Archives of Directives

Archive

DOE N 350.5, Use of Facility Contractor Employees for Services to DOE in the Washington, D.C., Area

Functional areas: Human Resources

To clarify and modify policies and procedures for management of Department of Energy (DOE) facility contractor employees located in the Washington, D.C., area. A facility contractor employee is any employee of either a contractor responsible for managing a Department-owned facility, such as a National Laboratory, or a subcontractor of such a contractor. Facility contractor means any contractor performing under a Management and Operating (M&O), Management and Integration (M&I), or Environmental Restoration Management Contractor (ERMC) contract awarded by a DOE contracting officer. Canceled by DOE O 350.2.
n3505.pdf484.03KB
Version history and related documents
Document text

Text extracted from the attached file. Refer to the original document for the authoritative version.

Section 1

DISTRIBUTION: INITIATED BY: All Department Elements Office of Procurement and Assistance Management U.S. Department of Energy NOTICE Washington, D.C. Approved: 4-15-99 Expires: 4-15-00 SUBJECT: USE OF FACILITY CONTRACTOR EMPLOYEES FOR SERVICES TO DOE IN THE WASHINGTON, D.C., AREA 1. OBJECTIVES. To clarify and modify policies and procedures for management of Department of Energy (DOE) facility contractor employees located in the Washington, D. C., area. A facility contractor employee is any employee of either a contractor responsible for managing a Department-owned facility, such as a National Laboratory, or a subcontractor of such a contractor. Facility contractor means any contractor performing under a Management and Operating (M&O), Management and Integration (M&I), or Environmental Restoration Management Contractor (ERMC) contract awarded by a DOE contracting officer. Note: This Notice replaces DOE N 350.4, USE OF MANAGEMENT AND OPERATING CONTRACTOR AND NATIONAL LABORATORY EMPLOYEES FOR SERVICES IN THE WASHINGTON, D.C., AREA, dated 2-26-98, which expired 12-31-98. 2. APPLICABILITY. The provisions of this Notice apply to all Departmental Elements except the Bonneville Power Administration and the Office of Naval Reactors. This Notice does not apply to the assignment of facility contractor employees to the Washington, D.C., area for periods of less than 30 continuous days, assignments under Interdepartmental Personnel Agreements (IPAs), Work-for-Others (WFO) agreements not reimbursed by DOE, or such others as may be exempted by the Director of Management and Administration. See the Contractor Requirements Document (CRD) which is Attachment 1. 3. REQUIREMENTS. a. The number and types of positions of facility contractor employees located in the Washington, D.C., area must be within approved ceilings for either the Headquarters or staff offices or the facility contractor office staffing plans. b. Facility contractors may assign personnel to positions in the Washington, D.C. area, provided those positions conform to the following conditions: DOE N 350.5 CANCELE D CANCELE D Welcome This Notice replaces DOE N 350.4, USE OF MANAGEMENT AND OPERATING CONTRACTOR AND NATIONAL LABORATORY EMPLOYEES FOR SERVICES IN THE WASHINGTON, D.C., AREA, dated 2-26-98, which expired 12-31-98. 2 DOE N 350.5 4-15-99 1 An initial assessment of assignment(s) duration and cost should be made to find ways to minimize costs (e.g. per diem vs. relocation costs). • Personnel provide a Headquarters program or staff office with technical expertise and experience critical to their operations or programs when that expertise and experience is not otherwise available at lower cost through other types of contracts (e.g., support service contracts). • Personnel undertake tasks that must be located in the Washington, D.C., area because staff must coordinate or interface in person with Headquarters staff or other agencies. • Personnel provide administrative support in a facility contractor’s office. The number and types of administrative support staff must be based on good business practices. • Personnel provide technical expertise within the mission and scope of work of the contract under which the assignment is made. Administrative support staff are excluded from this requirement. c. Facility contractor and subcontractor employees must not be assigned to the Washington D.C., area under any of the following conditions:

Section 2

• to compensate for reductions in support service contracting; • to provide administrative support within Federal facilities or for Federal employees; • to perform functions inherently reserved for Federal employees, including directly supervising Federal employees and making fiscal and/or policy decisions; • to exceed 12-month assignment(s) in the Washington, D.C., area unless the individual’s continued assignment is critical and represents significant mutual benefit to the program sponsor and the facility;1 • to provide contractor business development or legislative liaison; • to extend support beyond the completion of the work assignment(s); or • if an employee’s absence adversely affects the contractor’s or subcontractor’s ability to meet contract commitments. d. A facility contractor is not to award subcontracts, or subcontract work tasks, to provide direct support to program offices in the Washington, D.C., area. e. Facility contractor employee work assignments performed in the Washington D.C., area must conform with the relevant program office critical skills staffing plan or contractor office support staffing plan. The process required for establishing staffing requirements (illustrated in Attachment 2) is as follows: CANCELE D CANCELE D DOE N 350.5 3 4-15-99 (1) Each Headquarters program or staff office that uses facility contractor employees within the Washington, D.C., area will submit to the Chief Financial Officer (CFO) and cognizant HCAs an annual staffing plan by April 1 of each year. This plan will delineate the required skills and expertise to be provided by facility contractor employees who will be reimbursed with Department funds. The plan submitted in FY 99 would propose staffing for FY 00 and would include a proposed ceiling for the number of assignments during FY 00. (Attachment 3 provides a sample format for this plan.) (2) Each head of contracting authority (HCA) or designee, working with the respective facility contractor, will develop and submit an annual office support staffing plan to the CFO by April 1 of each year (see Attachment 4). The plan will include– • all administrative, office support, overhead positions, and any positions that do not support specific program offices (but are for effecting efficiency in task performance), which are located at the facility contractor’s Washington office and are reimbursed by the Department, • the program account they are charged against, and • the proposed ceiling on assignments for the next fiscal year. f. The CFO and MA will consult with affected organizations to establish facility contractor ceiling numbers for employees to be located in the Washington, D.C., area for each Headquarters program, staff, and Facility Contractor Support Office. The ceilings are to be approved by the CFO, with concurrence by the Director of Management and Administration, by October 1 of each year. (1) Each program and staff office must meet the criteria for assignments and for remaining within its facility contractor employee ceiling allocation. (2) Each facility contractor must operate within its office support staffing plan. g. Any Headquarters program, staff, or contractor support office that needs to exceed its ceiling may request a temporary waiver from the CFO. CFO approval for such a request requires concurrence from the Office of Management and Administration. The request must include the following information:

Section 3

• justification for modifying the staffing plan and a listing of the critical work task(s) that require additional staffing; • the start and end dates for the work assignment; • the organizational subcomponent (or other organization or contractor) to which the employee will provide services; CANCELE D CANCELE D 4 DOE N 350.5 4-15-99 • the physical location of the facility contractor employee assignment; and • an explanation of how the facility contractor employee assignment is cost effective. h. Procedures for approving assignments or work tasks given facility contractor employees in the Washington D.C., area, must incorporate the Department’s Work Authorization Process. The required procedures (as illustrated in Attachment 5) are as follows: (1) The Headquarters program or staff office, in concert with Facility Contractor and the HCA or designee, develops a task assignment statement showing the required skills mix, scope of work, estimated duration, reporting requirements, funding source, and any other information required by a work authorization. In addition, the Headquarters program or staff office must certify that Washington, D.C., employee assignments conform with its staffing plan and is within the facility contractor employee ceiling allocation. (2) The facility contractor informs the cognizant contracting officer of the personnel qualified and available to accomplish the assignment. (3) The contracting officer or designee examines the task assignment statement to ensure assignments will not adversely affect the contractor’s performance. The contracting officer or designee will also update the data base that has been established to maintain a current inventory of assignments in the Washington, D.C., area. (4) To initiate assignments to the Washington area, facility contractors must submit requests to the HCA or designee for review and approval. Requests must include the following information: scope of work, estimated duration, reporting requirements, source of funding, and certification that the assignment conforms with the facility contractor office staffing plan and is within the ceiling. The cognizant contracting officer will authorize the facility contractor employee assignment and update the data base. i. Headquarters program or staff offices and HCAs must consult with the CFO to establish discreet Budget and Reporting Classification Codes (B&R) which identify costs of facility contractor employees who are assigned to the Washington, D.C., area. Facility contractor employees who are assigned to the Washington, D.C., area and perform tasks for a Headquarters organization must be accounted for in the facility contractor’s accounting system as a direct charge to a discreet DOE B&R. Facility contractor employees who, prior to their assignment to the Washington, D.C. area, may have been charged to an allocated cost pool (Overhead, G&A, Organizational Burden, etc.), must be removed from that allocated cost pool and placed in a cost pool established solely for facility contractor employees performing tasks in the Washington, D.C., area. This guidance is not applicable to the costs of employees working in the facility contractor’s Washington, D.C., support office. CANCELE D CANCELE D DOE N 350.5 5 4-15-99 (1) Contractors shall be required to report this information to the HCA no later than October 30 of the fiscal year just ended (see Attachment 6).

Section 4

(2) The appropriate contracts should be modified to include this requirement as soon as practicable, but no later than the next scheduled modification, or if a new contract is contemplated, when the new contract is awarded. j. Payments to a facility contractor employee for any additional tax burden caused by an extended assignment will not be reimbursed by the Department. k. By November 15 of each year, the HCA must provide each Attachment 6 report received from the facility contractors to the CFO and MA. 4. RESPONSIBILITIES. a. Headquarters Program and Staff Offices. (1) Assess the need and cost effectiveness of the task(s) and assignment of facility contractor employee(s). (2) Complete an annual critical skills staffing plan to define facility contractor employees who will provide technical support to meet the program mission while conforming with Departmental policy (Attachment 3) (3) Work with field managers and facility contractors to develop tasks for new facility contractor employee assignments, ensuring that these assignments do not exceed the facility contractor employee ceiling. b. Heads of Contracting Authorities. (1) Work with the facility contractor to develop their annual facility contractor office support staffing plan (see Attachment 4). (2) Authorize tasks and assign facility contractor employees in Washington, D.C. area [see paragraph 4(h)]. (3) Ensure that facility contractors under their cognizance submit Attachment 6 by October 30 of each year. (4) Maintain data base inventory of current (facility contractor employee) assignments. (5) By November 15 of the fiscal year just ended, submit to the CFO and MA Attachment 6 which includes total facility contractor employee assignments and total dollars supporting these facility contractor employees. (6) Review the facility contractor’s use of leased space to ensure that Government- owned space is used to the maximum extent practicable. CANCELE D CANCELE D 6 DOE N 350.5 4-15-99 (7) Periodically review facility contractor staffing assignments to ensure conformance with the staffing plan. c. Office of Management and Administration. (1) Review, evaluate, and approve staffing plans proposed by Headquarters program and staff offices for facility contractor employees. (2) Establish, in concert with CFO, facility contractor employee annual ceilings for the number of facility contractor employee assignments for each Headquarters program and staff office. (3) Develop a composite inventory of facility contractor employees in the Washington, D.C. area by November 30 of each year, from information supplied by the program, staff, and field offices inventories and the staff inventory database. (4) Review and approve requests, in coordination with CFO, for facility contractor employee assignments who would exceed the approved facility contractor employee ceiling or whose expertise is outside the critical skills categories. d. Chief Financial Officer. (1) In conjunction with MA, review, evaluate, and approve facility contractor employee ceilings of facility contractor annual staffing plans. (2) Review and approve temporary waiver requests, with concurrence from MA, for assignment of facility contractor employees who would exceed the approved facility contractor employee ceilings or whose expertise is outside the critical skill categories. (3) Prepare reports required for Congress, in conjunction with MA. 5. CONTACT. For information about this Notice, contact Jeremy Schuller at 202-586-9205.

Section 5

6. REFERENCE. DOE 5700.7C WORK AUTHORIZATION SYSTEM dated 5-18-92, established the work authorization and control process for work performed by site management contractors for DOE. 7. DEFINITIONS. Please refer to the DOE glossary on the Internet at http://www.explorer.doe.gov. BY ORDER OF THE SECRETARY OF ENERGY: RICK FARRELL DIRECTOR OF MANAGEMENT AND ADMINISTRATION CANCELE D CANCELE D DOE N 350.5 Attachment 1 4-15-99 Page 1 1 An initial assessment of assignment(s) duration and cost should be made to find ways to minimize costs (e.g., per diem vs. relocation costs). CONTRACTOR REQUIREMENTS DOCUMENT DOE N 350.5, USE OF FACILITY CONTRACTOR EMPLOYEES FOR SERVICES TO DOE IN THE WASHINGTON, D.C., AREA 1. The number and types of positions of facility contractor employees located in the Washington, D.C., area must be within the CFO and MA approved ceilings for either the Headquarters sponsoring organization or the facility contractor office staffing plans. 2. Facility contractors may assign personnel to positions in the Washington, D.C. area, provided those positions conform to the following conditions: • Personnel provide a Headquarters program or staff office with technical expertise and experience critical to their operations or programs when that expertise and experience is not otherwise available from the Federal workforce or at lower cost through other types of contracts (e.g., support service contracts). • Personnel undertake work tasks that must be located in the Washington, D.C., area because staff must coordinate or interface in person with Headquarters staff or other agencies, or because such assignment can be demonstrated to be cost effective for performance of the task. • Personnel provide administrative support in a facility contractor’s office. The number and types of administrative support staff must be based on good business practices. • Personnel provide technical expertise within the mission and scope of work of the contract under which the assignment is made. Administrative support staff are excluded from this requirement. 3. Facility contractor or subcontractor employees must not be assigned to the Washington D.C., area under any of the following conditions: • to compensate for reductions in support service contracting; • to provide administrative support within Federal facilities or for Federal employees; • to perform functions inherently reserved for Federal employees, including directly supervising Federal employees and making fiscal and/or policy decisions; • to exceed 12-month assignment(s) in the Washington, D.C., area unless the individual’s continued assignment is critical and represents significant mutual benefit to the program sponsor and the facility;1 CANCELE D CANCELE D Attachment 1 DOE N 350.5 Page 2 4-15-99 • to provide contractor business development or legislative liaison; • to extend support beyond the completion of the work assignment(s); or • if an employee’s absence adversely affects the contractor’s or subcontractor’s ability to meet contract commitments. 4. A facility contractor is not to award subcontracts or subcontract work tasks to provide direct support to program offices in the Washington, D.C., area. 5. Facility contractor employee work assignments performed in the Washington D.C., area must conform with the relevant program office critical skills staffing plan or contractor office support staffing plan. The facility contractor is required to work with the head of contracting authority (HCA) or designee to develop and submit an annual office support staffing plan to the CFO by April 1 of each year (as illustrated by Attachment 3 in DOE N 350.5). The plan will include–

Section 6

• all administrative, office support, and overhead positions for the facility contractor’s Washington office that are reimbursed by the Department, • the program account they are charged against, and • the proposed ceiling on assignments for the next fiscal year. The plan submitted in FY 99 will propose staffing for FY 00. 6. Each facility contractor must operate within its office support staffing plan. 7. Any Headquarters program, staff, or contractor support office that needs to exceed its ceiling may request a temporary waiver from the CFO. CFO approval for such a request requires concurrence from the Office of Management and Administration. Contractors must include the following information for such requests: • justification for modifying the staffing plan and a listing of the critical work task(s) that require additional staffing; • the start and end dates for the work assignment; • the organizational subcomponent (or other organization or contractor) to which the employee will provide services; • the physical location of the assignment; and • an explanation of how the assignment is cost effective. 8. Contractors must justify the use of any leased space, including the cost of the space, to obtain approval by the contracting officer. CANCELE D CANCELE D Establishing Facility Contractor Employee Staffing Requirements PROGRAM/STAFF OFFICE •Prepares Annual Staffing Plan Delineating Critical Skill Requirements. Plan Includes the Proposed Ceiling for Number of Staff to be Assigned for Next Fiscal Year. (Attachment 3 Provides Sample Format) •Prepares Requests for a Wavier to the Ceiling which may be Submitted Based on a Critical Need. •Submits an Inventory of all Personnel Supporting Office During Previous Fiscal Year. (Attachment 3, Page 3-3 Provides Sample Format) HCA •Develops, in Conjunction with the Facility Contractor, a HCA Office Support Staffing Plan with a Proposed Ceiling for the Contractor’s Washington Office. (Attachment 4 Provides Sample Format) •Maintains On-Line Data Base of Current Assignments. •Submits an Inventory of all Personnel Supporting Contractor Office During Previous Fiscal Year. (Attachment 3, Page 3-3 Provides Sample Format) CFO OFFICE •Review Staffing Plans. Establish Ceiling for Each Program/Staff Office with Concurrence by the Director of Management & Administration. •Review Requests for Waivers from Established Ceilings as required. •Prepares Congressional Report Regarding Status of Facility Contractor Employees in Washington. Assistance Provided by the Office of Management & Administration. Required Time Frame April 1 April 1 As Required As Required October 30 October 30 Required Time Frame Ceilings Established by October 1 Waivers Granted or Rejected as Appropriate Submits Congressional Reports as Necessary DOE N 350.5 Attachment 2 4-15-99 Page 2-1 (and Page 2-2) CANCELE D CANCELE D DOE N 350.5 Attachment 3 4-15-99 Page 3-1 FACILITY CONTRACTOR EMPLOYEE STAFFING PLAN OFFICE OF _____________________ Fiscal Year 2000 Proposed Employee Ceiling___Positions Current Number of Assignments_________ This plan adequately reflects the anticipated support required from facility contractor employees by (program or staff office) necessary to meet program objectives. ____________________________ (Assistant Secretary/Office Director) April 1, 1999CANCELE D CANCELE D Attachment 3 DOE N 350.5 Page 3-2 4-15-99

Section 7

OFFICE OF (SUBPROGRAM OFFICE) FISCAL YEAR 1999 OFFICES (Sub-organizational Offices) Federal FTEs Contractor Employees FY’98 FY’99 FACILITY CONTRACTOR EMPLOYEE (Key Functions and Critical Skills) XOffice XX-# Office Objectives and Performance Measures for FY’99 # # # T T T T T XOffice XX## Office Objectives and Performance Measures for FY’99 # # # T T T T T XOffice XX ### Office Objectives and Performance Measures for FY’99 # # # T T T T T FY’99 program direction funds: $ FY’99 program funds: $ (including $ for support services) Laboratories being funded: , , CANCELE D CANCELE D DOE N 350.5 Attachment 3 4-15-99 Page 3-3 (and Page 3-4) CURRENT FACILITY CONTRACTOR EMPLOYEES SUPPORTING OFFICE OF _____________________ NAME JOB ASSIGNMENT * % TIME WORKING PRO- GRAM START /END COST ($K/MO) **SITE CONTRACTOR /SUB * % Time Working = Percent of time charged against program funds ** Site: G = Located within DOE facilities O = Located within contractor office CANCELE D CANCELE D DOE N 350.5 Attachment 4 4-15-99 Page 4-1 ANNUAL SUPPORT PLAN DOE CONTRACTOR ADMINISTRATIVE/OVERHEAD STAFF FOR WASHINGTON, D.C., OFFICES FY1999 DOE Contractor: ____________________ Address: ____________________ ____________________ Washington, D.C. office(s): Site 1: ____________________ Office Manager: ___________________ ____________________ Phone Number: ___________________ ____________________ Site 2: ____________________ Office Manager: ____________________ ____________________ Phone Number: ____________________ ____________________ Administrative support staff required for FY 1999 for each site (M&O contractor employees only - does not include subcontractor support): SITE #1 (NAME THE SITE) Administrative Staff Member Duration of Assignment (Start Date to Anticipated End Date) Function Statement of Necessity for Presence in Washington, D.C. Office Payroll Cost Account(s) Charged% Charged(e.g. NE-70%, Overhead- 30% CANCELE D CANCELE D Attachment 4 DOE N 350.5 Page 4-2 4-15-99 SITE #2 (NAME THE SITE) Administrative Staff Member Duration of Assignment (Start Date to Anticipated End Date*) Function Statement of Necessity for Presence in Washington, D.C. Office Payroll Cost Account(s) Charged% Charged (e.g., NE-70%, Overhead - 30%) SUBCONTRACTOR SUPPORT Function Performed by Subcontractor Basis for Subcontracting Function FTE’s Required in FY 1999 Anticipated FY1999 Cost Account Charged Subcontract or Company Ratio of Administrative to Technical Staff: Site #1 (NAME): Number of Professional Technical Staff: Ratio: Site #2 (NAME): Number of Professional Technical Staff: Ratio: CANCELE D CANCELE D DOE N 350.5 Attachment 4 4-15-99 Page 4-3 (and Page 4-4) TECHNICAL OR “SPECIAL CATEGORY” STAFF SUPPORTED BY DISCRETIONARY FUNDING MULTI-PROGRAM FUNDING: Staff Member Term of Assignment Function Statement of Justification Anticipated FY1999 Cost Account Charged Anticipated events during FY1999 that may impact the number of positions, costs, or duration of assignments reflected in the table above (i.e., expansion of a program; discontinuance of support services provided by home site):

Section 8

Anticipated costs for maintaining the office (i.e., rent, office equipment, office supplies, etc.): FY1999 FY1998**(FOR COMPARISON) Site #1 (NAME): (ITEMIZE COSTS) Site #2 (NAME): (ITEMIZE COSTS) **Significant variances in costs are attributable to the following: APPROVAL: This plan accurately reflects the administrative support anticipated by (contractor) and (DOE Field Office) as necessary for the contractor to meet FY1999 requirements in support of DOE’s mission. ____________________ _________________________ Contracting Officer (Contractor’s negotiating official) (DOE FIELD OFFICE) CANCELE D CANCELE D Procedures for Work Assignments in Washington D.C. Program Field Office Contractor Program Initiated Requirement •Expectations (Deliverables/Outcomes •Expertise Required •Time Frame •Within Ceiling Allocation Documentation Contractor Initiated Requirement •Expectations (Deliverables/Outcomes •Expertise Required •Time Frame •Within Ceiling Allocation Documentation HCA Defines Task Assignment •Products •Timeline Refined •Skill Level Confirmed •Estimate Detailed HCA •Task Assignment Released •Data Base Updated Program(s) Concurrence Program Initiated Requests •Contractor Provides Input •Personnel Selected Contractor Employee •Acceptance of Assignment •Work Started DOE N 350.5 Attachment 5 4-15-99 Page 5-1 (and Page 5-2) CANCELE D CANCELE D DOE N 350.5 Attachment 4-15-99 Page 6-1 FACILITY CONTRACTOR/SITE SUPPORT ACTUAL FY 1999 COSTS Appropriation (Fund Type)/ProgramName/ Type of Cost FY 1999 Actual Costs (fully burdened) (dollars in thousands) A. Facility Contractor Employee Costs Fund Type Y9 /Photovoltaics Name(s) of Contractor Employee(s): _____________________________________________ ___________________________________________________________________________ Salaries/Benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Travel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Office Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Other Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Total, Photovoltaics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX Fund Type Y9/Geothermal Name(s) of Contractor Employee(s): _____________________________________________ ___________________________________________________________________________ Salaries/Benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Travel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Office Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Other Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Total, Geothermal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX Total, Fund Type Y9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fund Type WA/Basic Energy Sciences Name(s) of Contractor Employee(s): _____________________________________________ ___________________________________________________________________________

Section 9

Salaries/Benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Travel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Office Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CANCELE D CANCELE D DOE N 350.5 Attachment 6 4-15-99 Page 6-2 Appropriation (Fund Type)/ProgramName/ Type of Cost FY 1999 Actual Costs (fully burdened) (dollars in thousands) 2A portion of fully loaded costs of DOE programs will contain a portion of overhead/burdened costs for the facility contractor’s Washington, D.C., support office. If these costs are “deminimous,” so state. Other Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Total, Basic Energy Sciences . . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX Fund Type WA/Magnetic Fusion Name(s) of Contractor Employee(s): _____________________________________________ ___________________________________________________________________________ Salaries/Benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Travel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Office Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Other Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Total, Magnetic Fusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX Total, Fund Type WA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX Total Facility Contractor Employee Costs . . . . . . . . . . . . . . . . . . . $XXX,XXX B. Washington Site Office Name(s) of Contractor Employee(s): _____________________________________________ ___________________________________________________________________________ Salaries/Benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Travel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Office Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Other Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Total, Washington Site Office . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX Less: Allocations of overhead/burden costs duplicated in Item A above2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -$XXX,XXX CANCELE D CANCELE D DOE N 350.5 Attachment 6 4-15-99 Page 6-3 (and 6-4) Appropriation (Fund Type)/ProgramName/ Type of Cost FY 1999 Actual Costs (fully burdened) (dollars in thousands) Net cost of Facility Contractor Employee and Support Costs in the Washington, D.C., area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $XXX,XXX CANCELE D CANCELE D DOE N 350.5 Attachment 1 (CRD) Attachment 2 Attachment 3 Attachment 4 Attachment 5 Attachment 6 Print:

Something wrong with this record? Tell us