DOE O 350.2, Use of Facility Contractor Employees for Services to DOE in the Washington, D.C., Area
Functional areas: Human Resources
To clarify and modify policies and procedures for management of Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facility contractor employees located in the Washington, D.C., area.
Cancels DOE N 350.5. Certified 12-28-06. Canceled by DOE O 350.2A.
Supersedes:
Superseded By:
Certified By:
DOE O 350.2 (Cert Memo), Certification for DOE O 350.2 on Dec 28, 2006
Version history and related documents
Superseded by
A newer version replaces this document.
Supersedes
Earlier documents this one replaced.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DISTRIBUTION: INITIATED BY:
All Departmental Elements Office of Management Systems
U.S. Department of Energy ORDER
Washington, D.C.
DOE O 350.2
Approved: 7-12-01
SUBJECT: USE OF FACILITY CONTRACTOR EMPLOYEES FOR SERVICES TO DOE IN
THE WASHINGTON, D.C., AREA
1. OBJECTIVE. To clarify and modify policies and procedures for management of
Department of Energy (DOE), including National Nuclear Security Administration
(NNSA), facility contractor employees located in the Washington, D.C., area.
2. CANCELLATION. This Order replaces DOE N 350.5, Use of Facility Contractor
Employees for Services to DOE in the Washington, D.C., Area, dated 4-15-99.
3. APPLICABILITY.
a. DOE Elements. The provisions of this Order apply to all DOE elements,
including those within the NNSA, except for those elements specifically
exempted in paragraph 3c.
b. Contractors. This Order applies to the assignment of facility contractor
employees to the Washington, D.C., area for more than 30 continuous calendar
days. A facility contractor is any contractor performing under a management and
operating contract, a management and integration contract, or an environmental
restoration management contract awarded by a DOE contracting officer. A
facility contractor employee is an employee of either a facility contractor or a
subcontractor of such a contractor. The Contractor Requirements Document
(CRD), Attachment 1, identifies requirements that apply to contractors.
Contractor compliance with the CRD will be required to the extent set forth in a
contract.
c. Exclusions. This Order does not apply to the Bonneville Power Administration
and the Deputy Administrator for Naval Reactors. This Order also does not apply
to assignments under Intergovernmental Personnel Act Mobility Program
Agreements, Work-for-Others agreements not reimbursed by DOE, or such others
as may be exempted by the Director, Office of Management and Administration
(MA), or the Headquarters personnel officer, NNSA.
4. REQUIREMENTS.
a. The number and types of positions for DOE facility contractor employees located
in the Washington, D.C., area must be within approved staffing ceilings for either
the Headquarters program or staff offices or the facility contractor office staffing.
CANCELE
D
CANCELE
D
2 DOE O 350.2
7-12-01
b. At the request of a Headquarters program or staff office, the head of the
contracting activity (HCA) may authorize DOE facility contractors to assign
personnel to positions in the Washington, D.C., area, provided those positions
conform to one or more of the following conditions.
(1) Personnel provide a Headquarters program or staff office with technical
expertise and experience critical to that office’s operations or programs
when that expertise and experience is not otherwise available at lower cost
through other types of contracts (e.g., support service contracts).
(2) Personnel undertake tasks that must be performed in the Washington,
D.C., area because staff must coordinate or interface in person with
Headquarters staff or other agencies or because such assignments can be
demonstrated to be cost effective for performance of the task.
(3) Personnel provide administrative support in a facility contractor’s office.
The number and types of administrative support staff must be based on
good business practices and approved by the HCA.
(4) Personnel, other than administrative support staff, provide technical
expertise within the mission and scope of work of the contract under
which the assignments are made.
Section 2
c. Assignment of DOE facility contractor employees to the Washington, D.C., area
must not adversely affect the contractor’s mission or otherwise adversely affect
the contractor’s ability to meet contract commitments.
d. DOE facility contractor employees shall not be assigned to the Washington, D.C.,
area to—
(1) compensate for reductions in support service contracting;
(2) provide administrative support (e.g. clerical or para professional) within
Federal facilities or for Federal employees;
(3) perform functions inherently reserved for Federal employees, including
directly supervising Federal employees and making fiscal and/or policy
decisions;
(4) perform assignments that exceed 12 months in duration unless the
individual’s continued assignment is critical and represents significant
mutual benefit to the program sponsor and the facility;
(5) perform contractor business development or lobbying;
CANCELE
D
CANCELE
D
DOE O 350.2 3
7-12-01
(6) extend support beyond the completion of the work assignments; or
(7) perform any function that may be construed as a personal or organizational
conflict of interest as referenced in DEAR Subpart 909.5 or 970.0905 and
defined in 952.209-72.
e. A DOE facility contractor is not to award subcontracts, or subcontract work tasks,
to provide direct support to program offices in the Washington, D.C., area.
f. DOE facility contractor employee work assignments performed in the
Washington, D.C., area must conform to the relevant program office critical skills
staffing plan or contractor office support staffing plan. The process required for
establishing staffing requirements (see Attachment 2) is as follows.
(1) Each Headquarters program or staff office that uses facility contractor
employees within the Washington, D.C., area will submit a critical skills
staffing plan for facility contractor personnel to the Director, MA, or
Headquarters personnel officer, NNSA, as appropriate, and cognizant
HCAs by May 1 of each year (see Attachment 3). This plan will—
(a) delineate the required skills and expertise to be provided by facility
contractor employees who will be reimbursed with Department
funds and
(b) include a proposed ceiling for the number of contractor staff to be
assigned for the next fiscal year.
(2) Each HCA or designee will develop and submit through the cognizant
secretarial officer an office support staffing plan to the Director, MA, or
Headquarters personnel officer, NNSA, as appropriate, by April 1 of each
year (see Attachment 4).
(a) The plan will include the following positions that are located at the
facility contractor’s Washington office and the costs of which are
reimbursed by the Department:
1 all administrative, office support, and overhead positions
and
2 any positions that ensure efficient task performance but do
not support specific program offices.
(b) The plan will also indicate the program account each position is
charged against and the proposed ceiling on such assignments for
the next fiscal year.
CANCELE
D
CANCELE
D
4 DOE O 350.2
7-12-01
(3) The Director, MA, or the Headquarters personnel officer, NNSA, as
appropriate, will consult with affected organizations to establish facility
contractor ceiling numbers for employees to be located in the Washington,
D.C., area for each Headquarters program, staff, and facility contractor
support office. The ceilings are to be approved by the Deputy Secretary,
DOE, with concurrence by the Director, MA, or the Headquarters
personnel officer, NNSA, as appropriate, by August 1 of each year.
NNSA Headquarters personnel officer and MA will distribute approved
allocation notifications to appropriate offices.
Section 3
(a) Each DOE Headquarters program and staff office is responsible for
meeting the criteria for assignments and for remaining within its
facility contractor employee ceiling allocation.
(b) Each facility contractor must operate within its office support
staffing plan.
g. Any DOE Headquarters program, staff, or contractor support office facing a
critical need to exceed its ceiling may request a waiver from the Deputy Secretary,
DOE. All waiver requests must be concurred in by the Director, MA, before
submission to the Deputy Secretary, DOE. For requests from NNSA
organizations, concurrence of the Headquarters personnel officer, NNSA, is also
required. The request must include the following information:
(1) justification for modifying the staffing plan and a list of the critical work
task(s) that require additional staffing;
(2) the start and end dates for the work assignments requiring the waiver;
(3) the organizational subcomponent (or other organization or contractor) to
which the employee will provide services;
(4) the physical location of the facility contractor employee assignments; and
(5) an explanation of how the facility contractor employee assignments are
cost effective.
h. All assignments of facility contractor employees to the Washington, D.C., area
require the authorization of the HCA or designee. Procedures for approving
assignments of facility contractor employees in the Washington, D.C., area must,
at a minimum, meet the requirements of the Department’s Work Authorization
Process. The required procedures (illustrated in Attachment 5) must include the
following.
CANCELE
D
CANCELE
D
DOE O 350.2 5
7-12-01
(1) The DOE Headquarters program or staff office, in concert with the facility
contractor and the DOE HCA or designee, develops a work authorization
statement showing the required skills mix, scope of work, estimated
duration of assignments/needs, reporting requirements, funding source,
and any other information required for a work authorization.
(2) The DOE Headquarters program or staff office must certify that
Washington, D.C., employee assignments conform with its staffing plan
and are within the facility contractor employee ceiling allocation.
(3) The facility contractor informs the cognizant DOE contracting officer or
designee of the personnel qualified and available to accomplish the
assignments.
(4) The DOE contracting officer or designee examines the work authorization
statement to ensure assignments will not adversely affect the contractor’s
performance. The DOE contracting officer or designee will also update
the database that has been established to maintain a current inventory of
assignments in the Washington, D.C., area and provide notification to the
Contract Administration Division, Office of Contract Management, Office
of Procurement and Assistance Management, Headquarters (MA-522).
i. The DOE contracting officer or designee, upon DOE HCA approval of a new
assignment of a facility contractor employee to the Washington, D.C., area or
upon the expiration of an existing assignment, enters the appropriate changes to
an MA database of facility contractor employees providing services to DOE in the
Washington, D.C., area within 30 days of such change becoming effective.
j. Any facility contractor employee providing services subject to the provisions of
this Order must be listed in the database of facility contractor employees
referenced in paragraph 4i.
Section 4
(1) Failure to list such employees in the database will cause any costs
associated with that employee (e.g., salary and benefits) to be deemed
unallowable under the terms and conditions of the applicable contract.
(2) Payments to a facility contractor employee for any additional tax burden
caused by an extended assignment will also be deemed unallowable.
(3) In no event is the termination of employment of any specific individual
employed by a facility contractor to be directed by DOE.
k. The appropriate contracts should be modified to include the requirements of
paragraph 4j of this Order as soon as practicable, but no later than the next
CANCELE
D
CANCELE
D
6 DOE O 350.2
7-12-01
scheduled modification, or if a new contract is contemplated, when the new
contract is awarded.
5. RESPONSIBILITIES.
a. DOE Headquarters Program and Staff Offices.
(1) Assess the need for and cost effectiveness of the tasks and assignments of
facility contractor employees.
(2) Complete an annual critical skills staffing plan to define facility contractor
employees who will provide technical support to meet the program
mission; ensure conformance of plan with DOE policy (Attachment 3).
(3) Prepare requests for temporary waivers to facility contractor employee
staffing ceilings.
(4) Work with field managers and facility contractors to develop tasks for new
facility contractor employee assignments, ensuring that these assignments
do not exceed the facility contractor employee ceiling.
(5) Establish procedures for the assignment of facility contractor employees to
the Washington, D.C., area that, at a minimum, meet the requirements of
the Department’s Work Authorization Process.
b. DOE Heads of Contracting Activities.
(1) Work with the facility contractor to develop its annual facility contractor
office support staffing plan (see Attachment 4).
(2) Authorize work authorizations and assign facility contractor employees in
the Washington, D.C., area (see paragraph 4h).
(3) Maintain database inventory of current facility contractor employee
assignments.
(4) Review the facility contractor’s use of leased space to ensure that
Government-owned space is used to the maximum extent practicable.
(5) Periodically review facility contractor staffing assignments to ensure
conformance with the staffing plan.
(6) Modify contracts under his/her cognizance pursuant to paragraph 4k.
CANCELE
D
CANCELE
D
DOE O 350.2 7 (and 8)
7-12-01
c. Office of Management and Administration, and Headquarters Personnel Officer,
NNSA.
(1) Working with the program secretarial officer (PSO), review, evaluate, and
approve staffing plans proposed by DOE/ Headquarters program and staff
offices for facility contractor employees.
(2) Working with the PSO, establish facility contractor employee annual
ceilings for facility contractor employee assignments for each DOE
Headquarters program and staff office.
(3) Develop a composite inventory of facility contractor employees in the
Washington, D.C., area by November 30 of each year, from information
supplied by the program, staff, and field office inventories and the staff
inventory database.
(4) Review and concur in requests for temporary waivers to the approved
facility contractor employee ceilings.
(5) Coordinate with the appropriate Chief Financial Officers on any reports to
Congress.
(6) Issue approved allocation notifications for individual organizations in
accordance with the Deputy Secretary’s decisions.
Section 5
6. REFERENCE. DOE O 412.1, Work Authorization System, dated 4-20-99, established the
work authorization and control process for work performed by site management
contractors for DOE.
7. CONTACT. For information about this Order, contact Scott Geary at 202-586-3299.
BY ORDER OF THE SECRETARY OF ENERGY:
FRANCIS S. BLAKE
Deputy Secretary
CANCELE
D
CANCELE
D
DOE O 350.2 Attachment 1
7-12-01 Page 1
CONTRACTOR REQUIREMENTS DOCUMENT
DOE O 350.2, Use of Facility Contractor Employees
for Services to DOE in The Washington, D.C., Area
1. This Contractor Requirements Document applies to the assignment of facility contractor
employees to the Washington, D.C., area for more than 30 continuous calendar days.
A facility contractor employee is any employee of either a contractor responsible for
managing a Department of Energy- (DOE-) owned facility, such as a National Laboratory,
or a subcontractor of such a contractor.
2. DOE facility contractors may assign with HCA approval, personnel to positions in the
Washington, D.C., area, provided those positions conform to one or more of the
following conditions.
a. Personnel provide a DOE Headquarters program or staff office with technical
expertise and experience critical to operations or programs when that expertise
and experience is not otherwise available from the Federal workforce or at lower
cost through other types of contracts (e.g., support service contracts).
b. Personnel undertake work tasks that must be located in the Washington, D.C.,
area because staff must coordinate or interface in person with DOE Headquarters
staff or other agencies, or because such assignments can be demonstrated to be
cost effective for performance of the task.
c. Personnel provide administrative support in a facility contractor’s office. The
number and types of administrative support staff must be based on good business
practices.
d. Personnel, other than administrative support staff, provide technical expertise
within the mission and scope of work of the contract under which the assignments
are made.
3. DOE facility contractor or subcontractor employees cannot be assigned to the
Washington, D.C., area if employee absences will adversely affect the contractor’s or
subcontractor’s ability to meet contract commitments.
4. DOE facility contractor or subcontractor employees cannot be assigned to the
Washington, D.C., area under any of the following conditions:
a. to perform assignments exceeding the staffing ceiling approved by the Deputy
Secretary, DOE;
b. to compensate for reductions in support service contracting;
CANCELE
D
CANCELE
D
Attachment 1 DOE O 350.2
Page 2 7-12-01
c. to provide administrative support within Federal facilities or for Federal
employees;
d. to perform functions inherently reserved for Federal employees, including directly
supervising Federal employees and making fiscal and/or policy decisions;
e. to perform assignments that exceed 12 months in duration unless the individual’s
continued assignment is critical and represents significant mutual benefit to the
program sponsor and the facility;
f. to provide contractor business development or lobbying liaison; or
g. to extend support beyond the completion of the work assignments.
5. A DOE facility contractor is not to award subcontracts or subcontract work tasks to
provide direct support to Headquarters program or staff offices in the Washington, D.C.,
area.
Section 6
6. DOE facility contractor employee work assignments performed in the Washington, D.C.,
area must conform to the relevant program office critical skills staffing plan or contractor
office support staffing plan. The facility contractor is required to work with the DOE
head of the contracting activity or designee to develop and submit, through the cognizant
secretarial officer, an annual office support staffing plan to the Director, Office of
Management and Administration (MA), or Headquarters personnel officer, NNSA, as
appropriate, by April 1 of each year (see Attachment 3 in DOE O 350.2). The plan will
include all administrative, office support, and overhead positions for the facility
contractor’s Washington, D.C., office that are reimbursed by the Department; the
program account they are charged against; and the proposed ceiling on assignments for
the next fiscal year.
7. Each DOE facility contractor must operate within its office support staffing plan.
8. Any DOE office that needs to exceed its ceiling may request a waiver from the Deputy
Secretary, DOE. All waiver requests must be concurred in by the Director, MA, before
submission to the Deputy Secretary, DOE. For requests from NNSA organizations,
concurrence of the Headquarters personnel officer, NNSA, is also required. Contractors
must assist any DOE office to provide, as a minimum, the following information in
support of such requests:
a. justification for modifying the staffing plan and a list of the critical work task(s)
that require additional staffing;
b. the start and end dates for the work assignments;
c. the organizational subcomponent (or other organization or contractor) to which
the employee will provide services;
CANCELE
D
CANCELE
D
DOE O 350.2 Attachment 1
7-12-01 Page 3 (and Page 4)
d. the physical location of the assignments; and
e. an explanation of how the assignments are cost effective.
9. DOE contractors must justify the use of any leased space, including the cost of the space,
to obtain approval by the contracting officer.
10. Any facility contractor employee providing services subject to the provisions of
DOE O 350.2 must be listed in the database of facility contractor employees referenced
in paragraph 4i of the Order.
a. Failure to list such employees in the database will cause any costs associated with
that employee (e.g., salary and benefits) to be deemed unallowable under the
terms and conditions of the applicable contract.
b. Payments to a facility contractor employee for any additional tax burden caused
by an extended assignment will also be deemed unallowable.
c. In no event is the termination of employment of any specific individual employed
by a facility contractor to be directed by DOE.
CANCELE
D
CANCELE
D
DOE O 350.2 Attachment 2
7-12-01 Page 1 (and Page 2)
CANCELE
D
CANCELE
D
DOE O 350.2 Attachment 3
7-12-01 Page 1
DOE FACILITY CONTRACTOR EMPLOYEE STAFFING PLAN
OFFICE OF
Fiscal Year 20 Proposed Employee Ceiling: Positions
Current Number of Assignments:
This plan adequately reflects the anticipated support required from facility contractor employees
by (program or staff office) to meet program objectives.
(Program Secretarial Officer)
May 1, 20
CANCELE
D
CANCELE
D
Attachment 3 DOE O 350.2
Page 2 7-12-01
OFFICE OF
(SUBPROGRAM OFFICE)
FISCAL YEAR 20
Offices
(Suborganizational Offices)
Contractor
Employees
Facility Contractor Employee
(Key Functions and Critical Skills)FY* FY**
Section 7
Office Number
Office Objectives and Performance
Measures for FY______
Office Number
Office Objectives and Performance
Measures for FY______
Office Number
Office Objectives and Performance
Measures for FY______
*Previous fiscal year
**Proposed fiscal year
Total fiscal year program direction funds: $_______ (includes $ _______ for support services.)
Total fiscal year program funds:
(includes all indirect costs)
Laboratories/facilities being funded: _______________ , _______________ , _______________
CANCELE
D
CANCELE
D
DOE O 350.2 Attachment 3
7-12-01 Page 3 (and Page 4)
D
O
E
F
A
C
IL
IT
Y
C
O
N
T
R
A
C
T
O
R
E
M
PL
O
Y
E
E
S
SU
PP
O
R
T
IN
G
O
FF
IC
E
O
F
__
__
__
__
__
__
__
__
__
__
__
__
_
N
am
e
C
on
tr
ac
to
r/
Su
bc
on
tr
ac
to
r
Jo
b
A
ss
ig
nm
en
t
Si
te
*
Pr
og
ra
m
St
ar
t–
E
nd
D
at
es
Ti
m
e
C
ha
rg
ed
A
ga
in
st
Pr
og
ra
m
F
un
ds
(%
)
C
os
t*
*
($
K
/M
o)
*G
=l
oc
at
ed
w
ith
in
D
O
E
fa
ci
lit
ie
s;
O
=l
oc
at
ed
w
ith
in
c
on
tra
ct
or
o
ffi
ce
.
*
*I
nc
lu
de
s a
ll
in
di
re
ct
c
os
ts
.
CANCELE
D
CANCELE
D
DOE O 350.2 Attachment 4
7-12-01 Page 1
ANNUAL SUPPORT PLAN
DOE CONTRACTOR
ADMINISTRATIVE/OVERHEAD STAFF
FOR WASHINGTON, D.C., OFFICES
FY 20
(See paragraph 4f(2) of DOE O 350.2)
DOE Contractor: Phone Number:
Address:
Washington, D.C., offices:
Site 1: Office Manager:
Address: Phone Number:
Site 2: Office Manager:
Address: Phone Number:
CANCELE
D
CANCELE
D
Attachment 4 DOE O 350.2
Page 2 7-12-01
Administrative support staff required for FY 20 for each site (M&O contractor employees
only; does not include subcontractor support). Attach additional pages if needed.
Site 1 (name):
Administrative
Staff Member
Duration of
Assignment
(Start Date to
Anticipated End Date)
Function
(Statement of Necessity
for Presence in
Washington, D.C., Office)
Total
Cost*
Accounts
Charged
(%)**
*Includes all indirect costs. **For example: NE 70%; overhead 30%.
Site 2 (name):
Administrative
Staff Member
Duration of
Assignment
(Start Date to
Anticipated End Date)
Function
(Statement of Necessity
for Presence in
Washington, D.C., Office)
Total
Cost*
Accounts
Charged
(%)**
*Includes all indirect costs. **For example: NE 70%; overhead 30%.
Ratio of Administrative to Technical Staff
Site Name and Number
Total Administrative
(Admin.) Staff
(FTEs)
Total Technical
(Tech.) Staff*
(FTEs)
Ratio
(Admin.:Tech.)
*Includes professional technical staff only.
CANCELE
D
CANCELE
D
DOE O 350.2 Attachment 4
7-12-01 Page 3 (and Page 4)
Technical or Special Category Staff Supported by
Discretionary Funding/Multiprogram Funding
Name Contractor
Job
Assignment Site* Program
Start–End
Dates
Time
Charged
(%)**
Cost
($K/Mo)†
Accounts
Charged
*G=located within DOE facilities; O=located within contractor office. **Percent of time charged against program funds.†Includes all indirect costs.
Anticipated events during FY 20 that may impact the number of positions, costs, or duration of
assignments reflected in the table above (e.g., expansion of a program; discontinuance of support
services provided by home site):
Itemized Costs for Maintaining Offices*
Site Name and Number
Estimated
FY **
versus† Previous
FY **
*Include previously estimated staffing costs. **Total for each site. † Explain significant variances using additional pages if necessary.
Section 8
Approvals:
This plan accurately reflects the administrative support anticipated by (DOE
contractor) and (DOE field office) as necessary for the contractor to meet
FY 20 requirements in support of DOE’s mission.
DOE Contracting Officer
(DOE field office)
Contractor’s Representative
CANCELE
D
CANCELE
D
DOE O 350.2 Attachment 5
7-12-01 Page 1 (and Page 2)
Procedures for Work Assignments in Washington, D.C.
Task Requirement
• Expectations
(deliverables/
outcomes)
• Expertise required
• Time frame
• Within ceiling
allocation
documentation
Program Initiated
Requirement
• Expectations
(deliverables/
outcomes)
• Expertise required
• Time frame
• Within ceiling
allocation
documentation
DOE or NNSA
HCA
• Work authorization
released
• Database updated
Program Initiated
Requests
• Contractor provides
input
• Personnel selected
Contractor Employee
• Acceptance of
assignment
• Work started
DOE/NNSA
Program
DOE/NNSA
Field Office
DOE/NNSA
Contractor
DOE or NNSA
HCA
Defines work
authorization
• Products
• Timeline refined
• Skill level
confirmed
• Estimate detailed
CANCELE
D
CANCELE
D
DOE O 350.2
Attachment 1, Contractor Requirements Document
Attachment 2, Establishing Facility Contractor Employe Staffing Plan
Attachment 3, DOE Facility Contractor Employee Staffing Plan
Attachment 4, Annual Support Plan
Attachment 5, Procedures for Work Assignments in Washington, D.C.