DOE N 350.5, Use of Facility Contractor Employees for Services to DOE in the Washington, D.C., Area
Functional areas: Human Resources
To clarify and modify policies and procedures for management of Department of Energy (DOE) facility contractor employees located in the Washington, D.C., area. A facility contractor employee is any employee of either a contractor responsible for managing a Department-owned facility, such as a National Laboratory, or a subcontractor of such a contractor. Facility contractor means any contractor performing under a Management and Operating (M&O), Management and Integration (M&I), or Environmental Restoration Management Contractor (ERMC) contract awarded by a DOE contracting officer.
Canceled by DOE O 350.2.
Superseded By:
Version history and related documents
Superseded by
A newer version replaces this document.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DISTRIBUTION: INITIATED BY:
All Department Elements Office of Procurement and
Assistance Management
U.S. Department of Energy NOTICE
Washington, D.C.
Approved: 4-15-99
Expires: 4-15-00
SUBJECT: USE OF FACILITY CONTRACTOR EMPLOYEES FOR SERVICES TO
DOE IN THE WASHINGTON, D.C., AREA
1. OBJECTIVES. To clarify and modify policies and procedures for management of Department of
Energy (DOE) facility contractor employees located in the Washington, D. C., area. A facility
contractor employee is any employee of either a contractor responsible for managing a
Department-owned facility, such as a National Laboratory, or a subcontractor of such a
contractor. Facility contractor means any contractor performing under a Management and
Operating (M&O), Management and Integration (M&I), or Environmental Restoration
Management Contractor (ERMC) contract awarded by a DOE contracting officer. Note: This
Notice replaces DOE N 350.4, USE OF MANAGEMENT AND OPERATING
CONTRACTOR AND NATIONAL LABORATORY EMPLOYEES FOR SERVICES IN
THE WASHINGTON, D.C., AREA, dated 2-26-98, which expired 12-31-98.
2. APPLICABILITY. The provisions of this Notice apply to all Departmental Elements except the
Bonneville Power Administration and the Office of Naval Reactors. This Notice does not apply
to the assignment of facility contractor employees to the Washington, D.C., area for periods of
less than 30 continuous days, assignments under Interdepartmental Personnel Agreements
(IPAs), Work-for-Others (WFO) agreements not reimbursed by DOE, or such others as may be
exempted by the Director of Management and Administration. See the Contractor Requirements
Document (CRD) which is Attachment 1.
3. REQUIREMENTS.
a. The number and types of positions of facility contractor employees located in the
Washington, D.C., area must be within approved ceilings for either the Headquarters or
staff offices or the facility contractor office staffing plans.
b. Facility contractors may assign personnel to positions in the Washington, D.C. area,
provided those positions conform to the following conditions:
DOE N 350.5
CANCELE
D
CANCELE
D
Welcome
This Notice replaces DOE N 350.4, USE OF MANAGEMENT AND OPERATING
CONTRACTOR AND NATIONAL LABORATORY EMPLOYEES FOR SERVICES IN
THE WASHINGTON, D.C., AREA, dated 2-26-98, which expired 12-31-98.
2 DOE N 350.5
4-15-99
1 An initial assessment of assignment(s) duration and cost should be made to find ways to
minimize costs (e.g. per diem vs. relocation costs).
• Personnel provide a Headquarters program or staff office with technical expertise and
experience critical to their operations or programs when that expertise and
experience is not otherwise available at lower cost through other types of contracts
(e.g., support service contracts).
• Personnel undertake tasks that must be located in the Washington, D.C., area
because staff must coordinate or interface in person with Headquarters staff or other
agencies.
• Personnel provide administrative support in a facility contractor’s office. The number
and types of administrative support staff must be based on good business practices.
• Personnel provide technical expertise within the mission and scope of work of the
contract under which the assignment is made. Administrative support staff are
excluded from this requirement.
c. Facility contractor and subcontractor employees must not be assigned to the Washington
D.C., area under any of the following conditions:
Section 2
• to compensate for reductions in support service contracting;
• to provide administrative support within Federal facilities or for Federal employees;
• to perform functions inherently reserved for Federal employees, including directly
supervising Federal employees and making fiscal and/or policy decisions;
• to exceed 12-month assignment(s) in the Washington, D.C., area unless the
individual’s continued assignment is critical and represents significant mutual benefit to
the program sponsor and the facility;1
• to provide contractor business development or legislative liaison;
• to extend support beyond the completion of the work assignment(s); or
• if an employee’s absence adversely affects the contractor’s or subcontractor’s ability
to meet contract commitments.
d. A facility contractor is not to award subcontracts, or subcontract work tasks, to provide
direct support to program offices in the Washington, D.C., area.
e. Facility contractor employee work assignments performed in the Washington D.C., area
must conform with the relevant program office critical skills staffing plan or contractor office
support staffing plan. The process required for establishing staffing requirements (illustrated
in Attachment 2) is as follows:
CANCELE
D
CANCELE
D
DOE N 350.5 3
4-15-99
(1) Each Headquarters program or staff office that uses facility contractor employees
within the Washington, D.C., area will submit to the Chief Financial Officer (CFO)
and cognizant HCAs an annual staffing plan by April 1 of each year. This plan will
delineate the required skills and expertise to be provided by facility contractor
employees who will be reimbursed with Department funds. The plan submitted in FY
99 would propose staffing for FY 00 and would include a proposed ceiling for the
number of assignments during FY 00. (Attachment 3 provides a sample format for
this plan.)
(2) Each head of contracting authority (HCA) or designee, working with the respective
facility contractor, will develop and submit an annual office support staffing plan to the
CFO by April 1 of each year (see Attachment 4). The plan will include–
• all administrative, office support, overhead positions, and any positions that do
not support specific program offices (but are for effecting efficiency in task
performance), which are located at the facility contractor’s Washington office
and are reimbursed by the Department,
• the program account they are charged against, and
• the proposed ceiling on assignments for the next fiscal year.
f. The CFO and MA will consult with affected organizations to establish facility contractor
ceiling numbers for employees to be located in the Washington, D.C., area for each
Headquarters program, staff, and Facility Contractor Support Office. The ceilings are to
be approved by the CFO, with concurrence by the Director of Management and
Administration, by October 1 of each year.
(1) Each program and staff office must meet the criteria for assignments and for remaining
within its facility contractor employee ceiling allocation.
(2) Each facility contractor must operate within its office support staffing plan.
g. Any Headquarters program, staff, or contractor support office that needs to exceed its
ceiling may request a temporary waiver from the CFO. CFO approval for such a request
requires concurrence from the Office of Management and Administration. The request
must include the following information:
Section 3
• justification for modifying the staffing plan and a listing of the critical work task(s) that
require additional staffing;
• the start and end dates for the work assignment;
• the organizational subcomponent (or other organization or contractor) to which the
employee will provide services;
CANCELE
D
CANCELE
D
4 DOE N 350.5
4-15-99
• the physical location of the facility contractor employee assignment; and
• an explanation of how the facility contractor employee assignment is cost effective.
h. Procedures for approving assignments or work tasks given facility contractor employees in
the Washington D.C., area, must incorporate the Department’s Work Authorization
Process. The required procedures (as illustrated in Attachment 5) are as follows:
(1) The Headquarters program or staff office, in concert with Facility Contractor and the
HCA or designee, develops a task assignment statement showing the required skills
mix, scope of work, estimated duration, reporting requirements, funding source, and
any other information required by a work authorization. In addition, the
Headquarters program or staff office must certify that Washington, D.C., employee
assignments conform with its staffing plan and is within the facility contractor
employee ceiling allocation.
(2) The facility contractor informs the cognizant contracting officer of the personnel
qualified and available to accomplish the assignment.
(3) The contracting officer or designee examines the task assignment statement to ensure
assignments will not adversely affect the contractor’s performance. The contracting
officer or designee will also update the data base that has been established to
maintain a current inventory of assignments in the Washington, D.C., area.
(4) To initiate assignments to the Washington area, facility contractors must submit
requests to the HCA or designee for review and approval. Requests must include the
following information: scope of work, estimated duration, reporting requirements,
source of funding, and certification that the assignment conforms with the facility
contractor office staffing plan and is within the ceiling. The cognizant contracting
officer will authorize the facility contractor employee assignment and update the data
base.
i. Headquarters program or staff offices and HCAs must consult with the CFO to establish
discreet Budget and Reporting Classification Codes (B&R) which identify costs of facility
contractor employees who are assigned to the Washington, D.C., area. Facility contractor
employees who are assigned to the Washington, D.C., area and perform tasks for a
Headquarters organization must be accounted for in the facility contractor’s accounting
system as a direct charge to a discreet DOE B&R. Facility contractor employees who,
prior to their assignment to the Washington, D.C. area, may have been charged to an
allocated cost pool (Overhead, G&A, Organizational Burden, etc.), must be removed from
that allocated cost pool and placed in a cost pool established solely for facility contractor
employees performing tasks in the Washington, D.C., area. This guidance is not applicable
to the costs of employees working in the facility contractor’s Washington, D.C., support
office.
CANCELE
D
CANCELE
D
DOE N 350.5 5
4-15-99
(1) Contractors shall be required to report this information to the HCA no later than
October 30 of the fiscal year just ended (see Attachment 6).
Section 4
(2) The appropriate contracts should be modified to include this requirement as soon as
practicable, but no later than the next scheduled modification, or if a new contract is
contemplated, when the new contract is awarded.
j. Payments to a facility contractor employee for any additional tax burden caused by an
extended assignment will not be reimbursed by the Department.
k. By November 15 of each year, the HCA must provide each Attachment 6 report received
from the facility contractors to the CFO and MA.
4. RESPONSIBILITIES.
a. Headquarters Program and Staff Offices.
(1) Assess the need and cost effectiveness of the task(s) and assignment of facility
contractor employee(s).
(2) Complete an annual critical skills staffing plan to define facility contractor employees
who will provide technical support to meet the program mission while conforming
with Departmental policy (Attachment 3)
(3) Work with field managers and facility contractors to develop tasks for new facility
contractor employee assignments, ensuring that these assignments do not exceed the
facility contractor employee ceiling.
b. Heads of Contracting Authorities.
(1) Work with the facility contractor to develop their annual facility contractor office
support staffing plan (see Attachment 4).
(2) Authorize tasks and assign facility contractor employees in Washington, D.C. area
[see paragraph 4(h)].
(3) Ensure that facility contractors under their cognizance submit Attachment 6 by
October 30 of each year.
(4) Maintain data base inventory of current (facility contractor employee) assignments.
(5) By November 15 of the fiscal year just ended, submit to the CFO and MA
Attachment 6 which includes total facility contractor employee assignments and total
dollars supporting these facility contractor employees.
(6) Review the facility contractor’s use of leased space to ensure that Government-
owned space is used to the maximum extent practicable.
CANCELE
D
CANCELE
D
6 DOE N 350.5
4-15-99
(7) Periodically review facility contractor staffing assignments to ensure conformance with
the staffing plan.
c. Office of Management and Administration.
(1) Review, evaluate, and approve staffing plans proposed by Headquarters program
and staff offices for facility contractor employees.
(2) Establish, in concert with CFO, facility contractor employee annual ceilings for the
number of facility contractor employee assignments for each Headquarters program
and staff office.
(3) Develop a composite inventory of facility contractor employees in the Washington,
D.C. area by November 30 of each year, from information supplied by the program,
staff, and field offices inventories and the staff inventory database.
(4) Review and approve requests, in coordination with CFO, for facility contractor
employee assignments who would exceed the approved facility contractor employee
ceiling or whose expertise is outside the critical skills categories.
d. Chief Financial Officer.
(1) In conjunction with MA, review, evaluate, and approve facility contractor employee
ceilings of facility contractor annual staffing plans.
(2) Review and approve temporary waiver requests, with concurrence from MA, for
assignment of facility contractor employees who would exceed the approved facility
contractor employee ceilings or whose expertise is outside the critical skill categories.
(3) Prepare reports required for Congress, in conjunction with MA.
5. CONTACT. For information about this Notice, contact Jeremy Schuller at 202-586-9205.
Section 5
6. REFERENCE. DOE 5700.7C WORK AUTHORIZATION SYSTEM dated 5-18-92,
established the work authorization and control process for work performed by site management
contractors for DOE.
7. DEFINITIONS. Please refer to the DOE glossary on the Internet at
http://www.explorer.doe.gov.
BY ORDER OF THE SECRETARY OF ENERGY:
RICK FARRELL
DIRECTOR OF MANAGEMENT
AND ADMINISTRATION
CANCELE
D
CANCELE
D
DOE N 350.5 Attachment 1
4-15-99 Page 1
1 An initial assessment of assignment(s) duration and cost should be made to find ways to
minimize costs (e.g., per diem vs. relocation costs).
CONTRACTOR REQUIREMENTS DOCUMENT
DOE N 350.5, USE OF FACILITY CONTRACTOR EMPLOYEES FOR SERVICES TO
DOE IN THE WASHINGTON, D.C., AREA
1. The number and types of positions of facility contractor employees located in the Washington,
D.C., area must be within the CFO and MA approved ceilings for either the Headquarters
sponsoring organization or the facility contractor office staffing plans.
2. Facility contractors may assign personnel to positions in the Washington, D.C. area, provided
those positions conform to the following conditions:
• Personnel provide a Headquarters program or staff office with technical expertise and
experience critical to their operations or programs when that expertise and experience is
not otherwise available from the Federal workforce or at lower cost through other types of
contracts (e.g., support service contracts).
• Personnel undertake work tasks that must be located in the Washington, D.C., area
because staff must coordinate or interface in person with Headquarters staff or other
agencies, or because such assignment can be demonstrated to be cost effective for
performance of the task.
• Personnel provide administrative support in a facility contractor’s office. The number and
types of administrative support staff must be based on good business practices.
• Personnel provide technical expertise within the mission and scope of work of the contract
under which the assignment is made. Administrative support staff are excluded from this
requirement.
3. Facility contractor or subcontractor employees must not be assigned to the Washington D.C.,
area under any of the following conditions:
• to compensate for reductions in support service contracting;
• to provide administrative support within Federal facilities or for Federal employees;
• to perform functions inherently reserved for Federal employees, including directly
supervising Federal employees and making fiscal and/or policy decisions;
• to exceed 12-month assignment(s) in the Washington, D.C., area unless the individual’s
continued assignment is critical and represents significant mutual benefit to the program
sponsor and the facility;1
CANCELE
D
CANCELE
D
Attachment 1 DOE N 350.5
Page 2 4-15-99
• to provide contractor business development or legislative liaison;
• to extend support beyond the completion of the work assignment(s); or
• if an employee’s absence adversely affects the contractor’s or subcontractor’s ability to
meet contract commitments.
4. A facility contractor is not to award subcontracts or subcontract work tasks to provide direct
support to program offices in the Washington, D.C., area.
5. Facility contractor employee work assignments performed in the Washington D.C., area must
conform with the relevant program office critical skills staffing plan or contractor office support
staffing plan. The facility contractor is required to work with the head of contracting authority
(HCA) or designee to develop and submit an annual office support staffing plan to the CFO by
April 1 of each year (as illustrated by Attachment 3 in DOE N 350.5). The plan will include–
Section 6
• all administrative, office support, and overhead positions for the facility contractor’s
Washington office that are reimbursed by the Department,
• the program account they are charged against, and
• the proposed ceiling on assignments for the next fiscal year.
The plan submitted in FY 99 will propose staffing for FY 00.
6. Each facility contractor must operate within its office support staffing plan.
7. Any Headquarters program, staff, or contractor support office that needs to exceed its ceiling
may request a temporary waiver from the CFO. CFO approval for such a request requires
concurrence from the Office of Management and Administration. Contractors must include the
following information for such requests:
• justification for modifying the staffing plan and a listing of the critical work task(s) that
require additional staffing;
• the start and end dates for the work assignment;
• the organizational subcomponent (or other organization or contractor) to which the
employee will provide services;
• the physical location of the assignment; and
• an explanation of how the assignment is cost effective.
8. Contractors must justify the use of any leased space, including the cost of the space, to obtain
approval by the contracting officer.
CANCELE
D
CANCELE
D
Establishing Facility Contractor Employee Staffing Requirements
PROGRAM/STAFF OFFICE
•Prepares Annual Staffing Plan Delineating Critical
Skill Requirements. Plan Includes the Proposed
Ceiling for Number of Staff to be Assigned for Next
Fiscal Year.
(Attachment 3 Provides Sample Format)
•Prepares Requests for a Wavier to the Ceiling which
may be Submitted Based on a Critical Need.
•Submits an Inventory of all Personnel Supporting
Office During Previous Fiscal Year.
(Attachment 3, Page 3-3 Provides Sample Format)
HCA
•Develops, in Conjunction with the Facility
Contractor, a HCA Office Support Staffing Plan with
a Proposed Ceiling for the Contractor’s Washington
Office.
(Attachment 4 Provides Sample Format)
•Maintains On-Line Data Base of Current
Assignments.
•Submits an Inventory of all Personnel Supporting
Contractor Office During Previous Fiscal Year.
(Attachment 3, Page 3-3 Provides Sample Format)
CFO OFFICE
•Review Staffing Plans.
Establish Ceiling for Each
Program/Staff Office with
Concurrence by the Director of
Management & Administration.
•Review Requests for Waivers
from Established Ceilings as
required.
•Prepares Congressional Report
Regarding Status of Facility
Contractor Employees in
Washington.
Assistance Provided by the Office
of Management & Administration.
Required
Time Frame
April 1
April 1
As Required
As Required
October 30
October 30
Required
Time Frame
Ceilings Established
by October 1
Waivers Granted or
Rejected as Appropriate
Submits Congressional
Reports as Necessary
DOE N 350.5 Attachment 2
4-15-99 Page 2-1 (and Page 2-2)
CANCELE
D
CANCELE
D
DOE N 350.5 Attachment 3
4-15-99 Page 3-1
FACILITY CONTRACTOR EMPLOYEE STAFFING PLAN
OFFICE OF _____________________
Fiscal Year 2000 Proposed Employee Ceiling___Positions
Current Number of Assignments_________
This plan adequately reflects the anticipated support required from facility contractor
employees by (program or staff office) necessary to meet program objectives.
____________________________
(Assistant Secretary/Office Director)
April 1, 1999CANCELE
D
CANCELE
D
Attachment 3 DOE N 350.5
Page 3-2 4-15-99
Section 7
OFFICE OF (SUBPROGRAM OFFICE)
FISCAL YEAR 1999
OFFICES
(Sub-organizational Offices)
Federal
FTEs
Contractor Employees
FY’98 FY’99
FACILITY CONTRACTOR EMPLOYEE
(Key Functions and Critical Skills)
XOffice XX-#
Office Objectives and Performance Measures
for FY’99
# # # T
T
T
T
T
XOffice XX##
Office Objectives and Performance Measures
for FY’99
# # # T
T
T
T
T
XOffice XX ###
Office Objectives and Performance Measures
for FY’99
# # # T
T
T
T
T
FY’99 program direction funds: $
FY’99 program funds: $ (including $ for support services)
Laboratories being funded: , ,
CANCELE
D
CANCELE
D
DOE N 350.5 Attachment 3
4-15-99 Page 3-3 (and Page 3-4)
CURRENT FACILITY CONTRACTOR EMPLOYEES SUPPORTING
OFFICE OF _____________________
NAME JOB ASSIGNMENT * % TIME
WORKING
PRO-
GRAM
START
/END
COST
($K/MO)
**SITE CONTRACTOR
/SUB
* % Time Working = Percent of time charged against program funds
** Site: G = Located within DOE facilities
O = Located within contractor office
CANCELE
D
CANCELE
D
DOE N 350.5 Attachment 4
4-15-99 Page 4-1
ANNUAL SUPPORT PLAN
DOE CONTRACTOR
ADMINISTRATIVE/OVERHEAD STAFF
FOR WASHINGTON, D.C., OFFICES
FY1999
DOE Contractor: ____________________
Address: ____________________
____________________
Washington, D.C. office(s):
Site 1: ____________________ Office Manager: ___________________
____________________ Phone Number: ___________________
____________________
Site 2: ____________________ Office Manager: ____________________
____________________ Phone Number: ____________________
____________________
Administrative support staff required for FY 1999 for each site (M&O contractor employees
only - does not include subcontractor support):
SITE #1 (NAME THE SITE)
Administrative
Staff Member
Duration of
Assignment
(Start Date
to
Anticipated
End Date)
Function
Statement of Necessity for
Presence in Washington,
D.C. Office
Payroll
Cost
Account(s)
Charged%
Charged(e.g.
NE-70%,
Overhead-
30%
CANCELE
D
CANCELE
D
Attachment 4 DOE N 350.5
Page 4-2 4-15-99
SITE #2 (NAME THE SITE)
Administrative
Staff Member
Duration of
Assignment
(Start Date
to
Anticipated
End Date*)
Function
Statement of Necessity for
Presence in Washington,
D.C. Office
Payroll
Cost
Account(s)
Charged%
Charged
(e.g.,
NE-70%,
Overhead -
30%)
SUBCONTRACTOR SUPPORT
Function
Performed by
Subcontractor
Basis for
Subcontracting
Function
FTE’s
Required
in
FY 1999
Anticipated
FY1999
Cost
Account
Charged
Subcontract
or Company
Ratio of Administrative to Technical Staff:
Site #1 (NAME):
Number of Professional Technical Staff:
Ratio:
Site #2 (NAME):
Number of Professional Technical Staff:
Ratio:
CANCELE
D
CANCELE
D
DOE N 350.5 Attachment 4
4-15-99 Page 4-3 (and Page 4-4)
TECHNICAL OR “SPECIAL CATEGORY” STAFF SUPPORTED BY
DISCRETIONARY FUNDING MULTI-PROGRAM FUNDING:
Staff Member Term of
Assignment
Function
Statement of Justification
Anticipated
FY1999
Cost
Account
Charged
Anticipated events during FY1999 that may impact the number of positions, costs, or duration of
assignments reflected in the table above (i.e., expansion of a program; discontinuance of support
services provided by home site):
Section 8
Anticipated costs for maintaining the office (i.e., rent, office equipment, office supplies, etc.):
FY1999 FY1998**(FOR COMPARISON)
Site #1 (NAME): (ITEMIZE COSTS)
Site #2 (NAME): (ITEMIZE COSTS)
**Significant variances in costs are attributable to the following:
APPROVAL:
This plan accurately reflects the administrative support anticipated by (contractor) and (DOE Field
Office) as necessary for the contractor to meet FY1999 requirements in support of DOE’s
mission.
____________________ _________________________
Contracting Officer (Contractor’s negotiating official)
(DOE FIELD OFFICE)
CANCELE
D
CANCELE
D
Procedures for Work Assignments in Washington D.C.
Program Field Office Contractor
Program Initiated
Requirement
•Expectations
(Deliverables/Outcomes
•Expertise Required
•Time Frame
•Within Ceiling Allocation
Documentation
Contractor Initiated
Requirement
•Expectations
(Deliverables/Outcomes
•Expertise Required
•Time Frame
•Within Ceiling Allocation
Documentation
HCA
Defines Task Assignment
•Products
•Timeline Refined
•Skill Level Confirmed
•Estimate Detailed
HCA
•Task Assignment Released
•Data Base Updated
Program(s) Concurrence
Program Initiated
Requests
•Contractor Provides Input
•Personnel Selected
Contractor Employee
•Acceptance of Assignment
•Work Started
DOE N 350.5 Attachment 5
4-15-99 Page 5-1 (and Page 5-2)
CANCELE
D
CANCELE
D
DOE N 350.5 Attachment
4-15-99 Page 6-1
FACILITY CONTRACTOR/SITE SUPPORT
ACTUAL FY 1999 COSTS
Appropriation (Fund Type)/ProgramName/ Type of Cost
FY 1999 Actual Costs
(fully burdened)
(dollars in thousands)
A. Facility Contractor Employee Costs
Fund Type Y9 /Photovoltaics
Name(s) of Contractor Employee(s): _____________________________________________
___________________________________________________________________________
Salaries/Benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Travel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Office Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Other Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Total, Photovoltaics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX
Fund Type Y9/Geothermal
Name(s) of Contractor Employee(s): _____________________________________________
___________________________________________________________________________
Salaries/Benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Travel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Office Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Other Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Total, Geothermal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX
Total, Fund Type Y9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fund Type WA/Basic Energy Sciences
Name(s) of Contractor Employee(s): _____________________________________________
___________________________________________________________________________
Section 9
Salaries/Benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Travel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Office Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CANCELE
D
CANCELE
D
DOE N 350.5 Attachment 6
4-15-99 Page 6-2
Appropriation (Fund Type)/ProgramName/ Type of Cost
FY 1999 Actual Costs
(fully burdened)
(dollars in thousands)
2A portion of fully loaded costs of DOE programs will contain a portion of overhead/burdened
costs for the facility contractor’s Washington, D.C., support office. If these costs are “deminimous,” so
state.
Other Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Total, Basic Energy Sciences . . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX
Fund Type WA/Magnetic Fusion
Name(s) of Contractor Employee(s): _____________________________________________
___________________________________________________________________________
Salaries/Benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Travel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Office Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Other Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Total, Magnetic Fusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX
Total, Fund Type WA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX
Total Facility Contractor Employee Costs . . . . . . . . . . . . . . . . . . . $XXX,XXX
B. Washington Site Office
Name(s) of Contractor Employee(s): _____________________________________________
___________________________________________________________________________
Salaries/Benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Travel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Office Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Other Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Total, Washington Site Office . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX
Less: Allocations of overhead/burden costs duplicated in
Item A above2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -$XXX,XXX
CANCELE
D
CANCELE
D
DOE N 350.5 Attachment 6
4-15-99 Page 6-3 (and 6-4)
Appropriation (Fund Type)/ProgramName/ Type of Cost
FY 1999 Actual Costs
(fully burdened)
(dollars in thousands)
Net cost of Facility Contractor Employee and Support Costs in
the Washington, D.C., area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX
CANCELE
D
CANCELE
D
DOE N 350.5
Attachment 1 (CRD)
Attachment 2
Attachment 3
Attachment 4
Attachment 5
Attachment 6
Print: