DOE G 450.4-1B Vol 1, Integrated Safety Management System Guide (Volume 1) for use with Safety Management System Policies (DOE P 450.4, DOE P 450.5, and DOE P 450.6); The Functions, Responsibilities, and Authorities Manual; and DOE Acquisition Regulation
Functional areas: Integrated Safety Management, Safety
This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and the National Nuclear Security Administration (NNSA). This Guide is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Canceled by DOE G 450.4-1C.
Supersedes:
Superseded By:
DOE G 450.4-1C, Integrated Safety Management System Guide on Sep 29, 2011
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE G 450.4-1CIntegrated Safety Management System Guide (Sep 29, 2011)
Supersedes
Earlier documents this one replaced.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DOE G 450.4-1B
3-1-01
Volume 1 of 2
INTEGRATED SAFETY
MANAGEMENT SYSTEM GUIDE
for use with
SAFETY MANAGEMENT SYSTEM POLICIES
(DOE P 450.4, DOE P 450.5, AND DOE P 450.6);
THE FUNCTIONS, RESPONSIBILITIES,
AND AUTHORITIES MANUAL; AND THE
DEPARTMENT OF ENERGY ACQUISITION REGULATION
Volume One: Guidance
Assistant Secretary for
Environment, Safety and Health
Page ii - Integrated Safety Management System Guide - Volume 1
3-1-01
This page intentionally left blank.
Volume 1 - Integrated Safety Management System Guide - Page iii
Foreword 3-1-01
DOE G 450.4-1B
FOREWORD
This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is
approved for use by the Office of Environment, Safety and Health (EH) and the National Nuclear
Security Administration (NNSA). This Guide is available for use by all DOE components and
their contractors. This Guide is a consensus document coordinated by EH and prepared under the
direction of the DOE Safety Management Implementation Team (SMIT).
This Guide provides guidance for addressing the following requirements:
• DOE P 450.4, SAFETY MANAGEMENT SYSTEM POLICY;
• DOE P 450.5, LINE ENVIRONMENT, SAFETY AND HEALTH OVERSIGHT;
• DOE P 450.6, SECRETARIAL POLICY STATEMENT, ENVIRONMENT, SAFETY
AND HEALTH;
• DOE P 411.1, SAFETY MANAGEMENT FUNCTIONS, RESPONSIBILITIES, AND
AUTHORITIES POLICY; and
• Department of Energy Acquisition Regulation (DEAR) clauses promulgated in 48 Code of
Federal Regulations (CFR) 970.5223-1, 48 CFR 970.5204-2, and 48 CFR 970.1100-1.
Attachments 1 through 5 to Volume 1 contain the full text of these Policies and the relevant
Safety Management System (SMS) sections of the DEAR.
Volume 1 of this Guide addresses the following topics:
• Introduction;
• Chapter I, SMS Integration and Products;
• Chapter II, ISMS Core Functions and Principles;
• Chapter III, ISMS Development, Implementation, Review, and Approval; and
• Chapter IV, Maintaining (Through an ISMS Configuration Control Process) an Approved
ISMS and Reporting ISMS Status to DOE on an Annual Basis.
Page iv - Integrated Safety Management System Guide - Volume 1
3-1-01 Foreword
DOE G 450.4-1B
Volume 2 of the Guide includes the following appendixes:
• Appendix A: Glossary;
• Appendix B: Resources for Complying with the SMS Policies, the FRAM, and the
DEAR;
• Appendix C: Superseded;
• Appendix D: Discussion of Safety Management Assessment;
• Appendix E: ISMS Evaluation Guidance;
• Appendix F: Examples of Topics Addressed in ISMS Description Documents; and
• Appendix G: Feedback and Improvement Mechanisms.
This Guide was first revised in 1999 to address feedback received as a result of the 6-month trial
implementation period following the release and use of Revision 0. Although the Guide was
revised throughout, Chapter III, ISMS Development, Implementation, Review, and Approval,
and Appendix E, ISMS Evaluation Guidance, were substantially revised based on experience and
feedback. Additionally, Section, I.3, Tailoring the ISMS, and Appendix C were removed.
This revision (Revision 2) includes two substantial changes to Volume 1, Chapter II:
• the addition of a new Section 5.3, Sample Checklist for Authorization Agreements;
• the replacement of Section 6, Core Function 5, Feedback/Improvement.
Section 2
The new Section 6 reflects an expanded view of the feedback and improvement function and was
developed in response to commitments made in a letter (dated 6-3-98) from the Deputy Secretary
to the Defense Nuclear Facilities Safety Board. This proposed revision is supplemented by the
other change to the Guide: a proposed new Appendix G, which appears in Volume 2. The new
Appendix G provides examples of feedback and improvement mechanisms typically used within
DOE. It also provides guidance on the DOE Corrective Action Tracking System operation.
Another significant event that caused revision was the December 11, 2000, publication of the
final Nuclear Safety Management rule, 10 CFR 830. The rule now includes a set of safety basis
requirements that supersede those in DOE Orders 5480.21, 5480.22, and 5480.23.
Information on Integrated Safety Management (ISM) can be found on the Safety Management
Home Page (http://tis-nt.eh.doe.gov/ism), which includes this Guide; Policies relevant to the
Volume 1 - Integrated Safety Management System Guide - Page v
Foreword 3-1-01
DOE G 450.4-1B
SMS; DOE M 411.1-1B, MANUAL OF SAFETY MANAGEMENT FUNCTIONS,
RESPONSIBILITIES, AND AUTHORITIES (the FRAM); the lower-tier Functions,
Responsibilities, and Authorities (FRA) documents; and relevant parts of the DEAR.
Questions concerning the SMS Policy should be directed to Mr. Ted Wyka, Safety Management
Implementation Team, at 202-586-3519. Questions concerning administration or content of this
Guide should be directed to Mr. Richard Stark, EH, at 301-903-4407.
Page vi - Integrated Safety Management System Guide - Volume 1
3-1-01 Foreword
DOE G 450.4-1B
This page intentionally left blank.
Volume 1 - Integrated Safety Management System Guide - Page vii
Contents 3-1-01
DOE G 450.4-1B
CONTENTS
FOREWORD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
CHAPTER I, SMS INTEGRATION AND PRODUCTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1. GENERAL ASPECTS OF INTEGRATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1.1 SMS Integration by Site, Facility, and Activity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1.2 Integration of DOE and Contractor Roles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.3 Integration of Safety and Business Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.4 Integration by Type of Risk and Hazard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.4.1 Integration of Risk (Worker, Public, and the Environment) . . . . . . . . . . . . . 11
1.4.2 Hazard Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
1.4.3 Integration Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
1.5 Integration by Phase of Facility Life Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
2. ISMS DEVELOPMENT AND IMPLEMENTATION PROCESSES AND
PRODUCTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
2.1 Develop and Document the ISMS in Accordance with Requirements
Section 3
in the DEAR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
2.2 Review and Approve the ISMS as Required by the DEAR and in Accordance
with DOE Responsibilities in the FRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2.3 Evaluate the ISMS Implementation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2.4 Monitoring and Annual Update of the ISMS in Accordance with Requirements in the
DEAR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
3. TAILORING THE ISMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
CHAPTER II, ISMS CORE FUNCTIONS AND GUIDING PRINCIPLES . . . . . . . . . . . . . . . . 19
1. GUIDING PRINCIPLES 1, 2, AND 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
1.1 DOE Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
1.2 Contractor Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
2. CORE FUNCTION 1, DEFINE SCOPE OF WORK, AND GUIDING PRINCIPLE 4,
BALANCED PRIORITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
2.1 Describing the Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
2.2 Determining the Level of Detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
2.3 Establishing Expectations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
2.4 Worker Participation in Work Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
2.5 Providing for Integration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Page viii - Integrated Safety Management System Guide - Volume 1
3-1-01 Contents
DOE G 450.4-1B
2.6 Establishing Priorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
3. CORE FUNCTION 2, ANALYZE HAZARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
4. CORE FUNCTION 3, DEVELOP/IMPLEMENT CONTROLS; GUIDING
PRINCIPLE 5, IDENTIFICATION OF SAFETY STANDARDS AND REQUIREMENTS;
AND GUIDING PRINCIPLE 6, HAZARD CONTROLS
TAILORED TO WORK BEING PERFORMED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
4.1 Identification of Appropriate Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
4.2 Sitewide Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
4.3 Facility-Specific Requirements [Identification of Appropriate Controls] . . . . . . . . . 39
4.4 Worker Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
5. CORE FUNCTION 4, PERFORM WORK, AND GUIDING PRINCIPLE 7,
OPERATIONS AUTHORIZATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
5.1 Authorizing Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
5.1.1 Authorization Protocol . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
5.1.2 Authorization Agreement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
Section 4
5.2 Sample Format and Content for Authorization Agreements . . . . . . . . . . . . . . . . . . . 47
5.3 Sample Checklist for Authorization Agreements . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
6. CORE FUNCTION 5, FEEDBACK/IMPROVEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . 52
6.1 How does Feedback and Improvement Contribute to Safety? . . . . . . . . . . . . . . . . . . 52
6.2 Who Performs Feedback and Improvement? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
6.3 What is Feedback and Improvement? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
6.4 How is Feedback and Improvement Applied to Work and Organizational Levels? . 54
6.5 How Can Feedback Sources be Integrated? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
6.5.1 Consolidating Feedback Mechanisms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
6.5.2 Forming Feedback Process Owner Groups . . . . . . . . . . . . . . . . . . . . . . . . . . 56
6.5.3 Using Multiple Feedback Results to Conduct Reviews or Assessments . . . . 56
CHAPTER III, ISMS DEVELOPMENT, IMPLEMENTATION, REVIEW, AND
APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
1. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
2. DEVELOPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
2.1 DOE Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
2.1.1 Core Function 1, Define Scope of Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
2.2 Contractor Actions to Develop an ISMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
2.2.1 Evaluation of Existing Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
2.2.2 Gap Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Volume 1 - Integrated Safety Management System Guide - Page ix
Contents 3-1-01
DOE G 450.4-1B
3. IMPLEMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
3.1 DOE Actions Required to Support Implementation of ISMS . . . . . . . . . . . . . . . . . . 64
3.1.1 Core Function 2, Analyze Hazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
3.1.2 Core Function 3, Develop/Implement Hazard Controls . . . . . . . . . . . . . . . . 65
3.1.3 Core Function 4, Perform Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
3.1.4 Core Function 5, Feedback and Improvement . . . . . . . . . . . . . . . . . . . . . . . . 66
3.2 Contractor Actions to Implement ISMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
3.2.1 Preparing ISMS Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
3.2.2 Additional Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
3.2.3 ISMS Attributes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70
4. EXPECTATION AND ATTRIBUTES OF ISMS DOCUMENTATION . . . . . . . . . . . . . 70
4.1 Expectations for Core Function 1, Define Scope of Work, and Guiding
Section 5
Principle 4, Balanced Priorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
4.1.1 Translate Mission into Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
4.1.2 Set Expectations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
4.1.3 Provide for Integration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
4.1.4 Prioritize Tasks and Allocate Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
4.2 Expectations for Core Function 2, Analyze Hazards . . . . . . . . . . . . . . . . . . . . . . . . . 74
4.2.1 Identify Hazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
4.2.2 Analyze Hazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
4.2.3 Categorize Hazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
4.3 Expectations for Core Function 3, Develop/Implement Hazard Controls;
Guiding Principle 5, Identification of Safety Standards and Requirements; and
Guiding Principle 6, Hazard Controls Tailored to Work Being Performed . . . . . . . . 76
4.3.1 Identify Standards and Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
4.3.2 Identify Controls to Prevent/Mitigate Hazards . . . . . . . . . . . . . . . . . . . . . . . 77
4.3.3 Establish Safety Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
4.3.4 Implement Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
4.4 Expectations for Core Function 4, Perform Work, and Guiding Principle 7,
Operations Authorization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
4.4.1 Confirm Readiness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
4.4.2 Operations Authorization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
4.4.3 Perform Work Safely . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
4.4.4 Performance Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
4.5 Expectations for Core Function 5, Feedback and Improvement . . . . . . . . . . . . . . . . 81
4.5.1 Collect Feedback Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
4.5.2 Identify Improvement Opportunities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
4.5.3 Make Changes to Improve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
4.5.4 Oversight and Enforcement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
4.6 Expectations for Guiding Principle 1, Line Management Responsibility for
Safety, and Guiding Principle 2, Clear Roles and Responsibilities . . . . . . . . . . . . . . 83
Page x - Integrated Safety Management System Guide - Volume 1
3-1-01 Contents
DOE G 450.4-1B
4.7 Expectations for Guiding Principle 3, Competence Commensurate with
Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
Section 6
5. OVERSIGHT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
5.1 Oversight and Enforcement (FRAM 9.6.3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
5.2 Contractor Implementation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
CHAPTER IV, MAINTAINING AN APPROVED ISMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
1. OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
2. CONTRACTOR ANNUAL AND CONTINUOUS ACTIVITIES . . . . . . . . . . . . . . . . . . 90
3. DOE ANNUAL AND CONTINUOUS ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
4. ADDITIONAL CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
4.1 Detailed Discussion of Contractor ISMS Updating And Maintaining Activities . . . 92
4.1.1 Post Verification Activities-Verification Follow-up /Actions
Identified in Previous Annual ISMS Update Reports . . . . . . . . . . . . . . . . . . 92
4.1.2 Contractor Activities to Sustain, Measure, and Update
a Satisfactory ISMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
4.1.3 Introduction of a Major New Facility or Major Mission Change
Within an Existing Facility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95
4.1.4 Changes to Laws, Regulations, and Directives . . . . . . . . . . . . . . . . . . . . . . . 95
4.2 Detailed Discussion of DOE Required Activities Related to ISMS Continual
Evaluation and the Annual Updating of ISMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95
4.3 Considerations for Performing Another Phase I or II Verification . . . . . . . . . . . . . . 96
4.3.1 Loss of Confidence in the Adequacy of the Existing ISMS . . . . . . . . . . . . . 97
4.3.2 Change of Contractor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
4.4 Aids for Conducting Annual Reviews of an ISMS . . . . . . . . . . . . . . . . . . . . . . . . . . 98
4.5 DOE Requirements for Sustaining ISMS and Conducting Annual
Reviews/Approvals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
4.5.1 Assessment/self-assessment of DOE’s Performance . . . . . . . . . . . . . . . . . . 102
4.5.2 DOE Oversight of a Contractors Integrated Safety Management
Implementation and Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103
ATTACHMENT 1, DOE P 450.4, SAFETY MANAGEMENT SYSTEM POLICY . . . . . . . . . 107
ATTACHMENT 2, DOE P 450.5, LINE ENVIRONMENT, SAFETY
AND HEALTH OVERSIGHT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111
Volume 1 - Integrated Safety Management System Guide - Page xi
Contents 3-1-01
DOE G 450.4-1B
ATTACHMENT 3, DOE P 450.6, SECRETARIAL POLICY STATEMENT,
ENVIRONMENT, SAFETY AND HEALTH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 115
ATTACHMENT 4, DOE P 411.1, SAFETY MANAGEMENT FUNCTIONS,
RESPONSIBILITIES, AND AUTHORITIES POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . 117
ATTACHMENT 5, DEAR CLAUSES RELATED TO ISMS . . . . . . . . . . . . . . . . . . . . . . . . . . 119
Page xii - Integrated Safety Management System Guide - Volume 1
3-1-01 Contents
DOE G 450.4-1B
Section 7
This page intentionally left blank.
Volume 1 - Integrated Safety Management System Guide - Page 1
Introduction 3-1-01
DOE G 450.4-1B
INTRODUCTION
PURPOSE. This Guide has two purposes. One purpose is to assist Department of Energy
(DOE) contractors in developing, describing, and implementing an Integrated Safety
Management System (ISMS) in compliance with DOE P 450.4, SAFETY MANAGEMENT
SYSTEM POLICY (the SMS Policy); DOE P 450.5, LINE ENVIRONMENT, SAFETY AND
HEALTH OVERSIGHT; DOE P 450.6, SECRETARIAL POLICY STATEMENT
ENVIRONMENT, SAFETY AND HEALTH; DOE P 411.1, SAFETY MANAGEMENT
FUNCTIONS, RESPONSIBILITIES, AND AUTHORITIES (FRAM); and the following
provisions of the Department of Energy Acquisition Regulation (DEAR):
• 48 Code of Federal Regulations (CFR) 970.5223-1, which requires integration of
environment, safety, and health into work planning and execution;
• 48 CFR 970.5204-2, which deals with laws, regulations, and DOE directives; and
• 48 CFR 970.1100-1, which requires performance-based contracting.
Attachments 1 through 5 to Volume 1 contain the full text of the Policies and the relevant ISMS
sections of the DEAR.
A second purpose of this Guide is to assist DOE line managers and contracting officers (COs)
who—
• provide ISMS guidance and requirements,
• review and approve ISMS products,
• verify implementation of the ISMS, and
• perform various integrating activities (e.g., planning, budgeting, review, approval, and
oversight) that complement or are required for the ISMS.
DOE responsibilities for these activities are described in the three ISMS-related DEAR clauses
listed above, DOE M 411.1-1B, MANUAL OF SAFETY MANAGEMENT FUNCTIONS,
RESPONSIBILITIES, AND AUTHORITIES (the FRAM), and the lower-tier Functions,
Responsibilities, and Authorities (FRA) documents.
This Guide does not override, alter, or minimize the requirements of the SMS Policies, the
DEAR, the FRAM, or other DOE regulations and requirements. It is not a prescriptive document
but instead offers flexible guidance that complies with the requirements of the Policies, the law,
and the FRAM. Other practices that meet the intent of this Guide and comply with the
requirements may be used.
Page 2 - Integrated Safety Management System Guide - Volume 1
3-01-01 Introduction
DOE G 450.4-1B
ISMS OBJECTIVE. The objective of an ISMS is to incorporate safety into management and
work practices at all levels, addressing all types of work and all types of hazards to ensure safety
for the workers, the public, and the environment. To achieve this objective, DOE has established
guiding principles and core safety management functions. The objectives, principles, and
functions are set forth in the attached Policies and DEAR clauses and are discussed in detail in
this Guide. An effective ISMS must address these principles and functions while considering the
following:
• the planning and performance of all types of potentially hazardous work, including but not
limited to the following: construction, operations, maintenance and decommissioning, as
well as design, conceptual studies, environmental analyses, safety analyses, hazard
reduction analyses, pollution prevention/waste minimization and risk analyses;
• all types of hazards, including chemical, occupational, environmental, nuclear, electrical,
transportation, etc.; and
• the identification, analysis, and control of hazards, and the use of feedback for continuous
improvement in defining, planning, and performing work.
Section 8
In the SMS Policy and this Guide, the term “safety” is used to encompass environment, safety,
and health. Management and workers should understand that safety is an integral part of each
work activity. Accordingly, safety should be a prime consideration in the work practices of all
personnel, including line management at the field office, corporate, and division levels, and
program personnel at all management and working levels.
ISMS PROCESS AND PRODUCTS. The three DEAR clauses specify the processes and
products in developing and implementing an ISMS, including the following:
• The contractor develops and documents an ISMS in accordance with the requirements in
the DEAR (48 CFR 970.5223-1) and guidance provided by the CO. The ISMS description
allows DOE and the contractor to agree upon a framework for safety management of
contracted work.
• DOE reviews and approves ISMS documentation in accordance with the DEAR [48 CFR
970-5204-2(e)] and the responsibilities specified in the FRAM.
• DOE evaluates satisfactory ISMS implementation in accordance with the FRAM (Section
9.5.2).
• On an annual basis, the contractor reviews and updates for DOE approval its safety
performance objectives, performance measures, and commitments, consistent and in
response to DOE’s program and budget execution guidance and direction [48 CFR
970.5223-1(e)].
Volume 1 - Integrated Safety Management System Guide - Page 3
Introduction 3-1-01
DOE G 450.4-1B
In addition, the FRAM requires DOE to perform numerous ISM actions such as—
• monitoring the proper implementation of controls (Section 9.4.4), and
• performing assessments of their own organizations to identify areas in which continuous
improvements in the safety of DOE operations can be realized (Section 9.6.1.4).
APPLICABILITY. This Guide applies to the activities required of DOE/National Nuclear
Security Administration (NNSA) line managers and contracting officials (referred to as
contracting officers, heads of contracting authorities, or field element managers) in fulfilling their
responsibilities, as specified in the ISMS Policies, the DEAR, and the FRAM. (For simplicity,
“DOE,” as used throughout this Guide, includes NNSA.)
This Guide also applies to the activities required of DOE contractors in fulfilling their
responsibilities, as specified in the Policies and in the DEAR.
Page 4 - Integrated Safety Management System Guide - Volume 1
3-01-01 Introduction
DOE G 450.4-1B
This page intentionally left blank.
Volume 1 - Integrated Safety Management System Guide - Page 5
Chapter I 3-1-01
1 DOE P 450.4, SAFETY MANAGEMENT SYSTEM POLICY, is contained in Attachment 1.
2 Attachment 5 contains the applicable clauses of the DEAR, 48 CFR Chapter 9.
3 DOE P 411.1, SAFETY MANAGEMENT FUNCTIONS, RESPONSIBILITIES, AND AUTHORITIES
POLICY, is provided in Attachment 4.
DOE G 450.4-1B
CHAPTER I
SMS INTEGRATION AND PRODUCTS
DOE is responsible for ensuring that work performed at its sites is conducted efficiently and in a
manner that ensures protection of workers, the public, and the environment. To formalize this
responsibility, DOE issued DOE P 450.4, SAFETY MANAGEMENT SYSTEM POLICY,1 on
October 15, 1996. The SMS Policy specifies a formal, organized process based on key guiding
principles and core functions for ensuring the integration of safety, health, and environmental
considerations into all types of work, at all DOE sites and facilities, for all types of potential
hazards. As a result of the SMS Policy, DOE subsequently issued the related Department of
Energy Acquisition Regulation (48 CFR Chapter 9, the DEAR)2 on June 27, 1997, which, with
regard to integration, requires the following:
Section 9
• . . . The contractor shall ensure that management of environment, safety and health
(ES&H) functions and activities becomes an integral but visible part of the contractor’s
work planning and execution processes. . . . [48 CFR 970.5223-1(b)]
• . . . the System shall be integrated with the contractor’s business processes for work
planning, budgeting, authorization, execution, and change control. [48 CFR 970.5223-1(e)]
DOE also issued DOE P 411.1, SAFETY MANAGEMENT FUNCTIONS, RESPONSIBILITIES,
AND AUTHORITIES POLICY, on 1-28-97, and DOE M 411.1-1A, MANUAL OF SAFETY
MANAGEMENT FUNCTIONS, RESPONSIBILITIES, AND AUTHORITIES (the FRAM)3 on
10-18-99. Additionally, DOE P 450.5, LINE ENVIRONMENT, SAFETY AND HEALTH
OVERSIGHT, and DOE P 450.6, SECRETARIAL POLICY STATEMENT ENVIRONMENT,
SAFETY AND HEALTH, were issued to emphasize certain aspects of ISMS.
The DEAR describes ISMS responsibilities for both DOE and contractors, while the FRAM
(both the Headquarters Level 1 FRAM and the lower-tier directives known as “FRAs”) describes
responsibilities and authorities for DOE only.
Section 1 of this chapter discusses the general nature of integration and Section 2 discusses the
processes and products associated with the development and implementation of an ISMS.
Section 3 of this chapter discusses the concept of tailoring an ISMS.
Page 6 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter I
DOE G 450.4-1B
1. GENERAL ASPECTS OF INTEGRATION
In general, the development and implementation of an ISMS requires an organization to integrate
safety into all aspects of work planning and execution, using the guiding safety principles and
core functions set forth in the SMS Policy. Integration means that all management systems and
programs are designed to fit together to permit safe and efficient performance of work. Safety
should be incorporated as a value into all business and operations systems. Integration is
especially important for programs and activities with conflicting or competing goals or
requirements (e.g., fire protection and criticality safety, or personnel safety and safeguards and
security). Therefore, to achieve an ISMS that satisfies the DEAR, organizations should
document the ISMS policies, programs, procedures, and manuals they plan to use. They should
then submit their plan for DOE review and approval before finally implementing it. These
processes will generate a number of documents, products, and actions that can be used to track
and record the progress and success of the ISMS, as discussed in Section 2 of this chapter.
As described in Sections 1.1 through 1.5 below, choices made during the development of an
ISMS are affected by a number of factors. For example, ISMSs can vary significantly among
sites (even for similar activities), among facilities (even at the same site), and among activities
(even within the same facility). Other factors that may affect SMS integration include—
• the relative responsibilities of DOE and contractor personnel;
• business processes, such as budget and resource allocation;
• the type of contract in place;
• the nature of the hazard (i.e., nuclear, chemical, fire, industrial, environmental, and
combinations of these potential hazards); and
• the scope of the threat (local, sitewide, public, environmental, and combinations of these
individuals and sectors) posed by the hazard.
1.1 SMS Integration by Site, Facility, and Activity
Section 10
In general, operating organizations use corporate and sitewide safety programs (e.g., fire
protection and emergency planning) as well as facility- and activity-specific safety processes.
Some of these programs are established at the site level to address, for example, radiation
protection, environmental protection, industrial hygiene, industrial safety, and emergency
planning. Other programs, such as those for configuration management and conduct of
operations, are more appropriately specified at the facility or project level. And some processes,
Volume 1 - Integrated Safety Management System Guide - Page 7
Chapter I 3-1-01
DOE G 450.4-1B
such as quality inspection, or those used for Enhanced Work Planning (EWP), can be specified at
the task level.
All safety control measures, programs, and processes, regardless of the level at which they are
specified, and regardless of whether they are mandatory or voluntary, flow down and must be
implemented at the appropriate work level to achieve adequate safety. Both DOE and the
operating organization should review existing processes and programs to ensure they are
integrated, flow down to the task/activity work level, and adequately address ISMS requirements.
For these reasons, an ISMS must include processes for selecting and applying site and facility
processes or procedures to use in developing work-specific control measures. DOE and its
contractors also use a variety of voluntary safety initiatives that are outside the contract/
regulatory structure. The EWP initiative, for example, can be used for developing ISMS
objectives and expectations at the task/activity level.
Managers and workers at all organizational levels should be involved in developing, maintaining,
and improving the controls that must be applied to work at the task/activity level.
Safety must take top priority in keeping the workplace as free as possible of recognized hazards
that might endanger workers, the public, or the environment.
Figure 1 illustrates the layered structure that characterizes an ISMS. Each circle represents a
single organizational level; that is, the institution or site level, the facility level, and the activity
level. Individuals at each level of the organization play a role in work and safety planning. As
illustrated in Figure 1, the core safety functions are integrated activities at each level.
• At the facility and activity levels, workers (i.e., operational staffs) are essential in
identifying and implementing controls and performing work.
• At the facility level, multiple activities are defined and the work is planned and integrated
so as not to delay, interfere, or hinder other activities. The results of this lower-tier
integration feed back to higher tiers in the line management chain for integration with other
programs.
• At the institutional or facility level, the scope of work is defined using input from DOE (via
contracts) and from the lower-level line managers and facility workers who have detailed
knowledge of the work activities.
Page 8 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter I
DOE G 450.4-1B
Figure 1. An illustration of major interactions between organizational levels for the
five SMS core functions.
Figure 2 shows how sitewide activities overlay the facility, activity, and work for a Hazard
Category 2 facility. Although the SMS Policy is the same for all facilities and activities, the
contractor’s safety control measures are tailored to the site, facility, and activity based on the
hazards and work being performed.
Section 11
Volume 1 - Integrated Safety Management System Guide - Page 9
Chapter I 3-1-01
DOE G 450.4-1B
Figure 2. An illustration (derived from Defense Nuclear Facilities Safety Board Tech-16) of
typical safety management programs and controls at various organizational levels for a
Hazard Category 2 nuclear facility.
Page 10 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter I
DOE G 450.4-1B
1.2 Integration of DOE and Contractor Roles
Another aspect of integration is the complementary nature of DOE and contractor responsibilities
in ensuring integration of safety. Contractor responsibilities are typically defined in the DEAR
contract requirements and are incorporated in the contract, corporate policies, and manuals.
Application of these documents is outlined in the contractor’s ISMS description.
Although the DEAR specifies some DOE responsibilities, most are described in the FRAM.
Each line, support, oversight, and enforcement organization within DOE is responsible for
establishing a lower-tier FRA document specifying how its functions and responsibilities, as
assigned in the FRAM, are to be properly discharged. The FRAM also provides an overview of
the interfaces between DOE functions and those of operating organizations; that is, Government-
Owned, Contractor-Operated (GOCO) facilities and Government-Owned, Government-Operated
(GOGO) facilities. Such safety management responsibilities include budget management as well
as the use of feedback from oversight and review functions.
1.3 Integration of Safety and Business Processes
Determining budget and resource allocations necessary to provide safe operations must be
integrated with both DOE’s and the contractor’s annual planning and budget cycle. A first step is
to translate missions into work requirements in conjunction with the prioritization of budget and
resources. By accomplishing the two tasks—work analysis and budget formulation—in tandem,
DOE can more accurately estimate the funding required for safety analysis and control of hazards
associated with the task. Both DOE and contractor line managers should take the lead in
bringing safety expertise to bear in support of those programs/activities for which they are
responsible [see DEAR 48 CFR 970.5223-1(b) and (e)]. Integrated safety management should
also identify and communicate any projected vulnerabilities and risks not addressed within the
projected budget. This ensures that DOE is aware of any potential site vulnerabilities and
provides an opportunity to develop and enforce risk management options and strategies,
including re-scoping activities, re-allocating funds and resources to address the vulnerabilities, or
identifying the consequences of proceeding without addressing them.
1.4 Integration by Type of Risk and Hazard
Integration allows for effective and efficient management of risk to workers, the environment,
and the public. It is DOE line management’s responsibility to ensure that contractors—
• develop and effectively implement an ISMS tailored to the risk of the work and the
associated hazards and
• develop and effectively integrate their safety management systems with the business and
operational systems throughout their organizations.
Volume 1 - Integrated Safety Management System Guide - Page 11
Chapter I 3-1-01
DOE G 450.4-1B
Section 12
The integration process must also address all hazards and the possible risks these hazards may
present to workers, the public, and the environment. Individuals responsible for engineering the
processes (e.g., weapons assembly and disassembly, nuclear material fabrication and stabilization,
criticality experiments, waste storage, hazardous waste cleanup, routine maintenance, pollution
prevention, and waste minimization) should work with multidisciplinary teams who have direct
responsibility for analyzing hazards, identifying control measures derived from that analysis, and
ensuring those measures are effective. Similarly, individuals responsible for operations should
have direct responsibility for the safety of those operations and should be given the resources to
implement the necessary controls.
1.4.1 Integration of Risk (Worker, Public, and the Environment)
Systems for worker safety, industrial hygiene, medical services, radiation worker
protection, safeguards and security, emergency response, emissions control, waste
management, public safety, and environmental protection perform more effectively and
efficiently when they are integrated. For that reason, managers responsible for individual
systems should know where each of their processes interfaces with a process owned by
another organization. Responsible managers should then communicate routinely with
interfacing managers to assess the efficiency and effectiveness of the process and
communicate immediately whenever changes occur that have an impact on one or more
interfaces.
An ISMS provides the structure by which specific activities can be carried out by
different organizations while adopting a uniform approach to protecting the workers, the
public, and the environment. At the same time, an ISMS allows an organization the
flexibility to adapt and improve systems to its needs, priorities, and changing mission and
environment without jeopardizing the needs, priorities, and missions of other, interfacing
organizations.
Worker Safety
When worker safety is managed as a vital and valued part of an integrated safety
management system, both managers and workers gain ownership in the process. As a
result, work can be conducted safely and work processes can be continuously
improved. To be successful, however, a viable worker safety system requires
commitment from managers and meaningful involvement of workers. Meaningful
worker involvement requires each and every employee in an organization to be held
accountable for his or her safety performance.
Meaningful management commitment to worker safety requires the following:
C providing adequate resources for risk management;
C training workers how to work safely;
Page 12 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter I
DOE G 450.4-1B
C ensuring compliance with all applicable requirements and regulations;
C ensuring accountability for safety performance;
C soliciting worker input regarding workplace hazards and selection of appropriate
controls;
• identifying existing and potential workplace hazards and evaluating the risk of
associated worker injury or illness;
• encouraging worker responsibility to demonstrate a strong, questioning attitude
regarding work and the hazards associated with the work;
• ensuring strict compliance with precautions, limitations, requirements, and
constraints of work control documents, including work site conditions;
• empowering workers to exercise their Stop Work authority;
Section 13
• communicating risk with the worker;
• implementing a process to ensure that all identified hazards, such as
radiological, chemical, etc., are managed through a process of
prevention/mitigation or control;
• selecting hazard controls based on the following hierarchy:
- engineering controls,
- work practices and administrative procedures, and
- personal protective equipment;
• identifying Occupational Safety and Health Standards; and
• implementing radiological protection policy and practices based on the precept
that radiological exposures for workers should be kept as low as reasonably
achievable (ALARA).
Public Safety
Integrating public safety into operations requires increased and intentional
management awareness and commitment. Work planning must include the
consideration of its possible impact on public safety. Every impact that is identified
must be managed as a hazard to worker safety would be managed, and subjected to
Volume 1 - Integrated Safety Management System Guide - Page 13
Chapter I 3-1-01
4 See DOE STD-1120, Integration of Safety and Health into Facility Disposition Activities, and DOE-EM-
STD-5502, Hazard Baseline Documentation.
DOE G 450.4-1B
the same responsibility and accountability—as part of an integrated safety
management system.
Public protection is ensured via rigorous application of the ISMS core functions and
principles. The cornerstone of that effort is a thorough understanding of the hazards
attained by means of a comprehensive safety analysis program and the
implementation of robust control measures. DOE provides considerable guidance for
the analysis and evaluation of all types of hazards through its requirements for safety
analysis reports (SARs) for nuclear facilities and operations or their equivalents4 for
other types of facilities and operations (e.g., chemical and industrial activities).
Although DOE-STD-1120 is specifically written for disposition activities, it provides
guidance for all types of hazards and the methodology is generally applicable to other
parts of the facility life cycle.
Environmental Protection
The following techniques and methods for dealing with environmental risks are
consistent with the guiding principles and core functions to be addressed in an ISMS.
Threats to the environment are generally addressed through environmental
assessments (EAs) or environmental impact statements (EISs), which are required by
NEPA (National Environmental Protection Act, 10 CFR 1021).
In addition, environmental management systems (EMSs) used by the Federal
government should be integrated with the ISMS (see Section 3 of DOE STD-1120).
An EMS is that part of the overall management system that includes organizational
structure, planning activities, responsibilities, practices, procedures, processes, and
resources for developing, implementing, achieving, reviewing, and maintaining the
environmental policy. A discussion of EMSs is provided in DOE/EH-0573,
Environmental Management Systems Primer for Federal Facilities.
An EMS provides the structure by which specific activities can be carried out
efficiently and in a manner consistent with key organizational goals; an EMS also
allows an organization the flexibility to adapt the system to its needs and priorities.
The EMS approach has its genesis in the same movement that created the “quality
management” systems traditionally applied to manufacturing. The two predominant
EMS documents are the Code of Environmental Management Principles for Federal
Agencies (CEMP) and ISO 14001, Environmental Management Systems.
Section 14
Page 14 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter I
DOE G 450.4-1B
CEMP was developed by the Environmental Protection Agency (EPA) in response to
Executive Order 12856, Federal Compliance with Right-to-Know Laws and Pollution
Prevention Requirements, signed on August 3, 1993. EPA patterned the CEMP on
the common critical elements of a comprehensive management system tailored to the
environmental activities of an organization (i.e., an EMS). CEMP uses a construct of
five broad principles and underlying performance objectives as the basis for Federal
agencies to move toward responsible environmental management. CEMP principles
help ensure environmental performance that is proactive, flexible, cost-effective,
integrated, and sustainable.
ISO 14001, developed by the International Organization for Standardization, provides
a comparable EMS construct that is being implemented throughout the world. The
guiding principles and core functions of an ISMS correspond to the elements of an
EMS. Thus, an effective ISMS will address the environmental aspects of the safe
completion of mission.
DOE is responsible for transitioning facilities from operational status to deactivation and
eventual dismantlement or reuse. The characterization of hazards from residuals in such
facilities and the establishment of controls to maintain safety during the interim must
account for DOE responsibilities under the Atomic Energy Act. However, the controls
should also be compatible with the subsequent transition to regulation by EPA and the
States during the final disposition of facilities under the Comprehensive Environmental
Response, Compensation, and Liability Act (CERCLA), the Clean Water Act (CWA), the
Clean Air Act (CAA), and the Resource Conservation and Recovery Act (RCRA)
(e.g., decommissioning of the plutonium concentration facility, 233-S, at Hanford).
DOE- STD-1120 provides guidance for such disposition activities.
State, local, and Federal government permits and the controls to implement them
(e.g., CERCLA, CAA, and RCRA permits) need to be included in the ISMS.
1.4.2 Hazard Types
An ISMS should have similar and consistent processes for dealing with different types of
hazards; that is, nuclear, chemical, and industrial hazards, and natural disasters. Such
processes include analysis, development of technical or administrative controls, hazard
avoidance and prevention, and implementation of any mitigating measures. For example,
permits (both internal and external) issued by different groups at the activity level need to
be integrated to preclude duplication of effort and to ensure protection of the worker, the
public, and the environment. Further, for processes involving multiple types of hazards,
consideration should be given to the use of worker/management teams with a variety of
expertise to ensure that each type of hazard receives informed consideration. EWP can be
used to accomplish this integration.
Volume 1 - Integrated Safety Management System Guide - Page 15
Chapter I 3-1-01
DOE G 450.4-1B
1.4.3 Integration Responsibility
Everyone has a role in integrating safety on site! Line management is responsible and
accountable for safety, safety management, and the integration of safety into business and
operations at a site. Line management is responsible for appropriate use of ES&H in
performance of safety assessment tasks. Line management translates mission into work,
sets clear and prioritized expectations, directs the work, and bears accountability for the
results.
Section 15
Workers are responsible for participating in the safety management process to the level of
their responsibility and accountability for performing work safely. Depending on the
level of responsibility, each worker needs to ask, “How do I know safety has been
integrated into my work?” and “How do my activities contribute to safety?”
Line management directs work and helps workers translate missions into work, set
expectations, prioritize tasks, identify preliminary hazards to determine resource
allocation and priority assignment, and develop program plans that outline resources,
priorities, and tasks balanced against risks. Workers, on the other hand, perform work and
should question whether their work is defined clearly enough to work safely. This is
accomplished through stand-up meetings with supervisors, practical training, feedback,
and pre-job briefings.
1.5 Integration by Phase of Facility Life Cycle
The five core functions (see Table 1 in Chapter II) of the integrated safety management process
can be used at any stage of the facility life cycle (see Figure 3). The exact nature of the activity
changes as the safety processes are integrated—
• first, with the conceptual design, preliminary design, and final design activities;
• second, with the engineering design and development activities;
• third, with the more traditional integrated safety management activities associated with
the physical plant during the construction and operational phases; and
• finally, with the activities to be performed during facility disposition.
The seven guiding principles of integrated safety management (see Table 1 in Chapter II) are as
applicable to controlling conceptual design as to controlling facility operations and facility
disposition. Early implementation ensures that safety is integrated into the design process and
that operational safety issues are addressed early enough to affect the design. Addressing safety
measures early in the process permits cost-effective solutions to be implemented and prevents the
use of inappropriate and overly costly controls on hazards that can be reduced or eliminated. The
ISMS follows the same basic approach during all phases of facility disposition (deactivation,
Page 16 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter I
DOE G 450.4-1B
decommissioning, and long-term surveillance and monitoring). DOE-STD-1120-98 describes
the application of ISMS to all facility disposition activities.
2. ISMS DEVELOPMENT AND IMPLEMENTATION PROCESSES AND
PRODUCTS
DOE and the contractor should follow the steps outlined in the following sections to develop,
review, approve, implement, and monitor an ISMS that is fully integrated with the work.
Additional guidance on these development and implementation steps is provided in Chapter III
and in Appendixes D, E, and F.
2.1 Develop and Document the ISMS in Accordance with Requirements in the DEAR
The process for developing and documenting an ISMS is specified in the DEAR, 48 CFR
970.5223-1. It includes the following provisions:
• Each contractor is to manage and perform work in accordance with a documented ISMS
that fulfills all conditions in 48 CFR 970.5223-1(b) and (c) at a minimum. Paragraph (b)
of the clause describes the seven guiding principles of the SMS Policy. Paragraph (c)
also lists the five core functions.
• Each contractor is to submit its ISMS documentation of to the CO for review and
approval. The CO then establishes dates for submittal, discussions, and revisions to the
SMS [per 48 CFR 970.5223-1(e)].
Section 16
• The contractor-integrated SMS documentation is to describe how the contractor will
perform the five core functions using the seven guiding principles [48 CFR 970.5223-
1(c)]. In addition, the ISMS documentation is to describe how the contractor will
establish, document, and implement safety performance objectives, performance
measures, and commitments in response to DOE program and budget execution guidance
while maintaining the integrity of the ISMS.
• The ISMS documentation shall also describe how the contractor will measure system
effectiveness [48 CFR 970.5223-1(d)].
• The SMS is to be integrated with the contractor’s business processes for work planning,
budgeting, authorization, execution, and change control [48 CFR 970.5223-1(e)].
Chapter III, Section 3.2, provides guidance that may be helpful in complying with these
requirements.
The DEAR [48 CFR 970.5223-1(e)] also requires the contract to include safety performance
objectives and measures, which should cover both sitewide parameters (such as injury-caused
lost days of work), specific program measurements (such as SAR approval), and ES&H priorities
specific to the work to be accomplished. The DEAR also requires that the contractor measure the
Volume 1 - Integrated Safety Management System Guide - Page 17
Chapter I 3-1-01
5 DOE P 450.5, LINE ENVIRONMENT, SAFETY AND HEALTH OVERSIGHT, provides key elements of
the line environment, safety and health (ES&H) oversight process. The full text of this Policy is provided in
Attachment 2.
DOE G 450.4-1B
performance of the ISMS. Because of the potentially broad application of performance
measurement and the opportunity to share the results across programs and at all levels of
management, the development of performance objectives and measures is an important
integration activity.
2.2 Review and Approve the ISMS as Required by the DEAR and in Accordance with
DOE Responsibilities in the FRAM
DOE personnel must review and approve ISMSs in accordance with the DEAR [48 CFR
970.5223-1(e)] and the FRAM. The process for implementing review and approval is discussed
in Chapter III, Section 3, and in Appendix E. Additionally, the Office of the Deputy Assistant
Secretary, Oversight (EH-2), performs oversight of DOE safety management functions. The
FRAM is organized in accordance with the Policy and addresses DOE responsibilities and
authorities for each of the five core functions.
2.3 Evaluate the ISMS Implementation
The contractor should ensure that its approved ISMS description has been implemented. This is
done initially with the CO-implemented review and approval. Additional ISMS reviews are done
in accordance with DOE P 450.5. DOE evaluates implementation of the ISMS in accordance
with the DEAR and the FRAM. This evaluation is an effective process for ensuring the
contractor’s SMS is integrated and working as described in the ISMS documentation.
2.4 Monitoring and Annual Update of the ISMS in Accordance with Requirements in
the DEAR
The DEAR requires the following:
On an annual basis, the contractor shall review and update, for DOE approval,
its safety performance objectives, performance measures, and commitments
consistent with and in response to DOE’s program and budget execution
guidance and direction [48 CFR 970.5223-1(e)].
Section 17
Work processes and organizational safety management performance should be continuously
measured and evaluated to ensure that line management is aware of the contractor’s compliance
with the documented SMS.5 Accordingly, DOE and contractor organizations perform
management and independent assessments using quantitative and/or qualitative information
obtained from a variety of sources (e.g., in-process monitoring, performance indicators,
Page 18 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter I
DOE G 450.4-1B
occurrence reports, trending, statistical analysis, management assessments, independent
assessments, and workers, customers, suppliers, regulators, and stakeholders). Because such
evaluations are conducted at all organizational levels, they contribute to safety management
integration. Improvement actions identified are shared with similar organizations and are tracked
throughout implementation to determine whether they are yielding the anticipated improvements.
Evaluation reports, which document the process followed, the results, and measurements
indicating the success of the improvements, are part of the ISMS.
3. TAILORING THE ISMS
Because work can range in complexity and hazard potential from high-hazard operations in
major facilities to much simpler tasks, such as replacement of a contaminated component, DOE
safety management directives are structured to address a variety of hazardous operations. In this
context, tailoring is directed principally at developing safety controls fitted to the hazards and the
work. Through tailoring, existing guidance and safety management processes can be selectively
applied to planned work activities to meet applicable, enforceable requirements while adequately
protecting health, safety, and the environment.
The DEAR environment, safety, and health clause [48 CFR 970.5223-1(b)(6)] and the SMS
Policy state explicitly that administrative and engineering controls to prevent and mitigate
hazards shall be tailored to the work and associated hazards. To meet this requirement, DOE and
contractor personnel at all levels should not only tailor their ISMSs, but should also evaluate the
effectiveness of their work management systems to continuously improve system performance.
Work management systems must deal effectively with a full spectrum of work types and work
activities. They must allow flexibility in planning, analysis, and work preparation, which, in turn,
includes tailoring the work and hazard controls to the work at hand. As a result, a successful ISMS
should ensure high-quality work and compliance with predetermined performance expectations,
while continuously ensuring that work is conducted in an environmentally sound, safe, and
healthy way.
DOE G 450.3-3, TAILORING FOR INTEGRATED SAFETY MANAGEMENT
APPLICATIONS, provides guidance for tailoring an ISMS and its core functions.
Volume 1 - Integrated Safety Management System Guide - Page 19
Chapter II 3-1-01
6 Chapter II contains general discussions of the Core Functions and Guiding Principles. Chapter III (in
parentheses) provides review considerations regarding implementation of the Core Functions and Guiding
Principles in an ISMS.
DOE G 450.4-1B
CHAPTER II
ISMS CORE FUNCTIONS AND GUIDING PRINCIPLES
This chapter describes the seven guiding principles and five core functions set forth in the SMS
Policy (DOE P 450.4) and DEAR clauses. Attachments 1 and 5 contain the full text of the Policy
and DEAR SMS clauses.
Section 18
The three guiding principles that relate to all core functions are discussed first. The remaining
five sections in this chapter correspond to each of the five core functions and include discussions
of other guiding principles that apply (see Table 1 below).
Table 1. Matrix Showing How and Where Core Functions and Guiding Principles are
Addressed in this Guide
Core Functions
[See 48 CFR 970.5223-1(c).]
Guiding Principles
[See 48 CFR 970.5223-1(b).]
Chapter and
Section Number
- 1. Line Management Responsibility II.1 (III.4.6)6
- 2. Clear Roles and Responsibilities II.1 (III.4.6)
- 3. Competence per Responsibilities II.1 (III.4.7)
1. Define Scope of Work 4. Balanced Priorities II.2 (III.2.1.1; 4.1.4)
2. Analyze Hazards — II.3 (III.3.1.1; 4.2)
3. Develop and Implement
Controls
5. Identification of Safety Standards
6. Tailor Hazard Controls to Work
II.4 (III.3.1.2; 4.3)
4. Perform Work 7. Operations Authorization II.5 (III.3.1.3; 3.1.2;
4.4)
5. Feedback and Improvement — II.6 (III.3.1.4; 4.5)
Figure 3 illustrates the conceptual relationship among the core safety management functions.
However, these functions are not independent, sequential functions but instead, a linked,
Page 20 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
Figure 3. Relationship of the SMS Core Functions.
interdependent collection of functions that often occur at the same time. The output of each
function can affect the results of each of the other functions and, potentially, the whole system.
Work planning, for example, affects multiple functions several times before a plan is executed.
For instance, by identifying and eliminating hazards during work planning, an organization can
reduce the potential for related accidents later. During a Pollution Prevention Opportunity
Assessment, options can be identified to reduce or eliminate the use of a toxic chemical, thereby
minimizing a hazard to workers and the environment. Similarly, assessment and feedback
conducted at any time during the performance of one function can and should affect future
Volume 1 - Integrated Safety Management System Guide - Page 21
Chapter II 3-1-01
DOE G 450.4-1B
planning.
Generally, for complex sites or facilities, the five functions are reiterated, with the exchange of
information among participants progressing from a broad overview to detailed task descriptions.
The reader of this Guide should, therefore, consider the core safety management functions as an
integrated whole; however, for ease of presentation, the functions are discussed separately in this
chapter. It is important to recognize the iterative character of ISMS functions and the need to
integrate specific activities within the functions. An activity like training, for example, may be
necessarily addressed in all five core functions.
1. GUIDING PRINCIPLES 1, 2, AND 3
The following three guiding principles relate to responsibilities intrinsic in all five core functions
and are therefore addressed here:
• Line Management Responsibility for Safety,
• Clear Roles and Responsibilities, and
• Competence Commensurate with Responsibilities.
These interrelated guiding principles help ensure the management structure has personnel who
focus on safe accomplishment of mission, understand their assignments, and can carry out the
core safety management functions correctly and efficiently.
Section 19
These principles are dependent upon management commitment and employee involvement.
Management commitment is demonstrated by the documented ISMS and policy statements that
are communicated throughout the organization, managers’ accountability for safety performance,
and the visible presence of managers addressing safety issues. Management commitment is also
demonstrated by fostering employee involvement in development and implementation of the
ISMS, and emphasizing the importance of individual accountability for performing work safely.
Employees/workers should be actively and continually involved in the development and
deployment of the ISM processes that execute the ISM function. As individuals and as work
teams, employees/workers actively participate in the activities of the ISM processes that address
workplace safety, public safety, and environmental protection. Employees/workers continually
examine the ISM management processes used to conduct their individual work efforts for
continual improvement and actively pursue these improvements with contractor management.
Individual accountability for performing work safely is emphasized.
To be used effectively, these principles are dependent upon management commitment and
employee involvement. Management commitment can be demonstrated by the following actions:
• Management communicates the documented ISMS and policy statements throughout the
organization.
Page 22 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
• Managers are held accountable for safety performance.
• Managers are visibly present, addressing safety issues.
• Managers invite and encourage employees at all levels to participate in development and
implementation of the ISMS.
• Managers emphasize the importance of individual accountability for performing work
safely.
The ultimate responsibility and accountability for ensuring adequate protection in the operation
of DOE facilities, while meeting mission requirements, rests with DOE line management, as
described in this section. This principle relies upon a chain of responsibility that extends from
the Secretary, through DOE line management and COs, to contractor management and workers:
• DOE, as described in the FRAM, assigns safety responsibility and authority to DOE and
contractor line management.
• DOE, as described in the FRAM, assigns safety support responsibilities to organizations
outside of line management.
• DOE and contractor line managers are responsible for integrating safety into work.
• DOE and contractor line managers are responsible for ensuring competence of their
workforces and line managers.
1.1 DOE Responsibilities
The FRAM establishes the responsibilities for managing those functions that are fundamental to
safety management and that need to be performed consistently throughout the Department. In
accordance with the first guiding principle, Line Management Responsibility for Safety, the
FRAM specifies DOE safety management functions with clear lines of responsibility and
authority that are necessary to—
• define essential safety management functions;
• ensure compliance with legal and contractual requirements; and
• implement the standards necessary to provide reasonable assurance that workers, the
public, and the environment are adequately protected.
Section 20
Line management includes any management level within the line organization that is responsible
and accountable for directing and conducting work. Accordingly, line managers (i.e., Secretarial
Programmatic Officers and Field Managers) are responsible for ensuring operational safety and
ES&H compliance with requirements established by contract terms and conditions. It is
Volume 1 - Integrated Safety Management System Guide - Page 23
Chapter II 3-1-01
DOE G 450.4-1B
recognized that these responsibilities include the identification and use of ES&H professionals in
performance of some tasks important to safety.
The FRAM is a corporate-level directive. As such, the FRAM addresses functions,
responsibilities, and authorities for DOE organizations responsible for overall direction of
integrated safety for all DOE operations and facilities. The FRAM also describes roles and
responsibilities for setting Departmental direction, a step that must take place before
implementation of the safety management functions, plans, mission statements, budget resource
allocation, and the technical competence qualifications required of staff.
Implementation details are addressed in lower-tier FRA documents, which are required by the
FRAM Policy, DOE P 411.1, for each line, support, oversight, and enforcement organization
within DOE. These lower-tier FRA documents specify the functions to be performed and who
has the responsibility and authority for performing those functions.
The second guiding principle, Clear Roles and Responsibilities, builds upon the first by stating
the following:
Clear and unambiguous lines of authority and responsibility for ensuring safety
shall be established and maintained at all organizational levels within the
Department and its contractors.
The FRAM establishes a continuous line of authority from the Secretary to the DOE interface
with contractors by defining DOE roles and responsibilities for Headquarters and field element
line management. The FRAM addresses the second guiding principle, Clear Roles and
Responsibilities, as follows:
• clearly delineate management and safety responsibilities for approving the contractor’s
ISMS and other binding agreements that implement the ISMS;
• clarify the roles, responsibilities, lines of authority, and delegations between Headquarters
and field organizations;
• define functional relationships and responsibilities among DOE line, support, oversight,
and enforcement organizations; and
• address the coordination of line management direction from multiple program offices at a
single site.
The FRAM also addresses the third guiding principle, Competence Commensurate with
Responsibilities, by assigning each DOE element the responsibility for ensuring that its
employees are qualified to perform their assigned functions. The Assistant Secretary for
Management and Administration (MA-1) is assigned responsibility for assisting DOE line
managers in recruiting and retaining highly qualified technical personnel.
Page 24 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
In addition to the FRAM, other DOE directives provide direction for training and qualifying
personnel; some are listed below:
• DOE O 360.1, TRAINING, provides requirements for establishing, implementing,
documenting, and evaluating training programs for Federal employees.
• DOE O 541.1, APPOINTMENT OF CONTRACTING OFFICERS AND
CONTRACTING OFFICER REPRESENTATIVES, specifies qualifications for contract
officers.
Section 21
• DOE O 414.1A, QUALITY ASSURANCE, establishes quality assurance (QA) objectives
and requirements, including requirements that personnel are capable of performing their
assigned tasks..
The DOE Core Technical Group (CTG) has been established to support and supplement line
management as needed for special issues or projects. This group consists of technical experts
who may be used by DOE line organizations.
1.2 Contractor Responsibilities
In accordance with the first guiding principle, Line Management Responsibility for Safety,
contractor line management is responsible for ensuring that work is performed safely, in a
manner that ensures adequate protection for employees, the public, and the environment. Line
management includes those contractor and subcontractor employees managing or supervising
employees performing work.
The second guiding principle, Clear Roles and Responsibilities, builds upon the first by
stating—
Clear and unambiguous lines of authority and responsibility for ensuring safety
shall be established and maintained at all organizational levels within the
Department and its contractors.
The DOE Quality Assurance rule (10 CFR 830.120) applies to contractors operating DOE
nuclear facilities. In addition, DOE O 414.1A is a contractual requirement for many DOE
contractors. Both the CFR and the Order contain specific requirements for documenting the
organizational structure, functional responsibilities, levels of authority, and interfaces for those
managing, performing, and assessing the work. These details may be provided by reference to
the contract, regulations, and other contractor-specific documents.
The contractor’s description of its ISMS organization should clearly define roles and
responsibilities by specifying how contractor functions are to be carried out and identifying who
has the responsibility and authority to carry out those functions. Note that the organizational
Volume 1 - Integrated Safety Management System Guide - Page 25
Chapter II 3-1-01
DOE G 450.4-1B
description in the ISMS should not be so detailed that minor organizational or personnel changes
would require it to be revised.
The organizational description of contractor responsibilities should clearly demonstrate that line
management has responsibility for safety. In addition, the description should indicate how
responsibilities flow from the contractor’s senior management to the worker. Just as with DOE,
the contractor’s organization should emphasize the flowdown of safety responsibilities through
the chain of line management to the worker. In addition, the description should address
contractor flowdown to subcontractors and suppliers, which is required by DEAR 970.5223-1, as
follows.
Contractors are responsible for ensuring subcontractors are held accountable for ES&H
requirements by—
• clearly specifying ES&H requirements pertinent to the work scope in the request for
proposals;
• specifying ES&H requirements in the contract language;
• providing daily oversight of the subcontractor’s performance of work by a subcontract
technical representative;
• ensuring that safety and health representatives oversee the work site;
• providing site-specific training to subcontractors; and
• ensuring that safety professionals review and approve all safety plans and hazard
communication programs before the start of any project.
Depending on the complexity and hazards associated with the work, the
contractor may require that the subcontractor submit a Safety Management
System for the contractor’s review and approval.
Section 22
In addition to requiring clear lines of responsibility and authority [DEAR 970.5223-1(b)(2)],
DEAR 970.5223-1(b)(3) requires the contractor to ensure personnel possess the experience,
knowledge, skills, and abilities necessary to discharge their responsibilities. Therefore, the
contractor’s ISMS description should address the third guiding principle, Competence
Commensurate with Responsibilities, by identifying the qualifications required for specific
contractor positions.
Federal Acquisition Regulation (FAR) 15.605 and 41 United States Code (U.S.C.) 253a require
that “evaluation factors” be used in selecting DOE contractors. FAR 15.605 also cites
management capability and personnel qualifications as factors that must be evaluated.
Accordingly, contractor management determines the basis for selecting individual qualifications
Page 26 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
7 May also be called a “statement of work.”
DOE G 450.4-1B
for specific position/job responsibilities. Qualifications and capabilities are provided via
position/job descriptions, resumes of key personnel, or other, similar descriptions.
The following directives contain information for ensuring that personnel have the necessary
qualifications:
• DOE 5480.20A, PERSONNEL SELECTION, QUALIFICATION, AND TRAINING
REQUIREMENTS FOR DOE NUCLEAR FACILITIES;
• DOE O 440.1A, WORKER PROTECTION MANAGEMENT FOR DOE FEDERAL
AND CONTRACTOR EMPLOYEES; and
• DOE O 414.1A/10 CFR Part 830.120, QUALITY ASSURANCE.
2. CORE FUNCTION 1, DEFINE SCOPE OF WORK, AND GUIDING
PRINCIPLE 4, BALANCED PRIORITIES
DOE and the contractor identify and prioritize work and allocate resources. The contractor’s role
in this core function is generally to translate broad missions into specific work packages. DOE
provides performance expectations by strategic plans, goals, and objectives, and through program
execution guidance.
A well-defined scope of work7 is critical to the success of an SMS because it—
• sets the stage for the scope and depth of hazards identification/analysis,
• is the foundation for the budget formulation/allocation process, and
• is the primary factor in establishing expectations and accountability.
A fundamental objective of Core Function 1, Define the Scope of Work, is to identify the scope,
schedule, and costs of activities necessary to achieve DOE missions and expectations in a safe
and environmentally sound manner.
2.1 Describing the Work
Work planning begins the integration of all systems pertinent and necessary to a process,
operation, or task. The responsible manager is accountable for understanding as completely as
possible the work to be done through every phase of the work cycle: (l) inception,
(2) development and planning, (3) work conduct, and (4) shutdown.
Volume 1 - Integrated Safety Management System Guide - Page 27
Chapter II 3-1-01
DOE G 450.4-1B
To fulfill its operational responsibilities, line management must first determine the work to be
performed. To do that, DOE and contractor line management organizations should establish
formal processes for translating DOE mission statements into a scope of work. These processes
should be used to establish expectations for satisfactorily accomplishing the work, prioritizing
tasks, and allocating resources. DEAR 970.5223-1(b)(4) requires resources to be effectively
allocated to address ES&H, programmatic, and operational considerations to ensure that DOE
attends to its most significant hazards first, in a cost-effective manner. Therefore, when
translating the mission into a meaningful definition of the work, DOE and contractor line
management, including the Cognizant Secretarial Officer (CSO), must prioritize resources to
ensure that work and safety are integrated, and that sufficient resources are available to conduct
the work safely.
Section 23
Each field office is expected to develop appropriate work plans, delineating scope, schedule, and
funding allocations for each fiscal year. These plans should reflect the CSO mission assignments
to the field and the mission in terms of work by facilities, projects, and programs (FRAM 9.2.1).
The plans should also be consistent with—
• the DOE budget formulation process;
• DOE O 130.1, BUDGET FORMULATION; and
• the annual budget, prepared by the Field Element Manager (FEM), and his or her
contractors.
At the Department or program level, work is generally defined in terms of broad mission
objectives, major projects, key milestones, etc. At this level, DOE performance expectations
(e.g., cost, safety, quality, pollution prevention, schedules, etc.) address both the work processes
and the work product and are described in DOE strategic plans, goals, and objectives and in the
contract. (Section 9.1 of the FRAM describes DOE’s development of strategic plans.)
Below the Department or program level, DOE and its contractor organizations should establish a
hierarchy of work planning processes so that the plan at each successively lower tier reflects an
increasingly detailed description of the work to be performed. In this manner, broad DOE
mission objectives are eventually translated into discrete tasks for contractor personnel to
complete. DOE renders these descriptions into a formal scope of work through a variety of work
authorizing means, including the following examples: program execution guidance (PEG)
documents, the Albuquerque Workload Planning Guide (AWLPG), the Nuclear Weapons
Production and Planning Directive (P&PD), the Office of Environmental Management (EM)
Accelerated Cleanup: Paths to Closure, and project data sheets.
Section 3.1 of DOE STD 1120 illustrates the work planning process down to the level of detail
for a specific task or activity.
Page 28 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
2.2 Determining the Level of Detail
It is extremely important for DOE and its contractors to formally establish and clearly define the
work to be performed, the priority assigned, and the expectations for completion. The level of
detail required in a given scope of work should be commensurate with the importance of the
work, its complexity, and the potential risk of the associated hazards.
In some cases, the level of detail contained within the contract scope of work may be adequate
for both parties to clearly understand what is to be performed. In other cases, such as a
management and operating contract for a large DOE site, the scope of work stated in the contract
may be expressed in broad, general terms. Whatever the case, the work scope should include
those activities (such as fire protection, radiation protection, chemical hazards protection,
training, etc.) that are necessary to control hazards associated with the work.
If the scope of work is highly sensitive to changes in mission or annual budgets, it may be
necessary to adopt a more formal way to clarify the statement of work. For research and
development work conducted at a laboratory, for example, the scope of work may be simple: to
conduct certain experiments and to report on the technical progress or results. But if additional
detail is necessary, it can be provided through one or more documents formally required by the
contract, such as the annual operating plan (AOP), project execution plan, implementation plan,
award fee plan, accelerated cleanup, performance-based incentive, or activity description sheet
(ADS). DOE O 430.1A, LIFE-CYCLE ASSET MANAGEMENT, establishes requirements for
planning and planning approvals. Planning activities for decommissioning projects should be
consistent with DOE and EPA memorandums of agreement.
Section 24
2.3 Establishing Expectations
Internally, each contractor organization should have one or more methods for establishing
expectations for satisfactorily defining work, accomplishing work, prioritizing tasks, and
allocating resources. Such methods may include contractor project management system(s);
site/facility/activity operational plans and budgets; work packages, job plans, and special work
permits; and project management plans and work plans, which can include objectives, costs, and
methods. The use of multidisciplinary teams to conduct preliminary hazard analysis and develop
hazard controls can enhance the contractor’s ability to define expectations clearly. Again, the
formality required may depend upon the amount of work, its complexity, and the hazards. For
complex, hazardous activities, a detailed work plan may be warranted, using inputs from
operational staff who follow written procedures that require verbatim compliance. For low-
hazard, simple activities, the method for establishing expectations may be much less formal; for
example, simple verbal instructions provided by a supervisor to a worker may suffice for
establishing a clear understanding of the work to be performed and how safety should be
integrated with that work.
Volume 1 - Integrated Safety Management System Guide - Page 29
Chapter II 3-1-01
DOE G 450.4-1B
2.4 Worker Participation in Work Planning
Worker input should be integrated into planning activities. Methods for accomplishing this
integration include (1) involving workers early in the planning process before work tasks are
selected and assigned, (2) involving workers directly in the preparation and review of planning
documentation, and (3) ensuring planners receive input from workers on proposed work
methods, hazards, and controls. The benefits from these activities typically are improved worker
morale, reduction in unknowns such as work conditions or hazards that impact planning
effectiveness, and increased potential cost savings from improved work planning.
In developing an ISMS, DOE and the contractor should consider approaches for worker
involvement that have been defined as a part of the DOE Voluntary Protection Program (VPP),
Enhanced Work Planning (EWP), and Behavior Based Safety (BBS). More information on EWP
can be found on the EWP Web site at http://tis-nt.eh.doe.gov/WPPHM/ewp/ewp2.htm.
Additional information on VPP may be found on the DOE EH web site at
http://www.tis.eh.doe.gov/. It is important to distinguish between DOE and other regulatory
ES&H requirements and elective ES&H programs, such as ISO 14001, DOE-VPP, the Chemical
Manufacturer’s Association’s Responsible Care, and EPA’s Project Xcel, which are available to
DOE contractors who choose to go beyond compliance in environmental and/or worker safety
and health management. These elective programs, consisting of management systems for
preventing and controlling occupational and environmental hazards, augment ES&H protection
at the site beyond DOE requirements.
The responsible manager is accountable for communicating the parameters of the work to the
workers involved. Successful planning, which happens only when managers and workers plan
the work together, can efficiently and economically change work to eliminate or control hazards.
Some examples of actions that managers may take to promote worker involvement in planning
include the following:
C Define and incorporate into written procedures, mechanisms for incorporating worker
involvement and input to the work planning processes.
Section 25
C Involve workers early in the planning process.
C Involve workers directly in the preparation and review of planning documentation and job
hazard analysis, and ensure that planners incorporate input from workers on proposed
work methods, hazards, and controls.
C Hold line managers accountable for including workers in the work planning process.
Page 30 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
C Obtain information from other sites where management/worker trust has been
successfully addressed.
C Incorporate improved management/worker relationships into the supervisory process
using trust-building exercises and other behavioral change approaches.
C Develop, publish, and make visible work-planning-related performance indicators that the
workers can directly affect.
C Obtain union buy-in for the worker involvement process, wherever possible.
C Provide training for supervisors, managers, and work planners regarding effective use of
worker input.
C Establish safety committees.
C Perform job hazard analyses.
C Walk around with management.
Worker safety is addressed in 29 CFR 1910, 29 CFR 1926,10 CFR 835, and DOE O 440.1A.
The Department’s Voluntary Protection Program (DOE-VPP) is available to contractors seeking
recognition for excellence in safety and health management.
2.5 Providing for Integration
The ISMS should integrate environment, safety, and health into the contractor’s business
processes for work planning, budgeting, authorization, execution, and change control. This
requires integration within each line organization and integration among the different
organizational elements (e.g., legal, procurement, business administration, engineering, facility
and laboratory management, etc.).
Consistent with the guiding principles, some formal document should exist to establish clear
lines of authority within each organization for defining the scope of work, including approval of
subsequent changes. For contractors, this documentation would typically be a combination of
company-level policies, charters established for organizational elements, and position
descriptions. For DOE, the FRAM and the lower-tier FRA documents are the formal
documentation that establishes clear lines of authority.
In addition, a single work permit that replaces several permits (i.e., radiological, confined space,
hot work, etc.) can be used to ensure that integration flows down to the first-line supervisors and
workers. This single document should include all hazard information and controls required by
Volume 1 - Integrated Safety Management System Guide - Page 31
Chapter II 3-1-01
DOE G 450.4-1B
the individual permits while providing all information to the first-line supervisor and workers in
a single document. Figure 4a illustrates the general concept of developing ES&H controls for
various hazards and integrating them at the activity level.
2.6 Establishing Priorities
Section 26
Protecting the public, workers, and the environment is a top priority whenever the Department
plans and performs work. Critical to this objective is providing adequate resources and ensuring
that those resources are effectively allocated. Each organizational level (i.e., DOE Headquarters,
DOE field element, contractor) should, therefore, establish a method for ensuring a proper
balance among competing priorities of the organization (e.g., budget, schedule, safety, quality).
To do this, organizations should establish a process for reconciling internal and external conflicts
and imposing change control. In many cases, support activities, such as fire protection, radiation
protection, training, etc., must be integrated into the work scopes for programs those activities
support. Typically, a senior management review committee or council within DOE or the
contractor organization may be established to resolve conflicts, establish priorities, and ensure a
balance in resource allocation. In addition to Guiding Principle 4, Balanced Priorities, which
demonstrates the Department’s focus on prioritization, DEAR 970.5223-1(b)(4) provides
guidance for balancing priorities, as does DOE-DP-STD-3023-98, DOE Limited Standard,
Guidelines for Risk-Based Prioritization of DOE Activities.
An ISMS should address a variety of options and tradeoffs to promote the safe completion of
work. These tradeoffs include negotiating work scope, establishing performance objectives,
identifying resources, selecting personnel, and adjusting schedules. The goal is to define work
and allocate resources so that work is done safely and contributes to accomplishment of the DOE
mission. Each work package should be clearly defined so that the sum of the work packages is
necessary to accomplish the assigned mission.
DOE O 130.1, BUDGET FORMULATION, and DOE O 135.1, BUDGET EXECUTION—
FUNDS DISTRIBUTION AND CONTROL, address DOE budget formulation and execution
activities. Contract performance measures are a key feature of performance-based contracting,
which is required by 62 FR 34842 (which amends DEAR 48 CFR 970.1100-1). DOE G 120.1-5,
GUIDELINES FOR PERFORMANCE MEASUREMENT, gives guidance on contract
performance measures.
3. CORE FUNCTION 2, ANALYZE HAZARDS
The objective of hazards analysis is to develop an understanding of the potential for the hazard to
affect the health and safety of the worker, the public, and the environment. Hazard controls are
then established based on this understanding and other factors related to the work. The analysis
includes two steps: (1) identifying and categorizing the hazard and (2) analyzing accident
scenarios related to hazardous work. In identifying hazards at the task/activity level, workers are
Page 32 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
Figure 4a. An illustration derived from DNFSB Tech 16 of the development and
integration of ES&H controls at the activity level.
Volume 1 - Integrated Safety Management System Guide - Page 33
Chapter II 3-1-01
DOE G 450.4-1B
a valuable resource for their knowledge of the process and its hazards. Categorization may
address the character of the work [nuclear, chemical, thermal, electrical, and kinetic (motion)]
and the magnitude of the hazard. Several other methods (e.g., checklist, “what-if,” HAZOP
study, FMEA, etc.) are also suited to particular work environments and/or hazard magnitudes.
Section 27
DOE and its contractors have many acceptable ways of performing hazard analyses. For
example, during work design, or in the early project planning stages, hazards may be identified
and evaluated using broad, simple tools that delineate hazards and assess the potential magnitude
of the harm. At this stage, a simple hazard analysis can be sufficient as a tool for design
evaluation and design improvement.
For nuclear facilities, the hazard analysis should be based on the direction in 10 CFR 830.200,
Safety Basis Requirements, and DOE 5480.23, NUCLEAR SAFETY ANALYSIS REPORTS,
for identification of the safety-class and the safety-significant structures, systems, and
components. This level of hazard analysis is then used as the foundation for more detailed
analysis at the facility level, which in turn is used as the basis for the activity or task level hazard
analysis.
Two types of analysis methods commonly used by industry for evaluating hazards at the facility
and task level are the process hazard analysis (PHA) and the job hazard analysis (JHA). [See
DOE O 440.1A, WORKER PROTECTION MANAGEMENT FOR DOE FEDERAL AND
CONTRACTOR EMPLOYEES; OSHA 29 CFR 1910.119, Process Safety Management (PSM)
of Highly Hazardous Chemicals; and OSHA 3071, Job Hazard Analysis.] A JHA or a Job Safety
Analysis (JSA) is a basic and widely used tool for analyzing and reviewing operations and
procedures to identify potential worker protection hazards and deficiencies and can satisfy a
significant portion of the worker-protection hazard-identification requirements at most
workplaces. These hazard analyses are performed by experienced teams of hazard analysts,
facility and systems engineers, process operators, human factors engineers, and facility workers.
These may include safety professionals and technicians in specialities such as criticality, hazard
analysis, radiological protection, chemical process safety, industrial hygiene, and occupational
safety.
DOE has promulgated a number of directives (Policies, Regulations, Orders, Notices, Standards,
and Guides) that may be used for hazard analysis and hazard categorization. These include the
following:
• 10 CFR 830.200, Safety Basis Requirements;
• DOE 5480.23, NUCLEAR SAFETY ANALYSIS REPORTS, addresses nuclear
facilities.
Page 34 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
• DOE O 420.2, SAFETY OF ACCELERATOR FACILITIES, addresses accelerator
facilities.
• DOE 5481.1B, SAFETY ANALYSIS AND REVIEW SYSTEMS, addresses non-nuclear
facilities.
• DOE-STD-3009, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear
Facility Safety Analysis Reports, describes SAR preparation and review process, includes
the PSM process for nuclear facilities. This Standard also integrates the worker safety
hazard review requirements of 29 CFR 1910.119 into the 5480.23 safety/hazard analysis
and review process for identifying and understanding the hazards associated with highly
hazardous chemicals.
• 10 CFR 830.200, Safety Basis Requirements;
• DOE-STD-3011, Guidance for Preparation of DOE 5480.22 (TSR) and DOE 5480.23
(SAR) Implementation Plans;
• DOE-EM-STD-5502, Hazard Baseline Documentation;
• DOE-EM-STD-5503, Health and Safety Plan Guidelines;
• DOE-HDBK-1100, Chemical process Hazard analysis;
• DOE-STD-1027, Guidance on Preliminary Hazard Classification and Accident Analysis
Techniques for Compliance with DOE Order 5480.23, Safety Analysis Reports;
Section 28
• DOE-STD-1120-98, Integration of Safety and Health into Facility Disposition Activities,
provides specific guidance for safety management activities at facilities being deactivated
or decommissioned. This DOE Standard focuses on the deactivation, decommissioning,
and long-term surveillance and monitoring phases regarding SMS Policy requirements for
facility disposition activities. Although this document primarily addresses disposition
activities, the methods are generally applicable.
• DOE O 440.1A, WORKER PROTECTION MANAGEMENT FOR DOE FEDERAL
AND CONTRACTOR EMPLOYEES, provides general worker protection requirements
for all DOE operations and establishes requirements for a comprehensive worker
protection program that ensures that DOE and its contractor employees are afforded a
level of health and safety at least equal to that provided to private-sector employees under
the Occupational Safety and Health Act, 1970. DOE O 440.1A should be applied directly
at the task or activity level.
• DOE G 440.1-1A, WORKER PROTECTION MANAGEMENT FOR DOE FEDERAL
AND CONTRACTOR EMPLOYEES GUIDE FOR USE WITH DOE O 440.1, provides
Volume 1 - Integrated Safety Management System Guide - Page 35
Chapter II 3-1-01
DOE G 450.4-1B
specific guidance for undertaking exposure assessments at the worker task/activity level.
For those activities not covered by HAZWOPER, multidisciplinary teams should
undertake hazards analysis at the task (activity) level using standard techniques like those
described in this Guide.
• DOE O 151.1, COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM,
provides for comprehensive emergency management systems to accompany safety
analysis.
• DOE/DP-0135, U.S. Department of Energy Model Pollution Opportunity Assessment
Guidance.
• DOE O 452.2A, SAFETY OF NUCLEAR EXPLOSIVE OPERATIONS, provides
requirements for nuclear explosive operations.
• DOE G 452.2A-1A, IMPLEMENTATION GUIDE FOR DOE ORDER 452.2A,
SAFETY OF NUCLEAR EXPLOSIVE OPERATIONS, provides guidance for nuclear
explosive operations.
• DOE-DP-HDBK-XXXX, Draft HAR Handbooks for Pantex and Nevada.
• DOE-DP-STD-3016-99, Hazard Analysis Reports for Nuclear Explosive Operations.
Such directives, when incorporated into a contract, establish the processes and expectations for
contractor performance of hazards analyses. Note that, in addition, DOE has developed proposed
regulations that correspond to existing DOE nuclear safety Orders. These proposed rules remain
compatible with the ISMS and provide for implementation into ISMSs.
Requirements for hazards analyses to be performed to adequately protect the worker, the public,
and the environment can also be found as statutory and regulatory requirements. Examples
include 29 CFR 1910, 29 CFR 1926, 10 CFR 71, and 10 CFR 1021. Unless a DOE or contractor
activity is specifically exempted or waived, such regulatory requirements are mandatory (see
Attachment 5).
For decommissioning activities, 29 CFR 1910.120 and 29 CFR 1926.65 can be used to analyze
hazards. For environmental remediation and decommissioning hazardous waste work, the
HAZWOPER requirements of 29 CFR 1910.120 and 1926.63 may be applied for hazard
characterization.
EWP applications have yielded tools that can aid integration of hazards identification analysis
and control, such as the “Automated Job Hazard Analysis” (AJHA) used at Project Hanford. The
AJHA integrates hazards related to radiological protection, industrial safety and hygiene,
environmental compliance, fire protection, and nuclear safety. More information on these tools
is available at the following web site: http://tis-nt.eh.doe.gov/WPPHM/ewp/Ewp2.htm.
Section 29
Page 36 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
In addition, Pollution Prevention Opportunity Assessments (PPOAs) can be used to—
• identify the nature and amounts of waste, releases and emissions, and energy usage
resulting from processes and projects within a site’s operation;
• identify the opportunities for pollution prevention and energy conservation; and
• evaluate those opportunities for feasible implementation.
Regardless of the specific requirements and methods calling for different types of hazard
analysis, each analysis should depend and build upon the others. In this way, activity hazard
analyses can be totally integrated with site- and facility-level analyses (i.e., detailed hazard
analyses performed for a specific work task may take into account the impact of the work on
other areas of the site or facility, as well as how facility and site hazards affect the work task).
All types and levels of hazard analysis should provide for worker input to the process. Facility
workers are often the most knowledgeable regarding work conditions and associated hazards.
Worker involvement as members of the planning team is particularly important when performing
job hazards analysis because this process focuses specifically on a worker’s interactions with
hazards during the course of job duties. For more information on worker involvement in job
hazard analysis and control of hazardous exposures, see DOE G 440.1-3, OCCUPATIONAL
EXPOSURE ASSESSMENT.
As with all other aspects of the work, the level of management involvement in reviewing and
approving the hazard analysis should be commensurate with the complexity of the work and the
hazards entailed. For example, activities involving nuclear hazards (e.g., Hazard Category 1, 2,
and 3 nuclear facilities, as defined by DOE-STD-1027) may require DOE to review and approve
the hazard analysis. For EM facilities, DOE-EM-STD-5502, Hazard Baseline Documentation,
provides guidance for determining the level of facility safety documentation not only for nuclear
facilities, but for tailoring appropriate levels of documentation according to chemical inventory
thresholds for high, moderate, or low hazard non0nuclear and other industrial facilities.
Such categorizing of facilities will aid in tailoring the DOE requirements and expectations to the
work and hazards. Many DOE Orders use the hazard category to include or exclude specific
requirements. For example, DOE 5480.23 and 10 CFR 830.200 for nuclear facilities exclude the
requirement to address inadvertent criticality for Hazard Category 3 facilities as defined in DOE-
STD-1027 because such facilities do not contain sufficient fissile materials to present a criticality
hazard. Similarly, the hazard category plays a significant role in DOE O 420.1, FACILITY
SAFETY, relative to establishing seismic design requirements and seismic analysis requirements.
Regulatory and contractual requirements applicable to the work (i.e., the set of safety standards
and requirements) and the complexity and hazard of the work (i.e., scope of work) will dictate
the methods used by a contractor to analyze hazards. This illustrates the importance of the
Volume 1 - Integrated Safety Management System Guide - Page 37
Chapter II 3-1-01
DOE G 450.4-1B
relationship between the core functions of defining the scope of work and analyzing hazards,
which lead to Core Function 3, Develop and Implement Controls.
Section 30
4. CORE FUNCTION 3, DEVELOP/IMPLEMENT CONTROLS; GUIDING
PRINCIPLE 5, IDENTIFICATION OF SAFETY STANDARDS AND
REQUIREMENTS; AND GUIDING PRINCIPLE 6, HAZARD CONTROLS
TAILORED TO WORK BEING PERFORMED
4.1 Identification of Appropriate Standards
The terms and conditions that define DOE safety expectations for its contractors are set forth as
contract requirements. DEAR 970.5204-2 requires the contractor to comply with the
requirements of applicable Federal, State, and local laws and regulations (including DOE
Regulations) in developing and implementing controls, unless the appropriate regulatory agency
has granted relief in writing. DOE has identified safety requirements in Rules and DOE Orders
and has developed a wide variety of associated Technical Standards, Guides, and Manuals; in
addition, DOE encourages the use of national consensus technical standards.
In addition to complying with the requirements of applicable Federal, State, and local laws and
regulations (including DOE Regulations) in developing and implementing controls, as required
by DEAR 970.5204-2(a) (List A), the contractor must comply with the requirements of
applicable DOE directives appended to the contract [List B at DEAR 970.5204-2(b)].
ES&H requirements appropriate for work conducted by a contractor may be determined using a
DOE-approved process to (1) evaluate the work and the associated hazards and (2) identify an
appropriately tailored set of standards, practices, and controls. When such a process is used, the
set of tailored ES&H requirements must be reviewed for adequacy and approved by the CO. The
approved set shall be incorporated into List B as contract requirements with full force and effect.
These approved processes may also be used to identify standards that are specific to facilities or
activities and are generally, but not necessarily, a subset of List A and List B.
Approved processes for establishing ES&H requirements include the following:
• incorporation of a Standards/Requirements Identification Document (S/RID) into the
contract (per 90-2 Implementation Plan, Rev. 5);
• use of the Work Smart Standards Processes (DOE M 450.3-1, THE DEPARTMENT OF
ENERGY CLOSURE PROCESS FOR NECESSARY AND SUFFICIENT SETS OF
STANDARDS); and
• compliance with DOE directives and other applicable laws and regulations.
Page 38 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
Once DOE has agreed to the sitewide ES&H requirements established by the contractor, those
requirements are implemented by the contractors’ manuals of practice. Figure 4b illustrates how
ES&H requirements flow down, through contractual requirements, to the contractor’s safety
management program (implemented in manuals of practice) and are applied to facility, activity,
or task work. DOE approval of the contractor’s ISMS description and oversight of its
implementation are fundamental to the Department in satisfying its own responsibilities for
ensuring safety. Operation-specific controls, tailored to the hazards, to be mutually agreed upon
by DOE and the contractor, become contractual terms and conditions for performing the work.
Before work is performed, appropriate controls are developed and an applicable set of safety
standards and requirements identified. These safety standards and requirements may be from
List A or List B, or they may be a tailored set of standards derived from List B or other sources.
Developing and implementing hazard controls at the site or facility level includes–
Section 31
• identifying applicable standards and agreed-upon sets of requirements (to the extent that
appropriate requirements have not already been identified in the contractor’s manuals of
practice),
• identifying controls including pollution prevention options to prevent/mitigate hazards,
• establishing boundaries for safe operations (establishing a safety envelope), and
• implementing and maintaining configuration of controls [e.g., technical safety
requirements (TSRs) and operational safety requirements].
Specific controls needed at the activity level are developed using the results of activity hazard
analysis. For hazards that have been included in the sitewide analyses, the applicable standards
are included in lists A and B. However, facility-level and activity-level hazards analysis may
also identify new hazards or unanalyzed conditions for existing hazards that require unique
activity-specific controls be placed in the corporate manuals of practice or the authorization
agreement if one is needed for the project or facility. The hierarchy of controls (i.e., engineering,
administrative, and personal protective equipment) used at this level is the same as that used at
higher management levels, which are applied in a risk-based manner. The controls developed,
implemented, and maintained should be integrated with other controls and commitments,
particularly those in sitewide safety programs, such as fire protection and radiation protection
(See Figure 4a). In general, the use of administrative controls to address each hazard should be
minimized where the effectiveness and value of engineering controls can be demonstrated.
Although identification of standards is discussed here, as part of Core Function 3, Develop/
Implement Controls, standards identification may also occur during activities that define the
scope of work, analyze hazards, or provide feedback and improvement.
Volume 1 - Integrated Safety Management System Guide - Page 39
Chapter II 3-1-01
DOE G 450.4-1B
4.2 Sitewide Requirements
A multidisciplinary hazard analysis team composed of line management, health and safety
professionals, and workers should tailor the set of standards that apply to the work at each
management level. These standards should be commensurate with the hazards involved, per
Guiding Principle 5. To achieve this objective, DOE and contractor line management identify
laws, statutes, and Federal regulations that apply. Such requirements are generally mandatory
and non-discretionary for DOE and the contractor, although exemptions may be obtained when
necessary. DOE and contractor line management should establish (through the contract) any
additional requirements necessary to ensure adequate safety. These requirements may be derived
from DOE directives, DOE Technical Standards, or national consensus standards. Whatever the
approach, both DOE and contractor line management should review and concur on the set of
standards and requirements selected. The CO is responsible for ensuring that the set of
requirements selected is sufficient to achieve an adequate level of safety.
4.3 Facility-Specific Requirements [Identification of Appropriate Controls]
Section 32
The ISMS should have a process to identify engineering, administrative, and personal protective
equipment controls and pollution prevention/waste minimization options imposed on the work,
as derived from the agreed-upon set of standards and requirements. As with the set of standards
and requirements, the derived controls should be tailored to the work and the associated hazards,
in accordance with Guiding Principle 6. The controls should encompass all aspects of the work
(including potential abnormal or emergency situations) and each phase of work performance
(e.g., preparation, review, authorization, and execution). Emphasis should be on designing the
work and/or controls to reduce or eliminate the hazards and to prevent accidents and unplanned
releases and exposures [DEAR 48 CFR 970.5223-1(b)(6)].
Controls should be developed systematically at each management level, addressing all relevant
functional areas or disciplines of concern (e.g., quality assurance, fire protection, industrial
safety, radiological protection, chemical process safety, emergency preparedness, criticality
safety, maintenance). The information developed for controls at each management level should
be used as the basis for the next-lower level of controls (i.e., site controls should be integrated
with facility controls, which should be integrated with the controls applied to work at the task
level). The EWP process relies on a work planning team that includes subject matter experts to
specify the controls for the task/activity level of work. Controls should use inherently safe
design aspects and should be based on defense-in-depth considerations. (DOE-STD-3009
provides relevant guidance for nuclear facilities.) Such controls should address preventive and
mitigative considerations, passive and active aspects, and automatic versus manual operating
needs. DOE 5480.23, DOE 5480.22, 10 CFR 830.200, and corresponding DOE-STD-3009
provide guidance for nuclear facilities on establishing documented safety limits, limiting control
settings, and limiting conditions for operation, surveillance requirements, administrative controls,
and design features that result from a disciplined safety analysis. DOE 5481.1B contained
Page 40 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
Figure 4b. An illustration (derived from Tech-16) of the facility or activity level
implementation of ES&H requirements in a standards-based ISMS.
Volume 1 - Integrated Safety Management System Guide - Page 41
Chapter II 3-1-01
DOE G 450.4-1B
requirements and guidance for non-nuclear facilities. The following directives provide additional
information for DOE weapons facilities:
• DOE O 452.1A, NUCLEAR EXPLOSIVE AND WEAPON SURETY;
• DOE G 452.2A-1A, IMPLEMENTATION GUIDE FOR DOE ORDER 452.2A,
SAFETY OF NUCLEAR EXPLOSIVE OPERATIONS; and
• DOE O 452.2A, SAFETY OF NUCLEAR EXPLOSIVE OPERATIONS.
Specific controls derived from the agreed-upon set of standards and requirements may take
several forms: engineered controls, written procedures, or other administrative controls. The
form selected should be tailored to the hazard or importance of the desired attribute and, again,
should be determined by line management responsible for the work based on safety/hazard
analyses. The knowledge, skills, and abilities of the work force should be considered when
selecting the form of controls. DOE and contractor agreement on the safety envelope is required
as a condition for authorizing operations to proceed. Figure 5 shows the interconnection of DOE
Rules and Orders that may be used to establish the safety envelope for nuclear facilities.
Section 33
Once a set of controls has been established, processes should be provided for maintaining work
performance within the safety envelope established in the safety/hazard analysis. The processes
should clearly identify the controls used to establish the safety envelope. Some contractors
achieve this objective by using work packages, job plans, maintenance plans, and TSRs (nuclear
facilities). A process to review, approve, and provide change control of the safety envelope
should exist.
4.4 Worker Protection
DOE O 440.1A requires DOE elements and contractors to implement a written worker protection
program that describes an integrated management organization and support systems that fully
satisfy DOE worker protection requirements of all technical disciplines. DOE O 440.1A also
requires that workers be allowed, through their supervisors, to stop work when they discover
conditions that may expose them to imminent danger or other serious hazards. The stop-work
procedure should be exercised in a justifiable and responsible manner. DOE elements and
contractors should establish procedures that address stop-work authority and ensure that workers
are trained in those procedures.
DOE and contractor line organizations should assign and communicate worker protection
responsibilities to workers, ensuring that they have adequate authority and resources to carry out
those responsibilities. Line management should encourage and promote employee involvement
and commitment. An important component of employee involvement is the establishment of
worker protection committees to promote employee participation in developing program goals,
Page 42 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
Figure 5. An illustration (derived from Tech-16) of applicable ES&H requirements at
various organizational levels for a Hazard Category 2 nuclear facility.
Volume 1 - Integrated Safety Management System Guide - Page 43
Chapter II 3-1-01
DOE G 450.4-1B
objectives, and performance measures and identifying and correcting workplace hazards.
Employees should also be encouraged to perform informal worksite inspections as part of their
daily work. For inspections to be effective, employees should be trained in hazard recognition,
have access to worker protection professionals and reference sources (DOE requirements, guides,
technical standards, etc.), and be knowledgeable enough to suggest and track corrective actions.
5. CORE FUNCTION 4, PERFORM WORK, AND GUIDING PRINCIPLE 7,
OPERATIONS AUTHORIZATION
DOE and the contractor identify and implement safety controls BEFORE starting to work. Once
work begins, it is performed in accordance with those safety controls.
Accordingly, each contractor’s ISMS should have a process to confirm adequate preparation,
including adequacy of controls, prior to authorizing work to begin at the facility, project, or
activity level. DEAR 970.5223-1(b)(7) requires that DOE and the contractor establish and agree
upon the conditions and requirements to be satisfied for operations to be initiated and conducted.
These conditions and requirements are included in the contract and are therefore binding upon
the contractor. The formality and rigor of the review process and the extent of documentation
and level of authority for agreement should be based on the hazard and complexity of the work
being performed. The process should ensure programs addressing all applicable functional areas
are adequately implemented to support safe performance of the work.
Section 34
DOE O 425.1, STARTUP AND RESTART OF NUCLEAR FACILITIES, provides readiness
guidance for nuclear facilities. The requirement for an independent assessment or DOE review
should be established within the set of agreed-upon standards and requirements established for
the scope of work. Internal or external oversight groups, review teams, and audit organizations
should evaluate the process to identify and correct deficiencies. The process should ensure
corrective actions are effective in establishing a state of readiness. Examples of methods used by
DOE and contractors to confirm readiness include readiness assessments, operational readiness
reviews (ORRs), and Title III inspections (project design). Guiding Principle 7 and the DEAR
require conditions to be satisfied and established for operations to be initiated and operated.
These agreed-upon conditions and requirements are requirements of the contract
and binding upon the contractor. The extent of documentation and level of
authority for agreement shall be tailored to the complexity and hazards
associated with the work and shall be established in a Safety Management System
[48 CFR 970.5223-1(b)(7)].
The QA Rule, 10 CFR 830.120, and DOE O 414.1A require that work be performed to
established technical standards and controls. For certain sitewide systems and activities, such as
fire protection, emergency planning, and operator training, readiness may be confirmed
Page 44 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
periodically. The following provide requirements and guidance for sitewide programs involving
nuclear operations:
• 10 CFR 830.200, Safety Basis Requirements;
• DOE 5480.20A, PERSONNEL SELECTION, QUALIFICATION, AND TRAINING
REQUIREMENTS FOR DOE NUCLEAR FACILITIES;
• DOE O 420.1, FACILITY SAFETY;
• DOE O 460.1A, PACKAGING AND TRANSPORTATION SAFETY; and
• 10 CFR 835, RADIATION PROTECTION FOR OCCUPATIONAL WORKERS.
For nuclear facilities, 10 CFR 830.200/DOE 5480.23 require the development and description of–
• facility initial testing programs;
• facility in-service surveillance programs;
• facility maintenance programs based on DOE O 433.1, MAINTENANCE PROGRAM
FOR NUCLEAR FACILITIES;
• conduct of operations programs that define worker communications; and
• activities based on DOE 5480.19, CONDUCT OF OPERATIONS REQUIREMENTS
FOR DOE FACILITIES.
DOE O 430.1A, LIFE-CYCLE ASSET MANAGEMENT, provides similar requirements for
non-nuclear facilities. DOE-HDBK-XXXX-YR (proposed), CHEMICAL MANAGEMENT
HANDBOOK, provides guidance for specific programmatic chemical safety management
considerations wherever chemical hazards exist in nuclear or non-nuclear facilities. It should be
noted that chemical hazards exist throughout the DOE complex, and may be significant
contributors to risk in nuclear facilities, as well as facilities primarily involved in chemical
processing.
The ISMS should ensure that safety control measures that have been mutually agreed upon are
integrated into work performance and that—
• personnel are responsible and accountable for performance of work in accordance with
the controls established;
• the controls are adequate to ensure safe work performance and to prevent accidents,
uncontrolled releases, or unacceptable exposures to hazardous materials;
Volume 1 - Integrated Safety Management System Guide - Page 45
Chapter II 3-1-01
DOE G 450.4-1B
• the controls established for safety are a discernible part of the plan for work; and
Section 35
• the necessary safety support functions and interfaces required (e.g., training, maintenance,
radiological protection, etc.) have been established.
For nuclear facilities, DOE 5480.23 and 10 CFR 830.200 require appropriate consideration of
conduct of operations, emergency preparedness, fire protection, etc.
Typically, contractors use a system of written policies, manuals, and procedures to ensure safety
controls are integrated into work plans. At the work level, consideration must be given to
controls necessary for worker protection. Individual work plans, operating procedures, and
maintenance procedures are often used to implement safety controls at the task level. The
following should be factored into the selection of worker safety controls:
• hands-on training, safety awareness training, and the identification of necessary personal
protective equipment (PPE), which are vital in familiarizing a worker with job duties,
hazards, and controls;
• pre-job briefings and walkdowns, which provide a good opportunity to ensure workers
are aware of hazards and knowledgeable on the proper use of prescribed controls; and
• worker input, which should be solicited because workers can offer creative solutions for
controlling hazards in a safe yet practical and cost effective manner.
It is also important to keep in mind that some PPE may create a hazard. The ISMS should also
include a process to identify performance measures, including safety performance measures for
the work as required by DEAR 48 CFR 970.1100-1 (see Attachment 5).
5.1 Authorizing Work
DOE and the contractor should formally agree on the need for authorization agreements for those
nuclear and significant hazard facilities that must perform work safely without any undue risk to
the worker, the public, and the environment.
The contractor’s ISMS description should clearly identify the roles of the contractor and DOE in
authorizing work at appropriate levels. Understanding DOE and contractor roles with respect to
authorizing work and changes to the work is essential for successful implementation of the
ISMS. The following discussion on authorization protocol and authorization agreements
provides elementary information and guidance for consideration in the development of contractor
ISMSs.
Page 46 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
5.1.1 Authorization Protocol
The DOE FRAM defines authorization protocols as–
Those processes used to communicate acceptance of the contractor’s
integrated plans for hazardous work. Such protocols are expected to range
from preperformance review and approval by DOE of detailed safety-related
terms and conditions for performing work (authorization agreement) to less
rigorous oversight and postperformance assessment of the contractor’s work.
These protocols should be clearly delineated in the contractor’s ISMS description and
should clarify the understanding and agreements between the contractor and the
Department in performing hazardous work.
5.1.2 Authorization Agreement
An authorization agreement is a contractually binding agreement between DOE and the
contractor for predetermined hazardous facilities, tasks, or activities. The DOE FRAM
defines an authorization agreement as—
Section 36
A documented agreement between DOE and the contractor for high-hazard
facilities (Category 1 and 2), incorporating the results of DOE’s review of the
contractor’s proposed authorization basis for a defined scope of work. The
authorization agreement contains key terms and conditions (controls and
commitments) under which the contractor is authorized to perform the work.
Any changes to these terms and conditions would require DOE approval.
The need for an authorization agreement will depend on the organization and adequacy of
the existing, contractually binding documentation containing key terms and conditions.
For example, at sites or facilities that have S/RIDs in place, it would be undesirable to
duplicate the S/RID commitments in an authorization agreement. If an authorization
agreement were required, it could simply reference the S/RIDs. The Department and the
contractor should ensure that the ISMS includes procedural mechanisms that trigger a
review to determine the necessity of having, revising, or eliminating an authorization
agreement.
The authorization agreement may serve a number of purposes:
• To incorporate the results of DOE’s review of the contractor’s proposed authorization
basis for a defined scope of work.
• To define key terms and conditions (controls and commitments) under which the
contractor is authorized to perform work; these key terms and conditions must be
Volume 1 - Integrated Safety Management System Guide - Page 47
Chapter II 3-1-01
DOE G 450.4-1B
clearly identified in the agreement and any changes to these key terms and conditions
would require DOE approval.
• To delineate the key references DOE will approve versus that information that will
simply be reviewed for information. (The ISMS description may also serve this
function.)
• To consolidate the basis for a DOE determination to authorize operations by
combining key DOE and contractor authorization basis and assessment
documentation into one document.
• To minimize the amount of correspondence required between the contractor and the
Department when agreements for routine tasks and activities, requiring approval at
certain unique facilities, can be approved once.
Authorization agreements have also proved beneficial to DOE and contractors for
facilities being affected by significant changes in mission, those requiring significant
upgrade for their authorization bases, and those undergoing decontamination and
decommissioning.
5.2 Sample Format and Content for Authorization Agreements
The following sample format and content may be useful for documenting an authorization
agreement. Like the numerous and varied Nuclear Regulatory Commission licenses, the format
and content of agreements are likely to differ because of the unique and diverse facilities and
activities in the complex. The authorization agreement establishes agreed-upon operating
boundaries for conducting hazardous work by defining key terms and conditions for both DOE
and the contractor.
1. Scope of the Agreement
This section should clearly describe the work being authorized and the facility or facilities
where the work is to be performed. It should be consistent with the work analyzed in the
authorization basis and the controls established.
2. DOE Basis for Approval
Section 37
This section should include the basis for DOE approval to perform the work and the basis
for its conclusion that the work defined in the agreement can be performed without undue
risk to the worker, the public, and the environment. This section should include the key
reviews and assessments that form the basis of DOE approval. Typical examples include
DOE issuance of a SAR; review and approval of a SAR; reviews and approvals of TSRs,
Page 48 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
ORRs, or assessments; approval of the list of requirements required by the DEAR laws
clause; and approval of the contractor’s ISMS description in accordance with the DEAR
ES&H clause.
3. Listing of Documents that Constitute the Authorization Basis
This section should include a summary listing of key documents such as SARs, the basis
for interim operation, NEPA documentation including EIS, environmental permits, etc.
4. Terms and Conditions
This section should specify contractor commitments for assuring DOE that the authorized
work will be performed safely. The process to be used to keep the authorization
agreement current should be described. Key terms and conditions requiring DOE review
and approval need to be clearly identified in this section. This may include specific
implementation procedures or manuals of practice. Other terms and conditions may only
require DOE notification and review if deemed appropriate. Examples of terms and
conditions include the following:
• Controls identified in TSRs or TSR-like documents. Such controls would include
controls established from hazard analyses and those derived from contractual
requirements (i.e., List A and B from the DEAR laws clause).
• Commitments to a configuration management program including an unreviewed
safety question (USQ) or USQ-like process.
• Commitments to a process for reporting noncompliances with established controls or
terms of the authorization agreement. This process would include any special actions
to be taken if an unplanned event were to occur.
NOTE: Authorization agreements should be carefully written to avoid the need for
revision whenever a key reference is updated. It is necessary for the referenced
documents, or key conditions and commitments in these documents, to be contractually
binding and under configuration control without the need to change the authorization
agreement whenever a reference changes. The title and number of referenced documents
should be listed. Revisions should be indicated by the words “as amended” or “latest
revision” to indicate those documents can change without having to amend the
authorization agreement for each revision. For existing facilities with older revisions that
predate the first authorization agreement, a method to indicate the subsequent revisions
might include “Rev. X or higher.” For sites or facilities with S/RIDs in place, it will be
wise to avoid duplication in the authorization agreement with certain conditions already
specified and agreed upon in the S/RID. For example, it is quite appropriate for the
agreement to simply state that operating in accordance with the S/RID is required. In
Volume 1 - Integrated Safety Management System Guide - Page 49
Chapter II 3-1-01
DOE G 450.4-1B
such an instance, the S/RID is the agreement where the particular Emergency
Preparedness Program, Fire Protection Program, AB Documentation (including USQ),
and other such requirements are located.
Section 38
5. Contractor Qualification
This section should make a positive statement about DOE’s confidence in the contractor’s
ability to safely perform the work identified in the agreement.
6. Special Conditions
This section should cover any other special conditions that DOE wants to make
contractually binding. Such conditions may include aspects of environmental
management, safeguards and security, and protection of property.
7. Effective Date and Expiration Date (if it is to expire)
This section would include the duration of the agreement and when it will be
renegotiated, reviewed, or extended.
8. Statement of Agreement
This section would include signatures of the agreeing parties (DOE manager and
contractor manager) and dates with the typed names below the signature line.
9. Exceptions (if required)
This section would identify any specific exceptions or unusual circumstances that should
be noted. For example, at Rocky Flats, authorization agreements might address
appropriate liability and the understanding between DOE and the new contractor
regarding less than fully analyzed bases for controls.
EXAMPLES:
Examples of executed authorization agreements will be placed on the ISM home page
(http://tis-nt.eh.doe.gov/ism). These examples are for information only and should not be
interpreted as the only way to develop these agreements. Questions should be directed to
the agreement originator or to the Director, Safety Management Implementation Team.
5.3 Sample Checklist for Authorization Agreements
A checklist can improve consistency in the format of authorization agreements and can help
ensure that authorization agreements contain appropriate information to document the
agreements between DOE and its contractors. The following sample checklist was prepared as
an example to assist DOE and contractor personnel in preparing and reviewing authorization
Page 50 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
agreements. This checklist is based on evaluations of authorization agreements conducted by the
Offices of Defense Programs and Environmental Management. The checklist proved to be a
useful aid for the DP and EM evaluations. Users are reminded that this is a sample checklist. As
such, it cannot be expected to suit every circumstance and the attendant variations in hazards and
complexity. The documents that describe corporate expectations and DOE direction for the
authorization agreement must be referenced to define an appropriate checklist.
1. The Authorization Agreement Addresses the Following Issues and Follows the
Recommended Format
– Scope of the Agreement
– DOE Bases for Approval
– Listing of Documents that Constitute the Authorization Basis
– Terms and Conditions
– Contractor Qualifications
– Special Conditions
– Effective and Expiration Dates
– Statement of Agreement
– Exceptions
• Verify that the authorization agreement states if an issue or area is not
applicable, or if there are no contents.
2. Scope of Agreement
• Verify that the work to be authorized is clearly described (specific and not too
broad).
• Verify that the work to be authorized is within the authorization basis.
• Verify that the facility(ies) to which the authorization agreement is applied is
described (specific and not too broad).
3. DOE Bases for Approval
• Verify that the bases for approval are technically strong and clearly defined.
Section 39
• Verify that the DOE approval addresses the multiple dimensions of key nuclear
safety, non-nuclear safety, and environmental protection.
Volume 1 - Integrated Safety Management System Guide - Page 51
Chapter II 3-1-01
DOE G 450.4-1B
• Verify that the authorization agreement addresses safety review documents or
processes such as safety evaluation reports (SERs), SARs, TSRs, positive
USQs, DOE oversight, ORRs/RAs, etc.
• Verify that maintenance of authorization agreements is discussed.
4. Listing of Documents that Constitute the Authorization Basis
• Verify that the listing of key documents is consistent with authorization basis
and DOE direction. The listing may include such documents as nuclear safety
(SERs, SARs, basis for interim operations, TSRs, etc.); non-nuclear safety
[health and safety plans (HASPs), Hazards Surveys, and Hazards Assessments;
Emergency Action Levels (EALs); and default Protective Actions Lists, etc.];
environment (NEPA, EIS, etc.); State/local governments; and DOE approvals of
changes resulting from positive USQ determinations, if applicable.
• Verify that the references appear to be the correct revision.
5. Terms and Conditions
• Verify that a process exists for the contractor to commit to DOE that the
authorized work will be performed safely. This may include such measures as
controls in TSRs or TSR-like documents, commitments to a noncompliance
reporting process, or a process for handling violations of the authorization
agreements.
• Verify that a process exists for keeping an authorization agreement and basis
current; this may include a configuration management process, a process to
verify key terms and conditions for DOE approval are identified, a process to
verify implementation commitments or justification for continued operations, or
a USQ or USQ-like process.
6. Contractor Qualifications
• Verify the presence of a positive statement about, and justification for, DOE’s
confidence in the contractor’s ability to perform the activities in the facilities
identified in the authorization agreement. The justification may be based on
conducting DOE assessments or reviews.
Page 52 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
7. Special Conditions
• Verify that special conditions relating to the facility and activity have been
identified, such as aspects of environmental management, safeguards/security,
and property protection.
• Verify that the authorization agreement contains a statement that permits
emergency actions that depart from approved TSRs (or similar controls) when
the actions are needed to protect public health and safety.
8. Effective and Expiration Dates
• Verify that the approval date and duration of the agreement (or expiration date)
is shown.
9. Statement of Agreement
• Verify that the names (typed) and signatures of the DOE and contractor
managers are shown.
10. Exceptions
• Verify that specific exceptions to Orders, other requirements, S/RIDs, the WSS
process, or usual circumstances are shown, if necessary.
6. CORE FUNCTION 5, FEEDBACK/IMPROVEMENT
6.1 How does Feedback and Improvement Contribute to Safety?
Feedback and improvement complete the ISMS loop by connecting practical experiences of work
conducted to planning for future work. The feedback and improvement function is intended to—
• identify and correct processes or deviations that lead to unsafe or undesired work
outcomes;
• confirm that the desired work outcomes were obtained safely; and
Section 40
• provide managers and workers with information to improve the quality and safety of
subsequent similar work.
Volume 1 - Integrated Safety Management System Guide - Page 53
Chapter II 3-1-01
DOE G 450.4-1B
Mechanisms that support these goals include worker and management observations, pre- and
post-work review meetings, quality and safety issue resolution processes, issue tracking systems,
performance indicators, lessons learned, internal and external assessments, operational and
strategic planning, and a variety of other such activities. Appendix G provides supporting details
and examples of feedback and improvement mechanisms at various levels of DOE and contractor
organizations. It is necessary for each of these mechanisms to use information from the others to
derive maximum benefit from the Feedback and Improvement Safety Management Function.
6.2 Who Performs Feedback and Improvement?
Line management is directly responsible for establishing and implementing feedback and
improvement programs and processes to facilitate a culture that promotes ongoing examination
and learning. The desired operational and safety culture within DOE is one in which each
individual is encouraged and supported in continually asking the following questions:
• Was the work properly identified?
• Were the hazards properly analyzed?
• Were the proper controls established?
• Was the work performed as planned and with the expected outcome?
• Are there ways to perform the work better and more safely?
6.3 What is Feedback and Improvement?
The terms feedback and improvement are used jointly to describe the fifth ISMS core function;
however, in practice, it may be helpful to distinguish between the two terms. Feedback is
typically thought of as information generated from actual work or operating experience. That
information may be in the form of equipment indicators, such as gauges, analytical tests, or
observations by workers, supervisors, and managers. The value of the operating experience
feedback is obtained by analyzing the information and comparing it to requirements or
expectations. Such analysis is necessary to determine if equipment, people, and systems are
operating within acceptable parameters and if the expected results are obtained during the
performance of work. Three outcomes of analysis are typical: verification of acceptable
performance, identification of needed corrections, and identification of opportunities to improve
the quality of work outcomes or processes. The term improvement is most often used to mean
identification of needed corrections and identification of opportunities to improve the quality of
work outcomes or processes.
Page 54 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
The feedback and improvement function generally may be categorized by three principal
activities:
1. generate and collect data,
2. analyze data and develop information, and
3. improve the process or activity and share the improvement.
DATA
generate and collect ANALYSIS
organize and evaluate IMPROVE AND LEARN
correct, prevent, and share
Data generation results from physical measurement, such as in-process monitoring and sampling;
work observations; peer review; worker interviews; quality problem and safety issue reports;
audits/inspections; and external enforcement actions. A process to collect these data is needed
for analysis activity to proceed.
Section 41
Analysis involves the application of quantitative and qualitative techniques to evaluate
performance of systems, components, individuals, and organizational units in comparison to
agreed-upon standards of practice. Example analysis outputs include performance indicators,
trend reports, suggested corrective/preventive actions, or improvement recommendations.
Learning and improving consist of processes and mechanisms for applying experience-based
knowledge to improve decision making, work planning, and work results (output). Learning and
improving are future-oriented. Improvement begins with corrective actions undertaken when
operational or performance expectations are not being met (i.e., actions to bring something back
into compliance with original requirements). Improvements are then made on the process
features that allowed or caused the failure to meet expectations. Improvements are undertaken
when opportunities are identified to enhance operational performance or safety.
6.4 How is Feedback and Improvement Applied to Work and Organizational Levels?
Work Activities - There are numerous opportunities for data generation, analysis, correction, and
improvement at each level and within and among each ISMS function. All personnel in DOE
and contractor organizations are important contributors to the feedback and improvement
function. Workers can contribute significantly to the feedback and improvement function at the
task/activity level due to their knowledge of the work process(es). For example, workers can
Volume 1 - Integrated Safety Management System Guide - Page 55
Chapter II 3-1-01
DOE G 450.4-1B
apply lessons learned to particular tasks and also submit their own experience to the lessons
learned program. Work planners, subject matter experts, supervisors, and line managers play a
significant role in evaluating work design and work performance, as well as the design and
performance of the ISMS programs and processes at the facility and institutional levels.
In practice, task or cross-functional teams often collect data, perform analysis, and identify
improvement informally or formally. Similarly, data generation, analysis, and improvement are
implemented through a number of mechanisms, including formal assessment programs,
performance indicators, post-job briefings, event critiques, toolbox briefings, and lessons-learned
programs. The nature of the work, the hazards, and the complexity of the organization guide the
formality of feedback and improvement mechanisms.
• At some level of the organization, feedback and improvement mechanisms should be
documented and routinely monitored for effectiveness and value.
• Corrective actions or improvements should be tracked for completion. The SMS Policy
requires the mechanisms intended to perform the feedback and improvement function to
be defined in the ISMS.
Organizational Levels - The feedback and improvement function applies to each ISMS safety
management function and principle and to each organizational level (institutional, facility, and
activity). Similarly, feedback and improvement concepts apply to people working in the system
(observation of work performance, conditions, equipment, etc.); hardware (equipment
performance); and software (procedures, policies, instructions).
Section 42
At the activity level, routine surveillance, operator rounds, and pre- and post-job briefings are
examples of mechanisms to provide feedback and identify improvements. At the facility level,
plan-of-the-day meetings and management walk-arounds are often used. Strategic planning and
issues management are examples of mechanisms for feedback and improvement at the institutional
levels. Lessons learned programs are an example of feedback and improvement mechanisms often
used at each of these three organizational levels. The FRAM, paragraph 9.6.1.1, requires DOE
elements to implement a lessons learned program for their organizations.
6.5 How Can Feedback Sources be Integrated?
One of the important challenges of the ISM feedback and improvement function is to effectively
integrate the various feedback systems and to prioritize improvement actions across systems. A
wealth of feedback mechanisms and associated feedback data exist throughout the Department, at
every level in the organization, including at the field office, program office, and corporate levels.
The challenge is to effectively characterize, analyze, integrate, prioritize, and communicate the
results of these various feedback mechanisms. The ultimate goal is to create a unified system of
feedback mechanisms, so that feedback information is obtained where necessary and acted upon
Page 56 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
appropriately. Consolidated feedback findings can be more influential when built from or
confirmed by multiple feedback mechanisms. For example, a variety of feedback mechanisms
may provide information on conduct of operations.
The following approaches should be considered for creating a system of feedback mechanisms.
6.5.1 Consolidating Feedback Mechanisms
Feedback mechanisms should be consolidated where possible and cost-effective. The
mechanisms may be consolidated at the issue identification stage by using a common form for all
personnel to identify potential deficiencies or feedback items (e.g., non-conforming items,
reportable occurrences, and radiation control anomalies). Consolidation may be accomplished
more effectively at the tracking stage by managing corrective actions from a variety of
mechanisms in a single database. Increased use of computerized information systems can
provide an effective tool for DOE line management to use in monitoring multiple data streams of
assessments and corrective action information. The approval of corrective actions can also be
consolidated by assigning a single manager to make ultimate disposition of recommended
improvement actions for a variety of feedback mechanisms. Disposition of safety issues and
prioritization of corrective actions can be improved by using systems that compare corrective
actions across feedback mechanisms. These systems can ensure that resources for corrective
actions are consistently applied, based on risk and other relevant factors. In many cases, it is not
possible to consolidate disparate feedback mechanisms because they have different users with
different needs, different sources of feedback, different data fields, and different time frames and
processes.
6.5.2 Forming Feedback Process Owner Groups
Section 43
Even though “process owners” of different feedback mechanisms have different data, different
users, and different processes, they share a number of similar objectives and challenges. An
organization’s SMS Description or QA program should identify the different feedback
mechanisms in use, the types of feedback items being tracked, the governing process directives,
the process owner or manager, the database systems used, periodic feedback reports produced,
and other process-related information. Process owners can assist senior management in
establishing a unified feedback and improvement system. Process owners should periodically
share experiences and lessons learned to better characterize, analyze, integrate, prioritize, and
communicate the results of their various feedback mechanisms.
6.5.3 Using Multiple Feedback Results to Conduct Reviews or Assessments
Periodic review of the results from multiple feedback mechanisms offer a “big picture”
perspective. This type of review can be used to identify common trends and management issues.
For example, managers may use the information to establish priorities for improvement activities
or to identify the feedback mechanisms that are more effectively used or managed. A
Volume 1 - Integrated Safety Management System Guide - Page 57
Chapter II 3-1-01
DOE G 450.4-1B
consolidated or overarching review of multiple feedback mechanisms is particularly useful at the
time of the annual ISM update. The DOE office may want to review all of the feedback
mechanisms to identify desired performance improvements, objectives, and commitments.
Similarly, the contractor may want to do a similar review to help identify beneficial measures,
objectives, and commitments.
Page 58 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter II
DOE G 450.4-1B
This page intentionally left blank.
Volume 1 - Integrated Safety Management System Guide - Page 59
Chapter III 3-1-01
DOE G 450.4-1B
CHAPTER III
ISMS DEVELOPMENT, IMPLEMENTATION, REVIEW,
AND APPROVAL
This chapter provides guidance on development, implementation, review, and approval of an
ISMS. This guidance is based on the SMS Policies, the DEAR, the FRAM, and experience
obtained during ISMS implementation activities at various facilities.
1. BACKGROUND
The DEAR ES&H clause [48 CFR 970.5223-1(b)(6)] requires the contractor to document its
ISMS and submit that documentation to the CO for review and approval. In addition, the FRAM
requires the Head of the Contracting Activity (HCA) to approve the safety management
descriptions. (Note that although the FRAM identifies the requirement for DOE approval of
“safety management descriptions,” the review and approval process currently being used seeks to
obtain information to support approval of the documented ISMS.)
The following guidance has been developed to assist both DOE and contractors in developing,
implementing, and describing their ISMSs to satisfy the requirements of the ISMS Policies,
DOE P 450.4 (Attachment 1), DOE P 450.5 (Attachment 2), DOE P 450.6 (Attachment 3),
DOE P 411.1 (Attachment 4), and the DEAR, 48 CFR Chapter 9 (Attachment 5). This guidance
will also be useful to the DOE line manager responsible for reviewing the contractor’s ISMS and
ensuring it is incorporated into the contract. This guidance is based on a number of documents,
including those identified above and the FRAM, and experience with using the Draft Integrated
Safety Management System Verification Process, Team Leader’s Handbook (DOE-SAFT-0065).
Appendix E provides a general summary of the review and approval process based on experience
acquired to date. This experience has primarily been gained from Defense Program facilities but
has included some Environmental Management and Energy Research facilities with nuclear
hazards.
Section 44
The guidance provided here emphasizes the need for the contractor to satisfy requirements in the
DEAR. In addition, for the ISMS to be effective, contractor and DOE field organizations must
integrate the contractor’s ISMS with DOE ISMS requirements outlined in the FRAM. The HCA
and the DOE review staff (e.g., budget specialists, environmental, safety, and health professionals,
and other technical personnel) should use the expectations in Sections 2, 3, and 4 of this chapter
when reviewing the contractor’s ISMS documentation.
This chapter provides a set of expectations and attributes that the HCA or other review personnel
can use during contract preparations to focus discussions on the ISMS guiding principles and
Page 60 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter III
DOE G 450.4-1B
core functions necessary to achieve an ISMS. Contractors should use the discussion of these
expectations and attributes to develop and implement ISMSs that integrate appropriate contractor
programs, procedures, controls, and initiatives affecting safety. In addition, this chapter
discusses the importance of the FRAM and FRAs for DOE Headquarters and field elements.
These documents, among other things, identify the DOE Headquarters and field element roles in
ensuring that integrated safety management is implemented on a continuing basis.
2. DEVELOPMENT
2.1 DOE Development
Most DOE requirements for developing and maintaining the ISMS are detailed in the FRAM and
the FRA documents being developed. This section highlights many important DOE functions in
the FRAM necessary for development of an ISMS.
2.1.1 Core Function 1, Define Scope of Work
a. Translate Mission into Work (FRAM 9.2.1). Section 9.2.1 of the FRAM
requires each field element to develop appropriate documents delineating its plan
of work, including scope, schedule, and funding allocations for each fiscal year.
b. Set Expectations (FRAM 9.2.2). Section 9.2.2 of the FRAM contains several
subsections that address the processes involved in establishing expectations:
• 9.2.2.1 Policies, Orders, Notices, Manuals, and Guides;
• 9.2.2.2 Technical Standards for Use Within DOE;
• 9.2.2.3 Rules;
• 9.2.2.4 Contract Performance Expectations;
• 9.2.2.5 Organization Functions, Responsibilities, and Authorities Manuals; and
• 9.2.2.6 Approval of Safety Management Systems Documentation.
These subsections define the many functions, authorities, and responsibilities of
DOE Headquarters and field element line management related to the development
of an ISMS. Some of these subsections merit additional descriptions.
Section 9.2.2.1 requires the CO to negotiate with each contractor, in consultation
with the FEM and CSO, to establish which directives or provisions of directives,
if any, are to be included in the contract. This section also requires the FEM to
develop and maintain controls to identify the directives or directives provisions
Volume 1 - Integrated Safety Management System Guide - Page 61
Chapter III 3-1-01
DOE G 450.4-1B
applicable to the field organization and to incorporate such provisions into the
field’s management systems.
Section 45
Section 9.2.2.4 requires the CSO to provide guidance to FEMs on expected
performance, to set goals and priorities, and to allocate resources. This section
also requires the FEM to ensure that contracts establish clear expectations and
work performance measures and to ensure the contracts define the actions
necessary to meet site mission and safety expectations. Section 9.2.2.4 also
requires the CO to approve and issue contracts that meet contract regulations and
provide clear expectations and performance measures to contractors regarding
work to be performed and the mission and safety requirements. The CO must also
ensure contracts clearly delineate contractor responsibilities regarding
subcontractors and suppliers.
Section 9.2.2.6 requires the HCA to approve ISMS descriptions and revisions.
Section 9.2.2.6 also requires the HCA to determine the need for the team to
review the safety management description. If a team review is needed, the HCA
selects members of the review team for specific applications and the team leader
from the approved list of senior technical managers provided by the Deputy
Secretary. (The CSO, FEM, and EH provide input to the Deputy Secretary in
developing and approving this List.)
c. Provide for Integration (FRAM 9.2.2.5). Section 9.2.2.5 of the FRAM specifies
requirements for lower-tier FRA documents to provide details of the functions,
responsibilities, and authorities of DOE Headquarters and field elements
necessary to integrate SMSs.
d. Prioritize Tasks and Allocate Resources (FRAM 9.2.3 and 9.2.4). Section 9.2.3
of the FRAM requires the CSO and the FEM to prepare budget execution
guidance in accordance with the DEAR, DOE O 135.1, and DOE M 135.1-1 to
allocate resources to contractors and to ensure that funds and resources are
appropriately used.
Section 9.2.4 requires the CSO to ensure that the ISMS adequately prioritizes
work to ensure that mission and safety expectations for the site are met within
available budget and resources.
Section 9.2.4 also requires the FEM to review and support development of
expected performance objectives and related CSO goals and priorities.
Section 9.2.4 requires the CSO to review and provide guidance to the FEM
regarding the ISMS and its ability to ensure that mission and safety objectives can
be met within budget constraints.
Page 62 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter III
DOE G 450.4-1B
The DOE CSOs and field elements are developing FRAs to translate the FRAM
requirements into requirements specific to their scope of work. These important
actions are going on in parallel with the review and approval of contractor ISMSs
and should focus on the above FRAM sections.
2.2 Contractor Actions to Develop an ISMS
2.2.1 Evaluation of Existing Systems
The existing ISMSs used by DOE and its contractors include a number of sound
procedures and manuals of practice that have been proven over many years. It is not the
intention of the DEAR clauses in Attachment 5 to change these proven safety practices.
The objective is instead to improve the integration of these practices and ensure that the
seven ISMS principles and five core functions provide the foundation for safety
management practices.
Section 46
Experience has demonstrated the value of reviewing the existing procedures and manuals
of practice prior to instituting any changes or attempting to describe how the existing
ISMS satisfies the DEAR requirements. The contractor should first identify the complete
set of safety programs at the facility or site. These programs are typically described in
facility- or sitewide policy statements and are implemented through the use of facility- or
sitewide procedures and/or manuals of practice. The following procedures and programs
should be identified as part of this initial effort:
• work definition and planning;
• hazards identification and analysis;
• definition and implementation of hazards controls;
• development and implementation of operating procedures;
• performance of work; and
• monitoring and assessment of performance for improvement.
Subsequently, the facility- or operation-specific manuals of practice should also be
identified for major facilities with procedures and practices unique to their operations.
Preparing a matrix similar to the one shown in Figure 6 can help with the analysis of how
well these programs meet the functions and principles of ISMS. More of these matrixes
may be required to address the sitewide and facility-specific procedures and practices.
When properly filled in, a matrix of this type can help analyze the completeness of the
ISMS.
Volume 1 - Integrated Safety Management System Guide - Page 63
Chapter III 3-1-01
DOE G 450.4-1B
G
ui
di
ng
P
ri
nc
ip
le
s
C
or
e
Fu
nc
tio
ns
L
in
e
M
gm
t
R
es
po
ns
ib
le
fo
r
Sa
fe
ty
C
le
ar
R
ol
es
&
R
es
po
ns
ib
ili
tie
s
C
om
pe
te
nc
e
C
om
m
en
su
ra
te
w
ith
R
es
po
ns
ib
ili
ty
Ba
la
nc
ed
Pr
io
ri
tie
s
ID
o
f S
af
et
y
St
an
da
rd
s &
R
eq
ui
re
m
en
ts
H
az
ar
ds
C
on
tr
ol
s
Ta
ilo
re
d
to
W
or
k
O
pe
ra
tio
ns
A
ut
ho
ri
za
tio
n
D
ef
in
e
Sc
op
e
A
na
ly
ze
H
az
ar
ds
D
ev
el
op
&
Im
pl
em
en
t
C
on
tr
ol
s
Li
st
a
pp
lic
ab
le
pr
oc
ed
ur
es
a
nd
m
an
ua
ls
o
f p
ra
ct
ic
e
Pe
rf
or
m
W
or
k
Fe
ed
ba
ck
&
C
on
tin
uo
us
Im
pr
ov
em
en
t
Fi
gu
re
6
.
M
at
ri
x
fo
r
U
se
in
R
ev
ie
w
o
f E
xi
st
in
g
Sy
st
em
.
Page 64 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter III
DOE G 450.4-1B
2.2.2 Gap Analysis
As the complete set of programs is identified, it is necessary to objectively analyze the
programs to determine which of the seven guiding principles and five core functions are
addressed by the various procedures and manuals of practice.
Accordingly, ISMS developers use the “gap analysis” to ensure integration and to identify
missing or weak elements. A gap analysis can be completed in conjunction with the
review of the existing system, using the matrix in Figure 6. In each cell of the matrix, the
contractor should enter the procedures from the existing manuals of practice and address
the core functions and guiding principles. When there is no cell entry or the procedure
entered is judged deficient, a gap in the ISMS for the facility, activity, or site being
analyzed is identified. For some types of facilities, one or more missing elements may be
appropriate. However, if the missing or weak element is deemed to be important,
corrective action should be taken to provide revised documentation that will permit
implementation of the necessary ISMS element.
3. IMPLEMENTATION
Section 47
3.1 DOE Actions Required to Support Implementation of ISMS
This section highlights several DOE functions in the FRAM that DOE must perform to support
implementation of an ISMS. Note that the ISMS expectations in Section 4 include expectations
for the DOE field office. Expectations related to DOE are narrowly focused on those functions,
responsibilities, and authorities that clearly interface with the contractor’s ISMS. It should be
clear from the outset that the DOE field office and the contractor must work as a team to ensure
effective integration of all safety management functions.
The sections below identify the important DOE functions in the FRAM that relate to
implementation of an ISMS. The contractor and the DOE field elements should both become
familiar with these because the contractor’s ISMS must support DOE in its performance of these
functions. These DOE functions flow from the Orders. Further guidance is provided in the
FRAM and FRAs.
3.1.1 Core Function 2, Analyze Hazards
a. Identify Hazards (FRAM 9.3.1). Section 9.3.1 requires the FEM to ensure the
contractor’s analysis covers the hazards associated with the work and is sufficient
for selecting safety standards.
Section 9.3.1 requires EH to monitor and provide technical support on hazard
identification and analysis activities as requested or directed by the CSO to ensure
Volume 1 - Integrated Safety Management System Guide - Page 65
Chapter III 3-1-01
DOE G 450.4-1B
the standards are sufficient to facilitate selection of the appropriate safety
standards. EH is also required to provide guidance for and interpretation of
requirements for all DOE elements on hazard analyses.
b. Analyze Hazards (FRAM 9.3.1). See “a” above.
c. Categorize Hazards (FRAM 9.3.2). Section 9.3.2 requires CSO approval of the
final facility categorization (if this authority has not been delegated). This section
also requires the FEM to concur in the facility/activity classification level based
on input from contractors regarding the type and amounts of hazards.
3.1.2 Core Function 3, Develop/Implement Hazard Controls
a. Identify Standards and Requirements (FRAM 9.4.1.1). For Hazard Category 1
nuclear facilities, FRAM 9.4.1.1 requires the FEM to direct the contractor to
propose site- or facility-specific standards tailored to the work and hazards. The
CSO must approve the specific requirements to be included in the contract, the
safety documentation, and the authorization basis. The FEM must ensure that
appropriate safety requirements in necessary functional areas are included in the
contracts. The CO must incorporate approved standards into contract
requirements. Similar requirements are given in Section 9.4.1.2 for Hazard
Category 2 and below nuclear facilities and non-nuclear facilities. However, for
these facilities, the CSO may retain or delegate approval authority. Sections
9.4.1.3, 9.4.1.4, and 9.4.1.5 provide guidance on options for exemptions.
b. Identify Controls to Prevent/Mitigate Hazards (FRAM 9.4.2). For Hazard
Category 1 nuclear facilities, Section 9.4.2.1 requires the FEM to direct the
contractor to document controls for prevention and mitigation of hazards and to
review the adequacy of the controls and their documentation. The FEM must also
provide line management oversight and ensure the implementation of hazard
mitigation programs and controls. The CSO must ensure the adequacy of these
controls and the adequacy of funding for their implementation.
Section 48
Section 9.4.2.2 provides similar requirements for Hazard Category 2 and 3 nuclear
and non-nuclear facilities. However, the CSO provides line management
oversight of the FEM program for these facilities.
c. Establish Safety Controls (FRAM 9.4.3). For Hazard Category 1 nuclear
facilities, Section 9.4.3.1 requires the CSO to approve the authorization basis and
associated safety documentation. The CSO may delegate this authority to a
Headquarters program line manager or to the FEM. The FEM must direct
preparation of the authorization basis and associated safety documentation and
Page 66 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter III
DOE G 450.4-1B
oversee implementation by the contractor. EH shall review and comment on the
authorization basis and associated safety documentation for Hazard Category 1
nuclear facilities where requested or directed. Section 9.4.3.2 contains similar
requirements for Hazard Category 2 and below nuclear and high and moderate
hazard accelerators. The CSO may also delegate this authority to the FEM.
Section 9.4.3.3 describes responsibilities for authorization protocols. This section
requires the CSO to ensure systems are in place for the development and
implementation of appropriate authorization protocols, including a protocol for
assessment support to the FEM. The HCA is required to determine the
appropriate protocol based on the work and hazard, to approve the authorization
agreement, and to append it to or modify the affected contract.
d. Implement Controls (FRAM 9.4.4). Section 9.4.4 requires the FEM to monitor
the proper implementation of controls, including contractor processes for USQs
and configuration management and compliance with the technical safety
requirements.
3.1.3 Core Function 4, Perform Work
a. Confirm Readiness (FRAM 9.5.1). Section 9.5.1.1 requires the FEM to ensure
that the ORR is conducted by an ORR team in accordance with DOE O 425.1,
STARTUP AND RESTART OF NUCLEAR FACILITIES. Section 9.5.1.3
requires the FEM to determine the appropriate level of readiness necessary for the
startup of non-nuclear facilities.
The FEM and EH must shut down work if a clear and present safety danger exists.
The FEM must promptly notify the CSO and EH.
b. Perform Work Safely (FRAM 9.5.2). Section 9.5.2 requires the CSO and the
FEM to ensure that the ISMS is properly implemented. The FEM must also
ensure contracts are properly implemented and must perform line management
oversight of the contractor’s worker, public, environment, and facility protection
programs. The FEM must also maintain day-to-day operational oversight of
contractor activities at applicable facilities through DOE Facility Representatives.
Section 9.5.3 requires the Secretarial Officer (SO) and the FEM to ensure
implementation of QA programs and to ensure that contractors implement quality
assurance programs.
Volume 1 - Integrated Safety Management System Guide - Page 67
Chapter III 3-1-01
DOE G 450.4-1B
3.1.4 Core Function 5, Feedback and Improvement
a. Collect Feedback Information (FRAM 9.6.1.1 and 9.6.1.2). Section 9.6.1.1
requires the CSO to implement a lessons-learned program and remain cognizant
of information likely to be useful in improving the performance of the programs
under that office’s direction. The CSO must also collect information for use in
this program from assessments of contractor and field element operations.
Section 49
Section 9.6.1.1 requires the FEM to direct the contractors to develop a lessons-
learned program and to monitor its implementation.
Section 9.6.1.2 requires the FEM to direct the contractor to report occurrences on
the Occurrence Reporting and Processing System (ORPS). The program manager
is responsible for approving ORPS reports. The FEM must review the reports and
approve proposed corrective actions, where authority is delegated, or recommend
approval decision to the CSO. EH is required to develop, maintain, and
implement the ORPS and to prepare and disseminate information obtained from
analysis of this information. EH must also develop requirements and guidance for
occurrence reporting, seek feedback for continuous improvement of ORPS, and
upgrade the requirements as appropriate.
b. Identify Improvement Opportunities (FRAM 9.6.1.3). Section 9.6.1.3 requires
EH to perform oversight of ES&H performance, to identify needed improvements,
and to communicate that information to CSOs, FEMs, and contractors as
appropriate.
c. Make Changes to Improve (FRAM 9.6.2). Section 9.6.2 requires all DOE
elements to continuously improve the efficiency and quality of operations and to
develop, implement, and track corrective actions in order to profit from prior
experience and the lessons learned.
3.2 Contractor Actions to Implement ISMS
As mentioned in Section 1 of this chapter, the contractor is required to provide a documented
ISMS. The documentation includes an ISMS description that explains how the existing
documented procedures and manuals of practice satisfy ISMS. Appendix F provides material
extracted from some of the existing ISMS description documents that illustrates approaches to
providing the descriptions.
Page 68 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter III
DOE G 450.4-1B
3.2.1 Preparing ISMS Documentation
The DEAR requires that the ISMS be documented. To a large extent, the required
documentation may consist of the contractor’s corporate procedures and manuals of
practice used to perform work. In addition, a data base may also be compiled based on
information from the existing procedures and manuals of practice and a gap analysis of
the type identified in Section 2 of this chapter. The ISMS description can serve as a “road
map” explaining the relationship of these documents to the activities being performed,
assuming these documents exist and are complete in their coverage of the DOE
requirements. If this is not the case, deficiencies in the documentation should be
identified and scheduled for correction prior to completion of the review and approval of
the system.
Generally, the ISMS description identifies existing policies, procedures, manuals of
practice, and other contractor ISMS mechanisms. Additionally, many contractors have
found it beneficial to provide details on the overall ISMS philosophy or vision, the
implementation mechanisms, and the integrating mechanisms. Most contractors have
organized their ISMS descriptions to reflect the core functions and guiding principles (see
Appendix F and the DEAR).
Section 50
a. Identifying and Describing Procedures and Manuals of Practice. As part of
the ISMS implementation process, the contractor should review and evaluate
existing policy manuals, procedure manuals, and workplace instructions. Some of
these will be sitewide documents while others will be specific to a facility or work
activity, including activities performed by subcontractors. The documentation of
interest includes business procedures and practices that allocate resources and
prioritize work, as well as work instructions intended to protect the public,
worker, and environment. This set of documentation currently exists at most sites
and facilities, but may not be readily identified with the DOE functions and
principles required in an ISMS. Contractors may find it appropriate to evaluate
how these manuals form an integrated system.
b. Describing Integrating Mechanisms. Documented procedures and practices do
not inherently produce the integration that is expected by DOE Policies and the
DEAR clauses. This is particularly true for sites that have many diverse facilities
performing work for several DOE program offices. It is also true that sitewide
programs usually exist to address safety, environmental, and waste minimization
activities that need to be integrated with specific programmatic work.
A number of mechanisms may be incorporated into the ISMS to encourage
integration. Specific business and work procedures may be used to support the
integration. Some organizations use regularly scheduled subject area meetings
Volume 1 - Integrated Safety Management System Guide - Page 69
Chapter III 3-1-01
DOE G 450.4-1B
(e.g., engineering councils) at various levels of the organization to encourage
integration and information exchange. Such councils can be part of the
documented business practices in the ISMS. Other integration mechanisms may
include sitewide maintenance manuals, sitewide safety meetings, and safety
boards. Reviews and assessments, both programmatic and sitewide, and feedback
of lessons learned to all programs are mechanisms that also contribute to
integration. Although DOE-STD-1120 is specifically written for disposition
activities, it provides guidance and examples for integrating planning, hazards
analysis, and controls, and the methodology is generally applicable to other parts
of the facility life cycle.
Typical sitewide programs that should be integrated into work activities include
engineering support, fire protection, emergency preparedness, maintenance,
environmental protection, waste management, industrial hygiene, occupational
safety, chemical safety, radiological protection, training, and conduct of
operations (including procedures).
An ISMS description should identify the integration of environment, safety, and
health into the contractor’s business processes for work planning, budgeting,
authorization, execution, and change control. This requires integration within the
line organizations and integration with the organizations supporting the line. The
ISMS description should address the flow-down of safety management to
subcontractors. The development of procedures and practices for prioritization of
both programmatic and sitewide work activities important to safety is an
important integration activity that should be documented and integrated with
interfacing DOE procedures and practices.
3.2.2 Additional Considerations
Section 51
Contractors that have successfully implemented an ISMS have appointed a group, team,
or board with responsibility for oversight, maintenance, and implementation of the ISMS.
Implementation is much more than producing good ISMS documentation and
disseminating it. As discussed in Chapter III, Section 2.2, the first step is generally to
identify weaknesses in the existing system and fix them through additional policies,
procedures, mechanisms, and/or training. A well-functioning team conducts periodic
meetings with the affected organizations to monitor progress, communicate changes to
ISMS procedures, and promote improvement of the ISMS. The need for a process to
evaluate ISMS effectiveness is included in the DEAR.
Contractors with complex nuclear facilities have also found it necessary to form or reform
integrating mechanisms to meet the intent of the ISMS Policy. Specifically, they have
generally constituted boards or panels that report to line management and have the
Page 70 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter III
DOE G 450.4-1B
responsibility for and authority to obtain functional area support to provide advice,
expertise, and/or approval as appropriate on ES&H integration issues. Some contractors
have found it useful to “pilot” any new integrating mechanisms (e.g., safety boards) at
one facility to work the bugs out before implementing it sitewide.
3.2.3 ISMS Attributes
The attributes listed below summarize DOE expectations for the overall performance and
documentation of the contractor’s ISMS.
• The ISMS is consistent with the DOE Policies, DEAR Requirements for
Integrated Safety Management, and HCA direction to the contractor.
• The ISMS description indicates how the contractor will evaluate and improve the
effectiveness of the ISMS.
• The ISMS description indicates how performance objectives and performance
measures are established in response to DOE program and budget guidance.
• The contractor directs, monitors, and verifies implementation of the ISMS as
described in the system description.
• Implementation and integration expectations and mechanisms are evident
throughout all organizational functions and across all organizations from the site
to the individual activities.
• The contractor has assigned responsibilities and established the mechanisms to
ensure that the ISMS is maintained and that the annual update information is
prepared and submitted.
4. EXPECTATIONS AND ATTRIBUTES OF ISMS DOCUMENTATION
This section describes the expectations and attributes of a contractor’s ISMS for the benefit of
those who must prepare the ISMS documentation and for reviewers who must evaluate adequacy
of the ISMS. The list of expectations provide summary descriptions of ISMS performance with
respect to the ISMS core functions and principles. The attributes identify specific criteria that
can be used to guide development and evaluation of an ISMS.
Responsibilities for review and approval of ISMS are specified in DOE M 411.1-1, which makes
the HCA responsible for approving the ISMS description and revisions. HCA responsibilities are
normally assigned to the manager of the cognizant DOE operations office, who is generally
known as the approval authority. To carry out these responsibilities, the approval authority must
Volume 1 - Integrated Safety Management System Guide - Page 71
Chapter III 3-1-01
DOE G 450.4-1B
Section 52
decide whether team review is needed, and, if it is, select members of the review team. If a
review team is needed, the approval authority selects the team leader from a list approved by the
Deputy Secretary. The team leader and the assembled team should use the guidance provided in
Volume 2, Appendix E, of this Guide and the Draft Integrated Safety Management System
Verification Process, Team Leader’s Handbook, Project Number SAFT-0065, to plan for and
conduct the ISMS review. The team reports the results of the review to the approval authority
along with a recommendation concerning approval of the ISMS.
DOE and its contractors should ensure that the ISMS that has been developed is consistent with
the objectives, guiding principles, and core functions required by the DEAR. The expectations
and attributes described below serve as a guide for addressing the five core functions and the
seven guiding principles in the contractor’s ISMS documentation. The acceptability of the level
of detail for each item should be based on the work and its associated hazards to ensure adequate
protection for workers, the public, and the environment. Note that ISMS expectations and
attributes include subjects to be addressed by the DOE field office. This is appropriate because
both the SMS Policy (DOE P 450.4) and the FRAM lay out expectations for DOE with respect to
the contractor’s ISMS.
4.1 Expectations for Core Function 1, Define Scope of Work, and Guiding Principle 4,
Balanced Priorities
DOE establishes a set of processes to ensure that the scope of work is adequately reviewed and
that interactions with the contractor proceed efficiently and effectively.
4.1.1 Translate Mission into Work
An ISMS should include a process to identify the activities necessary to accomplish the
assigned mission and a process to develop these activities into discrete tasks. DOE uses
strategic plans, goals, objectives, and mission statements to define the contractor’s broad
work assignments; the contractor in turn uses these assignments to prepare its work
proposals (see Chapter II, Section 2.1).
Attributes
• Expectations received from DOE as part of the field budget call are translated into
tasks that permit identification of resource requirements, priorities, and
performance metrics.
• DOE has incorporated DEAR 970.5223-1, Integration of Environment, Safety and
Health into Work Planning and Execution, into the contract.
• The DEAR requirements are communicated to management and workers.
Page 72 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter III
DOE G 450.4-1B
• The DEAR requirements are applied to subcontracts involving complex or
hazardous work.
4.1.2 Set Expectations
An ISMS should include processes for establishing performance objectives that address
safety objectives and the work assignments for the site. Such processes should include
DOE budget execution guidance and employee performance reviews and appraisals. As
directed in the DEAR ES&H clause, performance objectives and performance measures
are to be a result of the DOE budget guidance and are linked to mission accomplishment
as defined in strategic plans of DOE, the line programs (e.g., ER, EM, DP), and site-
specific mission objectives. Additionally, those safety objectives and measures
developed should demonstrate connection to the safety functions and principles identified
in the DEAR clause and reinforced in DOE P 450.4.
Attributes
Section 53
• DOE budget and work expectations and priorities are authorized and
communicated to the contractor [e.g., via a work authorization statement (WAS)
or other authorization document].
• Expectations for tasks flow from DOE to the Management and Operating (M&O)
or Management and Integrating (M&I) contractors, to the subcontractors, to the
individual facility, process, or work task as appropriate.
4.1.3 Provide for Integration
The DEAR ES&H clause [48 CFR 970.5223-1(b)(6)] and DOE P 450.4 require the
integration of environment, safety, and health functions and activities including pollution
prevention and waste minimization into work planning and execution. Integration should
be evident throughout all organizational functions at all organizational levels from the site
to the individual activity. Chapter I, Section 1, discusses in detail important considerations
for proper integration. Typical sitewide processes, procedures, and/or programs that need to
be integrated include engineering support, fire protection, emergency preparedness,
maintenance, environmental protection, waste management, industrial hygiene,
occupational safety, chemical safety, radiological protection, and training.
Attributes
• Environment, safety, and health management processes and procedures and/or
programs that apply to site, facility, and work activities are integrated (see
Section 4.4 below).
Volume 1 - Integrated Safety Management System Guide - Page 73
Chapter III 3-1-01
DOE G 450.4-1B
• The ISMS is applied to all types of work and addresses all types of hazards.
• ES&H requirements flow down to each person (employees, subcontractors,
temporary employees, visiting researchers, vendor representatives, etc.)
performing work.
• Line management is responsible for compliance with ISMS requirements
regardless of who is performing the work.
4.1.4 Prioritize Tasks and Allocate Resources
An ISMS should include processes for prioritizing and allocating work. To establish
balanced priorities, a formal method should be employed (see Chapter II, Section 2). The
necessary criteria for a quality risk-based prioritization method are described in DOE-DP-
STD-3023-98, Guidelines for Risk-Based Prioritization of DOE Activities. Protecting the
public, the workers, and the environment is always a priority in the planning and
performance of work activities. Balancing priorities is particularly important when
defining work, assessing hazards, identifying controls, and designing feedback and
continuous improvement programs. Once a decision is made to accomplish a particular
task, all the controls identified for that task are also necessary; as a result, the decision to
do the work includes a prioritization decision to apply the necessary resources as defined
by the agreed-upon controls (see Chapter II, Section 2).
Note that each of the processes described above would generally be part of the
contractor’s project management system, which would be used in defining operations
plans, work plans, and budgets (see Chapter II, Section 2).
Attributes
• DOE approves the contractor’s proposed tasks and prioritization of the mission
expectations transmitted to the contractor.
• The approved task identification, prioritization, and funding are subject to
configuration management processes to ensure formal change control.
• Task prioritization and funding allocation clearly address both ES&H and
programmatic needs.
• Line management provides input and approval of task prioritization and funding
Section 54
allocation.
Page 74 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter III
DOE G 450.4-1B
• Task prioritization and funding allocation clearly address commitments to and
agreements with DOE and stakeholders.
• Funding allocation provides resources to adequately analyze hazards associated
with the work.
• Funding allocation provides resources for implementation of hazard controls for
tasks being funded.
4.2 Expectations for Core Function 2, Analyze Hazards
Hazard analyses are performed at each organizational level—from the work defined in the sitewide
mission statement (as in an EIS), to the processes at an individual facility (SARs, HASPs, pollution
prevention, etc.), to the individual operational or maintenance item contemplated within a facility
(as in a job hazard analysis). The objective of hazards analysis is to develop an understanding of
the potential for a hazard to affect the worker, the public, and the environment and to develop a
seamless hazard analysis covering the site, facility, and work task being performed. The selection
of controls is then developed, in part, based on the hazard analysis.
In addition to the hazard identification and analysis performed to support line management,
safety-related training and heightened safety awareness through structured worker programs
should enable each worker to identify hazards in the workplace. It is important that workers
know where to go and what to do should a new hazard be identified. Environmental, safety, and
health professionals and line supervisors must be visible and available to assist workers in better
understanding hazards in the workplace. Administrative controls should be established through
the application of safe work standards and/or agreed-upon requirements to keep the workplaces
safe. Again, workers must question their understanding of what the hazard controls are in each
work area so that they fully understand the measures taken for their protection.
Each level of hazard analysis is the foundation for more detailed analysis; that is, a site-level
hazard analysis is used as the basis for the facility-level analysis, which in turn is used as the
basis for the activity- or task-level analysis. Hazard identification and analysis may occur at any
point in a project life cycle: as part of design, operations, maintenance, deactivation or
decommissioning.
4.2.1 Identify Hazards
An ISMS includes processes for identifying hazards (e.g., nuclear, industrial, fire,
external events, construction, environmental impact, etc.).
Volume 1 - Integrated Safety Management System Guide - Page 75
Chapter III 3-1-01
DOE G 450.4-1B
Attributes
• All types of hazards (e.g., nuclear, chemical, industrial, fire, external events,
construction, environmental impact, etc.) are addressed.
• The identification process is tailored to the type of hazard (e.g., walk-throughs for
industrial hazards), the type of work (e.g., design, construction, operation,
maintenance, deactivation and decommissioning, etc.), and the magnitude of the
hazard’s risk.
4.2.2 Analyze Hazards
An ISMS includes processes for analyzing hazards.
Attributes
• DOE and other regulatory requirements (e.g., those addressed by DOE 5480.23,
DOE 5480.25, 29 CFR 1910, 40 CFR, 10 CFR 830.200, etc.) are implemented as
appropriate to the work, the type of hazard identified, and the magnitude of its
risk.
• Hazard analysis methods address all types of hazards (e.g., nuclear, industrial fire,
external events, natural phenomena, construction, chemical, etc.).
Section 55
• Hazard analysis methods are applied to all types and stages of work (e.g., design,
construction, normal operations, surveillance, deactivation, maintenance, facility
modification, decontamination and decommissioning, etc.)
4.2.3 Categorize Hazards
An ISMS should include a process for categorizing hazards, such as that defined in
DOE-STD-1027 for nuclear facility operations. DOE O 430.1, LIFE-CYCLE ASSET
MANAGEMENT, its associated guides, and DOE-STD-1120 provide special hazard
identification and analysis methods that apply to facility disposition activities.
Attributes
• The hazard analysis method, level of detail, and resultant controls are appropriate
to the hazard category (see Chapter II, Section 3).
• Hazard categorization is consistent with DOE-STD-1027 and DOE O 430.1A.
Page 76 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter III
DOE G 450.4-1B
• Additional guidance for EM facilities hazard categorization (including chemical
hazards) is given in DOE-EM-STD-5502.
4.3 Expectations for Core Function 3, Develop/Implement Hazard Controls; Guiding
Principle 5, Identification of Safety Standards and Requirements; and Guiding
Principle 6, Hazard Controls Tailored to Work Being Performed
Before work is performed, the associated hazards are evaluated and DOE and the contractor
agree upon a set of ES&H requirements that, if properly implemented, will provide adequate
assurance that the public, the workers, and the environment are protected. Figure 4 (Chapter II)
illustrates the conceptual process for establishing sitewide ES&H requirements and applying
those requirements to individual tasks.
4.3.1 Identify Standards and Requirements
(Core Function 3 and Guiding Principle 5) An ISMS should include processes to
establish the set of ES&H requirements for the work consistent with the requirements of
the DEAR (see Attachment 4 and 10 CFR 830.120, QUALITY ASSURANCE). The
process for identifying ES&H requirements should be one of the existing, accepted
approaches, or it should be consistent with the objectives and concepts of these existing,
accepted approaches (Chapter II, Section 4.1). If a method/approach other than an
existing, accepted one is proposed, the contractor should provide a description for DOE
review and approval.
The use of applicable laws, statutes, Federal rules, national consensus standards, DOE
directives, and DOE Technical Standards is described in Chapter II, Section 4.1.
Attributes
• The contractor identifies, selects, and approves ES&H standards and requirements
with a process that provides adequate protection to the public, the workers, and
the environment.
• The identified ES&H standards and requirements are agreed upon and approved
prior to the commencement of the operations or work being authorized.
• The identified ES&H standards conform to applicable laws, statutes, Federal
rules, and DOE directives.
• DOE reviews, verifies, and approves the contractor’s ES&H standards and
requirements, as defined in S/RIDs, Work Smart Standards (WSSs), or other
DOE-approved processes.
Volume 1 - Integrated Safety Management System Guide - Page 77
Chapter III 3-1-01
DOE G 450.4-1B
4.3.2 Identify Controls to Prevent/Mitigate Hazards
Section 56
An ISMS should include a process for identifying and tailoring administrative controls,
safety controls, safety programs, and other conditions that affect the work to be performed
(Guiding Principle 6). The processes should use information obtained in the hazard
analysis and define the requirements for each phase or discrete task of the planned work.
As with the hazard analysis, controls developed at the site level should be used as the
basis for facility controls and those in turn used to develop controls at the work/task level.
DOE-STD-1120 describes the process of developing detailed, task-level controls from the
generic, site-level controls.
Attributes
• Controls are tailored to the hazards associated with the work or operations to be
authorized.
• Hazard prevention programs appropriate to the facility’s life cycle are
implemented.
• Controls are addressed for all activities (e.g., construction, normal operations,
surveillance, maintenance work, facility modifications, etc.).
• Controls are addressed for all aspects of the work (e.g., initiation, review,
authorization, and execution).
• All types of controls (e.g., radiation protection, pollution prevention, RCRA,
CERCLA, etc.) are addressed.
• A process or mechanism should be provided that recognizes the control hierarchy
(Section 4) and integrates those controls.
• Identified controls are agreed upon and approved prior to the commencement of
the operations or work being authorized.
• Hazard controls are reviewed and approved by DOE as appropriate to the work.
4.3.3 Establish Safety Controls
An ISMS should include a process to establish and document engineered controls,
administrative controls, safety controls, safety programs, and other conditions that affect
the work to be performed. Nuclear facility controls must comply with 10 CFR 830.120
and 10 CFR 830.200. An ISMS should include processes for establishing and
Page 78 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter III
DOE G 450.4-1B
maintaining the safety boundaries (safety envelope) for the work. Some contractors
achieve this objective through the use of work packages, job plans, maintenance plans,
and formally established safety requirements, such as Operational Safety Requirements
(OSRs) or TSRs. The latter requirements are used in DOE nuclear facilities (see
Chapter II, Section 4.3).
Attributes
• Safety boundaries for the work are established and maintained.
• Appropriate controls, conditions, and requirements (e.g., TSRs, OSRs, OSHA and
EPA regulations) that constitute the safety boundaries are identified (see Chapter II,
Section 4.3 for additional details).
• Contractor and DOE procedures define the processes for development, approval,
and maintenance of work authorization documentation including authorization
agreements.
• Safety controls are established using the control hierarchy (Section 4).
4.3.4 Implement Controls
An ISMS should provide a method to implement the controls identified at every level of
work and hazard. The methods should provide assurance that the controls remain in
effect so long as the hazard is present. A method should be briefly described for
translating/transmitting formal control documentation to the working level (“floor level”)
procedures used by workers (see Chapter II, Section 4.3).
Attributes
• Engineered controls, administrative controls, safety controls, safety programs, and
other conditions that affect the work to be performed are implemented.
Section 57
• Personnel are qualified (e.g., a personnel training and qualification program) to
discharge their responsibilities satisfactorily (Guiding Principle 3) (see Chapter II,
Section 1).
• Controls for all authorized work are developed, approved, and implemented.
Volume 1 - Integrated Safety Management System Guide - Page 79
Chapter III 3-1-01
DOE G 450.4-1B
4.4 Expectations for Core Function 4, Perform Work, and Guiding Principle 7,
Operations Authorization
4.4.1 Confirm Readiness
An ISMS should include a process to confirm that the facility or process and the
operational work force are in an adequate state of readiness prior to authorizing the
performance of the work [e.g., Guiding Principle 7, readiness assessments, ORRs,
Title III inspections (project design), etc.] (see Chapter II, Section 5).
Attributes
• Controls are adequate to mitigate the identified hazards and the controls are
implemented prior to commencement of work.
• Personnel are qualified and trained for performance of work in accordance with
the controls established (Guiding Principle 3) (Chapter II, Section 1).
• Controls are adequate to ensure safe work performance and to prevent accidents,
uncontrolled releases, or unacceptable exposures to hazardous materials
(Chapter II, Section 5).
• The necessary safety support functions and interfaces (e.g., training, maintenance,
radiological protection, etc.) are established (Chapter II, Section 5).
• The operability of the necessary facility or process systems required for safe
operation are verified in accordance with the bases established in appropriate
authorization agreements.
4.4.2 Operations Authorization
An ISMS should include a method for gaining authorization to conduct operations.
Provisions should be included to grant operations authorizations for each level of effort at
the site, facility, activity, or process. Such provisions or procedures may include an ORR,
approval to resume operations following a weekend shutdown, and authorization to start
individual procedures or work items using controls such as work clearance permits, shift
orders, or shift manager’s control. An ISMS should also include a method for updating
and configuration control of the operations authorization documentation, such as
authorization agreements, permits, SARs, etc. (see Chapter II, Section 5).
Page 80 - Integrated Safety Management System Guide - Volume 1
3-1-01 Chapter III
DOE G 450.4-1B
Attributes
• Conduct of operations at the individual facility or process level is authorized by a
process appropriate to the work.
• DOE verifies and authorizes work as appropriate before work commences.
4.4.3 Perform Work Safely
An ISMS should include processes for ensuring that safety requirements are integrated
into work performance (e.g., via work practices and floor level procedures, described in
Section 4.3.4 above). Processes should be adequate to ensure that work is performed
within the controls that have been developed and implemented. Controls may include site
or facility commitments, such as conduct of operations and maintenance programs;
worker safety programs; specified safety systems; or specific controls in work permits.
The controls may be specified in site-level programs or facility-specific authorization
bases documents. An ISMS should include provisions to ensure that ongoing work
continues to be performed within the specified and agreed-upon controls.
Attributes
• Controls remain in effect so long as the hazard is present.
Section 58
• Personnel are responsible and accountable for performance of work in accordance
with the controls established (Chapter II, Section 1).
• The controls established for safety are a discernible part of the work plan.
• DOE ensures that work is performed within controls.
4.4.4 Performance Measures
An ISMS should include a process to identify performance measures and indicators,
including safety performance measures for the work (see Section 4.1.2 above and
Chapter II, Sections 5 and 6).
Attributes
• Performance measures and indicators provide information that is truly a direct
indicator of how safely the work is being performed.
• Performance measures and indicators are clearly linked to performance objectives
and expectations.
Volume 1 - Integrated Safety Management System Guide - Page 81
Chapter III 3-1-01
DOE G 450.4-1B
• Performance measures and indicators are performance based.
• Performance measures and indicators are used by line managers as part of the self-
assessment process (see Chapter III, Section 5.2, and Appendix D of Volume 2).
4.5 Expectations for Core Function 5, Feedback and Improvement
All aspects of an ISMS should be subject to continuous improvement through an assessment and
feedback process, which should function at each level of work and at every stage in the work
process. To determine adequacy and/or performance in execution of the ISMS, DOE and the
contractor should establish and agree upon a set of objectives and criteria. When used in
determining whether implementation of the ISMS is adequate, these agreed-to objectives and
criteria may support a determination of contractor fees. These objectives and criteria may also be
useful in identifying those day-to-day performance indic