For CT activities not
identified in an FAQS, such as other formal training courses or
attendance at professional conferences, the FTCP Agent must
concur on applicability of the proposed training activity to meeting
the 80-hour CT requirement.
(d) The organization-specific CTP should define the minimum number
of continuing training hours that TQP participants who are not
assigned FAQS are expected to complete over a nominal 5-year
CT cycle.
(e) TQP participants maintain proficiency in the performance of any
MPAs identified in their assigned technical qualification
standard(s) through satisfactory performance of normally assigned
job tasks. For tasks that are infrequently performed or where there
are no site-specific opportunities for actual performance, TQP
participants may use exercises conducted during formal classroom
training or use locally developed exercises as part of an assigned,
continuing training program to maintain proficiency.
(f) The organization-specific CTP should address expectations, if
applicable, for documenting satisfactory completion of
performance activities identified in technical qualification
standards (e.g., mandatory performance activities) during the
nominal 5-year CT cycle. The program should also address the
minimum number of performance activities expected to be
completed, if applicable, during the nominal 5-year CT cycle.
g. Accreditation. Organizations may accredit their TQPs by following the TQP
Accreditation Process, which is maintained on the FTCP website. For
organizations that have received accreditation, internal departmental oversight
DOE O 426.1B 15
3-5-2020
activities must credit that organization’s TQP for being properly implemented
during the period of time the accreditation is current.
5. RESPONSIBILITIES.
a. Deputy Secretary.
(1) Provides leadership, direction, and resources to recruit, deploy, develop,
and retain a workforce to accomplish DOE’s missions in a safe and
efficient manner;
(2) Resolves key FTCP issues, which require the authority of the Deputy
Secretary;
(3) Approves the FTCP Charter; and
(4) Approves TQP Accreditations.
b. Headquarters and Field Element Managers.
(1) Approve organization TQP implementing procedures;
(2) Appoint an FTCP Agent, who is qualified as an STSM and has ready
access to the Head of the element; and
(3) Ensure the following:
(a) Organization-specific staffing plans are developed to identify
priority TQP recruitment and hiring actions.
(b) TQP reports are reviewed to identify potential issues and develop
corrective actions that ensure organization attracts and maintains
the resources necessary to perform the Department’s missions.
(c) Metrics are established to monitor the qualification progress of
TQP participants.
Section 10
(d) Facilitation of recruitment activities to fill open TQP positions
with technically competent individuals.
(e) Periodic self-evaluations are conducted to evaluate the
effectiveness of their organizations’ TQP.
(f) Resolution of issues identified in their TQP organizations through
internal and external assessments.
(g) Qualified STSMs are in place, or compensatory measures are
established, to maintain adequate technical competence in the
16 DOE O 426.1B
3-5-2020
reporting structure of positions of authority for defense nuclear
facilities.
(h) Designation of positions and/or individuals in their respective
organizations that provide oversight of safety management
programs identified in the respective safety basis documents.
(i) Assignment of QOs to verify that TQP participants have obtained
the technical competencies in assigned technical qualification
standards.
(j) Required final qualification activities are conducted prior to
designating qualification of TQP participants.
(k) Personnel who are TQP-qualified oversee the work of any
contractors who support DOE/NNSA oversight of defense nuclear
facilities.
(l) OSQS are developed and assigned as needed.
(m) Local training is available for personnel to support obtainment of
technical competencies in any assigned Job-Specific and/or OSQS.
c. Director, National Training Center (NTC).
(1) Serves as the Chair of the FTCP.
(2) Facilitates the resolution of issues affecting the TQP.
(3) Oversees the development and implementation of the FTCP Charter.
(4) Signs FAQS and PSQS approved by the Panel for use throughout the
Department.
(5) Provides NTC support in the development and maintenance of FTCP-
approved processes.
(6) Provides recommendations to senior departmental officials regarding the
improvement of DOE technical capability.
(7) May appoint a Vice Chair from the FTCP membership.
d. FTCP Agents.
(1) Maintain STSM qualification.
(2) Oversee implementation of organization’s TQP and ensure the rigor of the
qualification process.
DOE O 426.1B 17
3-5-2020
(3) Solicit information and feedback from organization’s TQP participants
regarding opportunities to improve the technical capability of the
Department’s workforce.
(4) Lead, participate in, or oversee TQP assessments within their
organizations.
(5) Ensure a CTP is established and maintained for their organizations.
(6) Verify applicable TQP requirements are included in TQP position vacancy
announcements.
(7) Keep organizations informed of the progress/problems associated with
execution of their TQP and seek support from senior officials to assure
successful implementation.
(8) Concur on the assignment of a JSQS for any TQP participant.
(9) Provide review and comments on FAQS and PSQS per the FTCP
Technical Qualifications Standards Process.
(10) Review and comment on any OSQS or JSQS.
(11) Review and approve minor changes to MPAs for TQP participants
assigned an FAQS or PSQS, such as changes in the method of
performance or evaluation criteria to fit unanticipated or unique
organization-specific conditions.
(12) Participate in activities identified in the FTCP charter, such as periodic
conference calls and face-to-face meetings.
e. Headquarters FTCP Agents. In addition to the above requirements for all FTCP
Agents, HQ Agents within their program line management will:
(1) Support Field Element Agents to identify and resolve TQP and technical
staffing issues;
(2) Support obtainment of CTA concurrence if required on new or revised
FAQS; and
Section 11
(3) Serve as HQ management advocate to identify and resolve FTCP or TQP
programmatic issues and facilitate communication of FTCP-related
initiatives within their respective program offices.
f. Associate Under Secretary for Environment, Health, Safety and Security (AU).
(1) Serves as the Office of Primary Interest for this Order.
(2) Coordinates accreditation of TQPs.
18 DOE O 426.1B
3-5-2020
(3) Maintains the FTCP website in coordination with FTCP Chair.
g. Director, Office of Enterprise Assessments.
(1) Ensures NTC support for the FTCP and approved processes.
(2) Ensures NTC support of the eTQP or successor designated system of
record.
h. Chief, Human Capital Officer.
(1) Ensures DOE Human Capital processes related to recruitment, hiring, and
retention of TQP-identified positions support the overall objectives of this
Order.
(2) Designates a representative to participant in FTCP activities to maintain
cognizance of TQP-related human resources issues, such as recruitment,
hiring, and retention of TQP participants.
i. Supervisors with Responsibilities for TQP Personnel.
(1) Complete FTCP-approved TQP Overview Training.
(2) Develop JSQS as needed and obtain review and comment of the FTCP
Agent on the JSQS.
(3) Ensure TQP personnel qualification schedules are established and tracked.
(4) Implement compensatory measures to either restrict an individual without
adequate knowledge or skill, or identify those activities that must be
performed under supervision of a qualified individual.
(5) Facilitate initial TQP qualification by ensuring sufficient time and training
is provided to complete qualification tasks.
(6) Ensure that TQP participants are trained and qualified so that they are
capable of performing assigned duties.
(7) Ensure TQP participant responsibilities are maintained in Individual
Development and Performance Plans.
(8) Evaluate and concur on identified continuing training activities.
(9) Determine, based on job performance or newly assigned job duties,
whether personnel currently qualified in a TQP position should be
required to complete any portion of GTB Part B or any of the associated
training as part of continuing training.
DOE O 426.1B 19
3-5-2020
j. Qualifying Official.
(1) Complete FTCP-approved Qualifying Official Training.
(2) Maintain proficiency in assigned qualification area(s).
(3) Perform review of performance competency knowledge requirements and
MPAs and document results in eTQP or successor TQP system of record.
k. TQP Participants.
(1) Request and attend approved training to support completion of assigned
qualification standards.
(2) Complete assigned technical qualification standard requirements within
established timeframes and adhere to any established compensatory
measures while completing qualifications.
(3) Maintain qualification by completing required continuing training hours.
6. INVOKED STANDARDS. This Order does not invoke any DOE technical standards or
industry standards as required methods. Any technical standard or industry standard that
is mentioned in or referenced by this Order is not invoked by this Order. Technical
Qualification Standards identified in this Order are qualification standards that apply only
to Federal personnel included in the DOE TQP, and, therefore, do not meet the definition
of Invoked Technical Standards. Note: DOE O 251.1D, Appendix J provides a definition
for “invoked technical standard.”
7. REFERENCES. Find DOE directives online at www.directives.doe.gov.
Section 12
a. DOE O 226.1, Implementation of Department of Energy Oversight Policy, current
version.
b. DOE O 360.1, Federal Employee Training, current version.
c. DOE G 226.1-2, Federal Line Management Oversight of Department of Energy
Nuclear Facilities, current version.
d. DOE-STD-1063-2017, Facility Representatives.
8. DEFINITIONS.
a. Accreditation. A process that demonstrates that a specific DOE organization has
an effective program in place to validate the technical competence of employees
in the DOE TQP.
b. Competence. The ability to do something well or efficiently. A range of skill or
ability.
http://www.directives.doe.gov./
20 DOE O 426.1B
3-5-2020
c. Competency. The quality or state of being competent, such as the quality or state
of having sufficient knowledge, judgment, skill, or strength (as for a particular
duty or in a particular respect).
d. Competency Verification. The process used to confirm that a TQP participant has
obtained the knowledge associated with a specific competency or competencies in
a technical qualification standard through one or more of the following
techniques: oral evaluation, written examination, documented equivalences, or
completion of approved training courses that confirm attainment of specific
knowledge requirements. The depth and breadth of the competency verification
activity may be tailored based on a review of work products and the experience of
the TQP participant being evaluated. Competency verification activities are done
by designated qualification officials and the results of the selected verification
techniques are documented in the eTQP or subsequent system.
e. Compensatory Measures. The extent to which, or whether, a TQP participant can
provide direction to, or oversight of contractor technical activities that could
affect the safe operations of defense nuclear facilities. The identification and
documentation of any limitations on the TQP participant’s job duties related to the
safe operation of defense nuclear facilities are typically referred to as
compensatory measures.
f. Continuing Training. Prescribed training that must be completed on a defined
periodicity to maintain qualification after initial qualification.
g. Evaluated Facility Walkthrough. A type of final qualification activity where a
designated individual or group of individuals observes a TQP participant
performing their duties and responsibilities in their assigned facilities. The
evaluated facility walkthrough also includes an oral evaluation component where
a TQP participant is asked questions regarding procedures, safety implications,
safety systems, and other topics to determine whether they have obtained a
sufficient level of competency to independently perform their assigned duties and
responsibilities.
h. Field Element Manager. DOE officials who are responsible for execution of
oversight policy implementation.
i. Final Qualification Activity. A specific activity or activities that provide an
additional level of assurance that a TQP participant completing all technical
qualification standards has obtained a sufficient level of competency to
independently perform their assigned duties and responsibilities. Final
qualification activities include one or more of the following: Supervisory
verification of the completion of technical qualification standard requirements,
written examination, oral evaluation, evaluated facility walkthrough, and
evaluation of completed work products.
DOE O 426.1B 21
3-5-2020
Section 13
j. Headquarters Element. For the purposes of this Order, Headquarters Elements
include the Assistant Secretaries and Program Office Directors reporting to the
Secretary either directly or through the Deputy Secretary or Under Secretaries.
The NNSA Administrator is the only NNSA Head of the Departmental Element.
k. Job Task Analysis. A systematic method used in obtaining a detailed listing of the
tasks of a specific job.
l. Mandatory Performance Activities (MPA). A set of activities derived from a Job
Task Analysis (or equivalent type of analysis) that require TQP participants to
apply related knowledge to complete the particular activity to a defined level of
performance. The expected level of performance for MPAs is typically defined by
a set of evaluation criteria. MPAs are selected only for those job tasks that are
commonly performed across DOE in specific functional or program area and
whose performance is key to demonstrating that the associated performance
competency statement has been met.
m. Nuclear Facility Core and Crosscutting Performance Areas. Framework for
providing oversight of DOE nuclear facilities defined in DOE Guide 226.1-2A.
Core performance areas include Safety System Operability, Technical Safety
Requirement Implementation, Safety Management Program Effectiveness, Work
Planning and Control, Safety Management System Effectiveness, and Emergency
Preparedness. Crosscutting Performance Areas include Formality of Operations,
Safety Culture, and Issue Identification and Resolution.
n. Organization-Specific Qualification Standard. Generic term for site, office,
facility, or system-specific technical qualification standards. The OSQS includes
competencies that are required to perform a unit of work that is included within
the duties and responsibilities of a specific job. An OSQS may contain one or
more levels (e.g., site, office, facility, system) depending on specific job duties
and responsibilities.
o. Oral Board. A formal oral evaluation conducted by a group of designated
individuals. The organization-specific TQP implementing procedures must
specify specific membership and qualifications of oral board members,
expectations for oral board questions and answers, and criteria for passing the oral
board or requiring any remediation.
p. Oral Evaluation. A competency verification technique where a designated
qualification official verifies that a TQP participant has obtained the knowledge
associated with a specific competency or competencies in a technical qualification
standard by asking verbal questions and verifying that the participant provides an
acceptable answer. The questions and acceptable answers are found in the
technical qualification standards and any associated evaluation guides. The oral
evaluation is commonly used for knowledge requirements that require the
individual to “describe” or “discuss” a particular topic. An oral evaluation also
can be an approved, final qualification activity where a designated person,
22 DOE O 426.1B
3-5-2020
typically the first level supervisor, asks a set of verbal questions to evaluate
whether the TQP participant has obtained a sufficient level of competency to
independently perform their assigned duties and responsibilities.
q. Performance Competency. A statement of expected level of performance of a
specific job duty or group of tasks. Performance competencies include the
knowledge required to perform the related duties and tasks and may include
mandatory performance activities.
Section 14
r. TQP Participant. An individual whose duties and responsibilities meet the criteria
in this Order or organization-specific criteria to be included in the DOE TQP.
s. Technical Qualification Standards. Broad term for all qualification standards
assigned to TQP participants. Includes Functional Area Qualification Standards,
Program-Specific Qualification Standards, Job-Specific Qualification Standards,
and Organization-Specific Qualification Standards.
t. Transportability. The ability of TQP participants to transfer obtainment of an
entire set of performance competencies or a smaller group of individual
performance competencies from one DOE organization to another DOE
organization. Performance Competencies in FAQS and PSQS are common across
DOE organizations and, as a result, completed qualifications in these technical
standards is transportable. Individual performance competencies in JSQS and
OSQS may be transportable depending on job-specific duties and responsibilities.
9. CONTACT. Questions concerning this Order should be addressed to the Office of
Environment, Health, Safety and Security, Office of Health and Safety, at
(301) 903-7030.
DAN BROUILLETTE
Secretary of Energy
1. PURPOSE.
2. CANCELS/SUPERSEDES.
3. APPLICABILITY.
a. Departmental Applicability.
b. DOE Contractors.
c. Equivalencies/Exemptions for DOE O 426.1B.
4. REQUIREMENTS.
a. DOE Federal Technical Capabilities Principles.
5-2020b. Federal Technical Capabilities Panel.
c. Technical Qualification Program (TQP).
d. DOE Technical Qualification Standards.
e. Technical Qualification Standards Content, Development, and Maintenance.
f. Qualification.
g. Accreditation.
5. RESPONSIBILITIES.
a. Deputy Secretary.
b. Headquarters and Field Element Managers.
c. Director, National Training Center (NTC).
d. FTCP Agents.
e. Headquarters FTCP Agents.
f. Associate Under Secretary for Environment, Health, Safety and Security (AU).
g. Director, Office of Enterprise Assessments.
h. Chief, Human Capital Officer.
i. Supervisors with Responsibilities for TQP Personnel.
j. Qualifying Official.
k. TQP Participants.
6. INVOKED STANDARDS
7. REFERENCES
8. DEFINITIONS.
9. CONTACT