DOE O 426.1A Chg 1 (MinChg), Federal Technical Capability Program
Functional areas: Work Processes
To define requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Supersedes DOE O 426.1A. The Order was updated to clarify that it does not invoke Technical Standards. Canceled/superseded by DOE O 426.1B/
Supersedes:
DOE O 426.1A, Federal Technical Capability Program on Oct 04, 2019
Superseded By:
Canceled By:
Version history and related documents
Superseded by
A newer version replaces this document.
Supersedes
Earlier documents this one replaced.
- DOE O 426.1AFederal Technical Capability Program (Oct 04, 2019)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
U.S. Department of Energy MINOR CHANGE
Washington, DC
Chg 1 (Min Chg): 10-4-2019
SUBJECT: MINOR CHANGE TO DOE O 426.1A, FEDERAL TECHNICAL CAPABILITY
PROGRAM
1. EXPLANATION OF CHANGES. Changes were made to add the Invoked Technical
Standards paragraph, and to clarify that this Order does not invoke any technical
standards.
2. LOCATIONS OF CHANGES:
Page Paragraph Changed To
Throughout DOE-STD-1063-2011 DOE-STD-1063-2017
11 4.b.(6) (d) Maintenance of Qualifications.
The qualification period for FRs
is specifically addressed in
DOE-STD-1063-2011, Facility
Representatives.
Maintenance of Qualifications.
DOE-STD-1063-2017, Facility
Representatives, includes
acceptable methods to address
the qualification period for FRs.
17 6. Definitions INVOKED TECHNICAL
STANDARDS. This Order does
not invoke any DOE technical
standards or industry standards
as required methods. Any
technical standard or industry
standard that is mentioned in or
referenced by this Order is not
invoked by this Order. Note:
DOE O 251.1D, Appendix J
provides a definition for
“invoked technical standard.”
17-18 6.-8. Renumbered 7.-9.
18 8.b. Added DOE O 251.1, Departmental
Directives Program, current
version.
18 8.b.-8.d. Renumbered 8.c.-8.e.
18 8.e. DOE-STD-1063-2011,
Facility Representatives,
dated March 2012
(http://www.energy.gov/si
tes/prod/files/2013/12/f6/
DOE-STD-1063-2011_C
N1.pdf)
DOE-STD-1063-2017, Facility
Representatives, dated July
2017.
DOE O 426.1A
AVAILABLE ONLINE AT: INITIATED BY:
www.directives.doe.gov Office of Environment, Health Safety and Security
U.S. Department of Energy ORDER
Washington, D.C.
Approved: 1-17-2017
Chg 1 (Min Chg): 10-4-2019
SUBJECT: FEDERAL TECHNICAL CAPABILITY PROGRAM
1. PURPOSE. To define requirements and responsibilities for meeting the Department of
Energy (DOE) commitment to recruiting, deploying, developing, and retaining a
technically competent workforce that will accomplish DOE missions in a safe and
efficient manner through the Federal Technical Capability Program (FTCP). The
Department will strive to recruit and hire technically capable people; continuously
develop the technical expertise of its existing workforce; and, within the limitations of
executive policy and Federal law, retain critical technical capabilities within the
Department at all times. The FTCP principles are as follows:
a. As described in the Department's Integrated Safety Management Guiding
Principles, Federal personnel possess the experience, knowledge, skills, and
abilities that are necessary to discharge their safety responsibilities;
b. Line managers are accountable and have the responsibility, authority, and
flexibility to achieve and maintain organizational technical excellence;
c. Supporting organizations (personnel, training, contracts, finance, etc.) recognize
line managers as customers and effectively support them in achieving and
maintaining technical capabilities; and
d. An integrated corporate approach is required to assure that necessary technical
capabilities and resources are available to meet the overall needs of the
Department's defense nuclear facility missions.
2. CANCELLATION. DOE O 426.1, Chg 1, Federal Technical Capability, dated 9-20-11.
3. APPLICABILITY.
a. Departmental Applicability. This Order applies to any DOE, including National
Nuclear Security Administration (NNSA), organization that performs functions
related to the safe operation of defense nuclear facilities. Other organizations
within the Department may also apply elements of the program on an optional
basis.
Section 2
Technical Qualification Program (TQP) specifically applies to DOE technical
employees whose duties and responsibilities require them to provide assistance,
guidance, direction, or oversight that could affect the safe operation of a defense
nuclear facility, including evaluation of contractor activities at those facilities.
This includes personnel designated as Senior Technical Safety Managers (STSM)
and employees who are on extended detail or temporary assignment (i.e., 90 days
or longer). This does not include Federal Project Directors or personnel assigned
DOE O 426.1A
http://www.directives.doe.gov/
2 DOE O 426.1A
1-17-2017
qualification requirements in the Project Management Career Development
Program (PMCDP).
The Administrator of NNSA must assure that NNSA employees comply with
their respective responsibilities under this Order. Nothing in this directive will be
construed to interfere with the NNSA Administrator’s authority under section
3212(d) of Public Law (P.L.) 106-65 to establish Administration-specific policies,
unless disapproved by the Secretary.
b. Contractors. This Order does not apply to contractors.
c. Equivalencies for DOE O 426.1. In accordance with the responsibilities and
authorities assigned by Executive Order 12344, codified at title 50, United States
Code (U.S.C.), sections 2406 and 2511, and to ensure consistency throughout the
joint Navy/DOE Naval Nuclear Propulsion Program, the Deputy Administrator
for Naval Reactors (Director) will implement and oversee requirements and
practices pertaining to this directive for activities under the Director's cognizance,
as deemed appropriate.
d. Exemptions for DOE O 426.1. This Order does not apply to DOE, including
NNSA, organizations that do not perform functions related to the safe operation
of defense nuclear facilities.
4. REQUIREMENTS. DOE offices and organizations must ensure that their Federal
employees are appropriately trained and technically capable of carrying out their
responsibilities.
a. Federal Technical Capability Program (FTCP) Development and Administration.
(1) Each office listed below must designate a senior manager to serve as the
office representative (the Agent) on the FTCP Panel. These Agents must
be qualified as STSMs.
• Office of Science (SC)
o Deputy Director for Field Operations
o Integrated Support Center, Oak Ridge Office
o Integrated Support Center, Chicago Office
o Pacific Northwest Site Office
• Office of Environment, Health, Safety and Security (EHSS)
• Office of Enterprise Assessments (EA)
• National Nuclear Security Administration (NNSA)
o Associate Administrator for Safety, Infrastructure and
Operations
DOE O 426.1A 3
1-17-2017
o Chief of Defense Nuclear Security
o Livermore Field Office
o Los Alamos Field Office
o Nevada Field Office
o Sandia Field Office
o NNSA Production Office
o Savannah River Field Office
• Environmental Management (EM)
o Office of Environmental Management
o Chief of Nuclear Safety
o Carlsbad Field Office
o Consolidated Business Center
o Idaho Operations Office
o Oak Ridge Office of Environmental Management
o Office of River Protection
o Portsmouth/Paducah Project Office
o Richland Operations Office
o Savannah River Operations Office
Additionally, the Office of Human Capital Management, which receives
advice and support from the Office of the Deputy Secretary and other
supporting departmental organizations as appropriate, must designate a
senior representative on the Panel and ensure that the TQP meets DOE
requirements related to human capital management, working with others
on the FTCP Panel for an effective and sustainable program.
Section 3
(2) Functional Area Qualification Standards (FAQS) must be reviewed and
approved by the Panel and issued in accordance with the processes
established by the Department’s Technical Standards Program. At a
minimum, FAQS must address:
(a) Duties and Responsibilities associated with the position;
(b) Preferred education and experience for the position;
(c) Technical performance competencies required to perform as a
qualified individual in the subject matter of the FAQS;
(d) Knowledge and skills associated with the technical performance
competencies;
(e) Any mandatory performance requirements (i.e., performance
demonstrations for tasks considered as critical for demonstrating
proficiency in a technical performance competency;
4 DOE O 426.1A
1-17-2017
(f) Applicable continuing education and/or proficiency requirements;
(g) Updates to each FAQS must include a gap analysis, or a summary
of changes to the FAQS, to aid continuing training and/or
requalification as applicable. The FAQS must be approved by the
Panel Chair (See Appendix A, Development and Revision of
Technical Qualification Standards). Sponsors who develop and
revise an FAQS must use the FAQS template approved by FTCP
Chair and posted on the FTCP Web site at:
http://www.energy.gov/ehss/downloads/functional-area-qualificati
on-standards-template
(h) The National Training Center (NTC) must support the overall
FAQS process by facilitating the development and/or update of job
task analyses and FAQS evaluation guides, which are maintained
by the NTC and modified with subject matter expert review. The
NTC must also develop and maintain training to support the
obtainment of FAQS performance competencies.
(3) The FTCP Panel must develop and maintain an ongoing Operational Plan
that clearly identifies major issues related to needed technical
competencies and the Department’s TQPs and activities necessary to
resolve these issues in a timely manner.
(4) The FTCP Panel must prepare periodic reports to the Deputy Secretary,
Program Secretarial Officers (PSO), and other key Headquarters Offices
having TQP positions, based in part on the summary workforce analysis
and staffing plans described in this Order. The report will summarize
actions taken to address the Department’s hiring and deployment needs
and identify future actions to preserve critical technical capabilities to
ensure safe operations of defense nuclear facilities. The report must be
submitted at least on a biennial basis.
(5) The FTC Panel must assess the effectiveness of its functions at least every
4 years. These assessments must be conducted in accordance with the
requirements of DOE O 226.1, Implementation of Department of Energy
Oversight Policy, current version, and the current objectives and criteria
approved by the FTCP Chair and posted on the FTCP Web site at:
http://www.energy.gov/ehss/downloads/technical-qualification-program-a
nd-ftcp-assessment-crads
b. FTCP Implementation.
(1) Senior managers must conduct annual workforce analyses of their
organizations and develop staffing plans that identify critical technical
capabilities and positions that ensure safe operations of defense nuclear
http://www.energy.gov/ehss/downloads/functional-area-qualification-standards-template
http://www.energy.gov/ehss/downloads/functional-area-qualification-standards-template
http://www.energy.gov/ehss/downloads/technical-qualification-program-and-ftcp-assessment-crads
http://www.energy.gov/ehss/downloads/technical-qualification-program-and-ftcp-assessment-crads
Section 4
DOE O 426.1A 5
1-17-2017
facilities. Critical technical capability positions must participate in the
TQP.
Workforce analyses identify the critical technical capabilities that must be
maintained to ensure safe operation of defense nuclear facilities. A
position determined to have critical technical capabilities must meet the
following three criteria:
(a) The position must be technical in nature, in a field covered by an
FAQS and have responsibilities related to the safe operation of
defense nuclear facilities or other facilities as designated by Site
Management or PSO.
(b) The critical capabilities associated with the position must represent
a specialized skill set that could not typically be replicated in 90
days using formal training.
(c) Loss of the technical capabilities resident within the position could
jeopardize the Department’s ability to meet safety or regulatory
requirements.
(2) Each Headquarters and Field Element with defense nuclear facilities
responsibility must establish a TQP for its organization. Although the
programs may be designed to meet the unique needs and responsibilities
of each organization, the following principles must be used as the basis for
all TQPs.
(a) Demonstration of Competence. The program must clearly identify
and document the process used to demonstrate employee technical
competence (e.g., professional certifications, qualification cards,
background, and experience).
(b) Plans and Procedures. Plans and procedures must be developed and
implemented to govern the administration of the program.
(c) Qualification Tailored to Work Activities. Each DOE
Headquarters, field or organizational element must clearly identify
unique Department and position-specific work activities and
determine, where appropriate, if technical competencies are
required.
(d) Credit for Existing Technical Qualification Programs. The program
must be structured to allow credit, where appropriate, for other
TQP accomplishments to date.
(e) Transportable. Each DOE Headquarters, field or organizational
element determines whether office/site/facility-specific
6 DOE O 426.1A
1-17-2017
qualification standards technical competencies are needed for TQP
participants. Competency requirements identified as having
Department-wide applicability must be transferable. For ease of
transportability of qualifications between DOE elements,
competencies and knowledge, skills, and abilities (KSA) within the
DOE General Technical Base Qualification Standard and the
various DOE FAQSs must be used without modification or
additions.
(f) Measurable. The program, through quantifiable processes and
metrics, must ensure sufficient rigor to demonstrate compliance
with TQP.
(3) Each organization must document its TQP requirements in a TQP plan.
Organizations across the Department must use FAQS competencies and
KSAs as written in developing their TQP plans. The plans must be
approved by the head of the element and include processes and
requirements for the following:
(a) Identifying positions required to participate in the TQP;
(b) Identifying positions participating in the TQP responsible for
oversight of safety management programs as identified in the
respective facility safety documentation;
(c) Identifying employees that can serve as qualifying officials to
verify and certify qualifications;
(d) Identifying, developing, approving, revising, and updating
individual qualification requirements, as appropriate;
Section 5
(e) Establishing and/or updating Individual Development Plans (IDP),
training plans, or qualification-related records; for example,
qualification plans, qualification cards, supporting documentation,
and other records needed to support how the qualification was
attained. The TQP plans must reference the TQP in IDPs and
Performance Standards;
(f) Evaluating employees against FAQS, determining when to use oral
review boards (protocol, questioning procedures, pass/not pass
criteria, quorum requirements, reexamination requirements, etc.),
and documenting the approval of equivalencies for required
competencies. Equivalencies must be granted upon objective
evidence issued by an independent source. Acceptable objective
evidence sources could include approved performance evaluations,
approved assessments, or approved technical products;
DOE O 426.1A 7
1-17-2017
(g) Determining final qualification requirements, such as
comprehensive written examination, oral examination, site/facility
walk-through, or some combination thereof;
(h) Addressing oral or written examination failures or other
qualification failures, establishing reexamination requirements, and
making work area or position reassignments;
(i) Establishing interim limitations or compensatory measures to
support field office or program requirements for candidates who
have not achieved full qualification, as applicable;
(j) Implementing continuing professional development and continuing
training and/or requalification programs;
(k) Maintaining training and qualification records. Personnel
records/official personnel files are maintained separately by each
Headquarters, field and organizational element;
(l) Granting of equivalencies and criteria for extensions; and
(m) Involving the FTCP Agent in TQP vacancy announcements to
assure that qualification requirements of TQP are incorporated into
the selection criteria for covered positions.
(4) Each organizational element must use FAQS and any applicable
office/site/facility/position qualification standards to document technical
performance requirements for the position as determined needed. These
requirements must be established and implemented using the systematic
approach to training methodology and include the following:
(a) Basic Technical Knowledge about topics, such as radiation
protection, occupational safety, chemical safety, nuclear safety,
and environmental regulations. This area is covered through
completion of the DOE General Technical Base Qualification
Standard.
(b) Technical Discipline Competency (e.g., mechanical engineering or
chemical engineering), which can be demonstrated by education,
professional certification, or examination. In addition to meeting
Office of Personnel Management (OPM) requirements for the
position, current expertise and DOE-specific competencies are
demonstrated through completion of the respective FAQS.
(c) Position Knowledge, Skills, and Abilities specific to the position,
facility, program, and/or office, as determined by responsible
Headquarters or Field Element Managers (FEM). Technical
8 DOE O 426.1A
1-17-2017
requirements not included in the Position Description or FAQS
must be identified through a documented job task analysis.
(5) Headquarters and FEMs must implement their TQP Plans.
Section 6
(a) They must designate the positions and/or individuals in their
respective organizations required to participate in the TQP and the
qualification requirements that apply. An FTCP Agent must be
designated as responsible for program direction and performance.
TQP employees must be assigned to TQP positions and begin their
TQP requirements within 30 days. TQP employees must satisfy the
qualification requirements assigned to them in accordance with a
defined schedule established by line management. This schedule is
normally achieved in 18 months. If not completed within defined
schedule, compensatory measures must be put in place by the
FTCP Agent.
Attainment of individual competencies in the FAQS must be
evaluated and documented by a qualifying official and/or the
immediate supervisor using one, or a combination, of the following
methods:
1 Satisfactory completion of a written examination;
2 Satisfactory completion of an oral evaluation;
3 Satisfactory completion of an observed task or activity
related to a competency;
4 Documented evaluation of equivalencies based upon
objective evidence (i.e. approved performance evaluations,
approved assessments, or approved technical products)
granted by an independent source; or
5 Satisfactory completion of mandatory performance
activities.
(b) Equivalencies may be granted to employees who satisfy
competencies indicated in FAQS. Equivalencies must be based
upon objective evidence of previous education, training,
certification, or experience. Objective evidence includes any
combination of transcripts, certifications, and, in some cases, a
knowledge sampling demonstrated through a written and/or oral
examination. Equivalencies must be used with the utmost rigor and
scrutiny to maintain the spirit and intent of the TQP. The basis of
equivalencies must be independent of the individual seeking
DOE O 426.1A 9
1-17-2017
evaluation and must include objective evidence.
(c) FEMs or designees must qualify candidates as possessing the basic
technical knowledge; technical discipline competency; and any
site-determined, position-specific knowledge, skills, and abilities.
Final qualification must be performed using one or a combination
of the following methods:
1 Satisfactory completion of a comprehensive written
examination with a minimum passing score of 80 percent;
2 Satisfactory completion of an oral examination
administered by a qualified STSM or a qualification board
of technically qualified personnel that includes at least one
STSM;
3 Satisfactory completion of a walk-through of a facility with
a qualifying official for verifying a candidate’s knowledge
of and practical skills related to selected key elements; or
4 Satisfactory evaluation of completed work products (i.e.,
assessments, reviews, etc.).
(d) FEMs or designees must develop formal guidance, as part of TQP,
for walk-through and oral examinations that includes standards for
qualification, use of technical advisors by a board, questioning
procedures or protocol, pass/fail criteria, board deliberation and
voting authorization procedures, and documentation process.
(e) TQP participants who complete applicable qualification
requirements should continue their professional development and
maintain proficiency through participation in continuing training,
education, or other developmental activities.
Section 7
(f) The supervisor, in conjunction with the organizational FTCP
Agent, determines and documents if each position and/or
individual must participate in the TQP based on the duties and
responsibilities of the position description. If the position requires
participation in the TQP, the supervisor and FTCP Agent should
identify the appropriate FAQS and individual competencies for
that position. Individual performance standards must be consistent
with requirements set by the TQP.
(g) Workforce deployment, including reorganizations, must recognize
the performance requirements of covered positions and maintain
the safety, health, security, and environmental management
10 DOE O 426.1A
1-17-2017
technical performance competency requirements of the workforce.
(h) The Electronic Technical Qualification Program (e-TQP) must be
the “system of record” for TQP “official” records. The e-TQP
system has been identified by the NTC and concurred on by the
Office of Information Management (IM-23), as a “System of
Record” (Federal Register, DOE-27, General Training Records).
Records for validation of TQP qualification include:
1 Completed qualification cards for all competencies of the
General Technical Base Qualification Standard and FAQS
(active version at time qualification process began); and
2 Completed qualification card for appropriate competencies
related to assigned position (as determined by position
description and supervisor requirements).
All records entered in the e-TQP system must be the
responsibility of each site/program office and they must
determine whether to continue to maintain hard copies of
TQP records. The NTC must “maintain” the e-TQP system.
(i) Organizations may accredit their TQPs by following the TQP
Accreditation Process (see Appendix B). For organizations that
have received accreditation, internal departmental oversight
activities must credit that site program’s TQP for being properly
implemented during the period of time that the site or program’s
FTCP accreditation is current.
(6) Key Qualification Areas.
(a) The Manager/Assistant Secretary/NNSA Deputy or Associate
Administrator with responsibility for Defense Nuclear Facilities
must ensure that positions of authority (authority to make decisions
impacting safety of defense nuclear facilities) are staffed by
qualified STSMs.
(b) FEM and Deputy FEM. At least one of the individuals filling these
positions should meet the preferred education and experience for
STSMs as described in the STSM FAQS. Further, at least one of
the individuals must be a qualified STSM. Management must
consider putting in place compensatory measures if the incumbent
in an identified STSM position does not meet the preferred
education or experience contained in the Background and
Experience section of the STSM FAQS. In developing and
implementing compensatory measures, management must ensure
DOE O 426.1A 11
1-17-2017
that positions of authority are compensated by fully qualified
STSMs.
(c) FEMs or designees must, at a minimum, qualify TQP candidates
and document in their TQP plan.
Safety System Oversight (SSO) candidates (see Appendix C,
Safety System Oversight Duties, Responsibilities, Knowledge,
Skills, and Abilities for SSO candidates) must possess the basic
technical knowledge; technical discipline competency; and
position-specific knowledge, skills, and abilities required for their
positions. Final qualification of Facility Representatives (FRs) is
addressed in DOE-STD-1063-2017, Facility Representatives.
Section 8
Qualification for STSMs must be performed through satisfactory
completion of a comprehensive written examination with a
minimum passing score of 80 percent, and
1 Satisfactory completion of an oral examination by a
qualified STSM or a qualification board of technically
qualified personnel that includes at least one STSM; or
2 Satisfactory completion of a walk-through of a facility with
a qualifying official for verifying a candidate’s knowledge
of and practical skills related to selected key elements.
(d) Maintenance of Qualifications. DOE-STD-1063-2017, Facility
Representatives, includes acceptable methods to address the
qualification period for FRs. STSMs must qualify to the latest
version of the STSM FAQS. After qualification, STSMs must be
enrolled in a continuing training program (CTP) or provided with a
requalification plan prior to the end of the requalification period by
the FTCP Agent or if applicable, a STSM qualified supervisor.
Requalification of STSMs is every 5 years unless enrolled in a
CTP. Failure of the STSM to maintain satisfactory enrollment in a
CTP or if the 5-year period has lapsed without requalification
requires compensatory measures to be put in place for the STSM
by Headquarters or the FEM until CTP requirements are met or
requirements of the requalification plan have been completed.
1 The CTP/requalification program should be incorporated
into the organization's TQP plan/procedure to ensure TQP
supervisors/participants are aware and understand the
importance for maintaining their knowledge and
proficiency. Compensatory measures must be implemented
for individuals by their supervision in consultation with the
12 DOE O 426.1A
1-17-2017
FTCP Agent when CTP/requalification inadequacies are
identified. Should individual CTP/requalification program
inadequacies persist, the FTCP Agent should in
consultation with the FEM, determine the individual's
capability to remain in the TQP. The CTP/requalification
program may contain one or more of the following
elements:
- awareness and understanding of changes to applicable
directives;
- use of FAQs GAP Qualification Cards;
- appropriate classroom and/or online course refresher
training;
- cognizance of significant operating experience/lessons
learned in functional areas; and
- training as required by Headquarters or FEM’s tailored
to the needs of site operations, functions and
responsibilities.
(7) Self-Evaluation. Headquarters and Field Elements must conduct a
self-evaluation of TQP and FTCP implementation within their
organization at least every 4 years. These evaluations must be conducted
in accordance with the requirements of DOE O 226.1, Implementation of
Department of Energy Oversight Policy, current version , and the current
objectives and criteria approved by the FTCP Chair and posted on the
FTCP Web site at:
http://www.energy.gov/ehss/downloads/technical-qualification-progra
m-and-ftcp-assessment-crads
5. RESPONSIBILITIES.
a. Deputy Secretary.
(1) Appoints the FTCP Panel Chair and provides leadership, direction, and
resources to recruit, deploy, develop, and retain a workforce to accomplish
DOE’s missions in a safe and efficient manner;
(2) Institutionalizes the FTCP through related DOE policy to establish the
program’s objective, guiding principles, and functions; and
(3) Resolves key FTCP issues, which require the authority of the Deputy
Secretary.
http://www.energy.gov/ehss/downloads/technicalqualificationprogramandftcpassessmentcrads
http://www.energy.gov/ehss/downloads/technicalqualificationprogramandftcpassessmentcrads
Section 9
DOE O 426.1A 13
1-17-2017
b. Administrator, NNSA; Program Secretarial Officers (PSO); and Managers of
Field Elements (including Project Offices, Operation Offices, Site Offices, and
Service Centers).
(1) Establish/approve TQPs for defense nuclear facilities and designate the
positions and/or individuals in their respective organizations required to
participate in the TQP and the technical qualification standards that apply
to them. Determine the need for site-specific qualification standards and
cards.
(2) Reviews respective FTCP reports and the results of staffing analyses to
identify potential corrective actions that ensure that the Department
attracts and maintains the resources necessary to perform the
Department’s missions.
(3) Ensure that STSM assignments or compensatory measures are in place to
maintain an unbroken chain in the reporting structure of qualified STSMs
in positions of authority.
(4) Designate the positions and/or individuals in their respective organizations
that provide oversight of safety management programs identified in the
respective facilities DSAs.
(5) Implement formal training and qualification programs, based on the
appropriate FAQS, for employees who provide management direction or
oversight of contractor technical activities that could impact the safe
operation of a defense nuclear facility.
(6) Assign qualifying officials to sign TQP or site-specific qualification card
competencies to verify that the TQP candidate possesses the required level
of knowledge or skills. In addition to TQP participant supervisory
approval, FTCP Agents sign the STSM Qualification Cards to certify that
the qualification process met the requirements of the organization's TQP.
(7) Verify competency of TQP employees in technical positions, and approve
qualification of such employees following demonstrations of competency.
(8) Approve the workforce analysis and staffing plans for their TQP
organizations.
(9) Develop and implement staffing plan performance indicators to be
monitored on a regular basis.
(10) Resolve FTCP issues identified in their TQP organizations through
internal and external assessments.
14 DOE O 426.1A
1-17-2017
(11) Appoint an FTCP Agent, who is qualified as an STSM and has ready
access to the FEM, PSO, or Administrator, NNSA.
(12) Submit a list, upon request, of the Headquarters- or site-approved
designated STSM positions and incumbents in DOE.
(13) Conduct periodic self-evaluations to evaluate the effectiveness of TQP
within their organizations.
(14) Facilitate recruitments to fill open STSM positions with technically
competent individuals.
c. Chair of FTCP Panel.
(1) Oversees issues affecting the FTCP;
(2) Oversees development and implementation of FTCP Operational Plans;
(3) Presides over the Panel;
(4) Provides support to EHSS, develops and implements FTCP policy for the
Department;
(5) Oversees implementation of the Department’s TQP;
(6) Reviews and approves technical qualification standards for use throughout
the Department;
(7) Performs or oversees assessments of the effectiveness of the FTCP using
internal and external experts;
(8) Conducts periodic briefings for the Defense Nuclear Facilities
Safety Board (DNFSB) and its staff regarding execution of the
responsibilities of the FTCP and FTCP Panel;
(9) Provides recommendations to senior departmental officials regarding the
improvement of DOE technical capability; and
(10) May appoint a Vice Chair.
Section 10
d. Vice Chair of the FTCP Panel. Serves as Chair of the FTCP Panel in the absence
of the Chair.
(1) Performs periodic reviews of the FTCP;
(2) Provides support to assist site/program offices in conducting
self-evaluations of their TQP in accordance with this Order;
DOE O 426.1A 15
1-17-2017
(3) Provides support to EHSS, develops and implements FTCP policy for the
Department;
(4) Maintains a list, updated at least annually, of the Headquarters-or-site
approved designated STSM positions and incumbents in DOE; and
(5) Oversees the process for evaluating the qualification of employees filling
STSM positions.
e. FTCP Agents.
(1) Coordinate development of the annual workforce analysis and staffing
plans for their TQP organizations.
(2) Oversee implementation of the TQP for their organizations, and ensure
that the qualification process is relevant, and aligned with mission
priorities.
(3) Assist FEMs/PSOs/Lead PSOs (LPSO) in establishing or maintaining
formal STSM programs for their organizations.
(4) Concur with STSM vacancy announcements to ensure the inclusion of
adequate selection criteria.
(5) Lead, participate in, or oversee FTCP assessments and TQP assessments
within their organizations.
(6) Solicit information and feedback from people in their organizations
regarding the improvement of technical capability of the Department’s
workforce.
(7) Keep organizations informed of the progress/problems associated with
execution of FTCP, and seek support from senior officials regarding
successful implementation.
(8) Assist with the development of the FTCP and FTCP Panel.
(9) Review the STSM Qualification Card to certify that the qualification
process met the requirements of the organization's TQP.
f. Associate Under Secretary for Environment, Health, Safety and Security.
(1) Serves as the Office of Primary Interest for this Order.
(2) Coordinates accreditation of TQPs (see Appendix B).
16 DOE O 426.1A
1-17-2017
(3) Develops FTCP policies for the Department in conjunction with the FTCP
Panel Chair.
(4) In coordination with FTCP Panel Chair, maintains the FTCP Website.
g. Director, Office of Enterprise Assessments.
(1) Ensures NTC support for the FTCP Panel and FAQs processes.
(2) Ensures NTC support of an established e-TQP that will provide the DOE
use with a single electronic record system for managing the Technical
Qualification Program.
h. Chief, Human Capital Officer. Ensures that the TQP meets DOE requirements
related to human capital management, and works with others on the FTCP Panel
for an effective and sustainable program.
i. Supervisors with Responsibilities for TQP Personnel.
(1) Maintain STSM qualification when assigned line responsibility and
supervision of personnel who oversee safety of operations.
(2) Develop site-specific qualification standards and cards for TQP personnel,
if the site or office determines site-specific qualification standards and
cards are needed.
(3) Ensure TQP personnel qualification schedules are implemented.
(4) Facilitate TQP qualification by ensuring sufficient time and training is
provided to complete qualification tasks.
(5) Ensure that TQP candidates are trained and qualified so that they are
capable of performing assigned duties.
(6) Ensure TQP responsibilities are included and maintained in Individual
Performance Plans.
(7) Ensure TQP qualifications are maintained current by training and
assignments planned in IDPs.
Section 11
(8) Periodically evaluate program effectiveness and serve as a management
advocate within the Headquarters or the Field Element to resolve
programmatic issues.
6. INVOKED TECHNICAL STANDARDS. This Order does not invoke any DOE
technical standards or industry standards as required methods. Any technical standard or
industry standard that is mentioned in or referenced by this Order is not invoked by this
DOE O 426.1A 17
1-17-2017
Order. Note: DOE O 251.1D, Appendix J provides a definition for “invoked technical
standard.”
7. DEFINITIONS.
a. Critical Technical Capability. A position meeting the following three criteria:
(1) The position is technical in nature, in a field covered by an FAQS, with
responsibilities related to the safe operation of defense nuclear facilities or
other facilities as designated by Site Management or PSO.
(2) The critical capabilities associated with the position must represent a
specialized skill set that could not typically be replicated in 90 days using
formal training.
(3) Loss of the technical capabilities resident within the position could
jeopardize the Department’s ability to meet safety or regulatory
requirements.
b. Defense Nuclear Facilities. See 42 U.S.C. § 2286g. “Department of Energy
Defense Nuclear Facility” Defined
(http://www.dnfsb.gov/sites/default/files/About/Attachments/Enabling%20Legisla
tion%20-%202016.pdf) for formal definition of Department of Energy defense
nuclear facility.
c. Field Element Manager. DOE Officials who are responsible for execution of
oversight policy implementation (taken from DOE O 226.1B).
d. Job Task Analysis. A systematic method used in obtaining a detailed listing of the
tasks of a specific job. (taken from DOE O 426.2)
e. Key Qualification Area. A functional area that has exceptional impact on nuclear
safety at defense nuclear facilities (STSM, FR, and SSO).
f. Continuing Training/Requalification Program. The process leading to a qualified
candidate’s successful completion of updated TQP competency statements or
KSAs in a participant’s assigned qualification standards since their previous
qualification, including maintenance of proficiency where competency statements
or KSAs have not changed.
8. REFERENCES. Find DOE directives online at www.directives.doe.gov.
a. DOE O 226.1, Implementation of Department of Energy Oversight Policy, current
version.
b. DOE O 251.1, Departmental Directives Program, current version.
http://www.dnfsb.gov/sites/default/files/About/Attachments/Enabling%20Legislation%20-%202016.pdf
http://www.dnfsb.gov/sites/default/files/About/Attachments/Enabling%20Legislation%20-%202016.pdf
http://www.directives.doe.gov/
18 DOE O 426.1A
1-17-2017
c. DOE O 360.1, Federal Employee Training, current version.
d. DOE O 420.1, Facility Safety, current version.
e. DOE-STD-1063-2017, Facility Representatives, dated July 2017.
9. CONTACT. Questions concerning this Order should be addressed to the Office of
Environment, Health, Safety and Security, Office of Health and Safety at (301) 903-5926.
BY ORDER OF THE DEPUTY SECRETARY OF ENERGY:
DAN BROUILLETTE
Deputy Secretary
DOE O 426.1A Appendix A
4-17-2017 A-1
APPENDIX A
DEVELOPMENT AND REVISION
OF FUNCTIONAL AREA QUALIFICATION STANDARDS
Section 12
A key element of the Technical Qualification Program (TQP) is a set of common Functional
Area Qualification Standards (FAQS) and associated Job Task Analyses (JTA). These standards
are developed for various functional areas of responsibility in the Department, including
oversight of safety management programs identified as hazard controls in Documented Safety
Analyses (DSA). For each functional area, the FAQS identify the performance competencies,
supporting knowledge requirements, and mandatory performance activities for a typical qualified
individual working in the area. The TQP will not have a specific standard for project
management for individuals assigned project management responsibilities for defense nuclear
facilities. Qualifications for these individuals are accomplished through a combination of the
Project Manager Career Development Program and the General Technical Base Qualification
Standard.
1. GENERAL. Each FAQS has a sponsor organization, which is usually a Headquarters,
Service Center, or field/site office. Sponsor organizations are responsible for coordinating
the development, update, and revision of their respective FAQS in accordance with the
guidance contained in this Order.
The Panel Chair also maintains a list of recognized experts for the FAQS. Each
Headquarters, Service Center, and field/site office participating in the TQP can submit
the names of recognized experts for each FAQS. If an office does not have a recognized
expert for a particular standard, it does not have to submit a name. The FAQS Sponsor
evaluates the qualifications of the nominees and selects individuals who are recognized
experts within their respective functional areas. The names and contact information for
the recognized experts are provided to the sponsor organizations to help them develop,
revise, and/or review FAQSs. Maintaining an up-to-date and valid list of recognized
experts is essential to ensuring technically adequate and accurate FAQS.
Technical qualification standards are issued through the Department’s Technical
Standards Program (TSP), after approval by the Federal Technical Capability Program
(FTCP) Chair in accordance with the requirements of that program.
2. PROCESS FOR DEVELOPING OR REVISING AN FAQS. The process for developing
or revising an FAQS is shown in Figure A-1 and described in the following steps.
a. The sponsor organization coordinates a working group session with recognized
subject matter and training expertise to develop or revise a JTA and FAQS,
considering the typical duty areas, responsibilities, and tasks performed by a
qualified TQP participant in the subject matter of the FAQS. The purpose of the
session is to establish the following for a typical qualified individual working in
the functional area:
Appendix A DOE O 426.1A
A-2 1-17-2017
Figure A-1. Process for Developing FAQSs
FAQS Sponsor
Organization
Assignment
FAQS Working
Group Formation
JTA and FAQS
Development/
Revision
FAQS Recognized
Experts Review of
Draft Standard
FTCP Agent Draft
Standard Review
FTCP Agent
Comment
Resolution
Technical Standards
Program (TSP)
Review
TSP Comment
Resolution
FTCP Agent,
DNFSB, and FAQS
Recognized Experts
Final Review and
Comment
FAQS Dissemination
Final Comment
Resolution
Final
Technical
Edit
FTCP Agents Final
Review and
Approval/CTA
Concurrence as
Required in
DOE O 410.1
FTCP Chair Approval
DOE O 426.1A Appendix A
1-17-2017 A-3
(1) Performance competencies required to perform as a qualified individual in
the subject matter of the FAQS;
Section 13
(2) Knowledge requirements needed to demonstrate the performance
competencies;
(3) Any mandatory performance activities needed to demonstrate adequate
performance of tasks identified in the JTA (i.e., performance
demonstrations for tasks considered as critical for demonstrating
proficiency in a performance competency);
(4) Appropriate continuing education or proficiency opportunities;
(5) Applicable continuing education and/or proficiency requirements; and
(6) Updates to FAQSs must include a gap analysis, or a summary of changes,
to aid in continuing training and/or requalification, as applicable.
Recognized experts from across the complex should participate in this
session. The sponsor solicits volunteers from the list of recognized experts
maintained by the Panel. The preferred makeup of the group is recognized
experts from the field and from Headquarters with all the recognized
experts from different organizations.
b. Develop a draft JTA and FAQS using data from the recognized expert working
group session. (Note: This step may be done as part of the working group session
described above, if time allows.) The sponsor develops the draft standard in the
format described in this Order and using the standard template approved by the
Panel and posted on the FTCP Website. The sponsor does research as necessary to
expand upon the information obtained in the working group session to ensure that
performance competency statements, supporting knowledge requirements, and
mandatory performance requirements are technically adequate and accurate.
c. The sponsor sends the draft FAQS to the list of DOE-recognized experts for
review and comment. The sponsor revises the standard as applicable based on the
comments received, the JTA developed, and using the FTCP FAQS template as a
guide.
d. The sponsor sends the draft FAQS to the Panel Chair. After ensuring that the
standard is consistent in format with all other FAQS, the Panel Chair transmits the
draft FAQS to Panel members for review.
e. The sponsor works with the Panel Chair, Panel members, and the working group
to resolve comments.
Appendix A DOE O 426.1A
A-4 1-17-2017
f. The sponsor transmits the draft FAQS to the Office of Environment, Health,
Safety and Security (EHSS) for formal review and comment using the DOE
Technical Standards RevCom tool.
g. EHSS transmits the draft FAQS for Defense Nuclear Facilities Safety Board
(DNFSB) staff review and comment.
h. The sponsor works with the FTCP Panel Chair, Panel members, working group,
and DNFSB staff to resolve comments as the Panel deems appropriate. The
sponsor reviews all comments and catalogs them in a comment resolution
document. The comment resolution document shows the organization that made
the comment, the comment, and the sponsor’s resolution of the comment. The
draft FAQS is revised as applicable based upon the comments received.
i. After completing all requirements of the TSP, the sponsor transmits the final draft
FAQS and the comment resolution document to the Panel Chair. After ensuring
that the standard is consistent in format with all other FAQS, the Panel Chair
transmits the final draft FAQS and the final comment resolution document to
Panel members for review and approval. Once the Panel approves the standard,
the Panel Chair signs the standard and transmits it to EHSS for distribution
throughout the Department. (See DOE TSP link.)
Section 14
j. When updating an FAQS, sponsors working with subject matter experts make a
recommendation to the FTC Panel regarding the need for periodic requalification.
Prior to submitting a revised FAQS for Department-wide review process, the
sponsor, with support from subject matter experts, explains the basis for their
recommendation during an FTCP Panel Face-to-Face or teleconference meeting.
The FTCP Panel will then evaluate the recommendation’s merits and render a
final decision for that qualification standard. The incumbent then completes
qualification activities for new competencies (competencies added since initial
qualification) and those competencies where the self- assessment concluded the
position’s routine duties were not sufficient to maintain proficiency.
3. TECHNICAL QUALIFICATION STANDARD FORMAT. FAQS template (with
standardized language) and approved by FTCP Chair is available through the FTCP
Website at:
http://www.energy.gov/ehss/downloads/functional-area-qualification-standards-template
http://www.energy.gov/ehss/downloads/functional-area-qualification-standards-template
DOE O 426.1A Appendix B
1-17-2017 B-1
APPENDIX B
ACCREDITATION OF DOE TECHNICAL QUALIFICATION PROGRAMS
1. OVERVIEW.
The accreditation of Technical Qualification Programs (TQP) enables both Headquarters
and Field organizations in DOE to demonstrate that they have an effective program in
place to ensure the technical competency of Department of Energy (DOE) technical
employees whose duties and responsibilities require them to provide assistance, guidance,
direction, oversight, or evaluation of contractor activities that could impact the safe
operation of a defense nuclear facility. Accredited organizations are recognized for
having programs and processes in place that adhere to established objectives and criteria
for an effective TQP. Accreditation ensures the consistent application of TQP
requirements across the Department, thereby facilitating the transportability of
qualification when an individual moves from one organization to another.
2. PROCESS.
The accreditation process is applicable to those organizations within DOE that choose to
seek accreditation of the TQP.
a. Accreditation Process Elements.
The TQP accreditation process consists of the activities described below. These
activities are further described in this appendix and are depicted in Figure B-1.
• Development and implementation, by the organization requesting
accreditation, of a TQP that meets the requirements stated in this Order.
A comprehensive self-evaluation of the TQP against the objectives and
supporting criteria as described in a document entitled “TQP Accreditation
Objectives and Criteria” and posted on the Federal Technical Capability
Program (FTCP) Website by the requesting organization
(http://www.energy.gov/ehss/downloads/technical-qualification-program-a
ccreditation-objectives-and-criteria). The details and conclusions of that
evaluation are documented in a self-evaluation report. The self-evaluation
report and a declaration of readiness by the senior manager are transmitted
to the TQP accreditation support office.
• Evaluation of the requesting organization’s TQP by an onsite accreditation
review team. This team, consisting of specifically qualified individuals, will
evaluate the TQP against the objectives and criteria. The Team Leader is
selected by the FTC Panel Chair, in consultation with the Office of
Environment, Health, Safety and Security (EHSS). The onsite evaluation
team pays particular attention to ensure that the program is being effectively
implemented throughout the organization. The results of the onsite review
are documented in a TQP Accreditation Review Team Report.
Section 15
http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-objectives-and-criteria
http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-objectives-and-criteria
Appendix B DOE O 426.1A
B-2 1-17-2017
• A recommendation to the Deputy Secretary for accreditation of the
program by the independent TQP Accreditation Board. This Board,
consisting of senior managers from DOE and usually an expert from
outside of DOE, makes this recommendation based on a formal meeting
with senior representatives from the requesting site and the TQP
accreditation review team leader. The recommendation is based upon
information contained in the accreditation review report, and feedback and
input from senior management from the requesting organization.
• A determination by the Deputy Secretary regarding accreditation.
• Continuous implementation and maintenance of TQP accreditation for
approximately 4 years. The organization is expected to continue to
maintain and implement the TQP in a manner that meets the objectives
and criteria and that ensures a robust program. Renewal of accreditation is
accomplished by the same process as initial accreditation, and involves
both a self-evaluation report submitted by the organization, as well as a
review by an onsite accreditation review team. The TQP Accreditation
Board will review the results of these efforts and make a recommendation
to the Deputy Secretary to renew or defer accreditation.
Organization
conducts
Self-Evaluation
Organization reviews process
and criteria and decides if they
are ready to pursue
accreditation
Notify the
FTCP Chair
Organization
plans and
schedules
Self-Evaluation
Organization
submits SER
to FTCP
FTC Previews
SER
Schedule
on-site
accreditation
review
Organization
upgrades
self-identified
areas for
Improvement
FTCP updates list
of orgs. pursuing
accreditation
Team
Manager visit
and team
preparation
Team
conducts
on-site
accreditation
review
Submit TQP
accreditation
team report
Organization
upgrades
areas for
improvement
identified by
team
Schedule and
conduct TQP
Accreditation
Board
Begin
four-year
accreditation
renewal cycle
Organization
upgrade
deficiencies
Ready for
accreditation?
Ready for
Accreditation
Board?
Accreditation
awarded?
Yes
Yes
No
No
START
No
Yes
Figure B-1. TQP Accreditation Process
DOE O 426.1A Appendix B
1-17-2017 B-3
b. Accreditation Support.
The Office of Health and Safety, within EHSS, serves as the TQP accreditation
support office and, in that role, reports to the FTC Panel Chair. The TQP
accreditation support office is responsible for facilitating the TQP accreditation
process. This includes the following:
• Developing and maintaining program documents;
• Supporting the National Training Center in providing training on the TQP
accreditation process;
• Providing assistance as requested to support the TQP accreditation
process;
• Establishing accreditation review teams;
• Supporting the TQP Accreditation Board;
• Providing accreditation status reports to the Panel Chair;
• Supporting the process to maintain and revalidate accredited TQPs; and
• Coordinating the necessary resources to support the accreditation process.
c. Self-evaluation and Self-evaluation Reports.
Section 16
In preparation for initial accreditation or accreditation renewal, a TQP
accreditation self-evaluation report is prepared for the TQP under review. The
self-evaluation report serves as the “application” for accreditation. Before the
accreditation review team visits the site, the requesting organization conducts a
thorough self-evaluation of its program against the objectives and supporting
criteria as described in “TQP Accreditation Objectives and Criteria” posted on
FTCP Website:
(http://www.energy.gov/ehss/downloads/technical-qualification-program-accredit
ation-objectives-and-criteria) and documents the results in a self-evaluation
report; and corrects, or begins to correct, any identified problems. The purpose of
this self-evaluation is for the requesting organization to ensure that their program
satisfies the criteria of an effective TQP. Organizations are encouraged to use an
outside expert or peer from another organization to assist in this assessment and
provide an objective, outside perspective. The TQP accreditation self-evaluation
should meet the following key criteria:
• Senior managers oversee the self-evaluation process to ensure
identification and description of TQP strengths and correction of
weakness.
http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-objectives-and-criteria
http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-objectives-and-criteria
Appendix B DOE O 426.1A
B-4 1-17-2017
• Line managers and their staffs actively participate in the self-evaluation
process.
• Self-evaluations of the TQP recognize both the strengths of the program
and problems that need to be corrected.
• Alternative perspectives from other organizations or individuals are
actively solicited.
• Activities or accomplishments (e.g., related International Organization for
Standardization certifications, other professional certifications,
participation in university-sponsored programs) are identified and
encouraged.
• Significant problems in the TQP are documented and investigated for root
or contributing causes, and actions are taken to correct and prevent
recurrence. Follow-up reviews are used to verify the effectiveness of
corrective actions.
The TQP accreditation self-evaluation report is a comprehensive, stand-alone
document that describes the requesting organization’s TQP. For programs being
reviewed for accreditation renewal, the TQP accreditation self-evaluation report
reflects strengths and areas for improvement identified throughout the 4-year
renewal period. The senior manager responsible for the organization requesting
accreditation approves the report and forwards it to the DOE TQP accreditation
support office approximately 2 months before the accreditation team visit. The
forwarding memo includes a declaration by the senior manager that the
organization is implementing the TQP in accordance with the requirements of this
Order and is ready for accreditation.
EHSS reviews the TQP accreditation self-evaluation report and ensures that the
report was prepared in accordance with the guidance in “TQP Accreditation
Objectives and Criteria” posted on FTCP Website
(http://www.energy.gov/ehss/downloads/technical-qualification-program-accredit
ation-objectives-and-criteria), and meets the criteria for TQP accreditation
self-evaluation reports. The TQP accreditation support office coordinates with the
senior manager responsible for the organization requesting accreditation to
resolve any discrepancies or ambiguities within the TQP accreditation
self-evaluation report prior to the TQP accreditation review team evaluation.
Section 17
d. Accreditation Review Team and Team Activities.
The purpose of the TQP accreditation review team evaluation is to conduct a
thorough and independent evaluation to review the status of TQP implementation
and assess the actions taken to address areas for improvement identified in the
self-evaluation report. For initial TQP accreditation, an accreditation team
evaluation will be scheduled when the requesting organization submits a
http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-objectives-and-criteria
http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-objectives-and-criteria
DOE O 426.1A Appendix B
1-17-2017 B-5
comprehensive TQP accreditation self-evaluation report. Accreditation review
team evaluations typically are scheduled approximately 3 months before the TQP
Accreditation Board review date.
The accreditation review team may consist of TQP accreditation support office
staff, FTCP Agents, outside experts, and peer reviewers from other sites. The
team members have collective expertise in facility operations, technical
qualification programs, and facility management. They also meet specific,
pre-established qualification requirements and receive training on the TQP
accreditation process. The accreditation review team composition should
represent a cross-section of the National Nuclear Security Administration
(NNSA) and DOE elements (e.g., Program Secretarial Officers (PSO)).
The TQP accreditation support office nominates the accreditation review team
leader for a particular review, and the Panel Chair approves the team leader. The
TQP accreditation support office selects the most qualified individual to do the
job. In making the selection, the following criteria should be considered:
• The individual is a senior level (GS-15 or above) manager, qualified as a
Senior Technical Safety Manager (STSM), who is very knowledgeable of
the development and implementation of TQPs.
• The individual has experience leading evaluation teams.
• The individual, by virtue of reputation, background, and experience, will
be respected by the organization being assessed. FTCP Agents are
encouraged to participate as team leaders.
The accreditation review team leader has the primary responsibility for selecting
the team members. The importance of this task cannot be overemphasized. No
other task has such a direct impact on the overall quality of the accreditation
review. Typically, a TQP accreditation review team will have a team leader and
four to six team members, one of which will be selected by the Chief of Defense
Nuclear Safety (CDNS) or the Chief of Nuclear Safety (CNS).
Assessment team members should have technical experience relevant to the
assignment and knowledge of TQPs. They should also have some experience
conducting program assessments. This experience provides the background for
team members to work independently at an unfamiliar location, gather
information quickly, and make objective recommendations. Team members
should have qualifications that will be respected by the organization requesting
the assistance (e.g., reputation, relevant background, and type and length of
experience).
Accreditation review team evaluations typically last about 1 week. During the
evaluation, team members observe TQP activities, interview staff and
management personnel, review qualification requirements and qualifications of
Appendix B DOE O 426.1A
B-6 1-17-2017
Section 18
personnel, and examine TQP materials. The TQP is evaluated against all of the
objectives and criteria using specifically developed lines of inquiry.
Accreditation review team results are discussed with staff and management
personnel at the site on a daily basis during the review.
Following the onsite evaluation, the TQP accreditation review team prepares an
exit report to describe the results of the review. This report forms the basis for an
exit meeting with senior management of the organization being reviewed and
identifies applicable strengths or areas for improvement. Following the exit
meeting, the requesting organization submits written responses that describe the
actions taken or planned for identified areas for improvement. The accreditation
review team leader prepares a detailed TQP Accreditation Review Team Report
that describes the results of the accreditation review team evaluation, but does not
provide a recommendation regarding accreditation. This report is submitted to the
TQP Accreditation Board for review and deliberation.
The format of the TQP Accreditation Review Team Report is as follows.
• Cover Page. Include the title of the report, the name of the office assessed,
and the date of the report.
• Executive Summary. One page that provides a short overview of the team
composition, dates of the assessment, and methodology. The Executive
Summary should briefly describe assessment results, including strengths
and weaknesses.
• Introduction. Provide relevant background information and describe the
purpose and format of the report.
• Scope and Methodology. Describe the makeup of the team in general
terms (referring to the attachment of the report for more detail), describe
the scope of the assessment referencing the use of the objectives and
criteria, and briefly describe the methodology applied.
• Results. Address in detail the overall program and each of the applicable
objectives, including how the objective is met and identifies any strengths,
areas for improvement, or other noteworthy information. Definitions of
these three items are included in “TQP Accreditation Objectives and
Criteria” posted on FTCP Website
(http://www.energy.gov/ehss/downloads/technical-qualification-program-a
ccreditation-objectives-and-criteria).
• Addressing each criterion for the objectives is not necessary; however, any
criterion that is not achieved should be identified as a deficiency for that
objective.
http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-objectives-and-criteria
http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-objectives-and-criteria
DOE O 426.1A Appendix B
1-17-2017 B-7
• Attachments. Include the following.
- Objectives and criteria used for the evaluation.
- List of team leader and team members, including a brief
description of their backgrounds and experience.
- List of people contacted, activities observed, and documents
reviewed.
- Any other information the team leader deems pertinent.
e. Accreditation Board.
Five members of the TQP Accreditation Board meet as a voting board to consider
the TQP for accreditation or accreditation renewal. The Board typically meets
approximately 2 to 3 months following the accreditation review team evaluation.
The composition of the voting board includes one senior executive from NNSA,
the Office of Environmental Management, Office of Science, or other PSO; one
senior executive from EHSS; one manager of a field or site office; the CDNS or
CNS; and one outside expert. Board members should not be directly associated
with the TQP that is being considered for accreditation. Board members should be
knowledgeable about the TQP, receive training on the accreditation process, and
be approved by their PSO. For each Board conducted, the Chair will be the senior
executive from EHSS.
Section 19
The TQP Accreditation Board meeting is attended by the responsible managers
from the organization requesting accreditation, including the senior manager
responsible for the TQP. Attendance is at the discretion of the organization
requesting accreditation; however, it is essential that a senior manager who can
make commitments to the Accreditation Board be present. The accreditation
review team leader is also present at the meeting. Based on the information
contained in the accreditation review team report, the Board members assess the
status of the TQP and interact with Field Element Managers (FEM) and the
accreditation review team leader. The TQP Accreditation Board decision is based
on a comparison of the TQP with the accreditation objectives and supporting
criteria, status of corrective actions for any identified problems, and interactions
with organizational managers during the meeting. Based on a majority vote, the
TQP Accreditation Board will make one of the following recommendations to the
Deputy Secretary of Energy.
• Award initial accreditation (or defer initial accreditation pending
completion of corrective actions and additional Board review).
• Renew accreditation.
• Place accredited TQPs on probation. (A TQP placed on probation retains
Appendix B DOE O 426.1A
B-8 1-17-2017
accredited status.)
• Withdraw accreditation.
• The Deputy Secretary of Energy will make the final decision regarding
TQP Accreditation.
f. Maintaining Accreditation.
Organizations maintain TQP accreditation by continuing to implement and
improve their programs in accordance with the objectives and criteria. By various
means (for example, review of site events or EHSS reviews), the TQP
Accreditation Board may learn that one or more accreditation criteria are not being
met for an accredited program. For each such reported problem, the Panel Chair
will consult with the Deputy Secretary, and at the request of the Deputy Secretary,
may initiate a review commensurate with the apparent magnitude of the problem. If
such a review is conducted, the Panel Chair will inform the appropriate managers
of the problem and will either request additional information or have a team
conduct an onsite review of the affected program. If appropriate, the affected DOE
managers will be asked to demonstrate to the TQP Accreditation Board that
accreditation of the affected program should be continued.
Organizations for those TQPs placed on probation submit a corrective action plan
to the TQP Accreditation Board within 30 days of being notified of probationary
status. The corrective action plan should address all issues identified by the
Accreditation Board and identify any mitigating or compensatory measures. The
organization should submit monthly reports to the Accreditation Board indicating
the status of implementing the corrective actions to improve the program. An
accreditation review team may review activities at the site to determine if
corrective actions are being effectively implemented. The TQP Accreditation
Board will review the status of probationary programs on a quarterly basis and
decide if the organization should remain on probation, if accreditation should be
restored, or if accreditation should be withdrawn.
Accreditation is valid for approximately 4 years. The organization is expected to
continue to maintain and implement the TQP in a manner that meets the
objectives and criteria and ensures a robust program. Renewal of accreditation is
accomplished by the same process as initial accreditation, and involves both a
self-evaluation report submitted by the organization, as well as a review by an
onsite accreditation review team.
Section 20
3. ACCREDITATION OBJECTIVES AND CRITERIA.
The TQP objectives and supporting criteria are described in “TQP Accreditation
Objectives and Criteria” posted on FTCP Website
(http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-o
bjectives-and-criteria).
http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-objectives-and-criteria
http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-objectives-and-criteria
DOE O 426.1A Appendix B
1-17-2017 B-9
4. SELF-EVALUATION REPORT GUIDANCE AND FORMAT.
a. Self-Evaluation Process.
Line manager and staff involvement in, and support of, the self-evaluation process
are the foundation of the TQP accreditation effort. This includes their
involvement in the self-evaluation of the program and the preparation of the
accreditation self-evaluation report. In assessing TQP effectiveness, line managers
and staff determine whether the program is resulting in measurable improvements
in the organization.
Accreditation evaluations are performed using the objectives and supporting
criteria as described in “TQP Accreditation Objectives and Criteria” posted on
FTCP Website
(http://www.energy.gov/ehss/downloads/technical-qualification-program-accredit
ation-objectives-and-criteria ). The strengths and areas for improvement are
substantiated with examples and selected anecdotal evidence that help clarify and
provide perspective on their scope and depth. The root or contributing causes of
areas for improvement are investigated, and actions are taken to correct the
problems. Corrective action effectiveness reviews verify that problems identified
in self-evaluations remain corrected.
b. Development of a Self-Evaluation Report.
The results of accreditation self-evaluations are described in a report submitted
approximately 2 months before a TQP accreditation review team evaluation. The
accreditation self-evaluation report is a stand-alone document that conveys the
health of the TQP. For accreditation renewal, the report also describes the results
of ongoing and periodic focused self-evaluation conducted during the
accreditation period. As such, report quality can be enhanced by maintaining and
periodically updating it rather than reflecting the results of a single
comprehensive evaluation.
Two months before the accreditation review team visit, the senior manager
responsible for the organization requesting accreditation submits an approved
self-evaluation report to the executive director of the TQP accreditation support
office. The purpose of the report, together with an accreditation review team
evaluation report, is to communicate sufficient information regarding the health of
the TQP to facilitate an accreditation or accreditation renewal decision by the
TQP Accreditation Board. Report content includes program strengths and areas
for improvement, important program changes since accreditation or the last
accreditation renewal, and brief descriptions of how each TQP Assessment
Objective included in the document is met. The report will be submitted to the
TQP Accreditation Board for accreditation or accreditation renewal consideration;
it should be written with that audience in mind.
http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-objectives-and-criteria
http://www.energy.gov/ehss/downloads/technical-qualification-program-accreditation-objectives-and-criteria
Section 21
Appendix B DOE O 426.1A
B-10 1-17-2017
Organizations are encouraged to be critical in evaluating their TQPs and candid in
describing areas for improvement. The report summarizes the root or contributing
causes for areas for improvement and corrective actions taken or planned. The
section of the report that requires a written description of how each objective is
met can be organized by addressing each criterion associated with the objective,
or the objective description can be presented in a narrative format. The decision
on which option to use is left entirely to the discretion of the organization
submitting the report. The TQP Accreditation Board decision, however, will be
based on how well each objective is met, not on whether any particular criterion is
met.
c. Definitions of Key Terms for Accreditation Self-Evaluation Reports.
(1) Area for Improvement. A TQP-related issue or problem that contributes to
an accreditation objective not being fully met or that adversely impacts
future TQP effectiveness is an area for improvement.
(2) Strength. This is an objective-level positive aspect of the TQP that is key
to achieving superior performance. A strength adds significant value or
improves organizational performance, as demonstrated by the following
elements:
• enhanced ability of the organization to implement the TQP;
• successful implementation based on performance results;
• efficient use of organizational resources; and
• potential to serve as a model for other organizations to emulate.
(3) Noteworthy Information. This refers to comments included in the
discussion section of the report that describe the quality of the TQP and
provide perspective on the effectiveness of the program. Noteworthy
information may be positive, but not strength or it may be a less
significant problem or precursor to a more significant problem. For
example, positive noteworthy information could be an aspect identified
during a self-evaluation that is not considered strong enough to be called
strength. Conversely, negative noteworthy information could be a problem
that is not substantial enough to be considered an area for improvement.
Noteworthy information provides additional management perspective that
can be of value to the accreditation review team and to the Accreditation
Board.
d. Format of the Self-Evaluation Report.
The self-evaluation report includes the following sections:
DOE O 426.1A Appendix B
1-17-2017 B-11
(1) Introduction and Summary.
This section is used to share management’s perspective on the TQP with
the accreditation review team and the Accreditation Board. It is expected
that each organization will include information that best conveys the
appropriate perspective on the TQP. This section is normally one to three
pages and should include information, such as:
• significant organizational performance issues and regulatory
interactions that have helped shape the current organizational
culture;
• strategic plans or events that have affected, or are likely to affect,
the TQP, such as changes in staffing or loss of experienced
personnel;
• overall management-level statement of how the TQP has been used
to facilitate excellence in performance and strategy for the future;
and
• description of how the accreditation self-evaluation report was
prepared, the composition of the team, and the base of
self-evaluation information used to develop the report.
(2) Mission and Organization.
Section 22
This section is used to describe the mission(s) and functions of the
organization requesting accreditation. The section also describes the
organizational structure including high-level organizational charts,
functions, and responsibilities.
(3) Self-Evaluation Results (by Objective).
This section comprises the majority of the self-evaluation report. Each
objective is addressed individually in its own section. The following
information is included for each objective.
• Discussion of Objective: Include noteworthy information and a
brief summary of the status of how the objective is achieved. This
section can be organized to address each criterion associated with
the Objective or can be presented in a narrative format. In either
case, address the following information for each Objective using
examples and limited anecdotal evidence, where appropriate, to
provide perspective.
• Strength(s): Include examples and applications of the strength, and
describe the benefits achieved by the strength.
Appendix B DOE O 426.1A
B-12 1-17-2017
• Area(s) for Improvement: Include date of identification, examples
of the problem, root or contributing causes, actions taken or
planned to correct the problem, and results of effectiveness reviews
if performed.
NOTE: If no strengths or areas for improvement have been identified for
the objective, then include the following statement: “No objective-level
strengths or areas for improvement were identified.”
DOE O 426.1A Appendix C
1-17-2017 C-1
APPENDIX C
SAFETY SYSTEM OVERSIGHT, DUTIES,
RESPONSIBILITIES, KNOWLEDGE, SKILLS, AND
ABILITIES
1. OVERVIEW. Safety System Oversight (SSO) personnel are a key technical resource
qualified to oversee contractor management of safety systems at the Department of
Energy (DOE) defense nuclear facilities. Unlike Facility Representatives (FR), who are
responsible for monitoring the safety performance of DOE defense nuclear facilities
and day-to-day operational status, staff members assigned to SSO are responsible for
overseeing assigned systems to ensure they will perform as required by the safety basis
and other applicable requirements. SSO personnel are highly qualified people who
perform assessments and investigations to confirm performance of assigned safety
systems in meeting established safety and mission requirements and review sections of
the Documented Safety Analysis (DSA) related to these systems. DOE line
management is responsible for oversight of safety at DOE facilities and for meeting
mission objectives and goals. Integrated Safety Management (ISM) System processes
help to ensure systems are able to perform their design safety functions. Effective
implementation of ISM relies upon the ability to apply engineering expertise to
maintain safety system configuration and assess system condition and effectiveness of
safety management program implementation. Federal staff requires a working
knowledge of assigned systems and the contractor’s application of the cognizant
system engineer concept and safety program management as described in DOE O
420.1, Facility Safety, current version.
The SSO Qualification Program is a key part of the Technical Qualification Program
(TQP), considered an additional level of technical qualification, and builds upon
technical discipline competencies through TQP qualification under various Functional
Area Qualification Standards (FAQS).
2. DUTIES AND RESPONSIBILITIES.
a. SSO Personnel.
Section 23
(1) Maintain communication and oversight of systems and monitor
performance of the contractor’s Cognizant System Engineer Program.
(2) Attend selected contractor meetings with FRs and contractor personnel
responsible for system performance (e.g., cognizant system engineers,
design authorities, and program managers), review system health/status
reports, review test results, interface with external organizations that
can provide insights on performance, and perform other oversight
activities on a routine basis.
(3) Perform assessments, periodic evaluation of equipment configuration,
and material condition. The effect of aging on system equipment and
components, the adequacy of application of work control and change
Appendix C DOE O 426.1A
C-2 1-17-2017
control processes, and appropriateness of system maintenance and
surveillance should be considered with respect to reliable performance
of safety functions.
(4) In conjunction with FRs, perform evaluations of contractor
troubleshooting, investigations, root cause evaluations, and selection
and implementation of corrective actions. SSO personnel may also be
requested to respond to off normal and/or off normal hours events and
investigations and be able to provide relevant insights and serve as the
DOE recognized expert on issues related to assigned areas.
(5) Provide support to other Federal employees as appropriate. This may
include program and project managers responsible for supervision of
facility safety systems installed in new and modified facilities. It may
also include those managing the implementation of ISM in the
operation, maintenance, and configuration management of facility
safety systems.
(6) Assess contractor compliance with relevant DOE regulations, industry
standards, contract requirements, safety basis requirements, and other
system requirements.
(7) Confirm configuration documentation, procedures, and other sources of
controlling information are current and accurate.
(8) Report potential or emergent hazards immediately to DOE line
management and FRs, and stop tasks, if required, to prevent imminent
impact to the health and safety of workers and the public, to protect the
environment, or to protect the facility and equipment and immediately
notify the on-duty or on-call FR.
(9) May serve as a qualifying official in the development or revision of
FAQS, mentor assigned backups, and qualify other candidates to the
same FAQS attained to achieve SSO qualification.
(10) Maintain cognizance of the appropriate funding and resources to
maintain and improve safety systems.
(11) May perform additional duties and responsibilities as assigned by their
respective Field Element Managers (FEM) if needed to meet specific
requirements of their sites/facilities, systems/program activities, or other
involved organizations.
b. FEMs.
(1) Establish SSO qualification programs as part of the TQP.
DOE O 426.1A Appendix C
1-17-2017 C-3
(2) Establish appropriate training and performance requirements for SSO
personnel and hold supervisors of SSO personnel accountable for
achieving them.
(3) Define SSO requirements and ensure that SSO staffing needs are filled.
(4) Clearly define the functions, responsibilities, and authorities of
personnel assigned to perform SSO and their interface/support of FRs.
Ensure affected DOE and contractor managers understand their roles
and relationships to FRs and the contractor’s cognizant system
engineers, and provide the necessary access and support.
Section 24
(5) Verify that SSO candidates possess the required level of knowledge or
skills to perform assessments and investigations to confirm performance
of safety systems in meeting established safety and mission
requirements.
(6) Assign qualifying officials to sign site-specific qualification cards.
c. Supervisors with Responsibilities for SSOs.
(1) Maintain STSM qualification.
(2) Develop site-specific SSO qualification standards and cards for safety
systems and safety management programs.
(3) Identify and approve candidate selection.
(4) Establish SSO personnel qualification schedules.
(5) Facilitate SSO qualification (e.g., ensure sufficient time and training is
provided to complete qualification tasks).
(6) Train and qualify SSO candidates so they are capable of performing
assigned duties.
(7) Ensure SSO responsibilities are included and maintained in individual
performance plans.
(8) Ensure SSO qualifications are maintained current by training and
assignments planned in Individual Development Plans (IDP).
(9) Periodically evaluate program effectiveness and serve as management
advocates within their respective field elements to resolve
programmatic issues.
Appendix C DOE O 426.1A
C-4 1-17-2017
3. SSO KNOWLEDGE, SKILLS, AND ABILITIES.
a. Consistent with this Order, each field element organization develops a TQP to
include the knowledge, skills, and abilities listed below for all SSO personnel. It
is understood that as part of the TQP, all SSO personnel acquire the necessary
basic technical knowledge and technical discipline competencies linked to their
individual job descriptions. In addition, the overall competency expectation for
SSO personnel is that they have a working knowledge of, and ability to oversee,
those safety systems to which they have been assigned. The following knowledge,
skills, and abilities were developed to meet this expectation.
(1) Identify and describe the Authorization Basis (AB) documents and
describe the function and purpose of the assigned safety systems and
major components and how these functions support the full spectrum of
system operations.
(2) Given the major design basis supporting analyses, system design
descriptions, calculations, and other information sources, explain how
system performance requirements satisfy the AB.
(3) Describe the maintenance requirements of the safety system, describe how
to determine the status and adequacy of contractor maintenance activities,
and explain how the contractor maintains the configuration of the safety
system (both physical and document configuration) throughout the work
control and design change processes.
(4) Describe the unreviewed safety question process and its importance for
maintaining the original safety basis.
(5) Describe the contractor’s Cognizant System Engineer Program, the
program’s role in maintaining and improving safety system performance,
the key criteria for determining that this role is adequately performed, and
how to assess the program to confirm it is fulfilling assigned
responsibilities.
(6) Describe the key considerations in preparing and implementing a
troubleshooting plan to determine the root cause for equipment failures
(e.g., evidence preservation, need for contingencies, and application of
ISM to troubleshooting). Describe how to obtain related facility or
industry experience to support the cause determination.
Section 25
b. In addition to evaluating and documenting how the above knowledge, skills, and
abilities have been achieved as part of the SSO personnel qualification, field
element organizations should also use practical exercises, such as the following to
evaluate SSO staff knowledge, skills, and abilities.
DOE O 426.1A Appendix C
1-17-2017 C-5 (and C-6)
(1) Performing walk downs of the system and/or contractor facilities to
demonstrate how system requirements and performance data are gathered.
(2) Conducting (preferably leading) performance-based assessments (through
walk downs, interviews, document reviews, and field observations) to
confirm that:
(a) AB documents are accurate and adequately maintained;
(b) system operation, maintenance, and performance is in accordance
with this basis;
(c) the effect of aging on system equipment and components is
addressed; and
(d) the contractor has an adequate Cognizant System Engineer
Program (e.g., staffing, qualifications, responsibilities, programs)
for monitoring, maintaining, and improving system performance.
(3) Achievement and demonstration of knowledge, skills, abilities, and related
practical factors are fully documented on the SSO candidate’s
qualification card.
MINOR CHANGE TO DOE O 426.1A, FEDERAL TECHNICAL CAPABILITY PROGRAM
1. EXPLANATION OF CHANGES.
2. LOCATIONS OF CHANGES:
SUBJECT: FEDERAL TECHNICAL CAPABILITY PROGRAM
1. PURPOSE.
2. CANCELLATION
3. APPLICABILITY.
a. Departmental Applicability
b. Contractors
c. Equivalencies for DOE O 426.1
d. Exemptions for DOE O 426.1
4. REQUIREMENTS. DOE offices and organizations must ensure that their Federal employees are appropriately trained and technically capable of carrying out their responsibilities.
a. Federal Technical Capability Program (FTCP) Development and Administration.
b. FTCP Implementation.
5. RESPONSIBILITIES.
a. Deputy Secretary.
b. Administrator, NNSA; Program Secretarial Officers (PSO); and Managers of Field Elements (including Project Offices, Operation Offices, Site Offices, and Service Centers).
c. Chair of FTCP Panel.
d. Vice Chair of the FTCP Panel. Serves as Chair of the FTCP Panel in the absence of the Chair.
e. FTCP Agents.
f. Associate Under Secretary for Environment, Health, Safety and Security.
g. Director, Office of Enterprise Assessments.
h. Chief, Human Capital Officer
i. Supervisors with Responsibilities for TQP Personnel.
6. INVOKED TECHNICAL STANDARDS
7. DEFINITIONS.
8. REFERENCES. Find DOE directives online at www.directives.doe.gov.
9. CONTACT. Questions concerning this Order should be addressed to the Office of Environment, Health, Safety and Security, Office of Health and Safety at (301) 903-5926.
APPENDIX A. DEVELOPMENT AND REVISIONOF FUNCTIONAL AREA QUALIFICATION STANDARDS
1. GENERAL
2. PROCESS FOR DEVELOPING OR REVISING AN FAQS
Figure A-1. Process for Developing FAQSs
3. TECHNICAL QUALIFICATION STANDARD FORMAT.
APPENDIX BACCREDITATION OF DOE TECHNICAL QUALIFICATION PROGRAMS
1. OVERVIEW.
2. PROCESS.
3. ACCREDITATION OBJECTIVES AND CRITERIA.
4. SELF-EVALUATION REPORT GUIDANCE AND FORMAT.
APPENDIX C. SAFETY SYSTEM OVERSIGHT, DUTIES, RESPONSIBILITIES, KNOWLEDGE, SKILLS, AND ABILITIES
1. OVERVIEW
2. DUTIES AND RESPONSIBILITIES.
3. SSO KNOWLEDGE, SKILLS, AND ABILITIES.