DOE O 226.1B, Implementation of Department of Energy Oversight Policy
Functional areas: DOE Oversight, Oversight, Safety
This Order implements the policy that establishes a Department-wide oversight process to protect the public, workers, environment, and national security assets effectively through continuous improvement. Supersedes DOE O 226.1A.
Related To:
Related From:
Version history and related documents
Superseded by
A newer version replaces this document.
Supersedes
Earlier documents this one replaced.
Related documents
- BPA Exemption for DOE O 226.1B
- DOE P 226.1BDepartment of Energy Oversight Policy
- DOE G 226.1-2Federal Line Management Oversight of Department of Energy Nuclear Facilities
- DOE G 226.1-2AFederal Line Management Oversight of Department of Energy Nuclear Facilities
- DOE O 227.1Independent Oversight Program
- DOE G 414.1-1CManagement and Independent Assessments Guide
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
AVAILABLE ONLINE AT: INITIATED BY:
www.directives.doe.gov Office of Health, Safety and Security
U.S. Department of Energy ORDER
Washington, D.C.
Approved: 4-25-11
SUBJECT: IMPLEMENTATION OF DEPARTMENT OF ENERGY OVERSIGHT POLICY
1. PURPOSE. This Order establishes requirements and provides direction for implementing
Department of Energy (DOE) Policy (P) 226.1B, Department of Energy Oversight
Policy, dated 04-25-11.
2. CANCELLATION. This Order cancels DOE Order (O) 226.1A, Implementation of
Department of Energy Oversight Policy, dated 07-31-07.
Cancellation of a directive does not, by itself, modify or otherwise affect any contractual
or regulatory obligation to comply with the directive. Contractor Requirements
Documents (CRD) that have been incorporated into a contract remain in effect
throughout the term of the contract unless and until the contract or regulatory
commitment is modified to either eliminate requirements that are no longer applicable or
substitute a new set of requirements.
3. APPLICABILITY.
a. Departmental Applicability. Except for the exemptions in paragraph 3.c., this
Order applies to all Departmental Elements.
The Administrator of the National Nuclear Security Administration (NNSA) must
assure that NNSA employees comply with their respective responsibilities under
this Order. Nothing in this Order will be construed to interfere with the NNSA
Administrator’s authority under section 3212(d) of Public Law (P.L.) 106-65 to
establish Administration-specific policies, unless disapproved by the Secretary.
This Order applies to oversight processes implemented by DOE line management
1
organizations (both Headquarters and Field Elements) that manage or operate
onsite oversight programs and DOE independent oversight
2
organizations. This
Order covers operational aspects of environment, safety, and health; safeguards
and security; cyber security; and emergency management.
1
DOE line management refers to the unbroken chain of responsibility that extends from the Secretary of Energy to the Deputy
Secretary, to the Secretarial Officers who set program policy and plans and develop assigned programs, and to the program and
Field Element Managers who are responsible for execution of these programs.
2
Independent oversight refers exclusively to oversight by DOE Headquarters organizations that do not have line management
responsibility for the activity. Other DOE directives establish additional requirements for independent oversight activities.
Oversight by supporting organizations that are direct reports to line management is not considered DOE independent oversight.
DOE O 226.1B
2 DOE O 226.1B
4-25-11
b. DOE Contractors.
(1) Except for the equivalencies/exemptions in paragraph 3.c., the CRD,
Attachment 1, sets forth requirements of this Order, which will apply to
contracts that include the CRD. The CRD, Attachment 1, must be
included in all contracts for the management and operation (M&O) of
DOE-owned or DOE-leased facilities (i.e., those contracts that contain 48
C.F.R. 970.5402-2, Laws, Regulations, and DOE Directives). In addition,
the applicable requirements of the CRD must be included in contracts that
do not contain 48 C.F.R. 970.5402-2, but do contain 48 C.F.R. 952.204-2,
Security Requirements; 48 C.F.R. 952.204-70, Classification/
Declassification; and/or 48 C.F.R. 952.223-71, Integration of
Environment, Safety, and Health into Work Planning and Execution.
Section 2
c. Equivalencies/Exemptions.
(1) In accordance with the responsibilities and authorities assigned by
Executive Order 12344, codified at 50 U.S.C., sections 2406 and 2511,
and to ensure consistency throughout the joint Navy/DOE Naval Nuclear
Propulsion Program, the Deputy Administrator for Naval Reactors
(Director) will implement and oversee requirements and practices
pertaining to this Order for activities under the director's cognizance, as
deemed appropriate.
(2) With respect to intelligence-related activities of the Director, Office of
Intelligence and Counterintelligence, and counterintelligence-related
activities of the Office of Intelligence and Counterintelligence, this Order
applies only to information protection and cyber security measures
pursuant to Executive Order 12333.
(3) Consistent with Secretarial Delegation Order Number 00-033.00B to the
Administrator and Chief Executive Officer, Bonneville Power
Administration, this Order does not apply to oversight of environmental
programs or occupational safety and health programs at Bonneville Power
Administration.
(4) This Order does not apply to the Office of Inspector General.
(5) Equivalencies and exemptions granted against the requirements of DOE
Order (O) 226.1A, Implementation of Department of Energy Oversight
Policy, dated 07-31-07 will continue to stay in effect after issuance of this
Order.
4. REQUIREMENTS.
a. All applicable DOE organizations must:
DOE O 226.1B 3
4-25-11
(1) Establish and implement an effective oversight program consistent with
DOE P 226.1B and the requirements of this Order.
(2) Maintain sufficient technical capability and knowledge of site and
contractor activities to make informed decisions about hazards, risks, and
resource allocation; provide direction to contractors; and evaluate
contractor performance.
b. Oversight processes implemented by applicable DOE line management
organizations must:
(1) Evaluate contractor and DOE programs and management systems,
including site assurance systems, for effectiveness of performance
(including compliance with requirements). Such evaluations must be
based on the results of operational awareness activities; assessments of
facilities, operations, and programs; and assessments of the contractor’s
assurance system. The level and/or mix (i.e., rigor or frequency in a
particular area) of oversight may be tailored based on considerations of
hazards, the maturity and operational performance of the contractor’s
programs and management systems.
(2) Include written plans and schedules for planned assessments, focus areas
for operational oversight, and reviews of the contractor’s self-assessment
of processes and systems. Address the role of the Central Technical
Authorities and their support staff for core nuclear safety functions.
(3) Include DOE Headquarters line organizations’ conduct of oversight
processes that are focused primarily on their DOE Field Elements,
including reviewing contractor activities to the extent necessary to
evaluate the implementation and effectiveness of the Field Element’s
oversight of its contractors.
(4) Include an issues management process that is capable of categorizing
findings based on risk and priority, ensuring relevant line management
findings are effectively communicated to the contractors, and ensuring that
problems are evaluated and corrected on a timely basis. The issues
management process must ensure for issues categorized as high
Section 3
significance findings:
(a) A thorough analysis of the underlying causal factors is completed;
(b) Corrective actions that will address the cause(s) of the findings and
prevent recurrence are identified and implemented;
(c) After completion of a corrective action or a set of corrective
actions, the conduct of an effectiveness review using trained and
4 DOE O 226.1B
4-25-11
qualified personnel that can verify the corrective action/corrective
action plan has been effectively implemented to prevent
recurrences;
(d) Documentation of the analysis process and results described in (a)
and maintenance tracking to completion of plans and schedules for
the corrective actions and effectiveness reviews described in (b)
and (c) above, in a readily accessible system; and
(e) When findings and/or corrective actions apply to more than one
Secretarial Office, a lead office is appointed by mutual agreement
between the affected Secretarial Officers.
(5) Be tailored according to the effectiveness of contractor assurance systems,
the hazards at the site/activity, and the degree of risk, giving additional
emphasis to potentially high consequence activities.
c. DOE line management must establish and communicate performance expectations
to contractors through formal contract mechanisms. Such expectations (e.g.,
safety performance measures and commitments) must be established on an annual
basis, or as otherwise required or determined appropriate by the Field Element.
d. DOE line management must have effective processes for communicating
oversight results and other issues in a timely manner up the line management
chain, and to the contractor as appropriate, sufficient to allow senior managers to
make informed decisions.
e. For activities and programs at Government-owned and Government-operated
facilities and sites that are not under the cognizance of a DOE Field Element,
DOE Headquarters program offices must establish and implement comparably
effective oversight processes consistent with requirements for the contractor
assurance system (see attachment 1) and DOE line management oversight
processes.
5. RESPONSIBILITIES.
a. The Administrator, NNSA; the Under Secretary of Energy; and the Under
Secretary for Science. The Administrator, NNSA; the Under Secretary of Energy;
and the Under Secretary for Science maintain operational awareness of nuclear
operations. To assist in these responsibilities, the Secretary has established
Central Technical Authorities to maintain operational awareness, especially with
respect to complex, high-hazard nuclear operations, for ensuring that the
Department’s safety policies and requirements are adequate and properly
implemented.
DOE O 226.1B 5
4-25-11
b. Administrator, NNSA; Cognizant Secretarial Officers; DOE and NNSA
Procurement Executives; and Program Secretarial Officers.
(1) Establish oversight programs and implement the requirements in this
Order at Headquarters and Field Elements.
(2) Ensure that Field Elements perform effective oversight in all relevant
areas and place high priority on oversight of high consequence activities,
such as high hazard nuclear operations, and assist the Field Elements in
implementing and improving documented oversight program plans and
schedules through direction and feedback.
(3) Establish and maintain appropriate qualification standards for personnel
with Headquarters and Field Element oversight responsibilities and clear,
Section 4
unambiguous lines of authority and responsibility for oversight.
c. Central Technical Authorities (CTA).
(1) Maintain awareness of the implementation of nuclear safety requirements
and guidance consistent with principles of Integrated Safety Management
across the organization (including, for example, reviewing documented
safety analyses, authorization agreements, and readiness reviews as
necessary to evaluate the adequacy of safety controls and implementation).
(2) Periodically review DOE organizations to determine whether sufficient
numbers of qualified Federal and dedicated support personnel are
provided to effectively fulfill the organizations’ nuclear safety
responsibilities.
(3) Periodically assess DOE Headquarters and Field Element programs for
oversight of high consequence activities, such as high hazard nuclear
operations.
d. Office of Health, Safety and Security.
(1) Serves as Office of Primary Interest for DOE O 226.1B.
(2) Distributes lessons learned resulting from independent oversight
appraisals and/or corrective actions as part of the Department’s Operating
Experience Program.
(3) Coordinates any changes, revisions, or directives developed in support of
this Order.
(4) Consults with Program Secretarial Officer or NNSA Administrator on
request for exemptions/equivalencies from this Order.
6 DOE O 226.1B
4-25-11
(5) Conducts independent oversight, and ensures that high priority is placed
on independent oversight of operational awareness activities and
appraisals of high consequence activities.
e. Heads of Field Elements/Heads of Contracting Activities.
(1) Establish oversight programs and implement the requirements in this
Order.
(2) Notify the contracting officer of affected contracts so that the CRD, or its
applicable requirements, may be incorporated into those affected contracts
as appropriate.
(3) Establish and implement line management oversight programs and
processes at the Field Element level to meet the requirements of this Order
and hold personnel accountable for implementing these programs and
processes.
(4) Approve the initial contractor assurance system description. Review and
assess the effectiveness of the Contractor Assurance System.
(5) Establish performance expectations and communicate same to contractors
through formal contract mechanisms.
(6) Use the results of DOE line and independent oversight and contractor
assurance systems to make informed decisions about corrective actions
and the acceptability of risks and to improve the effectiveness and
efficiency of programs and site operations.
f. Contracting Officers, once notified, must incorporate the CRD or equivalent
national and international consensus standards or contract clauses into their
contracts as soon as practical but no later than 6 months after the effective date of
this Order.
6. DEFINITIONS.
a. Assurance systems encompass all aspects of the processes and activities designed
to identify deficiencies and opportunities for improvement, report deficiencies to
the responsible managers, complete corrective actions, and share in lessons
learned effectively across all aspects of operation.
b. DOE Oversight encompasses activities performed by DOE organizations to
determine whether Federal and contractor programs and management systems,
including assurance and oversight systems, are performing effectively and
complying with DOE requirements. Oversight programs include operational
DOE O 226.1B 7 (and 8)
Section 5
4-25-11
awareness activities, onsite reviews, assessments, self-assessments, performance
evaluations, and other activities that involve evaluation of contractor
organizations and Federal organizations that manage or operate DOE sites,
facilities, or operations.
c. Site programs refers to programs that protect the public, workers, the
environment, and national security interests or support essential mission activities.
Site programs may include environment, safety, and health; safeguards and
security; cyber security; and emergency management.
d. Site management systems refers to required management systems that provide the
framework for a set of related site programs. Site management systems can
include Integrated Safety Management, Quality Assurance Programs,
Environmental Management Systems, Radiation Protection Programs, and
Worker Safety and Health Programs.
7. CONTACT. Questions concerning this Order should be addressed to the Office of
Health and Safety at (301) 903-5926.
BY ORDER OF THE SECRETARY OF ENERGY:
DANIEL B. PONEMAN
Deputy Secretary
DOE O 226.1B Attachment 1
4-25-11 Page 1
CONTRACTOR REQUIREMENTS DOCUMENT
DOE O 226.1B, IMPLEMENTATION OF DEPARTMENT OF ENERGY
OVERSIGHT POLICY
Contractor Assurance System
1. RESPONSIBILITIES.
Regardless of the performer of the work, the contractor is responsible for complying with
the requirements of this Contractor Requirements Document (CRD). The contractor is
responsible for flowing down the requirements of this CRD to subcontractors at any tier
to the extent necessary to ensure the contractor’s compliance with the requirements.
Contractors must monitor and evaluate all work performed under their contracts,
including the work of subcontractors, to ensure work performance meets the applicable
requirements for environment, safety, and health, including quality assurance and
integrated safety management; safeguards and security; cyber security; and emergency
management.
2. REQUIREMENTS.
a. The contractor must establish an assurance system that includes assignment of
management responsibilities and accountabilities and provides evidence to assure
both the Department of Energy’s (DOE) and the contractor’s managements that
work is being performed safely, securely, and in compliance with all
requirements; risks are being identified and managed; and that the systems of
control are effective and efficient.
b. The contractor assurance system, at a minimum, must include the following:
(1) A method for validating the effectiveness of assurance system processes.
Third party audits, peer reviews, independent assessments, and external
certification may be used and integrated into the contractor’s assurance
system to complement, but not replace, internal assurance systems.
(2) Rigorous, risk-informed, and credible self-assessment and feedback and
improvement activities. Assessment programs must be risk-informed,
formally described and documented, and appropriately cover potentially
high consequence activities.
(3) A structured issues management system that is formally described and
documented and that:
(a) Captures program and performance deficiencies (individually and
collectively) in systems that provide for timely reporting, and
taking compensatory corrective actions when needed.
Attachment 1 DOE O 226.1B
Page 2 4-25-11
(b) Contains an issues management process that is capable of
categorizing the significance of findings based on risk and priority
Section 6
and other appropriate factors that enables contractor management
to ensure that problems are evaluated and corrected on a timely
basis. For issues categorized as higher significance findings,
contractor management must ensure the following activities are
completed and documented:
(1) A thorough analysis of the underlying causal factors is
completed;
(2) Timely corrective actions that will address the cause(s) of
the findings and prevent recurrence are identified and
implemented;
(3) After completion of a corrective action or a set of
corrective actions, an effectiveness review is conducted
using trained and qualified personnel that can validate the
effectiveness of corrective action/plan implementation and
results in preventing recurrences; and
(4) Documentation of the analysis process and results
described in (1) above, and maintenance and tracking to
completion of plans and schedules for the corrective actions
and effectiveness reviews described in (2) and (3) above in
a readily accessible system.
(5) Communicates issues and performance trends or analysis
results up the contractor management chain to senior
management using a graded approach that considers
hazards and risks, and provides sufficient technical basis to
allow managers to make informed decisions and correct
negative performance/compliance trends before they
become significant issues.
(4) Timely and appropriate communication to the Contracting Officer,
including electronic access of assurance-related information.
(5) Continuous feedback and improvement, including worker feedback
mechanisms (e.g., employee concerns programs, telephone hotlines,
employee suggestions forms, labor organization input), improvements in
work planning and hazard identification activities, and lessons learned
programs.
DOE O 226.1B Attachment 1
4-25-11 Page 3 (and Page 4)
(6) Metrics and targets to assess the effectiveness of performance, including
benchmarking of key functional areas with other DOE contractors,
industry, and research institutions.
c. The contractor must submit an initial contractor assurance system description to
the Contracting Officer for DOE review and approval. That description must
clearly define processes, key activities, and accountabilities. An implementation
plan that considers and mitigates risks should also be submitted if needed and
should encompass all facilities, systems, and organization elements. Once the
description is approved, timely notification must be made to the Contracting
Officer of significant assurance system changes prior to the changes being made.
d. To facilitate appropriate oversight, contractor assurance system data must be
documented and readily available to DOE. Results of assurance processes must
be analyzed, compiled, and reported to DOE as requested by the Contracting
Officer (e.g., in support of contractor evaluation or to support review/approval of
corrective action plans).
1. PURPOSE
2. CANCELLATION
3. APPLICABILITY
a. Departmental Applicability
b. DOE Contractors
c. Equivalencies/Exemptions
4. REQUIREMENTS
5. RESPONSIBILITIES
a. The Administrator, NNSA; the Under Secretary of Energy; and the Under Secretary for Science.
b. Administrator, NNSA; Cognizant Secretarial Officers; DOE and NNSA Procurement Executives; and Program Secretarial Officers.
c. Central Technical Authorities (CTA).
d. Office of Health, Safety and Security.(
e. Heads of Field Elements/Heads of Contracting Activities.
f. Contracting Officers
6. DEFINITIONS
a. Assurance systems
b. DOE Oversight
c. Site programs
d. Site management
7. CONTACT.
ATTACHMENT 1. CONTRACTOR REQUIREMENTS DOCUMENT
1. RESPONSIBILITIES
2. REQUIREMENTS