DOE G 441.1-1C Chg 1 (Admin Chg), Radiation Protection Programs Guide for Use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection
Functional areas: Administrative Change, Defense Nuclear Facility Safety and Health Requirement, Packaging and Transportation, Radiation Protection
Provides guidance for implementing the provisions of the functional areas contained in 10 CFR 835. The revision to the guide reflects changes in the June 2007 amendment to 10 CFR 835, Worker Safety and Health Program.
Admin Chg 1, dated 7-8-11, cancels DOE G 441.1-1C.
Version history and related documents
Supersedes
Earlier documents this one replaced.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
AVAILABLE ONLINE AT: INITIATED BY:
www.directives.doe.gov Office of Health, Safety and Security
DOE G 441.1-1C
05-19-08
Chg 1
07-08-11
RADIATION PROTECTION PROGRAMS GUIDE
for Use with
Title 10, Code of Federal Regulations, Part 835,
Occupational Radiation Protection
[This Guide describes nonmandatory approaches for meeting requirements. Guides are not
requirements documents and are not to be construed as requirements in any audit or appraisal for
compliance with the parent Rule, Policy, Order, Notice, or Manual.]
Department of Energy
Office of Health, Safety and Security
DOE G 441.1-1C i
5-19-08
TABLE OF CONTENTS
RADIATION PROTECTION PROGRAMS .............................................................. 1
1.0 PURPOSE AND APPLICABILITY ...................................................................... 1
1.1 USE OF CONSENSUS STANDARDS ...................................................... 2
1.2 ACRONYMS .............................................................................................. 3
2.0 DEFINITIONS ......................................................................................................... 6
3.0 RADIATION PROTECTION PROGRAMS ...................................................... 16
3.1 Implementation Guidance ......................................................................... 17
3.2 Organization and Administration .............................................................. 18
3.2.0 Administrative Processes .............................................................. 19
3.2.1 Radiological Control Organization ............................................... 20
3.2.2 Education, Training, and Skills ..................................................... 20
3.2.3 Internal Audit and Self Assessment .............................................. 22
3.2.4Radioactive Material Transportation Exclusion................................23
3.3 RPP Functional Elements ......................................................................... 24
Appendix 3.A Preparation, Review, and Approval of RPPs.................................. 26
4.0 ALARA ................................................................................................................... 39
4.1 Implementation Guidance ......................................................................... 39
4.2 ALARA Programs .................................................................................... 40
4.2.0 Formal Plans and Measures .......................................................... 40
4.2.1 Policy and Management Commitment.......................................... 41
4.2.2 ALARA Training .......................................................................... 41
4.2.3 Plans and Procedures .................................................................... 42
4.2.4 Internal Assessments/Audits ......................................................... 42
4.2.5 ALARA Design Review ............................................................... 42
4.2.6 Radiological Work/Experiment Administration and Planning ..... 46
4.2.6.0 Job/Task/Experiment Reviews....................................... 46
4.2.6.1 Consideration of Non-radiological Hazards .................. 47
4.3 Records ..................................................................................................... 48
Section 2
5.0 INTERNAL DOSIMETRY PROGRAM ............................................................. 49
5.1 Implementation Guidance ......................................................................... 50
5.2 Program Management and Administration ............................................... 51
5.2.0 General Requirements ................................................................... 52
5.2.1 Organization, Staffing, and Facilities ........................................... 52
5.2.1.0 Organization ................................................................... 52
5.2.1.1 Staffing ........................................................................... 53
5.2.1.2 Facilities and Resources ................................................. 53
5.2.2 Technical Basis Document ............................................................ 53
5.2.3 Internal Dosimetry Procedures Manual ........................................ 54
5.2.4 Quality Assurance ......................................................................... 54
5.3 Air Monitoring and Contamination Control Programs ............................. 54
5.3.0 Air Monitoring When There
Is No Practical Radiobioassay Method... ...................................... 55
5.3.1 Recourse for Technology Shortfall (DIL<MDA) ......................... 55
DOE G 441.1-1C ii
5-19-08
5.4 Individual Monitoring Program ................................................................ 56
5.4.0 Establishing the Need for Individual Monitoring ......................... 56
5.4.1 Investigation Levels/Derived Investigation Levels ...................... 57
5.4.2 Minimum Detectable Amount (MDA).......................................... 57
5.4.3 Frequency of Measurement........................................................... 58
5.4.4 Detection and Confirmation of Intakes ......................................... 58
5.4.5 Internal Dose Management ........................................................... 59
5.4.6 Planned Special Exposures ........................................................... 59
5.4.7 Medical Response ......................................................................... 60
5.5 Internal Dose Evaluation........................................................................... 60
5.5.0 Required Dose Calculations .......................................................... 60
5.5.1 Interpretation of Radiobioassay Data ............................................ 61
5.5.2 Evaluation of Internal Dose from Radiobioassay and Air
Monitoring Data ............................................................................ 61
5.5.3 Periodic Reevaluation of Internal Dose ........................................ 61
5.6 Recordkeeping and Reporting................................................................... 62
6.0 EXTERNAL DOSIMETRY PROGRAM............................................................ 65
6.1 Implementation Guidance ......................................................................... 67
6.2 Program Management and Administration ............................................... 68
6.2.0 General Requirements ................................................................... 68
6.2.1 Organization, Staffing, And Facilities .......................................... 69
6.2.1.0 Organization ................................................................... 69
6.2.1.1 Staffing ........................................................................... 69
Section 3
6.2.1.2 Facilities and Resources ................................................. 70
6.2.2 Technical Basis Document ............................................................ 70
6.2.3 Procedures ..................................................................................... 71
6.2.4 Quality Assurance ......................................................................... 71
6.3 Area Monitoring Program ......................................................................... 71
6.3.0 Monitoring Instruments and Devices ............................................ 72
6.3.1 Performance of Area Radiation Monitoring ................................. 72
6.3.2 Allowance for Physical Characteristics ........................................ 73
6.3.3 Recourse for Technology Shortfall ............................................... 73
6.4 Individual Monitoring Program ................................................................ 73
6.4.0 Establishing the Need for Individual Monitoring ......................... 73
6.4.1 Routine Monitoring of Individual External Doses........................ 75
6.4.1.0 Whole Body Monitoring ................................................... 76
6.4.1.1 Lens of the Eye Monitoring .............................................. 76
6.4.1.2 Skin and Extremity Monitoring ....................................... 77
6.4.1.3 Embryo/Fetal Monitoring ................................................. 77
6.4.1.4 Non-Uniform Radiation Fields ......................................... 77
6.4.1.5 Supplemental Dosimeters ................................................. 78
6.4.2 Lost, Damaged, or Contaminated Dosimeters .............................. 79
6.4.3 Nuclear Accident Dosimetry ......................................................... 79
6.4.4 Planned Special Exposures ........................................................... 80
6.4.5 Personal Protective Equipment ..................................................... 80
DOE G 441.1-1C iii
5-19-08
6.5 External Dose Evaluation ......................................................................... 80
6.5.0 Required Dose Calculations .......................................................... 80
6.5.1 Special Considerations .................................................................. 82
6.6 Recordkeeping and Reporting................................................................... 83
7.0 RADIATION GENERATING DEVICES ........................................................... 85
7.1 Implementation Guidance ......................................................................... 85
7.2 Administrative Organization and Controls ............................................... 86
7.2.0 Contractor Management................................................................ 86
7.2.1 RGD Custodian ............................................................................. 86
7.2.2 RGD Operator ............................................................................... 87
7.2.3 Qualified Expert ............................................................................ 87
7.2.4 Radiological Control Manager ...................................................... 88
7.2.5 Radiological Control Organization ............................................... 88
7.3 Development of Site-Specific Documents ................................................ 89
7.3.0 Radiological Monitoring ............................................................... 89
Section 4
7.3.1 Sealed Radioactive Source Leak Testing ...................................... 90
7.3.2 Area Posting .................................................................................. 90
7.3.2.0 Radiological Conditions................................................. 90
7.3.2.1 Operational Status .......................................................... 90
7.3.2.2 Maintenance Status ........................................................... 91
7.3.3 Training .........................................................................................92
7.3.4 Records 92
7.4 Engineered Safety Controls ...................................................................... 92
7.4.0 Shielding, Controls, & Safety Devices ......................................... 92
7.4.0.0 Shielding ........................................................................... 93
7.4.0.1 Access Control and Safety Devices ............................... 93
7.4.0.2 Interlocks........................................................................... 94
7.4.0.3 Device Controls ................................................................ 95
7.4.0.4 Run-Safe and Emergency Shutdown Devices ............... 95
7.4.0.5 Monitoring Instruments .................................................... 96
7.4.1 Guidance for Specific RGD Installations ..................................... 96
7.4.1.0 Accelerators ................................................................... 96
7.4.1.1 Electron Devices that Generate X-Rays Incidentally ....... 96
7.4.1.2 Cabinet X-Ray Systems ................................................. 97
8.0 EVALUATION AND CONTROL OF RADIATION DOSE TO THE
EMBRYO/FETUS.................................................................................................. 98
8.1 Implementation Guidance ......................................................................... 98
8.2 Declaration of Pregnancy/Withdrawal of Declaration .............................. 98
8.3 Work Restrictions Following Declarations of Pregnancy ........................ 99
8.4 Counseling .............................................................................................. 101
8.5 Dose Determination and Monitoring Methods ....................................... 101
8.5.0 Dose Determination .................................................................... 101
8.5.1 Monitoring Methods ................................................................... 103
8.6 Training ................................................................................................... 103
8.7 Record -Keeping and Reporting ............................................................. 103
DOE G 441.1-1C iv
5-19-08
Appendix 8.A Declaration of Pregnancy Form ............... ……………………….104
Appendix 8.B Withdrawal of Pregnancy Declaration Form .................................. 105
Appendix 8.C Embryo/Fetal Equivalent Dose Record Form ................................ 106
9.0 PORTABLE MONITORING INSTRUMENT CALIBRATION ................... 107
9.1 Implementation Guidance ....................................................................... 108
9.2 Instrument Selection ............................................................................... 108
9.2.0 Type Testing ............................................................................... 109
9.2.1 Acceptance Testing ..................................................................... 109
Section 5
9.3 Instrument Calibration ............................................................................ 109
9.4 Operability Tests ..................................................................................... 110
9.5 Maintenance ............................................................................................ 110
9.6 Calibration Equipment/Calibration Quality ............................................ 110
9.7 Laboratory Documentation ..................................................................... 111
9.7.0 Laboratory Protocol .................................................................... 111
9.7.1 Laboratory Records ..................................................................... 111
9.7.2 Instrument Calibration Records .................................................. 111
9.7.3 Instrument Location .................................................................... 112
9.8 Laboratory and Staff ............................................................................... 112
9.8.0 Laboratory ................................................................................... 112
98.1 Calibration Staff Qualifications .................................................. 112
9.8.2 Calibration Staff Training ........................................................... 113
9.9 Assessments ............................................................................................ 113
10.0 AIR MONITORING ............................................................................................ 114
10.1 Implementation Guidance ....................................................................... 114
10.2 Determining the Needs for Air Monitoring ............................................ 115
10.2.0 Exposure Assessment.................................................................. 116
10.2.0.0 Type and Frequency of Bioassay ............................. 116
10.2.0.1 Estimation of Dose ................................................... 117
10.2.1 Personnel Protection ................................................................... 118
10.2.1.0 Need for Posting .......................................................... 118
10.2.1.1 Effectiveness of Engineered Controls ...................... 118
10.2.1.2 Proper Respiratory Protective Equipment ............... 118
10.2.2 Early Warning ............................................................................. 119
10.3 Placement of Air Sampling and Real-Time
Air Monitoring Equipment ..................................................................... 120
10.3.0 Locations of Release Points and Individuals .............................. 120
10.3.1 Purpose of Sample ...................................................................... 121
10.3.2 Room Air Flow Patterns ............................................................. 121
10.4 Air Sampling Equipment……………… ....... ………………………… 122
10.4.0 Breathing Zone Air Monitoring .................................................. 122
10.4.1 Source-Specific Air Sampling .................................................... 122
10.4.2 Grab Sampling ............................................................................ 123
10.4.3 Operability Checks...................................................................... 123
10.5 Real-Time Air Monitoring Equipment ................................................... 123
Section 6
10.5.0 Instrument Selection ................................................................... 123
DOE G 441.1-1C v
5-19-08
10.5.1 Alarm Set Points ......................................................................... 124
10.5.2 Alarm Capabilities ...................................................................... 124
10.5.3 Operability Checks...................................................................... 124
10.6 Sample Analysis and Data Review ......................................................... 125
10.7 Quality Control and Quality Assurance .................................................. 125
10.7.0 Sample Identification, Handling, and Storage ............................ 126
10.7.1 Air Sampling and Real-Time Air Monitoring Equipment .......... 126
10.7.2 Counting Room Equipment ........................................................ 127
10.7.3 Audits.... ………………………....... …………………………...127
10.7.4 Recordkeeping ............................................................................ 127
10.8 Administrative Controls .......................................................................... 127
10.8.0 Technical Basis Document ......................................................... 127
10.8.1 Written Procedures...................................................................... 128
11.0 RADIOACTIVE CONTAMINATION CONTROL ......................................... 129
11.1 Implementation Guidance ....................................................................... 130
11.2 Contamination Control Program Management ....................................... 130
11.3 Engineered Controls................................................................................ 131
11.4 Administrative Control ........................................................................... 133
11.4.0 Work Authorizations ................................................................... 133
11.4.1 Access Control ............................................................................ 134
11.4.1.0 Entry Controls .......................................................... 134
11.4.1.1 Egress Controls ........................................................ 135
11.4.1.2 Posting and Labeling................................................ 136
11.4.2 Areas of Fixed Contamination .................................................... 136
11.4.3 Conduct of Radiological Work ................................................... 137
11.4.4 Personnel and Material Decontamination ................................... 137
11.4.4.0 Skin and Clothing Contamination ............................ 137
11.4.4.1 Wound Contamination ............................................. 138
11.4.4.2 Material and Area Decontamination ........................ 138
11.5 Contamination Monitoring...................................................................... 138
11.5.0 Contamination Control Values ................................................... 139
11.5.1 Monitoring .................................................................................. 140
11.5.2 Control of Material and Equipment ............................................ 142
11.5.3 Portal Monitors, Laundry Monitors, and Tool Monitors ............ 145
12.0 POSTING AND LABELING FOR RADIOLOGICAL CONTROL .............. 146
12.1 Implementation Guidance ....................................................................... 146
Section 7
12.2 General .................................................................................................... 146
12.2.0 Design...... ................ ...................................................................148
12.2.1 Content.. ...... ……………………………………………………148
12.2.2 Visibility ..................................................................................... 149
12.2.3 Conditions ................................................................................... 150
12.2.4 Accessibility ................................................................................ 150
12.2.5 Boundaries and Barriers .............................................................. 152
12.3 Controlled Areas ..................................................................................... 152
12.4 Posting for Control of Exposure to External Radiation .......................... 152
DOE G 441.1-1C vi
5-19-08
12.5 Posting for Control of Contamination..................................................... 153
12.5.0 Removable and Airborne Radioactive Contamination ............... 153
12.5.1 Areas of Fixed Contamination .................................................... 154
12.6 Radioactive Material Posting .................................................................. 154
12.7 Exceptions from Posting Requirements .................................................. 156
12.8 Radioactive Material Labeling ................................................................ 157
12.8.0 Radioactive Material Labeling .................................................... 157
12.8.1 Exceptions from Labeling Requirements .................................... 158
Appendix 12.A – Standard Radiation Warning Trefoil ......................................... 160
13.0 OCCUPATIONAL RADIATION PROTECTION
RECORD-KEEPING AND REPORTING....................................................... 161
13.1 Implementation Guidance ....................................................................... 161
13.2 Records to be Generated and Maintained ............................................... 162
13.2.0 Individual Monitoring and Dose Records ................................... 162
13.2.0.0 Internal Doses .......................................................... 163
13.2.0.1 External Doses ......................................................... 165
13.2.0.2 Summation of Internal and External Doses ............. 165
13.2.0.3 Lifetime Occupational Dose .................................... 166
13.2.0.4 Non-Uniform Exposure to the Skin ......................... 167
13.2.0.5 Planned Special Exposures (PSEs) .......................... 168
13.2.0.6 Doses Resulting from Emergency
or Accidental Exposures .......................................... 168
13.2.0.7 Records of Embryo/Fetus Dose
and Declared Pregnant Workers .............................. 169
13.2.0.8 Individual Monitoring Program Records ................. 169
13.2.0.9 Equipment Capabilities ............................................ 170
13.2.1 Monitoring and Workplace Records ........................................... 170
13.2.1.1 Work Authorizations ................................................ 172
13.2.1.2 Area and Material/Equipment
Monitoring Records ................................................. 172
13.2.1.3 Airborne Radioactivity Monitoring Records ........... 173
13.2.1.4 Records of Releases of Materials
Section 8
and Equipment from Radiological Areas ................. 174
13.2.2 Administrative Records .............................................................. 174
13.2.2.0 Radiation Safety Training ........................................ 174
13.2.2.1 ALARA Records ...................................................... 176
13.2.2.2 Facility Design ......................................................... 177
13.2.2.3 Entry and Access Control Records .......................... 177
13.2.2.4 Sealed Radioactive Sources ..................................... 177
13.2.2.5 Radiation Protection Program, Policies and
Procedures.. .................................................. ............178
13.2.2.6 Audits and Programmatic Reviews .......................... 178
13.2.2.7 Posting and Labeling................................................ 178
DOE G 441.1-1C vii
5-19-08
13.2.2.8 Calibration, Functional Tests, and Maintenance
Records .................................................................... 179
13.3 Reports .................................................................................................... 179
13.3.0 Reports to Individuals ................................................................. 179
13.3.0.0 Records Requested by Monitored Individuals ......... 180
13.3.0.1 Termination Dose Reports ....................................... 180
13.3.0.2 Reports to DOE ........................................................ 181
13.3.1 Reports of Planned Special Exposures ....................................... 181
13.4 Privacy Act Considerations..................................................................... 181
13.4.0 Informing Individuals ................................................................. 182
13.4.1 Identifying Individuals ................................................................ 182
13.4.2 Requesting Correction or Amendment of a Record .................... 182
13.4.3 Responding to Requests .............................................................. 182
13.4.4 Accounting for Disclosures......................................................... 182
13.5 Record – Keeping Standards ................................................................... 183
14.0 RADIATION SAFETY TRAINING .................................................................. 184
14.1 Implementation Guidance ....................................................................... 184
14.1.0 General Information .................................................................... 184
14.2 Determination of Required Training ....................................................... 185
14.3 Training Course Content ......................................................................... 186
14.4 Facility-Specific Materials ...................................................................... 189
14.5 Conduct of Radiation Safety Training .................................................... 189
14.6 Completion of Radiation Safety Training ............................................... 190
14.7 Periodic Radiation Safety Training ......................................................... 192
14.8 Use of Escorts in Lieu of Training .......................................................... 193
14.9 Refresher Training .................................................................................. 193
14.10 Other Training Programs ........................................................................ 193
Section 9
14.11 Training Effectiveness Evaluations ........................................................ 194
15.0 SEALED RADIOACTIVE SOURCE
ACCOUNTABILITY AND CONTROL........................................................... 195
15.1 Implementation Guidance ....................................................................... 195
15.2 Organization and Responsibilities .......................................................... 196
15.3 Receipt .................................................................................................... 197
15.4 Labeling and Storage .............................................................................. 198
15.5 Inventory ................................................................................................. 199
15.6 Leak Testing............................................................................................ 200
15.7 Handling and Disposal ............................................................................ 202
Appendix 15.A Example Individual Accountable
Sealed Radioactive Source Form ............................................................ 203
Appendix 15.B – Example Sealed Radioactive Source
Accountability Form ............................................................................... 205
16.0 TECHNICAL TABLES FOR OCCUPATIONAL
RADIATION PROTECTION ............................................................................. 206
DOE G 441.1-1C viii
5-19-08
Appendix A ............................................................................................................ 206
Derived Air Concentrations (DAC) For Controlling
Radiation Exposure To Workers At DOE Facilities ................................ 206
Appendix B ............................................................................................................ 263
Reserved .................................................................................................. 263
Appendix C ............................................................................................................ 265
Derived Air Concentration (DAC) For Workers From
External Exposure During Immersion in a Cloud
of Airborne Radioactive Material ............................................... 265
Appendix D ............................................................................................................ 267
Surface Contamination Values ................................................................ 267
Appendix E ............................................................................................................ 269
Values For Establishing Sealed Radioactive Source
Accountability And Radioactive Material Posting
And Labeling Requirements ....................................................... 269
Appendix F............................................................................................................. 272
Radiation Weighting Factors ................................................................... 272
Appendix G ............................................................................................................ 273
Tissue Weighting Factors ........................................................................ 273
REFERENCES ................................................................................................................. 275
DOE G 441.1-1C 1
5-19-08
RADIATION PROTECTION PROGRAMS
1.0 PURPOSE AND APPLICABILITY
Section 10
In March 2007 the U.S. Department of Energy (DOE) published an updated implementation
Guide which discussed acceptable methods for ensuring that the functional elements of
radiological activities will be managed and administered in accordance with Title 10, Code of
Federal Regulations (CFR), Part 835, Occupational Radiation Protection (DOE 2007a), hereinafter
referred to as 10 CFR 835. The March 2007 Guide was part of DOE’s efforts to eliminate
redundant requirements and guidance and compiled the guidance previously provided in a set
of 13 Implementation Guides.
On June 8, 2007, the DOE published an amendment to 10 CFR 835. This Guide reflects the
June 8, 2007, amendment to 10 CFR 835 and continues to provide cross-references to other
Guides, DOE-STD-1098-2008, RADIOLOGICAL CONTROL (DOE 2008a), hereinafter referred to as
the RCS, DOE directives, and industry consensus standards that provide detailed guidance for
implementing specific requirements in 10 CFR 835.
DOE is in the process of updating all of its guidance documents for occupational radiation
protection to reflect the 2007 amendment to 10 CFR 835. This Guide is one of the first
documents to be updated, and as such, the cross-references to other DOE guidance documents
will change as additional updated guidance documents are finalized. The references to other
DOE guidance documents, which are scheduled to be updated, will include the notation “Use
the revised version, reflecting the 2007 amendment to 10 CFR 835, when available.”
This Guide provides guidance with respect to implementing the provisions of all the
functional areas contained in 10 CFR 835. These are listed in Chapter 3 of this Guide. Specific
regulatory citations are provided in the body of the Guide.
This Guide amplifies the regulatory requirements of 10 CFR 835 and provides explanations
and examples of the basic requirements for implementing the requirements of 10 CFR 835. The
requirements of 10 CFR 835 are enforceable under the provisions of Sections 223(c) and 234A of
the Atomic Energy Act of 1954, as amended (AEC 1954).
This Guide was developed consistent with DOE M 251.1C, Departmental Directives Program
Manual, (DOE 2009a) which states that guides: (1) Provide preferred, nonmandatory,
supplemental information about acceptable methods for implementing requirements, including
lessons learned, suggested practices, instructions, and suggested performance measures; (2) Do
not impose requirements but may quote requirements if the sources are adequately cited; and
(3) Provide alternate methods that may be used if it can be demonstrated that they provide an
equivalent or better level of performance.
Except for requirements established by a regulation, contract, or administrative means, the
provisions in this Guide are DOE's views on acceptable methods of program implementation and
are not mandatory. Conformance with this Guide will, however, create an inference of
compliance with the related regulatory requirements. Alternate methods that are
demonstrated to provide an equivalent or better level of protection are acceptable. DOE
DOE G 441.1-1C 2
5-19-08
encourages its contractors to go beyond the minimum regulatory requirements and to pursue
excellence in their programs.
The word "shall" is used in this Guide in reference to requirements from 10 CFR 835.
Compliance with 10 CFR 835 is mandatory except to the extent an exemption has been granted
pursuant to 10 CFR 820, Procedural Rules for DOE Nuclear Activities (DOE 2007b). The words
"should" and "may" are used to denote optional program recommendations and allowable
alternatives, respectively.
Section 11
This Guide may be used by all DOE activities that are subject to the requirements of
10 CFR 835. The Administrator of the National Nuclear Security Administration (NNSA) will
assure that NNSA employees and contractors comply with their respective responsibilities under
this Guide.
1.1 USE OF CONSENSUS STANDARDS
As discussed in the Department of Energy's Radiological Health and Safety Policy DOE P
441.1, (DOE 1996), DOE has established a system of regulatory policy and guidance reflective of
national and international radiation protection standards and recommendations. Consistent
with this policy, this Guide endorses the use of several national and international
recommendations and standards, including several from the International Commission on
Radiological Protection, the National Council on Radiation Protection and Measurements, the
American National Standards Institute. In regards to national consensus standards, to the
extent possible, this guidance document endorses and is written to be consistent with following
non-governmental national consensus standards for radiation protection:
ANSI N13.3, Dosimetry for Criticality Accidents
ANSI N43.3-1993, General Radiation Safety -Installations Using Non-Medical X-Ray and
Sealed Gamma-Ray Sources, Energies up to 10 MeV
ANSI N323A-1997, American National Standard Radiation Protection Instrumentation
Test and Calibration, Portable Survey Instruments
ANSI N13.5-R1989, American National Standard Performance Specifications for Direct
Reading and Indirect Reading Pocket Dosimeters
ANSI N42.17A-1989, Performance Specifications for Health Physics
Instrumentation - Portable Instrumentation for Use in Normal Environmental Conditions
ANSI N42.17C-1989, Performance Specifications for Health Physics
Instrumentation - Portable Instrumentation for Use in Extreme Environmental
Conditions
ANSI N42.17B, Performance Specifications for Health Physics
Instrumentation - Occupational Airborne Radioactivity Monitoring Instrumentation
ANSI N2.1-1971(R1989), Radiation Symbol
DOE G 441.1-1C 3
5-19-08
ANSI N13.27, Performance Specifications for Pocket-sized Alarming
Dosimeter/Ratemeters
ANSI Z88.2-1992, Practices for Respiratory Protection
ANSI/HPS N13.30-1996, Performance Criteria for Radiobioassay
ANSI/HPS N13.41-1997, Criteria for Performing Multiple Dosimetry
ANSI/HPS N43.6-1997, Sealed Radioactive Sources Classification
ANSI /HPS N13.6-1999, Practice for Occupational Radiation Exposure Records Systems
ANSI/HPS N43.2-2001, Radiation Safety for X-Ray Diffraction and Fluorescence Analysis
Equipment
ANSI/HPS N13.49-2001, Performance and Documentation of Radiological Surveys
ANSI/HPS N43.5-2005, Radiological Safety Standard for the Design of Radiographic and
Fluoroscopic Industrial X-Ray Equipment
ANSI/NCSL Z540-1-1994, American National Standard for Calibration - Calibration
Laboratories and Measuring and Test Equipment -General Requirements
ANSI N322, American National Standard Inspection, Test, Construction, and
Performance Requirements for Direct Reading Electrostatic/Electroscope Type
Dosimeters
ANSI N320, American National Standard Performance Specifications for Reactor
Emergency Radiological Monitoring Instrumentation
1.2 ACRONYMS
The following are the acronyms frequently used in this document.
AEC U.S. Atomic Energy Commission
ALARA Low As Is Reasonably Achievable
ALI Annual Limit on Intake
ANS American Nuclear Society
ANSI American National Standards Institute
Section 12
BEIR Biological Effects of Ionizing Radiations
BRH Bureau of Radiological Health
BZ Breathing Zone
CAM Continuous Air Monitor
CED Committed Effective Dose
CFR Code of Federal Regulations
http://webstore.ansi.org/ansidocstore/product.asp?sku=N322%2D1997
http://webstore.ansi.org/ansidocstore/product.asp?sku=N322%2D1997
http://webstore.ansi.org/ansidocstore/product.asp?sku=N322%2D1997
DOE G 441.1-1C 4
5-19-08
CSO Cognizant Secretarial Officer
CTED Cumulative Total Effective Dose
DAC Derived Air Concentration
DIL Derived Investigation Level
DL Decision Level
DOE Department of Energy
DOE G DOE Guide
DOE O DOE Order
DOE P DOE Policy
DOELAP Department of Energy Laboratory Accreditation Program
DOE-STD DOE Standard
DPM Disintegrations per Minute
EPA Environmental Protection Agency
FOIA Freedom of Information Act
FR Federal Register
GERT General Employee Radiological Training
HEPA High Efficiency Particulate Air (filter)
HPS Health Physics Society
ICRP International Commission on Radiological Protection
ICRU International Commission on Radiation Units and Measurements
IL Investigation Level
ISO International Organization for Standardization
MDA Minimum Detectable Amount/Activity
NCRP National Council on Radiation Protection and Measurements
NCSL National Conference of Standards Laboratories
NIST National Institute of Standards and Technologies
NRC Nuclear Regulatory Commission
PNL Pacific Northwest Laboratory
PSE Planned Special Exposure
PSO Program Secretarial Office
RCO Radiological Control Organization
RCS DOE-STD-1098-99, RADIOLOGICAL CONTROL
RCT Radiological Control Technician
RGD Radiation-Generating Device
RMA Radioactive Material Area
RPP Radiation Protection Program
RWP Radiological Work Permit
RWT Radiological Worker Training
DOE G 441.1-1C 5
5-19-08
SLAC Stanford Linear Accelerator Center
TED Total Effective Dose
TEDE Total Effective Dose Equivalent
TLD Thermo Luminescent Dosimeter
TWD Technical Work Document
UNSCEAR United Nations Scientific Committee on the Effects of Atomic Radiation
USLW United States Law Week
DOE G 441.1-1C 6
5-19-08
2.0 DEFINITIONS
Terms from 10 CFR 835 are used consistent with their regulatory definition.
Acceptance testing: Evaluation or measurement of performance characteristics to verify
that certain stated specifications and contractual requirements are met.
Air monitoring: Actions to detect and quantify airborne radiological conditions by the
collection of an air sample and the subsequent analysis, either in real-time or offline laboratory
analysis, of the amount and type of radioactive material present in the atmosphere.
Air sampling: A form of air monitoring in which an air sample is collected and analyzed at a
later time, sometimes referred to as retrospective air monitoring.
ALARA committee: The multi-disciplined forum that reviews and advises management on
improving progress towards minimizing radiation dose and radiological releases.
ALARA design review: A systematic review to ensure that ALARA considerations are
evaluated, incorporated if reasonable, and documented for the design of new facilities and
modifications to existing facilities that involve the potential for exposure to ionizing radiation.
ALARA job/task/experiment review: A systematic pre- and post-job review of high-dose
and potentially high-dose activities to ensure that ALARA controls are planned, evaluated,
implemented where reasonable, and documented.
Section 13
Alarm set point: The count rate or concentration at which a real-time air monitor will
alarm, usually set to correspond to a specific airborne radioactive material concentration
averaged over time (e.g., DAC-hour alarm equivalent) by calculating the sample buildup rate on
the collection medium.
Alpha (α): The probability (not to be confused with an alpha particle) of a Type I error or
false positive. This is also called the false positive probability.
Analyte: The particular radionuclide to be determined in a sample of interest.
Baseline bioassay: An appropriate bioassay measurement obtained from a radiobioassay
program participant prior to beginning or resuming work with radioactive material.
Beta (β): The probability (not to be confused with a beta particle) of a Type II error or false
negative. This is also called the non-detection probability.
Boundary identifier: A hazard identifier that is used to define the boundary of an area.
Boundary: The line that defines the transition from one specified area to another.
Breathing zone air monitoring: A form of air monitoring that is used to detect and quantify
the radiological conditions of air from the general volume of air breathed by the individual,
usually at a height of 1 to 2 meters. See "personal air monitoring."
DOE G 441.1-1C 7
5-19-08
Cabinet X-ray system: An X-ray system with the X-ray tube installed in an enclosure
(hereinafter termed "cabinet") which, independently of existing architectural structures except
the floor on which it may be placed, is intended to contain at least that portion of a material
being irradiated, provide radiation attenuation, and exclude individuals from its interior during
generation of X-radiation. Included are all the X-ray systems designed primarily for inspection of
carry-on baggage at airline, railroad, and bus terminals, and in similar facilities. An X-ray tube
used within a shielded part of a building or X-ray equipment which may temporarily or
occasionally incorporate portable shielding is not considered a cabinet X-ray system.
Challenge examination: An examination administered to ascertain the knowledge of a
worker with respect to radiation safety and provide an exception to the required training.
Check source: A radioactive source, not necessarily calibrated, that is used to confirm the
continuing satisfactory operation of an instrument.
Confirmed intake: An intake confirmed by follow-up radiobioassay, by association with a
known incident, or by investigation.
Contaminated area: Any area meeting the definition of “contamination area,” “high
contamination area,” or “airborne radioactivity area” provided in 10 CFR 835.2(a).
Continuous air monitor (CAM): An instrument that continuously samples and measures the
levels of airborne radioactive material on a "real-time" basis and has alarm capabilities at preset
alarm set points.
Decision level (Lc): The amount of a count (Lc or L c) as final instrument measurement of a
quantity of analyte (Dc or D c) at or above which a decision is made that the analyte is definitely
present.
Derived investigation level (DIL): A value of a radiobioassay or air monitoring measurement
that indicates an intake resulting in a dose exceeding an Investigation Level (IL).
Detector: A device or component designed to produce a quantifiable response to ionizing
radiation, normally measured electronically.
Section 14
Direct (in vivo) radiobioassay: The measurement of radioactive material in the human body
utilizing instrumentation that detects radiation emitted from the radioactive material in the
body.
DOELAP: The Department of Energy Laboratory Accreditation Program. This program
defines a set of reference performance tests and provides a description of the minimum levels of
acceptable performance for personnel dosimetry systems and radiobioassay programs under
either DOE STD-1111-98, THE DEPARTMENT OF ENERGY LABORATORY ACCREDITATION
PROGRAM ADMINISTRATION (DOE 1998A), or DOE STD-1112-98, THE DEPARTMENT OF ENERGY
LABORATORY ACCREDITATION PROGRAM FOR RADIOBIOASSAY (DOE 1998b).
Dose assessment: The process of determining radiological dose and uncertainty included in
the dose estimate, through the use of exposure scenarios, bioassay results, monitoring data,
DOE G 441.1-1C 8
5-19-08
source term information, and pathway analysis.
Elimination: The biological removal of a radionuclide from the body by excretion,
perspiration, exhalation, secretion (e.g., breast milk), exfoliation (sloughing of dead tissue), or
excision.
Embryo/fetus: A developing human organism from conception until birth.
Escort: An individual with the prerequisite training necessary for unescorted access to the
area(s) where the escort activities will be performed and who is authorized to accompany and
ensure the safety of individuals who lack such training.
Evaluation: The process of arriving at a value for intake or dose that uses, among other
inputs, measurement results.
Excretion: The biological removal of a radionuclide from the body via one or more excretion
pathways: urine and feces.
Exempt sealed radioactive source: A sealed radioactive source that does not meet the
accountability criteria established in the definition of the term “accountable sealed radioactive
source” provided in 10 CFR 835.2(a).
Exposure: The general condition of being subjected to ionizing radiation, such as by
proximity to external sources of ionizing radiation or through intake of radioactive material into
the body. In this document, exposure does not refer to the radiological physics concept of
charge liberated per unit mass of air.
False negative: A Type II (β) error, that is, concluding that analyte is not present when in fact
it is.
False positive: A Type I (α) error, that is, concluding that there is analyte present when it is
not.
Fixed contamination: Radioactive material that cannot be readily removed from surfaces
by nondestructive means, such as casual contact, wiping, or brushing.
Fixed-location sampler: An air sampler located at a fixed location in the workplace.
Frisk or frisking: Process of monitoring individuals or surfaces for contamination by directly
scanning the surface with a suitable radiation detector.
Functional tests: Tests (often qualitative) to determine that an instrument is operational
and capable of performing its intended function. Such tests may include, for example, battery
check, zero setting, or source response checks.
Geotropism: A change in an instrument's reading as its orientation changes, due to
gravitational effects.
DOE G 441.1-1C 9
5-19-08
Gestation period: The time from conception to birth; usually 40 weeks or approximately 9
months.
Grab sampling: A single sample removed from the air over a short time interval, typically a
few minutes for high volume air samplers and less than one hour for low volume air samplers.
Section 15
Hot particles: Small, discrete, highly radioactive particles that can cause extremely high
dose rates to a localized area.
Indirect (in vitro) radiobioassay: The measurement or analysis of radionuclides in excreta or
other biological samples removed from the body.
Instrument (radiation detection): A complete system consisting of one or more
subassemblies (e.g., detector, readout, etc.) designed to quantify one or more characteristics of
ionizing radiation or radioactive material.
Intake: The amount of radionuclide taken into the body by inhalation, absorption through
intact skin, injection, ingestion, or through wounds. Depending on the radionuclide involved,
intakes may be reported in mass (e.g., μg, mg), activity (e.g., μCi, Bq), or potential alpha energy
(e.g., MeV, J) units.
Interlock: A device for precluding access to an area of radiation hazard by either preventing
entry or by automatically removing the hazard. One example is an electro-mechanical control
mechanism that interrupts the beam of ionizing radiation or shuts down the radiation
installation whenever the interlock is challenged.
Internal audits: Reviews and evaluations of the content and implementation of the
documented radiation protection program conducted by an organization neither responsible
nor accountable for developing program content or implementing the program.
Investigation level (IL): The value of the committed effective dose from an intake(s) of a
radioactive material by a worker at or above which, for regulatory purposes, is regarded as
sufficiently important to justify further investigation
Irradiator: Any gamma- or neutron-emitting sealed radioactive material that has the
potential to create a radiation level exceeding 500 rads (5 grays) in 1 hour at 1 meter and is
operated within the requirements of an RGD installation.
Minimum detectable amount (MDA): The smallest amount (activity or mass) of an analyte
in a sample that will be detected with a probability, β, of non-detection (Type II error) while
accepting a probability, α, of erroneously deciding that a positive (non-zero) quantity of analyte
is present in an appropriate blank sample (Type I error). The MDA is computed using the same
value of α as used for the Lc. The MDA depends on both α and β. Measurement results are
compared to the Lc, not the MDA; the MDA is used to determine whether a program has
adequate detection capability. The MDA will be greater than or equal to the Lc.
Modification: Any alteration of the shielding configuration, device or installation operating
practices, or the replacement of the original RGD (or component part thereof) with another that
has not been previously evaluated, inspected, monitored, and documented by the radiological
DOE G 441.1-1C 10
5-19-08
control organization. This definition also includes the collocation of additional or multiple
unevaluated RGDs within a previously evaluated installation.
Normal operation: Operation under conditions as recommended by the manufacturer of
the RGD with recommended shielding and barriers in place, and as specified in the operating
procedures and requirements for the RGD installation.
Occupied (occupiable) area: An area or location that may be physically accessible by
individuals (or body parts thereof) while a radiation-generating device is in operation.
Off-normal operation: An event or condition that adversely affects, potentially affects, or
indicates degradation in the safety, security, environmental, or health-protection performance
or operation of an RGD installation.
Section 16
Optimization methodology: A documented methodology which describes how the factors
affecting a protection decision, i.e., social, technical, economic, practical, and public policy, are
assigned values to compare detriment and benefits.
Performance demonstration: A demonstration by a student of the skills required to
perform certain designated activities.
Performance tests: Tests performed periodically over the life of an instrument to verify that
it continues to meet operational requirements. Examples of performance tests are response
time and geotropism.
Personal air monitoring: A form of breathing zone air monitoring that involves the sampling
of air in the immediate vicinity (typically within one foot) of an individual’s nose and mouth,
usually by a portable sampling pump and collection tube (e.g., a lapel sampler) worn on the
body.
Physical barrier: A bounding physical obstruction that prevents unimpeded access to an
area.
Portable air sampler: An air sampler designed to be moved from area to area.
Portable monitoring instrument: An instrument intended to be operated while being
carried by an individual.
Qualified expert: An individual having the knowledge, training, and recognition of such by
management to measure ionizing radiation, to evaluate safety techniques, to design RGD
installations, and to provide advice on radiation protection requirements.
Radiation protection program (RPP): The documented program, approved by DOE,
including, but not limited to, the plans, schedules, and other measures developed and
implemented to achieve and ensure continuing compliance with 10 CFR 835 and to apply the as
low as is reasonably achievable (ALARA) process to occupational dose.
Radiation-generating device (RGD): Collective term for devices which produce ionizing
radiation, including, certain sealed radioactive sources, small particle accelerators used for
DOE G 441.1-1C 11
5-19-08
single purpose applications which produce ionizing radiation (e.g., radiography), and electron
generating devices that produce X-rays incidentally.
Radiography: Examination of the structure of materials by nondestructive methods, using a
RGD.
Radiological control organization (RCO): An organization responsible for radiation
protection activities.
Radiological engineer: An individual who is responsible for providing technical support and
assistance to supervisors, planners, schedulers, principal investigators, and design engineers to
reduce occupational doses and the spread of radioactive materials.
Radiological work permit (RWP): The document that identifies radiological conditions,
establishes worker protection and monitoring requirements, and contains specific approvals for
radiological work activities. The RWP serves as an administrative process for planning and
controlling radiological work and informing the worker of the radiological conditions.
Radon: Unless otherwise specified, the isotope 222Rn.
Real time air monitor: An instrument that measures the levels of airborne radioactive
material on a "real-time" basis.
Refresher training: Periodic (usually annual) training that provides current information on
changes to radiation protection policies and procedures or changes in facility conditions, or to
promote awareness of infrequently encountered radiological safety matters.
Removable contamination: Radioactive material that can be removed from surfaces by
nondestructive means, such as casual contact, wiping, or brushing.
Section 17
Representative air sampling: The sampling of airborne radioactive material in a manner
such that the sample collected closely approximates both the amount of activity and the
physical and chemical properties (e.g., particle size and solubility) of the contaminant to which
the individuals may be exposed.
Retention: The amount of material which, after being taken into the body by inhalation,
ingestion, entry through an open wound, or absorption through the skin, exists in the whole
body, a compartment, an organ, or a tissue at a specified time.
RGD Custodian: An individual who is trained and designated to maintain cognizance over
accountability control of radiation-generating devices assigned to him or her.
RGD installation: The sum of the radiation source (e.g., sealed radioactive material or x-ray
tube), the associated equipment and component items, and the space in which they are
operated.
Five types of installations are defined as follows:
DOE G 441.1-1C 12
5-19-08
(1) Shielded installations are those designed to use the room-within-a-room concept to
limit access to the RGD beam and to place more emphasis on distance as opposed to
shielding for radiation protection and include shielded, exempt shielded, and cabinet
x-ray installations;
(2) Unattended installations are those designed for a specific purpose and that do not
require personnel in attendance for operation and include unattended gauge and other
unattended installations;
(3) Open installations are those designed to accommodate a specimen that is so large as to
make an exempt shielded installation impractical;
(4) X-ray diffraction & fluorescence analysis equipment, including both open and closed
beam installations; and
(5) Incidental, including devices that emit low levels of ionizing radiation as a byproduct of
their normal function, such as electron beam welders, electronic microscopes, and pulse
generators.
RGD Operator: An individual who is trained and deemed qualified to use a
radiation-generating device.
Routine radiobioassay monitoring: Any radiobioassay measurement made on a
predetermined, periodic schedule, to establish whether a worker has had any intake of
radioactive material since previous radiobioassay measurements.
Source custodian: An individual who is trained and designated to maintain cognizance over
accountability and control of assigned sealed radioactive sources.
Source response check: A functional test that includes the observation of the response of
an instrument to a check source.
Source user: An individual who is trained and authorized to use sealed radioactive sources.
Source-specific air sampling: Collection of an air sample near an actual or likely release
point.
Special radiobioassay monitoring: Any radiobioassay measurement that is required for
confirmation of a suspected intake of radionuclides, or is required for follow-up evaluation of
confirmed intakes.
State-of-the-art: The most advanced technology that is commercially available and
successfully field tested.
Technical work document (TWD): A term used to generically identify formally approved
documents that direct work, such as procedures, work packages, or job or research plans. TWDs
provide radiological and ALARA controls applicable to the task.
DOE G 441.1-1C 13
5-19-08
Section 18
Technology shortfall: A technology shortfall for routine radiobioassay exists when the
derived investigation level (DIL) for a well-designed and appropriate routine radiobioassay
program, using current or state-of-the-art methods and equipment, is less than the minimum
detectable amount/activity of the routine monitoring method (e.g., the DIL is less than the
MDA).
Termination radiobioassay: A radiobioassay measurement performed for the purpose of
documenting the retention of radioactive materials in the body due to occupational exposure
either upon termination of employment or upon the cessation of potential exposure to a specific
nuclide.
Test: A procedure whereby an instrument, component, or circuit is evaluated against
certain criteria for satisfactory operation.
Thoron: Unless otherwise specified, the isotope 220Rn.
Traceability: The ability to show, through documentation, that a particular instrument or
radiation source has been calibrated using either the national standard or a transfer standard in
a chain or echelon of calibrations, ultimately leading to a comparison with the national standard.
Type test: An initial test of one or more production instruments made to a specific design to
show that the design meets certain specifications.
Type I error: Incorrectly concluding from a result that there is analyte present; the
probability (α) of a Type I error is usually taken as 0.05. The decision level is determined on the
basis of an acceptable level of Type I errors.
Type II error: Incorrectly concluding from a result that there is no analyte present; its
probability (β) is usually taken as 0.05.
DOE G 441.1-1C 15
5-19-08
Uniform exposure: Hypothetical radiation field in which the fluence and its angular and
energy distributions are the same throughout the volume of interest.
Useful beam: That part of the primary and secondary radiation beam that passes through
the aperture, cone, or other device used for collimation.
DOE G 441.1-1C 16
5-19-08
3.0 RADIATION PROTECTION PROGRAMS
10 CFR 835 establishes specific requirements for the development, content, revision, and
approval of the documented RPP for a DOE activity. These requirements include identifying
existing and/or anticipated operational tasks and formal plans and measures for maintaining
occupational radiation doses ALARA. Guidance provided in this Guide, in combination with the
provisions of site radiological control manuals developed and implemented consistent with
guidance provided by the RCS for those regulatory provisions not addressed by this Guide,
provide reasonable assurance that a site RPP will meet the requirements of 10 CFR 835.
The RPP for a specific DOE activity is approved by the DOE, typically by the cognizant DOE
Headquarters Program Office. The RPP is intended to provide DOE reasonable assurance that
the DOE activity will be conducted in compliance with the provisions of 10 CFR 835. The RPP
also satisfies the requirement for an Implementation Plan found in other DOE directives.
Guidance concerning the specific documentation required for DOE approval of RPPs as required
in 10 CFR 835.101(f), (g), and (h) is provided in Appendix 3.A, PREPARATION, REVIEW AND
APPROVAL OF RADIATION PROTECTION PROGRAMS. Appendix 3.A is based on guidance which
previously was provided in DOE-STD-1082-94, PREPARATION, REVIEW, AND APPROVAL OF
IMPLEMENTATION PLANS FOR NUCLEAR SAFETY REQUIREMENTS. Guidance is also provided by
the cognizant DOE Headquarters Program Office.
Section 19
Program Offices will also provide guidance should DOE need to direct or make modifications
to an RPP as provided under 10 CFR 835.101(b). 10 CFR 835 permits changes, additions, or
updates to an RPP to become effective without prior DOE approval only if the changes do not
decrease the effectiveness of the RPP and the RPP, as changed, continues to meet the
requirements of the rule. Proposed changes that decrease the effectiveness of the RPP shall not
be implemented without submittal to and approval by DOE [10 CFR 835.101(h)]. Guidance
regarding the process for submitting and approving changes will be provided by the appropriate
DOE Headquarters Program Office.
The RPP is the basis for implementing operational radiation protection program
requirements for a DOE activity. A combination of various methods which can be used to
achieve regulatory compliance is discussed in this Guide. DOE recognizes that many of the
requirements of 10 CFR 835 are not new. Equivalent requirements were previously
promulgated in DOE Orders and the DOE Radiological Control Manual, which were implemented
under contractual obligations for most DOE activities involving occupational exposure to ionizing
radiation. Therefore, much of the RPP documentation required to ensure compliance with
10 CFR 835 has already been developed to ensure compliance with contractually-imposed
radiation protection standards. DOE recognizes that significant effort was expended in
upgrading radiation protection of the work force and does not intend for its contractors to
expend significant additional effort to develop and implement a separate, redundant program
to satisfy the RPP requirements of 10 CFR 835. The RPP should rely on existing documents, such
as the site radiological control manual, contractual agreements, procedures, and memoranda, to
effectively administer and manage regulatory commitments. However, the completeness of
these existing documents should be verified to ensure that all 10 CFR 835 requirements are
satisfied. This chapter of this Guide provides guidance on the management and administrative
aspects of the RPP to achieve and maintain compliance with specific requirements in
10 CFR 835.
DOE G 441.1-1C 17
5-19-08
Internal audits of the radiation protection program, including examination of program
content and implementation, shall be conducted through a process that ensures that all
functional elements of the program are reviewed no less frequently than every 36 months
(10 CFR 835.102). This Guide discusses the role of an internal audit program in effectively
managing and administering an RPP that complies with 10 CFR 835. These internal audits may
also be incorporated into quality assurance programs developed under 10 CFR 830 Subpart A,
Quality Assurance Requirements (DOE 2001a) and/or DOE Order 414.1C, Quality Assurance
(DOE 2005a). Functional elements of a comprehensive RPP are identified and discussed
throughout Section 3.2 of this Guide. The specific functional elements for a DOE activity will
depend upon the types of radiological work being performed and the radiological hazards
present. Other functional elements necessary for an integrated worker health and safety
program are not addressed in this Guide, but should be integrated with a radiological control
program. These other functional elements include: respiratory protection, radioactive material
shipment and receipt, radioactive waste management, and emergency response.
3.1 Implementation Guidance
Section 20
The approved RPP details how a DOE activity shall be in compliance with 10 CFR 835 and
should identify the functional elements appropriate for that activity. Additional documentation
should be developed and maintained to supplement the approved RPP to demonstrate that an
RPP can be effectively managed and administered to achieve compliance with 10 CFR 835. This
documentation typically includes a site radiological control manual developed to the guidance
contained in the RCS, as well as detailed implementing procedures, appropriate management
policy statements, and technical basis documentation. While this documentation need not be
part of the RPP, it should be clearly linked to the compliance commitments contained in the
RPP.
DOE has developed technical guidance to support effective implementation of programs to
ensure compliance with 10 CFR 835. The RCS was developed to provide detailed guidance on
and best practices for line management implementation of DOE's radiation protection
requirements. DOE has also developed a set of technical standards and handbooks addressing
radiation protection issues, such as training, internal dosimetry, or plutonium operations.
Additionally, DOE has developed a set of Radiological Control Technical Positions (RCTPs). The
RCTPs provide acceptable approaches to implementing specific provisions, or otherwise address
specific issues, of the Rule (available at
http://www.hss.energy.gov/HealthSafety/WSHP/radiation/tpp.html). In addition, this Guide
provides acceptable methods for achieving compliance with a variety of technical and
administrative requirements.
RPP changes may be implemented without prior DOE approval only if the RPP continues to
meet 10 CFR 835 requirements and the changes do not reduce program effectiveness
[10 CFR 835.101(h)]. Due to the wide range of activities subject to 10 CFR 835 and the variety of
methods used by these activities to ensure compliance, no specific criteria exist by which DOE
may predetermine whether an RPP change results in a reduction in program effectiveness.
Factors that should be considered include the impact of the proposed change(s) on:
radiological conditions in occupied areas;
DOE G 441.1-1C 18
5-19-08
individual and collective doses;
worker awareness of radiological conditions and controls;
management oversight and control of routine and non-routine radiological work
activities;
sufficiency of area and personnel monitoring programs;
completeness and irretrievability of records;
radiological control performance indicators;
adherence to consensus standards; and
other factors that ensure full implementation of the RPP.
Documentation of the rationale applied to RPP changes implemented without prior DOE
approval should be retained for future reference and demonstration of compliance.
The terms "likely" and "potential" have been used judiciously throughout the rule to
allow the use of professional judgment and experience in making decisions in specific
circumstances and provide the flexibility necessary to implement the regulatory
requirements under a broad range of activities. The technical bases and other
considerations should be documented when professional judgment is exercised. This
documentation should provide sufficient detail to permit individuals who are responsible for
implementing and assessing the RPP to clearly understand how regulatory compliance is
achieved and maintained. The RCS, Guides, and other DOE technical standards and
Section 21
handbooks are designed to facilitate development and implementation of a comprehensive
RPP commensurate with the radiological hazards associated with the DOE activity. In
addition, consensus standards, such as those developed by the American National Standards
Institute (ANSI) and the Health Physics Society (HPS), may provide additional guidance
concerning technical issues not specifically addressed by the Guides, RCS, DOE technical
standards, or other DOE guidance documents.
3.2 Organization and Administration
The RPP shall include plans, schedules, and other measures for achieving compliance with
10 CFR 835 [10 CFR 835.101(f)]. Plans should include establishing the organization and
administration of the RPP to ensure that the program is effectively implementing appropriate
measures that ensure regulatory compliance can be achieved and sustained. The authority and
responsibility for radiation protection should originate at the highest levels of line management
and should be emphasized throughout the organization. Ultimately, workers should be aware of
their individual responsibilities for radiation protection. Programmatic documentation should
be developed to document the organizational and administrative aspects of the RPP.
DOE G 441.1-1C 19
5-19-08
3.2.0 Administrative Processes
The degree of formality and scope of the associated administrative processes should be
commensurate with the radiological hazards encountered and complexity of the associated
control measures. More rigorous administrative processes should be implemented for more
complex or hazardous DOE activities. Administrative processes should include a hierarchy of
documents that clearly and unambiguously delineate management policies, requirements,
expectations, and objectives for the RPP. This documentation should typically include the
following:
Policy statement: The policy statement should articulate management’s commitment to
conduct radiological operations in a manner that will ensure the health and safety of all
its employees, contractors, and the general public. This policy statement should be
patterned after DOE P 441.1, Department of Energy Radiological Health and Safety
Policy (DOE 1996).
Site-specific radiological control manual or handbook: This document should be issued
and endorsed by senior management for a DOE activity. This manual or handbook
should address all functional elements of the RPP for the DOE activity.
Procedures: These documents should provide detailed instructions for implementing
various functional elements of the RPP. Responsibilities and actions required of
management and workers should be clearly and unambiguously stated. Written
procedures shall be developed and implemented as necessary to ensure compliance
with 10 CFR 835, commensurate with the radiological hazards created by the activity
and consistent with the education, training, and skills of the individuals exposed to
those hazards (10 CFR 835.104).
It is not necessary for written procedures to be developed and implemented for all
of the requirements of 10 CFR 835. Written procedures should be developed and
employed under the following circumstances:
– worker health and safety are directly affected;
– the expected outcome for the process or operation requires that a specific
method be followed;
– the process or operation is infrequently used and competence training cannot
assure adequate implementation; or
Section 22
– to document the approved method to implement specific processes or
operations. In evaluating the need for written procedures, consideration shall
be given to the level and extent of the radiological hazards, the complexity of
the measures required to achieve compliance, and the education, training and
skills of the individuals who must implement those measures (10 CFR 835.104).
Under such a regimen, a low hazard activity employing a stable staff of highly
educated and skilled workers having demonstrated an advanced knowledge of
radiation protection principles and practices could have fewer and less detailed
DOE G 441.1-1C 20
5-19-08
procedures than a higher hazard activity employing a transient workforce with
less knowledge of radiation protection practices and principles. This Guide
provides additional guidance regarding specific procedural aspects of the RPP.
Technical basis documents: Document decisions and approaches used to achieve
regulatory compliance, such as those decisions where professional judgment has been
exercised. The document should include supporting analyses and justifications
sufficient to demonstrate that regulatory compliance can be achieved and maintained.
This Guide contains specific recommendations for documenting the technical basis for
various RPP functional elements.
10 CFR 835 specifies the frequency for performing certain activities. Internal audits shall be
conducted on a 36 month cycle (10 CFR 835.102); radiation safety training shall be conducted
every twenty four months [10 CFR 835.901(e)]; and accountable sealed radioactive sources shall
be inventoried and leak tested every six months [10 CFR 835.1202(a) and (b)]. DOE expects that
those entities responsible for ensuring compliance with the rule will undertake those measures
necessary to perform the required activities within the prescribed time frame (e.g., if a sealed
radioactive source is leak tested on January 15, DOE would expect the subsequent leak test to
be performed on or before July 15 of the same year). 10 CFR 835.3(e) allows a grace period of
up to 30 days when operational or scheduling considerations preclude adherence to the
required schedule (e.g., the leak test could be performed no later than August 14 of the same
year). If the provisions of 10 CFR 835.3(e) are exercised, documentation of the schedule
deviation should be developed and include a discussion of the specific activity involved and the
reason for the schedule deviation. Schedule extensions beyond the 30 day grace period can
only be granted through the regulatory exemption process under 10 CFR 820.62.
3.2.1 Radiological Control Organization
A radiological control organization should be established to support line managers and
workers. To function effectively and be consistent, as necessary, with the requirements in DOE
O 226.1, Implementation of Department of Energy Oversight Policy (DOE 2005b) the radiological
control organization should be independent of the line organizational element responsible for
production, operation, or research activities, and should have an equivalent reporting level.
Radiological control organization function is discussed in detail in the RCS. Other organizational
schemes that allow effective compliance with the standards set forth in 10 CFR 835 should be
considered to address site- or facility-specific needs.
3.2.2 Education, Training, and Skills
Section 23
Individuals responsible for developing and implementing measures necessary for ensuring
compliance with the requirements of 10 CFR 835 shall have the appropriate education, training
and skills to discharge these responsibilities (10 CFR 835.103). These individuals can include
technical and management personnel within the radiological control organization, independent
assessors, and line managers responsible for radiological work activities. In addition,
10 CFR 830.122(b), Quality Assurance Criteria, specifies that nuclear facility personnel shall be
trained and qualified to ensure they are capable of performing their assigned work.
DOE G 441.1-1C 21
5-19-08
DOE previously issued requirements and guidance with regard to education, training, and
skills for many categories of personnel, including individuals responsible for developing and
implementing measures necessary for ensuring compliance with the requirements of
10 CFR 835. Some of these requirements are addressed in DOE O 426.2, Personnel Selection,
Training, Qualification, and Ceftification Requirements for DOE Nuclear Facilities (DOE 2010a).
This order establishes training and qualification requirements for technical professionals and
management personnel operating defense nuclear facilities. While these requirements are not
mandatory for all DOE facilities, this information may be useful for all DOE facilities in
developing training programs and standards for the education, training, and skills appropriate
for personnel to achieve compliance with the requirements of 10 CFR 835.103 and
10 CFR 830.122(b).
Key radiation protection positions are identified in DOE STD-1107-2007, Chg 1.
KNOWLEDGE, SKILLS AND ABILITIES FOR KEY RADIATION POSITIONS AT DOE FACILITIES (DOE
2007g). This document supplements the requirements discussed above by synthesizing
guidance from several source documents into a single reference. DOE STD-1107-2007 describes
the level of knowledge, skills, and abilities for personnel in key radiation protection involved
with DOE activities. The approach taken in DOE STD-1107-2007 reinforces the DOE’s emphasis
on establishing a system of criteria for key radiation protection positions that reflects the
increasing levels of education, training, and skills needed for positions of increasing
responsibility. The information contained in this standard should be strongly considered when
evaluating the education, training, and skills of personnel in key radiation protection positions.
The standards in DOE O 426.2 and DOE STD-1107-2007 are based on DOE, Nuclear
Regulatory Commission, and related industry standards and provide an acceptable method for
achieving compliance with the requirements of 10 CFR 835.103.
DOE STD-1107-2007 includes radiological control technicians (RCTs) in the list of key
radiation protection positions. While 10 CFR 835 does not establish specific requirements for
RCT training, DOE considers the typical job functions associated with RCTs to be critical in
implementing an acceptable RPP. These typical job functions include: prescribing and
implementing radiological work controls, performing radiological monitoring, responding to
radiological incidents, or evaluating radiological conditions in the workplace. Individuals
performing these functions shall meet the provisions of 10 CFR 835.103. Chapter 6, Part 4, of
the RCS discusses the essential elements of RCT training and qualification, including qualification
standards, oral examination boards, and continuing training. In support of these elements, DOE
has developed and maintains the core course for RCTs. DOE considers the DOE-developed core
course for RCTs, augmented with site specific training, an acceptable level of training for
individuals performing the typical job functions associated with RCTs. As is the case with using
any of the DOE-developed training courses, sites need to evaluate the individual’s job functions
and ensure the adequacy of the training provided.
Section 24
To ensure that the work performed by RCTs receives the appropriate level of review and
evaluation, it is important that RCT Supervisors receive a higher level of training and maintain a
higher level of knowledge than those expected of RCTs. Chapter 6, Part 4 of the RCS also
provides guidance on the essential elements of RCT Supervisor training and qualification,
including continuing training and oral examination boards.
DOE G 441.1-1C 22
5-19-08
DOE developed and implemented core courses to enhance the content of training provided
to general employees, radiological workers, and radiological control technicians across the DOE
complex and bring these core training programs up to a standard consistent with the
commercial industry. The use of the core courses is not mandatory. However, these courses
should strongly be considered as a basis for developing and implementing radiation safety and
radiological control technician training programs. Additional guidance regarding compliance
with the Subpart J requirements is provided in Chapter 14 of this Guide.
DOE has also sponsored development of additional training courses and guidance. DOE
strongly encourages its operating entities to implement these courses and guidance. These
courses and guidance, when augmented with site specific information and appropriately revised
to reflect the most current regulatory requirements, provide acceptable approaches for
providing radiation safety training or training for individuals responsible for developing and
implementing measures necessary for ensuring compliance with the rule. These courses
include:
DOE-HDBK-1130-2008; RADIOLOGICAL WORKER (RW) TRAINING MATERIALS; APPENDIX
A, RADIOLOGICAL CONTROL TRAINING FOR SUPERVISORS. (DOE 2008c)
DOE-HDBK-1145-2008; RADIOLOGICAL SAFETY TRAINING FOR PLUTONIUM FACILITIES
(DOE 2008d)
DOE-HDBK-1141-2008; RADIOLOGICAL ASSESSOR TRAINING (DOE 2008e)
DOE-HDBK-1129-2008; TRITIUM SAFE HANDLING AND STORAGE(DOE 2008f)
DOE-HDBK-1106-2008, RADIOLOGICAL WORKER TRAINING; Appendix B: RADIOLOGICAL
CONTAMINATION CONTROL TRAINING FOR LABORATORY RESEARCH (DOE 2008g)
DOE-HDBK-1108-2002; RADIOLOGICAL SAFETY TRAINING FOR ACCELERATOR FACILITIES
(DOE 20025b)
DOE-HDBK-1130-2008, RADIOLOGICAL WORKER (RW) TRAINING MATERIALS; Appendix
C: RADIOLOGICAL SAFETY TRAINING FOR RADIATION-PRODUCING (X-RAY) DEVICES (DOE
2008h)
DOE-HDBK 1110-2008, ALARA TRAINING FOR TECHNICAL SUPPORT PERSONNEL (DOE
2008b)
DOE-HDBK-1113-2008, RADIOLOGICAL SAFETY TRAINING FOR URANIUM FACILITIES
(DOE 2008i)
DOE-HDBK-1122-2009, RADIOLOGICAL CONTROL TECHNICIAN TRAINING (DOE 2009a)
3.2.3 Internal Audit and Self Assessment
Internal audits and self assessments are two of the numerous checks and balances needed
in an effective RPP. Internal audits of the RPP, including examination of program content and
http://www.eh.doe.gov/radiation/RST/rct3/rct-web-cover.htm
DOE G 441.1-1C 23
5-19-08
implementation, shall be conducted through a process that ensures that all functional elements
of the program are reviewed no less frequently than every 36 months (10 CFR 835.102). The
RCS discusses how assessments, including internal audits, provide independent feedback to
senior line managers concerning the implementation of the RPP.
Section 25
An audit plan or mechanism should be developed that identifies the functional elements of
the RPP and the schedule for review to ensure that over a 36 month period, all of the functional
elements are reviewed. Internal audits should be conducted on a continuing basis. DOE
cautions against conducting a single comprehensive internal audit of the entire RPP once every
three years. DOE does not believe that such an approach is effective in assuring that a DOE
activity will be conducted in conformance with its approved RPP. DOE recommends that, at a
minimum, an annual, broad scope audit of the program be conducted. Under this approach, the
audit plan would identify each functional element to be reviewed during the annual audit and
ensure that all functional elements would be reviewed during a 36 month cycle. Thus, the RPP is
under continuing review and deficiencies can be identified and corrected in a timely manner.
The functional elements of a comprehensive RPP are discussed in this Guide. All of these
functional elements may not be applicable to a specific DOE activity, but should be selected
based upon the type of radiological work being performed and the radiological hazards
encountered.
Internal audits should be conducted by individuals who are organizationally independent
from the organizations responsible for developing and implementing the RPP.
3.2.4 Radioactive Material Transportation Exclusion
10 CFR part 835 excludes radioactive material transportation not performed by DOE or a
DOE contractor (10 CFR 835.1(b)(7)). The intent is to exclude from 10 CFR part 835
transportation by the U. S. Postal Service or a commercial carrier, such as FedEx or UPS, which
transport radioactive material as part of their normal operations. A company or subsidiary of a
corporation that operates a DOE facility would not be considered a commercial carrier - even if
such an organization transports radioactive material as part of its contractual agreement with
DOE. Activities related to transportation such as the preparation of material or packaging for
transportation, storage of material awaiting transportation, or application of markings and
labels required for transportation is not included in the exclusion (See 10 CFR 835.2, Definitions,
Radioactive material transportation).
Subparts F (Entry Control Program) and G (Posting and Labeling) do not apply to radioactive
material transportation conducted by a DOE individual or DOE contractor, when the radioactive
material is under the continuous observation and control of an individual who is knowledgeable
of and implements required exposure control measures or when conducted in accordance with
Department of Transportation regulations or DOE orders that govern such movements (10 CFR
835.1(d)). This does not affect the application of requirements to radioactive material
transportation in the other subparts of 10 CFR part 835. In accordance with the definition of
“radioactive material transportation,” the exclusion applies while the material is in the process
of undergoing movement, including nominal stoppages such as for traffic considerations or
refueling activities.
DOE G 441.1-1C 24
5-19-08
Occupational doses received as a result of radioactive material transportation performed by
other than the DOE or a DOE contractor, shall be considered to the extent practicable when
determining compliance with the occupational dose limits (10 CFR 835.1(c)). Occupational
doses received by DOE or DOE contractor employees while conducting radioactive material
transportation shall be considered when determining compliance with the occupational dose
limits.
Section 26
3.3 RPP Functional Elements
This section identifies the programmatic functional elements of a comprehensive RPP. For
each element, the following table identifies the applicable regulatory provisions, contractual
requirements, and recommended guidance document(s) which are useful in achieving
compliance with these provisions.
DOE G 441.1-1C 25
5-19-08
Functional Element Regulatory Provision Contractual/Guidance
Document
1. Organization and Administration 10 CFR 835, Subpart B Chapter 3.0 of this Guide
2. ALARA Program 10 CFR 835.101(c), Subpart K Chapter 4.0 of this Guide.
3. External Dosimetry Program 10 CFR 835.401 (a), 402(a), (b) Chapter 6.0 of this Guide.
4. Internal Dosimetry Program 10 CFR 835.401(a), 402(c), (d) Chapter 5.0 of this Guide.
5. Area Monitoring and Control
a. Area Radiation Monitoring 10 CFR 835.401(a) Chapter 6.0 of this Guide.
b. Airborne Radioactivity Monitoring 10 CFR 835.209, 401(a), 403 Chapter 10.0 of this Guide.
c. Contamination Monitoring and
Control
10 CFR 835.401(a), Subpart L Chapter 11.0 of this Guide.
d. Instrument Calibration and
Maintenance
10 CFR 835.401(b) Chapter 9.0 of this Guide.
6. Radiological Controls
a. Radiological Work Planning 10 CFR 835.501(d), 1001(b),
1003
DOE-STD-1098-2008,
RADIOLOGICAL CONTROL
b. Entry and Exit Controls 10 CFR 835, Subpart F Chapter 7.0 of this Guide.
c. Radiological Work Controls 10 CFR 835, Subpart F, 1003 Chapter 7.0 of this Guide.
d. Posting and Labeling 10 CFR 835, Subpart G Chapter 12.0 of this Guide.
e. Release of Materials and
Equipment
10 CFR 835.1101 Chapter 11.0 of this Guide.
f. Sealed Radioactive Source
Accountability and Control
10 CFR 835, Subpart M Chapter 15.0 of this Guide.
7. Emergency Exposure Situations 10 CFR 835.1301, 1302 DOE O 151.1-1C,
Comprehensive Emergency
Management System (DOE
2005c)
8. Nuclear Accident Dosimetry 10 CFR 835.1304 Chapter 6.0 of this Guide.
9. Records 10 CFR 835, Subpart H Chapter 13.0 of this Guide.
10. Reports to Individuals 10 CFR 835, Subpart I Chapter 13.0 of this Guide.
11. Radiation Safety Training 10 CFR 835, Subpart J Chapter 14.0 of this Guide.
12. Limits for the Embryo/Fetus 10 CFR 835, Subpart C Chapter 8.0 of this Guide.
DOE G 441.1-1C 26
5-19-08
Appendix 3.A
PREPARATION, REVIEW, AND APPROVAL OF
RADIATION PROTECTION PROGRAMS
3.A 1. PREPARATION OF RPPs
The RPPs detail how the site, facility, or activity has met or will meet the requirements of 10
CFR 835. The format for the RPP is not specified. This flexibility will permit the RPP submitting
organizations to take advantage of pre-existing documents. The following sections describe the
minimum content expected in RPPs.
Note: The term “Operations Office” is used throughout this
document. Where it is used, the term “Field Office,” “Site Office” or the
term “Area Office,” as appropriate, should be substituted where there is
no Operations Office.
3.A 1.1 RPP SUMMARY
Each RPP should contain a summary section in the front to allow DOE management and
reviewers to quickly assess the more significant information contained in the RPP. The summary
should identify the following minimum information:
(1) Any requests for exemptions contained in the RPP;
(2) The total additional funding required to meet the commitments of the RPP and the
expected sources of funding by fiscal year;
(3) Any significant new programs or activities needed to meet the requirements;
(4) Any significant impacts to other programs or activities not included in the RPP;
Section 27
(5) Any constraints to implementing the RPP; and
(6) Those areas where there is currently full compliance with the requirements.
3.A 1.2 GENERAL INFORMATION
The RPP should include general information which: (1) identifies that the RPP addresses the
requirements of 10 CFR 835; (2) identifies whether the RPP is the initial submittal or a revision;
(3) identifies the facilities or activities, missions, and organizations involved; and (4) briefly
discusses the content and format of the RPP.
3.A 1.3 APPLICABILITY OF REGULATORY REQUIREMENTS
The RPP should identify the specific facilities or activities covered by the RPP. Any
determination that a specific requirement is not applicable to the facilities or activities
addressed in the RPP should be documented in the RPP to ensure that the determination
is clearly communicated. DOE approval of the RPP will constitute agreement with
applicability statements contained therein.
DOE G 441.1-1C 27
5-19-08
Applicability statements may not be used to provide relief where the requirements
are clearly stated to be applicable in 10 CFR 835. Relief from 10 CFR 835 can only be
granted by an approved exemption granted in accordance with 10 CFR Part 820, Subpart E
as discussed in Section 3.A 1.8 of this technical document.
The information provided in the plan should clearly identify which of the following
three categories applies to each requirement for a given facility, site, or activity:
(1) The requirement is applicable and the RPP defines the actions and schedules for
compliance;
(2) The requirement is applicable and an exemption is being requested; or
(3) The requirement is not applicable for the reasons documented in the RPP.
The RPP should also identify any requirements that are only partially applicable, the
limits of the applicability, and the reasons for the limitation.
Individuals should contact the appropriate Operations Office to assist with any needed
clarification of applicability statements. The Operations Office should contact the Office
of Health and Safety for any needed technical clarifications or the Office of the General
Counsel for legal interpretations of 10 CFR 835.
For example, the DOE General Counsel responded to a question concerning what
activities are intended to be included within the scope of the 10 CFR 835.1(b)(3) exclusion.
In response, General Counsel Ruling 95-1 stated "This exclusion is drafted narrowly to
cover only those activities necessary to prevent an accidental or unauthorized nuclear
detonation (that is, where the component parts of a nuclear weapon have been
assembled in a manner such that a nuclear detonation could take place)."
There are potential situations where a DOE protective force individual could receive
an exposure to ionizing radiation in excess of the 10 CFR 835 limits (or be in
noncompliance with other 10 CFR 835 provisions) as a result of emergency actions taken
to protect nuclear or other material from theft or diversion. Per General Counsel Ruling
95-1, these situations would not be included within the scope of the 10 CFR 835.1(b)(3)
exclusion. However, these situations, if conducted as part of an emergency response to a
threat to nuclear or other material, would likely fall within the scope of 10 CFR 835.3(d)
which states that "Nothing in this part shall be construed as limiting actions that may be
necessary to protect health and safety."
3.A 1.4 GUIDES AND TECHNICAL STANDARDS
Section 28
The RPP should identify the guides and technical standards that are to be adopted as the
means to meet 10 CFR 835. The use of guides and technical standards is not required; however,
it is encouraged for the following reasons:
DOE G 441.1-1C 28
5-19-08
(1) The use of previously approved methodologies will streamline the review and approval
process; and
(2) The use of guides and technical standards will enhance the consistent and successful
implementation of requirements across the DOE complex.
The implementing organization should consider methods and guidance from guides and
technical standards when developing the RPPs; however, alternative methods that achieve
equivalent or better results are acceptable. When an implementing organization identifies an
alternate way to implement the requirements, a reasonable opportunity will always be provided
to demonstrate compliance with the requirements using the alternate method. Demonstration
of compliance does not require an organization to address the differences between the
alternate method and the method in the guide or technical standard unless the comparison is
necessary to demonstrate acceptability.
When guides or technical standards are used, the RPP should indicate if they are adopted in
their entirety or adopted with exceptions. The exceptions, if any, should be specifically noted.
Methodologies and guidance that are adopted with exceptions will be reviewed on a
case-by-case basis.
The adopted guides and technical standards should be listed either by:
(1) Including a list of applicable guides and technical standards in the RPP, or
(2) Incorporating a list of guides and technical standards by reference.
Commitments in an RPP to meet all or parts of guides and technical standards are
enforceable as part of the RPP.
3.A 1.5 RESOURCE ASSESSMENT
New RPPs should contain an estimate of the additional life cycle costs to implement 10
CFR 835. Revised RPPs may contain an estimate of the change in life cycle costs associated
with the revision, if the change in life cycle cost is significant. The goals of this element of
the RPP are as follows: (1) to communicate the expected new costs of implementation to
DOE management for the purposes of budget planning and prioritization; (2) to identify the
need to explore more cost effective means of achieving compliance; and (3) to identify cases
where exemptions should be requested on the basis of insufficient benefit versus the
expected implementation costs. Identification of required resources should also serve to
open a dialogue between DOE and the RPP submitting organization on adjusting costs and
activities to the available resources.
When performing the assessments, the estimator should consider monetary costs, as well as
non-monetary resource considerations such as the limited availability of special job capabilities
(e.g., health physicists). The assessment should (1) be guided by available quantitative and
qualitative information; (2) reflect the current status of plant conditions, configurations, and
DOE G 441.1-1C 29
5-19-08
processes; (3) consider the availability of materials and resources; and (4) consider any other
information that is relevant to the radiation protection requirements.
Section 29
RPP submitting organizations should seek to achieve the broadest consistency in the
methods used to evaluate the resource requirements so that the assumptions, evaluations, and
results of the assessment can be objectively compared with the equivalent parameters of other
resource assessments. This will assist DOE and RPP activity management to determine priorities
for the use of funding. All assumptions and estimates should be made using the best available
knowledge and information.
After evaluating the resource impacts, consideration should be given if a more cost-effective
means of achieving the intent of the requirement is available. As a minimum, the use of more
cost-effective methods of compliance, or exemptions (see section 3.A 3.1.6.7 of this
attachment), should be considered whenever the resource expenditures necessary to meet a
requirement are not commensurate with the expected safety improvements. One of the criteria
for granting an exemption to a nuclear safety requirements is that the requirement results in
resource impacts which are not justified by safety improvements. In the past DOE has granted
exemptions on this basis for such topics as radiological postings and recording tritium intakes,
see http://www.eh.doe.gov/whs/rhmwp/exemption.html.
There should be limited effort used to develop the resource assessments to only that level
of detail necessary to achieve the goals of the assessment as stated above.
3.A 1.6 PRIORITIZATION
The RPP should include a discussion of the prioritization process used to integrate the
proposed activities into a facility or site schedule of activities. The prioritization process is to be
used to develop the proposed schedules and should be sufficiently flexible to accommodate
changes at later dates.
The prioritization process should consider available information from safety analyses and
other sources and give primary attention to controlling and reducing risks to the public, the
environment, and the workers to an acceptable level. It should also consider other factors such
as mission needs, outage schedules, and external regulations.
The prioritization process should be selected in consultation with the applicable DOE
Operations Office and Program Offices to ensure that the prioritization of efforts meets DOE
expectations. The prioritization schedule should tie budgets to schedules.
3.A 1.7 MILESTONES AND SCHEDULES
Per 10 CFR 835.101(f), the RPP must identify proposed milestones with achievable schedules
developed in accordance with the prioritization process identified in the RPP (see Section 3.A 1.6
above). In developing the schedules, consider the resources available to support the work, as
well as any major work reductions or schedule changes in other areas that will be required in
order to meet the proposed schedules. The RPP should identify major impacts to activities or
commitments outside the scope of the RPP that will be caused by the proposed additional
activities.
DOE G 441.1-1C 30
5-19-08
Schedules should be developed using the best information available with any assumptions
on availability of resources (monetary or non-monetary) clearly stated. The milestones and
schedules will be enforceable commitments upon approval of the RPP. Schedule commitments
should be firm commitments and consequently, should not be listed as contingent on funding.
Thus, it is essential that line program representatives participate in the review and approval of
RPPs that involve additional funding needs. Following approval of the RPPs, DOE has a
responsibility to provide appropriate funding to support the RPP schedules, the RPPs should be
revised to reflect the new schedules supported by funding (provided any schedules specifically
prescribed in the DOE requirements documents are met or schedule exemptions are approved).
Such revisions should be submitted to DOE for review and approval.
Section 30
Alternatively, RPP developers may consider requesting an exemption for unfunded
activities, if the criteria for granting an exemption are met (see Section 3.A 1.8 of this
attachment).
3A 1.8 EXEMPTIONS
Exemptions are to be requested whenever relief is sought from an applicable DOE
requirement. The RPP should clearly identify any exemptions that have been approved or are
being requested from the subject requirements. The organization conducting RPP activities may
submit requests for exemptions as part of the RPP provided that they relate to the same
requirements. Requests for exemption that are submitted as part of the RPP should be
identified in the RPP summary for early recognition. Early identification of exemption requests
is important because they may need to follow a separate review and approval process.
The provisions for requesting and granting exemptions to rules are stated in 10 CFR Part
820, Subpart E, Exemption-Relief.
3.A 2 SUBMITTAL OF RPPS
Per 10 CFR 835.101, RPPs must be submitted to the designated DOE point-of-contact within
the schedule specified in 10 CFR 835.
Normally, the RPP is submitted to a point-of-contact located in a DOE Operations Office.
The Operations Office point-of-contact should date stamp the receipt of the RPP.
Contact the Operations Office point-of-contact in advance of the submittal date to
determine the number of copies to be submitted. Documents that are incorporated by
reference should be submitted with the RPP unless other arrangements are made with the
Operations Office point-of-contact. In addition, if the RPP is not a stand-alone document (able
to be reviewed independent of other documents), contact the Operations Office
point-of-contact prior to submittal of the RPP to discuss which supporting documents are to be
transmitted with the RPP or made available for onsite review.
Also see section 3.A 4 below for additional submittal requirements for final RPPs.
3.A 3. REVIEW AND APPROVAL OF RPPs
DOE G 441.1-1C 31
5-19-08
3.A 3.1 REVIEW AND APPROVAL PROTOCOL
The Department’s protocol for review and approval of RPPs is described below. The
protocol defines the roles, interfaces, and responsibilities of Department organizations with
respect to review and approval of RPPs. Organizations who prepare the RPPs and the DOE
organizations responsible for review and approval of the RPPs should have a shared vision of
what should be in the completed RPPs before submission of the RPP to DOE. In order to ensure
this shared vision and the development of successful RPPs, early and continual dialogue
between the RPP submitting organization and the Review Team is essential. This dialogue
should begin well before the RPP is submitted to DOE. The process described below was built
on the lessons learned in similar efforts and was designed to facilitate that dialogue.
Because review and approval of the RPPs will often involve multiple Departmental
organizations, the review and approval process should provide for coordination, consistency of
review, and resolution of issues among those offices. In addition, the review and approval
process should address both the technical adequacy of the proposed RPPs and the
programmatic responsibilities (i.e., funding and mission). These responsibilities will require
additional coordination within the Department as they may reside in different organizations.
Section 31
The review and approval process should be sufficiently flexible to accommodate the
subjects addressed by 10 CFR 835 and adequately structured to permit efficient completion of
the review and approval within the 180 days [See 10 CFR 835.101(i)]. Table 1, at the end of this
attachment, provides recommended time periods to meet this 180-day requirement.
In the review and approval process, the Operations Office should be responsible for
coordination between the RPP submitting organization and the Department’s Headquarters
staff. This focused interface will ensure consistency in the information provided to the RPP
submitting organization and allow interaction with a single point-of-contact. In addition, the
Operations Office should be responsible for coordinating PSO (Program Secretarial Officer)
approvals. It should be noted that this attachment contains a detailed protocol. However,
individual steps may be modified to or eliminated, based on local conditions, as long as the
process involves appropriate review and approval. For example, approval authority may have
been delegated to the Manager of the Field Element (or lower), which would obviate the need
for specific PSO approval
A RPP Review Team should be formed for each RPP to conduct the review of the RPP. The
Review Team members should include DOE Headquarters and Field Operations personnel with
technical expertise and coordinating responsibility for program decisions (e.g., funding,
schedule). Operations Office personnel should serve as points-of-contact and Review Team
Leaders for RPP reviews applicable to their sites. Individual participation in Review Team
activities will vary in level of effort and time frame based on review and approval needs.
The Operations Office point-of-contact plays a key role in coordinating all RPP review and
approval activities between DOE Headquarters and the RPP submitting organization.
The process for the development, review, and approval of RPPs is discussed below. The
provisions of 10 CFR 835.101(i) state that “an initial RPP or an update shall be considered
DOE G 441.1-1C 32
5-19-08
approved 180 days after its submission unless rejected by DOE at an earlier date.” See Table 1
for a typical schedule of activities to meet this provision.
3.A 3.1.1 Identifications of Responsible Review Staff
3.A 3.1.1.1 Points-of-Contact
Each Operations Office Manager should identify a point-of-contact for the RPP. The
Operations Office point-of-contact should be the primary interface for all activities associated
with the development, submittal, review, and approval of the RPPs. The Operations Office
point-of-contact should also be the Review Team Leader.
The Review Team Leader should coordinate assignment of Review Team members with the
PSOs and the Operations Office.
3.A 3.1.1.2 RPP Review Teams
As discussed in the previous paragraph, the Operations Office point-of-contact should
normally be the Review Team Leader. The Operations Office Manager may provide additional
team members and technical assistance as necessary. In addition, each affected PSO should
identify the Program Office representatives for each Review Team to the Review Team Leaders.
The PSO may assign multiple reviewers to a single site or a single reviewer.
3.A 3.1.2. Review Planning
3.A 3.1.2.1 RPP Guide
Each responsible PSO should prepare an RPP Guide that defines DOE’s specific technical and
programmatic expectations for the RPPs internal to their organization. The guide should include
Section 32
the following types of information: (1) criteria and/or checklists of items to be considered during
the review, (2) approaches to key issues, (3) direction on use of existing RPPs and approvals, (4)
review and approval authorities, and (5) specific issues relating to Headquarters or Operations
Office review responsibilities. The guide should be as brief as possible, should be user friendly,
and should not repeat general guidance available in other guidance documents such as this
attachment. The PSO should provide assistance and/or training to the Review Teams on the use
of the guide.
3.A 3.1.2.2 Implementation Action Plan
For each RPP, the Review Team Group should prepare an Implementation Action Plan that
defines the Review Team activities, priorities, and schedule. A copy of the plan should be
provided for information.
3.A 3.1.2.3 Responsibility and Interface Matrix
The PSO should prepare and maintain a matrix that identifies the Review Team Leader,
Review Team members, and DOE programmatic and technical contacts for each RPP.
DOE G 441.1-1C 33
5-19-08
3.A 3.1.3 Meetings, Conference Calls, and Status Reports
3.A3.1.3.1 Initial Site Meeting
The Review Team should meet with the RPP submitting organization at the earliest
feasible date to discuss the basic expectations for implementation of the DOE requirements
document and to discuss any issues that might impact the timely and acceptable completion
of the RPP. Issues to be discussed should include (1) how to best use existing plans or other
information in developing the RPP; (2) potential exemptions; (3) plans and schedules for
ongoing interactions; and (4) funding sources for new activities identified as necessary to
come into compliance. The Operations Office point-of-contact has primary responsibility for
planning and coordinating this meeting.
3.A 3.1.3.2 Status Meetings
Periodic status meetings should be held with the RPP submitting organization to fully
discuss all elements of the proposed RPPs that could affect the acceptability of the RPPs.
3.A3.1.3.3 Periodic Conference Calls
The Operations Office point-of-contact should coordinate regular conference calls with the
RPP submitting organization and the Program Offices to address and resolve issues as they arise.
As necessary, site or headquarters meetings should be held to resolve difficult issues. The
Operations Office point-of-contact has primary responsibility for coordinating phone
conferences, as well as necessary meetings to resolve issues.
3.A 3.1.4 Submittal and Distribution of RPPs
As discussed in Section3.A 2 of this attachment, RPPs should be submitted directly to the
Operation Office point-of-contact. The Operations Office point-of-contact should transmit a
copy of the RPP to the Review Team members and a copy of the transmittal memorandum to
the affected PSOs within four working days of the receipt of the RPP. The transmittal
memorandum should identify the required date for completing the review.
3.A 3.1.5 Review
3.A 3.1.5.1 Review to Review Teams
RPPs should be reviewed by an integrated Review Team with Program and Operations Office
representatives, as discussed in Section3.A 3.1.1.2 above. Program Office team members and
their contacts should, as a minimum, participate in the review of issues involving funding,
missions, schedules, priorities, and exemptions. The Review Team Leader should facilitate
resolution of unique or difficult issues not addressed in the RPP Guide.
Section 33
Review Team members should assist the RPP submitting organization in clearly
understanding what actions or changes are necessary to result in an acceptable RPP. DOE
comments and feedback should be routed through the Review Team Leader to ensure
consistent feedback. The Review Team Leader should also be responsible for resolving conflicts
prior to communication with the RPP submitter.
DOE G 441.1-1C 34
5-19-08
All reviewers should expedite their reviews to allow closure on an acceptable RPP as early as
possible.
3.A 3.1.5.2 Delegated Approval Authority for RPPs
The PSO may delegate the authority to approve specific RPPs. Any such delegation should
be provided in writing to the designee and documented in the Functions, Responsibilities, and
Authorities (FRA) document for that organization.
Wherever the authority to approve an RPP has been delegated to the Operations Office by
all of the affected PSOs, the Operations Office may choose to have the Review Team consist
entirely of Operations Office personnel provided any technical and programmatic requirements
can be handled by the designated team.
Per 10 CFR Part 820, Subpart E, the authority to approve exemptions to 10 CFR 835 cannot
be delegated.
3.A 3.1.6 Approval
3.A 3.1.6.1 Approval Recommendations by the Review Team
The Review Team Leader is responsible for ensuring that the Operation’s Office Manager
receives the Review Team’s final recommendation for approval within 145 days after receipt of
the RPP. That recommendation should either endorse acceptance of the RPP as submitted (or
changed through negotiations during the review process) or, if issues cannot be resolved,
provide recommendations regarding specific additional commitments or changes to be
incorporated in the RPP.
3.A 3.1.6.2 Operations Office Review of the Review Team Recommendations
The Operations Office Manager, or equivalent, should review the recommendation of the
Review Team and either endorse the recommendation or provide specific recommendations for
an acceptable RPP. The Operations Office Manager is responsible for ensuring that the PSO
receives the recommendations of the Review Team along with any recommendations from the
Operations Office no later than 159 days after receipt of the RPP [with information copy to the
affected CSOs [Cognizant Secretarial Officer)].
In some cases involving multiple PSOs, approval authority may be delegated by one or more
PSOs, but not all PSOs. In such cases, the Operations Office Manager should coordinate the
remaining approvals with the PSOs.
For cases in which the approval authority has been delegated by all affected PSOs to the
Operations Office Manager, the Operations Office Manager should skip to step 3.A 3.1.6.4
Approval Letter, below.
3.A 3.1.6.3 PSO Approval Memorandum
DOE G 441.1-1C 35
5-19-08
In order to ensure the Operations Office has a week to transmit the approval or disapproval
of the RPP before it becomes automatically effective 180 days after receipt of the RPP by DOE,
each affected PSO should indicate approval or disapproval of the RPP in a memorandum to the
Operations Office within 173 days of receipt of the RPP by DOE.
3.A 3.1.6.4 Approval Letter
The Operations Office Manager should transmit the approval memorandum by letter to the
RPP submitting organization no later than 180 days after receipt of the RPP by DOE.
3.A 3.1.6.5 Imposition of RPPs
Section 34
The Review Team will endeavor to resolve any issues identified during the review process. If
conflicts exist which cannot be resolved, the Department may exercise its authority [see 10 CFR
835.101(b)] to modify proposed RPPs to include those actions and schedules that the
Department finds appropriate for achieving full compliance in a reasonable and timely manner.
In such cases, the PSO approval memorandum should be replaced with a memorandum
imposing a revised RPP. The revised RPP should be transmitted to the RPP submitting
organization by the Operations Office Manager. The RPPs may be renegotiated at a later date,
but until it is replaced by another approved RPP, it will be the enforceable basis for
implementation of 10 CFR 835.
3.A 3.1.6.6 RPPs which are not Approved by Final Date
Per 10 CFR 835.101(I), RPPs which are not approved within the approval period specified in
the DOE requirements document should be considered to be approved unless another RPP is
imposed by the Department. These RPPs may be renegotiated at a later date, but until they are
replaced by another approved RPP, they will be the enforceable basis for implementation of 10
CFR 835.
3.A3.1.6.7 Approval of RPPs Containing Exemption Requests
RPPs may contain requests for exemptions. When they do, the requests may be granted in
the approval memorandum for the RPP, provided that all of the requirements for processing
exemptions are met, including the approval of the DOE Headquarters official designated by
10 CFR Part 820 Subpart E. When exemptions are approved as part of an RPP, the approval
document should state how the provisions of 10 CFR Part 820, Subpart E were met.
Alternatively, exemptions may be approved separately and referenced in the RPP approval
letter.
Upon submittal of the RPPs, the Review Team Leader should determine if any exemption
requests submitted in the RPPs need to be reviewed and approved separate from the RPPs.
Where separate review and approval is necessary, the Review Team Leader should alert the PSO
Review Team representatives to initiate a separate and expeditious review of the exemption
requests.
The provision in 10 CFR 835.101(i) that states that RPPs are considered approved 180 days
after submission, does not apply to exemptions.
DOE G 441.1-1C 36
5-19-08
Approval of an RPP pending granting of an exemption does not constitute or imply approval
of the exemptions contained therein.
3.A 3.2 DISTRIBUTION OF COPIES OF THE FINAL RPP
The Operations Office Manager should be responsible for distributing approved RPPs (if
changed from the originally submitted RPP) to the Office of the Docketing Clerk (in the Office of
Price Anderson Enforcement) and to the affected PSOs. Copies of approved RPPs transmitted to
the Office of the Docketing Clerk should include both a hard copy and an electronic copy. As
required by 10 CFR Part 820, the Office of Docketing Clerk will maintain a file of enforceable
actions based upon rule violations and noncompliance with RPPs.
3.A 3.3 REVIEW RESPONSIBILITIES
The Review Team should determine if the RPP provides an acceptable method to meet 10
CFR 835. The Review Team should also determine if the RPP adequately addresses the elements
discussed in Section 3.A 1 of this attachment (Preparation of RPPs). RPP submitting
organizations are encouraged to use the methodologies contained in this Guide for
implementation of 10 CFR 835 where they are reasonable and economical; however, one may
Section 35
elect to propose an alternate way to meet the requirements. In cases where an alternate
method is proposed, the Review Team should evaluate the proposed method to ensure that it
will be adequate to meet the requirements and provide a comparable level of safety.
The Review Team should verify that the RPP provides sufficient detail to permit DOE to
measure the progress towards meeting the DOE requirements.
The Review Team should also ensure that (1) the projected budget and schedule
information contained in the RPP is reasonable and consistent with the funding projects, (2) the
prioritization of efforts meets the DOE expectations, (3) the proposed milestones and schedules
will meet DOE needs, (4) the applicability of the requirements is correctly identified, and (5) the
compensatory actions are acceptable.
The Review Team should expect to see significant variations in the level of detail and size of
individual RPPs because of the diversity of types, sizes, and missions of DOE facilities. In order
to facilitate timely reviews and agreements on complex RPPs, the members of the Review Team
should visit the site and/or facility and have frequent communication during both the
preparation and the review of the RPP.
3.A 3.4 APPROVAL RESPONSIBILITIES
DOE approval of the RPP constitutes acceptance by the PSO that:
(1) The proposed activities represent an acceptable method to meet the requirements;
DOE G 441.1-1C 37
5-19-08
(2) The resources identified in the RPP are necessary and sufficient to ensure completion of
the activities contained in the RPP and are expected to be available to support the
proposed schedules;
(3) The proposed milestones and schedules are acceptable;
(4) The applicability of the requirements is correctly identified; and
(5) The identified compensatory actions are acceptable.
3A 4. REVISIONS TO RPPs
The RPPs will probably need to be revised and updated during the life cycle of the site,
facility, or activity. Approved RPPs should be revised as needed to reflect the addition or
deletion of other work at a facility or other factors that affect the ability to meet the approved
schedule, such as prospective changes in the level of funding or assumptions regarding the
availability of materials and other resources. The provisions in 10 CFR 835.101(h) contain
conditions under which RPPs may be revised without prior approval from DOE. In such cases,
submit the revised RPP to DOE within 30 days of the effective date of the RPP. All other changes
to RPPs should be reviewed and approved by DOE prior to the effective date of the change.
Revised RPPs should be submitted in a timely manner for DOE approval (at least 180 days before
the change is to be effective), along with justification for the revision. As noted previously,
proposed revisions will be considered approved 180 days after submittal to DOE, unless they are
approved or rejected by DOE.
The changes to the RPP should be clearly indicated (e.g., sidebars) to facilitate timely review.
Revised RPPs are to be submitted to DOE in the manner described in this section and reviewed
and approved in the manner described in section 3.A.3 above.
Any changes to RPPs which will result in a requirement not being met, require an approved
exemption.
3.A 5. EXTENSIONS TO THE SUBMITTAL SCHEDULE FOR RPPS
Extensions to the schedule for submitting an RPP will generally require an exemption
processed in accordance with 10 CFR Part 820, Subpart E, and approved by the Secretarial
Section 36
Officer responsible for environment, safety and health matters (i.e., the Chief Health, Safety and
Security Officer).
3.A 6. IMPLEMENTATION TRACKING
Following approval of the RPP and during the implementation process, the DOE Operations
Office should oversee progress in meeting the commitments in the RPP (for example, schedules,
milestones, and costs) and maintain a dialogue on any problems that arise.
3.A 7. INCORPORATION BY REFERENCE
DOE G 441.1-1C 38
5-19-08
The RPP submitting organization may choose to incorporate information into the RPP by
referencing all or selected portions of other documents. In such cases, the portions of the
referenced documents that are incorporated into the RPP are also subject to the provisions of
this Guide and attachment.
However there are situations when a citation or reference is used to indicate the origin of
some of the text in a document. For example, in this Guide, 10 CFR 835 is cited to indicate the
basis for statements containing the word “should” or “shall” (i.e., requirements). Consequently,
the RPP submitting organization should clearly indicate which documents (or portions of
documents) are considered part of the RPP commitments. The RPP submittal should maintain a
file of all documents incorporated by reference and should make non-DOE documents available
to DOE upon their request. See also section 3.A 1.2 above for submittal criteria.
Table 1. TYPICAL SCHEDULE FOR REVIEW AND APPROVAL OF RPPS
Submittal of RPP to Operations Office
0 days
Operations Office send RPP to Review Team/PSOs/Environment, Safety and Health
4 days
Review Team sends recommendation to Operations Office Manager
145 days
Operations Office Manager sends recommendation to PSO*
159 days
PSO Approval to Operations Office*
173 days
Operations Office Manager issues approval/disapproval to RPP submitting organization
180 days
*If approval authority not delegated to the Operations Office by the PSO.
DOE G 441.1-1C 39
5-19-08
4.0 ALARA
In promulgating 10 CFR 835, DOE considered alternatives to reduce the risk from radiation
exposure to workers that included retaining the current occupational dose limits, reducing these
limits, and emphasizing efforts to maintain occupational doses As Low As is Reasonably
Achievable (ALARA). After considering public comments on this issue, DOE elected to emphasize
the ALARA process to maintain occupational dose for DOE and contractor employees as far
below the current regulatory occupational dose limits as reasonably achievable. Adopting the
ALARA process in DOE occupational radiation protection regulations also provides consistency
with recommendations provided in the President’s Radiation Protection Guidance to Federal
Agencies For Occupational Exposure (EPA 1987), which endorsed the ALARA process.
The importance of the ALARA concept was further stressed in DOE P 441.1, DOE
Radiological Health and Safety Policy (DOE 1996), which states:
It is the policy of the Department of Energy to conduct its radiological operations
in a manner that ensures the health and safety of all its employees, contractors, and
the general public. In achieving this objective, the Department shall ensure that
radiation exposures to its workers and the public and releases of radioactivity to the
environment are maintained below regulatory limits and deliberate efforts are taken
to further reduce exposures and releases as low as reasonably achievable. The
Department is fully committed to implementing a radiological control program of
the highest quality that consistently reflects this policy.
Section 37
10 CFR 835 requires formal plans and measures for maintaining occupational exposures
ALARA as part of the documented radiation protection program (RPP). Measures include
incorporating ALARA considerations into the design of new facilities and modifications of
existing facilities, as well as activities that pose the potential for significant occupational dose.
Additionally, administrative controls are addressed as measures which supplement engineered
controls and are integrated into the work planning process. Record keeping and training
requirements related to ALARA are also specified. This chapter of this Guide discusses
acceptable methods for implementing the ALARA process provisions in 10 CFR 835.
Due to the complex nature of many DOE activities, a combination of radiological and
non-radiological hazards may be encountered. Identification of non-radiological hazards is
critical to the ALARA process, because efforts to apply the ALARA process may inadvertently
increase risks from non-radiological hazards. An integrated safety management approach that
optimizes worker protection from all hazards should be considered in the ALARA process for a
given DOE activity.
4.1 Implementation Guidance
Subpart B of 10 CFR 835 requires that a DOE activity shall be conducted in compliance with
an RPP approved by DOE [10 CFR 835.101(a)]. The content of the RPP shall be commensurate
with the nature of the activities performed and shall include formal plans and measures for
applying the ALARA process to occupational exposure [10 CFR 835.101(c)]. Subpart K of the rule
provides requirements for design and control for maintaining radiation exposures ALARA. The
primary methods used for maintaining radiation exposures ALARA in controlled areas shall be
DOE G 441.1-1C 40
5-19-08
engineered controls; administrative controls may be used as supplemental features and for
specific activities where engineered controls are impractical [10 CFR 835.1001(a) and (b)]. The
rule specifies objectives for design of new facilities or modifications to existing facilities
(10 CFR 835.1002) and the integration of work controls during routine operations
(10 CFR 835.1003). Additionally, the rule requires documentation of the actions taken to
maintain occupational exposures ALARA, including actions required by the RPP, as well as facility
design and control actions [10 CFR 835.704(b)].
Guidance on complying with the training requirements of 10 CFR 835.103 and 835.901 is
provided in Chapters 3 and 14 of this Guide.
This chapter provides the basic guidelines for conducting an occupational ALARA program.
It includes the requirements and guidance for developing, implementing, documenting, and
providing feedback and lessons learned for improving the program to reduce individual doses to
levels that are ALARA.
4.2 ALARA Programs
4.2.0 Formal Plans and Measures
The method of implementing an ALARA program is highly dependent on the complexity and
magnitude of potential radiological hazards associated with the DOE activity. The elements of
an effective ALARA program should be identified in a formal ALARA plan or procedure. The RPP
shall clearly identify the ALARA plans and measures employed by the DOE activity
[10 CFR 835.101(c)]. The degree of formality and the level of detail contained in these plans and
measures and other pertinent documentation should be commensurate with the magnitude of
the radiological hazard associated with the DOE activity. A DOE activity with higher collective
dose and/or potential for significant occupational doses should have more detailed ALARA
documentation than an activity with low collective doses and/or potential for significant
occupational doses. ALARA plans and measures should address the following elements at a level
commensurate with the radiological hazards associated with the DOE activity:
Section 38
Policy and Management Commitment: Establish commitment and participation of all
line management and all levels of the work force;
ALARA Training: Require ALARA training for all employees, including managers involved
with any aspect of radiological operations. Guidance is provided in Chapters 4 and 14 of
this Guide and the RCS;
Plans and Procedures: Consider administrative and engineered controls and
optimization methods during work procedure development to assure that the ALARA
process is fully integrated into the development of operational/experimental plans,
procedures, and protocols. Document formal plans and measures for applying the
ALARA process to occupational doses;
Internal Assessments/Audits: Conduct comprehensive internal reviews, audits, and
evaluations periodically and report the results to the highest levels of site management.
Guidance is provided in Chapter 3;
DOE G 441.1-1C 41
5-19-08
ALARA Design Review: Ensure the integration of appropriate methods and
considerations during the design phase to maintain occupational exposures ALARA
during subsequent construction, modification, and operation of the equipment or
facility;
Radiological Work/Experiment Administration and Planning: Implement controls and
use optimization methods to assure that occupational dose is maintained ALARA for
routine and special operations or experiments; and
Records: Maintain documents that demonstrate compliance and that the program is
adequately carried out. Guidance is provided in Chapter 13.
4.2.1 Policy and Management Commitment
Management commitment to ALARA, consistent with the DOE Radiological Health and
Safety Policy (DOE 1996), is a critical element in ensuring a successful ALARA program. This
commitment should take the form of a formal, written, policy statement from a high level of
corporate management, generally the senior site executive or company officer responsible for
radiological activities that cause the exposures. This commitment should hold all levels of
management and individual workers responsible for adhering to the company's ALARA policy. If
appropriate, union leadership endorsement of the ALARA policy should be considered.
Senior site and line management should demonstrate their support of the ALARA program
through direct communication, instruction, inspection of the workplace, and actions including:
management decisions that place ALARA considerations before cost or schedule
considerations (in accordance with numerical criteria; see section 4.2.5 below);
encouragement of and praise for workers who identify ALARA solutions;
support of the ALARA Committee; and
publication of ALARA success stories.
All site personnel should be made aware of management's commitment to ALARA and
radiological workers should be instructed on their responsibility to comply. Management’s
ALARA commitment statement should be periodically updated and reaffirmed.
4.2.2 ALARA Training
Specialized ALARA training should be developed for personnel who plan, prepare,
schedule, estimate, or engineer jobs that have the potential for significant radiological
consequences. The purpose of training these personnel in ALARA concepts and techniques
is to empower them to include ALARA considerations in the early phases of job planning and
engineering. This training should provide the basics of ALARA concepts and the use of
ALARA related equipment such as containment devices, shielding, ventilation, and special
Section 39
DOE G 441.1-1C 42
5-19-08
tools. Topics such as radiological waste minimization, application of decontamination
efforts, and basic contingency planning for mitigation of accidental spills and releases may
also be appropriate. DOE has developed specialized training material for these types of
positions in DOE HDBK 1110-2008, ALARA TRAINING FOR TECHNICAL SUPPORT PERSONNEL
(DOE 2008b).
Discipline-specific ALARA training may be appropriate for some organizations including:
operations, maintenance, engineering, production, and construction (craft workers). Chapter 3
provides additional guidance with respect to training for such individuals under 10 CFR 835.103.
Mock-up training may be appropriate for craft workers and others to prepare them for unique
and/or high dose jobs.
4.2.3 Plans and Procedures
10 CFR 835.101(c) requires that the content of each RPP be commensurate with the nature
of the activities performed and include formal plans and measures for applying the ALARA
process to occupational exposures. The RPP (approved by facility management and DOE) and
supporting procedures (approved by facility management) should describe the organization,
responsibilities, and method of operation of the ALARA program. These documents should be
reviewed and updated according to an established schedule. Chapter 3 provides additional
guidance with respect to procedures required under 10 CFR 835.104.
4.2.4 Internal Assessments/Audits
10 CFR 835.102 requires that internal audits of the RPP be conducted such that all functional
elements are reviewed no less frequently than every 36 months and shall include program
content and implementation. The ALARA program is one of these functional elements. Chapter
3 provides detailed guidance concerning internal audits. Management's responsibilities for
reviewing, auditing, and evaluating the ALARA program should be clearly documented. The
occupational ALARA program should be evaluated by an individual(s) or members of the ALARA
Committee with no direct responsibility for implementing the program.
4.2.5 ALARA Design Review
10 CFR 835.1001 requires that measures be taken to maintain radiation exposures in
controlled areas ALARA. The primary method used shall be engineered controls (e.g.,
confinement, ventilation, remote handling, and shielding); administrative controls shall be
incorporated only as supplemental methods and for specific activities where engineered
controls are demonstrated to be impractical (10 CFR 835.1001). 10 CFR 835.1003 further
requires that during routine operations, the combination of engineered controls and
administrative controls shall provide that the anticipated occupational dose to general
employees does not exceed regulatory limits and that the ALARA process is utilized for
personnel exposures to ionizing radiation. Engineered controls typically include features that
are used to control the work environment, such as permanent structures, systems, and controls,
including shielding, filtered ventilation systems, remote controls, containment devices, and the
DOE G 441.1-1C 43
5-19-08
use of designs and materials that facilitate operations, maintenance, and other activities. They
may also include controls (e.g., temporary shielding, confinement and ventilation systems) that
are typically used to facilitate short-term or emergent operations when the installed engineered
controls do not provide the desired level of protection. In addition to the engineered controls,
Section 40
initial consideration should be given to elimination or substitution of the hazards where feasible
and appropriate. This could include use of non-radioactive material or sources. Administrative
controls typically include controls that are implemented by the individual at the work site,
including written procedures, technical work documents, work authorizations, and other
controls that are used to guide individual actions in a manner that will facilitate implementation
of the ALARA process.
DOE has an approved set of directives concerning radiological design criteria for the design,
construction, operation, and decommissioning phases of its nuclear facilities. (See list below.)
The appropriate ALARA design features should be incorporated into modifications of existing
facilities and/or equipment and designs of new facilities and/or equipment as early as possible
in the engineering and design process. From early in the design phase and throughout the
project, a radiological engineer or representative of the radiation protection staff should be
assigned to the design team. This individual should ensure that reasonable radiological
considerations have been integrated into the design, construction procedures, proposed
operating procedures, and plans for decommissioning. Numerical criteria (e.g., dollars per rem
avoided) developed for site ALARA decisions should be used to determine those design features
that are reasonable. An individual with expertise in radiation protection, preferably from the
site staff, but at least familiar with the site program, should perform an independent ALARA
design review that includes the following elements:
review the general configuration of the facility and/or equipment, considering traffic
patterns, location of radiation areas, location and size of changing rooms, adequacy of
personnel decontamination facilities, location of fixed monitoring equipment, and
adequacy of space for anticipated operations, maintenance, production, research, and
decommissioning. Facility design and selection of materials shall include features that
facilitate operations, maintenance, decontamination, and decommissioning
[10 CFR 835.1002(d)]. The RCS provides additional guidance;
verify that radiological design criteria are consistent with applicable federal/state
regulations, recognized standards and guides, and with the following DOE directives
relating to radiological safety in design:
– 10 CFR 835;
– DOE O 458.1; Radiation Protection of the Public and the Environment (DOE
2011a);
– DOE P 441.1; Department of Energy Radiological Health and Safety Policy (DOE
1996)
DOE G 441.1-1C 44
5-19-08
– DOE O 420.2B, Safety of Accelerator Facilities (DOE 2004a);
– DOE 5480.30, Nuclear Reactor Safety Design Criteria (DOE 1993);
– DOE O 420.1B, Facility Safety (DOE 2005d);
– DOE O 413.3B, Program and Project Management for the Acquisition of Capital
Assets (DOE 2010b);
– DOE O 435.1, Radioactive Waste Management (DOE 2001b); and
– the RCS.
verify that the design of the confinement and ventilation systems provides the required
level of protection from airborne contamination, giving particular attention to patterns
of air flow and to the locations of air inlets, penetrations, and exhausts. Releases of
radioactive material to the workplace atmosphere should be avoided under normal
operating conditions and inhalation of such materials by workers should be controlled
to the extent reasonably achievable;
Section 41
evaluate and confirm the adequacy of specific control devices for reducing occupational
doses, including shielding, hoods, glove boxes, containments, interlocks, barricades,
shielded cells, decontamination features, and remote operations. External sources of
radiation in areas of continuous occupational occupancy (2,000 hours/year) shall be
maintained below an average of 0.5 millirem (0.005 mSv) per hour and as far below this
average as is reasonably achievable. For areas where occupancy differs from the above,
external dose rates should be ALARA and should be maintained at a rate so as not to
exceed 20% of the limits in 10 CFR 835.202;
verify that the design will be able to maintain personnel entry control for each
radiological area, commensurate with existing or potential radiological hazards
within the area, by using one or more of the methods listed in 10 CFR 835.501;
verify that each entrance or each access point to high and very high radiation areas will
have the control features required by 10 CFR 835.502; and
assess the adequacy of planned radiological monitoring and nuclear criticality safety
instrumentation and determine whether the proposed instrumentation is appropriate
for the expected types, levels, and energies of the radiation(s) to be encountered, and
whether it has sufficient redundancy and capability for operation under normal
operating conditions and during emergencies [10 CFR 835.401(b)].
The ALARA design review should have six discrete phases:
dose assessment;
DOE G 441.1-1C 45
5-19-08
review of projected radiological conditions against the trigger points or numerical
criteria established by management to initiate a review (e.g., creation of a new radiation
source or an increase in the dose rates from an existing source that causes increased
projected facility lifetime collective dose of greater than 5,000 millirem (50 mSv) or
annual collective dose of 1,000 millirem (10 mSv), from operations, maintenance,
production, research, inspection and decommissioning activities);
identification of the applicable radiological design criteria;
review of similar facilities, designs, and processes to assist in the selection of optimum
ALARA design features and less costly alternatives using approved numerical criteria;
and,
incorporation and documentation in the design package of features to reduce the:
exposure of personnel; spread of radioactive contamination; release of radioactive
effluent; and creation of radioactive waste; and
post-construction review of effectiveness of ALARA engineering features to provide
feedback to the design engineers and help refine the design process. The ALARA design
review should be conducted and documented in accordance with an approved
procedure and the design review package should be readily retrievable. Detailed
radiological design considerations are discussed in PNL-6577, Health Physics Good
Practices for Reducing Radiation Exposures to as Low as Reasonably Achievable (ALARA)
(PNL 1988a).
Optimization Methodology
Section 42
Optimization methods are required to assure that occupational exposure is maintained
ALARA in developing and justifying facility designs or modifications and physical controls.
Optimization methodology provides the technical and managerial basis for setting numerical
criteria for ALARA decisions in the design of facilities, development or review of work processes,
and the design/purchase of special tools and equipment. Selection of an appropriate cost
benefit factor for reducing occupational dose involves a judgment of the relative value of dose,
normally in terms of dollars per rem avoided. Additionally, guidance on optimization
methodology will also provide the basis for selection of trigger points or collective dose values
(facility lifetime, facility annual, job lifetime, one time job, etc.) above which an ALARA design
review or job review is appropriate. Numerical criteria for ALARA decision making should
include radioactive waste volume, radioactive effluent, contamination levels, and airborne
radioactivity levels. Optimization methodology has led to a multi-attribute analysis technique
which is discussed extensively in ICRP Publication 37, Cost-Benefit Analysis in Optimization of
Radiation Protection (ICRP 1982) and ICRP Publication 55, Optimization and Decision-making in
Radiological Protection (ICRP 1990).
At sites with significant collective dose, formally documented optimization methodologies
should be developed for ALARA reviews and decisions on implementation of ALARA efforts
should be developed. This may be on a site- or facility-specific basis. Application of
DOE G 441.1-1C 46
5-19-08
optimization methodologies to the ALARA process should lead to consistent, rational,
repeatable decisions as to which ALARA efforts are justifiable. The level of effort involved in
documenting ALARA decisions should be commensurate with the potential dose savings to be
realized. A detailed evaluation need not be made if its cost, including the cost of
documentation, outweighs the potential value of the benefits. The procedure used to evaluate
the "appropriateness" of dose-reduction and contamination minimization decisions should be
maintained. The RCS and PNL-6577 provide additional guidance on optimization methodologies.
4.2.6 Radiological Work/Experiment Administration and Planning
10 CFR 835.1003 requires that during routine operations, the combination of engineered
and administrative controls shall provide that the anticipated occupational dose to general
employees shall not exceed the limits established in 10 CFR 835.202 and that the ALARA process
is utilized for personnel exposures to ionizing radiation. Additionally, 10 CFR 835.501(d)
requires written authorizations to control entry into and perform work within radiological areas.
Often, these written authorizations take the form of radiological work permits (RWP) or
technical work documents (TWD) associated with jobs or experiments. These written
authorizations provide a convenient mechanism to integrate ALARA review of work tasks if the
requirement for ALARA review is embodied in the written authorization. Optimization
methodologies and appropriate radiological judgment should be used to develop numerical
criteria and/or trigger points for determining when a formal ALARA review of planned
radiological work activities is required. Once conducted, the completed ALARA review should be
incorporated into the written authorizations for the work activity.
Section 43
4.2.6.0 Job/Task/Experiment Reviews
A formal ALARA job/task/experiment review should be performed for work or experiments
with the potential to exceed the established numerical radiological criteria. The following are
examples of criteria that should trigger a formal ALARA review.
the estimated individual or collective dose is greater than pre-established criteria.
the predicted concentrations of airborne radioactivity could exceed pre-established
criteria (such as 100 times the DAC values provided in 10 CFR 835 Appendices A and C).
there is potential for significant radiological exposures.
the removable contamination in work areas could exceed pre-established criteria (such
as 100 times the values provided in 10 CFR 835 Appendix D).
individuals will enter areas where exposure rates could exceed pre-established criteria
[such as 1 rem/hour (0.01 Sv/hr)].
The ALARA job/task/experiment review should encompass three discrete phases: (1)
pre-job planning and dose assessment; (2) specification and implementation of ALARA controls
and dose tracking; and (3) post-job review.
Pre-job Planning and Dose Assessment
DOE G 441.1-1C 47
5-19-08
Pre-job planning should include an estimate of the collective dose resulting from the
job/task/experiment and a determination regarding whether the numerical criteria for an
ALARA job/task/experiment review will be exceeded. The estimates may be based on actual or
historical radiological monitoring results. If a review is required, the next step is to identify
appropriate ALARA controls and alternatives. This should include an assessment of the cost of
controls against numerical criteria.
ALARA Controls
During the work or experiment, periodic inspections should be made to ensure that ALARA
controls are being implemented and are effective. Typical ALARA controls implemented in the
field include: appropriate use of shielding and personal protective equipment (including
respiratory protection devices), monitoring of stay times, minimization of time in radiological
areas, maximizing distances from radioactive sources, and effective use of mock-up training and
pre-job briefings. In addition, individual and collective doses should be tracked and periodically
compared to the dose estimates to determine if intervention is needed.
Post-Job Review
Criteria should be established to trigger a formal post-job review. Examples include:
an actual collective dose equivalent of 5 person-rem or greater,
-job estimates,
use of the stop radiological work authority,
issuance of a radiological occurrence/deficiency report, or
identification of significant lessons learned.
The post-job review should compare the actual person-hours and person-rem with the
estimates, evaluate the effectiveness and cost of the ALARA controls, document the lessons
learned, and make recommendations on ways to control dose and contamination for similar
activities. The ALARA review should be documented and records should be readily retrievable.
In the special case of an ALARA review for a planned special exposure, additional
requirements are described under 10 CFR 835.204.
4.2.6.1 Consideration of Non-radiological Hazards
The work planning process should integrate the consideration of other industrial, physical,
and chemical hazards that an individual may encounter. Efforts to maintain worker doses
ALARA should ensure that the risk of personnel injury from other hazards is not
disproportionately increased. The ALARA process should consider the impact of other
occupational hazards when optimizing worker radiation dose. For example:
Section 44
excessive protective clothing to control personnel contamination events may lead to
heat stress situations.
DOE G 441.1-1C 48
5-19-08
respiratory protective devices used to reduce intakes of radionuclides may impair visual
acuity and communications capabilities between workers.
protective clothing to protect workers from chemical hazards may slow work down
leading to increased worker dose.
An integrated approach during the work planning process will ensure that all occupational
hazards are appropriately considered and the ALARA process is followed.
10 CFR 851, Worker Safety and Health Program (DOE 2006) provides requirements for
worker safety and health. The worker safety and health program must integrate the Rule’s
requirements with other site worker protection activities and the integrated safety management
system (ISMS) [851.11(a)(3)(ii)]. Coordination should be established, maintained, and
documented among worker safety and health technical disciplines and other safety and health
organizations (e.g., radiation control) at a site to ensure successful implementation of the
worker safety and health program.
Additional information concerning DOE expectations for integrating safety management can
be found in Department of Energy Acquisition Regulations (DEAR) clause 48 CFR 970.5223-1,
Integration of Environment, Safety and Health into Work Planning and Execution. This states that
“the contractor will manage and perform work in accordance with a documented Safety
Management System (System).”
DOE G 440.1-8, Implementation Guide for Use with Title 10 Code of Federal Regulations Part
851 (DOE 2006d) provides guidance for establishing and implementing an ISMS program.
4.3 Records
Actions taken to maintain occupational exposures ALARA shall be documented and retained
[10 CFR 835.701(a) and 835.704(b)]. Administrative controls discussed in this Guide should
include the systematic generation and retention of those auditable records and reports that
document major actions considered or taken to attain and maintain occupational doses and the
spread of radioactive contamination ALARA. The RCS and Chapter 13 provide detailed guidance
on record-keeping.
All documents and legal records used to demonstrate compliance with ALARA program
requirements should be reviewed and approved by supervisory or line management.
DOE G 441.1-1C 49
5-19-08
5.0 INTERNAL DOSIMETRY PROGRAM
In the 2007 amendment to 10 CFR 835 DOE changed most of the dosimetric terms used in
10 CFR 835 to reflect the recommendations for assessing dose and associated terminology from
ICRP Publication 60, 1990 Recommendations of the ICRP on Radiological Protection (ICRP 1991),
and ICRP Publication 68, Dose Coefficients for Intakes of Radionuclides by Workers (ICRP 1995).
DOE made this change mainly because these recommendations are based on updated scientific
models and more accurately reflect the occupational doses to workers than the models
currently used by DOE.
During the rulemaking process DOE received a comment that, under certain circumstances,
when an individual conducts multiple activities involving both activities under 10 CFR 835.1(b)(1)
and excluded activities (e.g., activities involving NRC licensed activities) it is ambiguous as to how
the rule would be applied when using different dose coefficients and weighting factors to
calculate the total effective dose for the worker from both activities. DOE agreed that guidance
was needed for this provision. In the preamble for the final rule DOE stated that for the purpose
of compliance with 10 CFR 835.1(b)(1) and (c), DOE considers the following terms to be
equivalent:
Section 45
Dosimetric Term as Defined by Excluded
Activity Cognizant Regulator DOE Amended Dosimetric Term
Committed effective dose equivalent
Committed effective dose
Committed dose equivalent
Committed equivalent dose
Cumulative total effective dose equivalent
Cumulative total effective dose
Deep dose equivalent
Equivalent dose to the whole body
Dose equivalent
Equivalent dose
Effective dose equivalent
Effective dose
Lens of the eye dose equivalent
Equivalent dose to the lens of the eye
Quality factor
Radiation weighting factor
Shallow dose equivalent
Equivalent dose to the skin or
Equivalent dose to any extremity
Weighting factor
Tissue weighting factor
Total effective dose equivalent
Total effective dose
DOE G 441.1-1C 50
5-19-08
Accordingly, for the purpose of compliance with the requirement in 10 CFR 835.1(c) for the
inclusion of doses from excluded activities in determining compliance with the limits, DOE
considers it acceptable to sum the equivalent dosimetric terms (per the above table) without
further adjustment. DOE recognizes that, for some situations, such as evaluation of uranium
intakes, this approach will overestimate radiation doses from excluded activities as compared to
those assessed using ICRP 60 values. For other situations, such as the evaluation of certain
neutron exposures or for intakes of selected radionuclides, this approach may underestimate
radiation doses from excluded activities as compared to those assessed using ICRP 60 values.
In cases where doses from excluded activities are expected to have been over estimated, no
additional activities above the standard radiological controls are required because this dose
estimate is unlikely to have resulted in a dose less than that estimated using ICRP 60 methods.
Regarding cases where doses from excluded activities are expected to have been
underestimated, a review of doses over the past several recent years, from both DOE and NRC,
indicated very few examples where individuals had neutron exposures or significant intakes of
those radionuclides which could underestimate radiation doses from excluded activities as
compared to those assessed using ICRP 60 values. Accordingly, the differences in assessing
these intakes or neutron doses between DOE (ICRP 60) and excluded activities would
infrequently result in doses challenging limits had they been entirely assessed using ICRP 60
values. Use of Administrative Control Levels, per the RCS, should be adequate to address
concerns regarding these situations.
See Section 6.0.1, “Protection and Operational Quantities” for a discussion on the use of
protection and operational quantities.
Radiation protection programs for limiting intakes of radioactive material are based on the
DOE policy of controlling radioactive material at the source. It is nonetheless recognized that
low-level, chronic, or intermittent occupational exposures to some materials may be difficult to
avoid due to the types of material handled or processed, their chemical or physical forms, and
the nature of operations, and that incidents may cause unplanned releases of radioactive
material. 10 CFR 835.402(c) requires internal dosimetry programs (including routine
radiobioassay programs) be conducted for radiological workers, declared pregnant workers,
occupationally exposed minors, and members of the public entering controlled areas who are
likely to receive intakes that exceed specified levels for committed effective dose in a year. An
internal dosimetry program generally consists of three elements:
Section 46
An air monitoring program, using a combination of real-time, fixed, and portable
devices, as appropriate;
an individual monitoring program, using direct and/or indirect radiobioassay, and
personal breathing zone (BZ) air monitoring, as appropriate; and
a dose evaluation program that evaluates the data collected by the air and individual
monitoring programs to determine the magnitude of individual doses.
5.1 Implementation Guidance
DOE G 441.1-1C 51
5-19-08
This section provides guidance for establishing and conducting internal dosimetry programs
for individuals who have the potential for intakes of radioactive materials. It includes guidance
for design and implementation of the radiobioassay program, and guidance for evaluating,
recording, reporting, and managing internal doses. Additional technical guidance is provided in
DOE-STD-1121-2008, INTERNAL DOSIMETRY (DOE 2008j) and the National Council on Radiation
Protection and Measurements (NCRP) Report No. 87, Use of Radiobioassay Procedures for
Assessment of Internal Radionuclide Deposition (NCRP 1987a).
An acceptable internal dosimetry program includes the following features:
adequate staff with appropriate technical training;
internal dosimetry technical basis documentation providing scientific information and
other rationale explaining essential elements of the internal dosimetry program to
support dose evaluation methods;
written policies and procedures covering essential steps in the activities used to
determine worker internal dose;
criteria and methods for implementing an appropriate air monitoring program;
defined criteria for identifying workers who need to participate in the individual
monitoring program;
appropriate radiobioassay measurement methods and frequencies;
methods for control, accountability, and safe handling of samples;
appropriate dosimetric models and default parameters for evaluating internal dose;
timely analysis of radiobioassay samples and measurements, transmission of results,
dose evaluation, and recommendations to operations management;
adequate detection capability and quality of radiobioassay measurements;
defined criteria and actions for identifying individuals with suspected intakes, based on
workplace measurements and radiobioassay measurements;
appropriate action level guidelines;
defined program to report internal doses to workers, management, and DOE;
historical records of radiobioassay measurement results and dose evaluations;
historical records of the program, and changes in the program over time; and a quality
assurance program covering essential steps in the activities that determine worker
internal dose.
5.2 Program Management and Administration
DOE G 441.1-1C 52
5-19-08
5.2.0 General Requirements
The internal dosimetry program shall be adequate to demonstrate compliance with the dose
limits established in Subpart C of 10 CFR 835 [10 CFR 835.402(d)]. In addition, radiobioassay
programs implemented to demonstrate compliance with the requirements in 10 CFR 835.402(c)
(individual monitoring thresholds) shall be:
accredited or excepted from accreditation in accordance with the DOELAP for
Radiobioassay [10 CFR 835.402(d)(1)]; or
determined by the Secretarial Officer responsible for environment, safety and health
matters (i.e., the Chief Health, Safety and Security Officer) to have performance
substantially equivalent to that of programs accredited under DOELAP for radiobioassay
[10 CFR 835.402(d)(2)].
Section 47
Guidance for achieving accreditation or exception from accreditation under DOELAP is
provided in DOE-STD-1111-98, DEPARTMENT OF ENERGY LABORATORY ACCREDITATION
PROGRAM ADMINISTRATION (DOE 1998a). Requests for other program determinations
will be considered by DOE on a case-by-case basis.
The provision requiring accreditation for radiobioassay programs implemented to
demonstrate compliance with 10 CFR 835.402(c) does not reflect an intent to provide a
lesser degree of protection to individuals unlikely to receive doses exceeding the regulatory
monitoring thresholds, nor does it express a desire to establish two separate radiobioassay
programs (i.e., an accredited program for individuals likely to exceed the regulatory
monitoring thresholds and a non-accredited program for individuals who are unlikely to
exceed these thresholds). Rather, those individuals who are unlikely to exceed the
regulatory monitoring thresholds are provided an adequate degree of protection by the
various engineering and administrative controls that limit their internal doses.
Implementation of a comprehensive air monitoring program in accordance with
10 CFR 835.401 and 403 verifies the effectiveness of these controls. When an accredited
radiobioassay program already exists and management of any given facility chooses to
provide monitoring for those individuals who are unlikely to exceed the regulatory
monitoring threshold, consideration should be given to using the accredited program. This
will obviate the need to implement two radiobioassay programs, one accredited and the
other not. In addition, it will avoid giving workers who are not required to be monitored the
impression that they are being provided a lesser degree of protection. However, this does
not imply that the monitoring program for those unlikely to exceed the monitoring threshold
must be accredited.
Sections 401 through 403 of 10 CFR 835 establish specific monitoring requirements for areas
and individuals. 10 CFR 835 also establishes requirements for maintaining individual monitoring
records (10 CFR 835.702) and reporting radiation doses to individuals (10 CFR 835.801).
5.2.1 Organization, Staffing, and Facilities
5.2.1.0 Organization
DOE G 441.1-1C 53
5-19-08
The internal dosimetry program should be administered by the radiological control
organization under the leadership of the radiological control manager. The internal dosimetry
program should have a designated leader with demonstrated expertise in internal dose
evaluation. When elements of the internal dosimetry program are performed by one or more
subcontractors, the radiological control organization should establish an arrangement of
contractual standards and assessments that ensure that subcontractors meet all applicable
requirements in 10 CFR 835, the documented Radiation Protection Program (RPP), DOELAP
standards, and the internal dosimetry technical basis document.
5.2.1.1 Staffing
The radiological control organization management should ensure that the internal
dosimetry program is adequately staffed to carry out its functions. The analysis of workplace
and radiobioassay measurement data and the evaluation of internal dose involve complex
evaluation and professional judgment. Personnel with responsibility for internal dose
evaluation should have the necessary expertise and skill, based on appropriate education and
Section 48
training in conjunction with practical experience, to perform their assigned duties. Additional
guidance on education, skills, and training is provided in Chapter 3. It is important that internal
dosimetry specialists be capable of recognizing conditions warranting follow-up radiobioassay
and dose evaluation. Personnel should be familiar with the relevant internal dosimetry
literature and the recommendations of national and international scientific organizations with
regard to internal dose evaluation.
Management of the radiological control organization should establish minimum
requirements for those staff who evaluate internal doses. These requirements should include
both experience and education requirements. Suggested educational background and formal
training needed for internal dosimetry program key positions are listed in DOE-STD-1107-2007,
Chg 1, KNOWLEDGE, SKILLS, AND ABILITIES FOR KEY RADIATION PROTECTION POSITIONS AT DOE
FACILITIES (DOE 2007g). Members of the internal dosimetry staff should meet these
requirements, or the staff should have access to individuals with the required background
(perhaps through interdepartmental agreements or contracted services). It is not necessary for
all personnel on the staff to have expertise in all of the listed subject areas.
5.2.1.2 Facilities and Resources
Computational facilities and software tools used by internal dosimetry personnel
should be adequate for performing calculations required for the evaluation of dose from
radionuclides in the body. A library of handbooks, reference materials, scientific
publications, and other resources pertaining to internal dosimetry should be readily
available. Suggested reference materials are included in the reference chapter of this
Guide. DOE O 414.1D, Quality Assurance (DOE 2011), establishes quality process
requirements to be implemented under a QA program (QAP) for the control of
suspect/counterfeit items (S/CIs), safety issue corrective actions, and safety software.
5.2.2 Technical Basis Document
DOE G 441.1-1C 54
5-19-08
Internal dosimetry technical basis documentation should be developed and should include
technical methods, supporting evidence, and reference information used to provide the
technical foundation for the internal Dosimetry program. The internal dosimetry technical basis
documentation should provide the approach to evaluating internal doses from radiobioassay
data, and for situations in which there is no practical radiobioassay, from representative air
monitoring or other appropriate data. The technical basis documentation should address all of
the topics listed under Section 3.1 of DOE-STD-1121-2003. The technical basis documentation
should be reviewed periodically and updated as necessary to ensure that the scientific bases are
appropriate for current conditions. The technical basis documentation should be controlled and
retained as a radiation protection program record.
5.2.3 Internal Dosimetry Procedures Manual
10 CFR 835 requires that written procedures be developed and implemented as necessary to
ensure compliance, commensurate with the radiological hazards created by the activity and
consistent with the education, training, and skills of the individuals exposed to those hazards
(10 CFR 835.104). Essential elements of the internal dosimetry program should be addressed in
written procedures. These procedures should be consistent with 10 CFR 835, the DOELAP
standard, and technical basis documentation.
Section 49
Detailed guidance on topics that should be addressed in the internal dosimetry procedures
manual are discussed in Section 3.2 of DOE-STD-1121-2008. Additional guidance on written
procedures is provided in Chapter 3 of this Guide.
5.2.4 Quality Assurance
Quality Assurance for internal dosimetry programs is addressed in DOE-STD-1121-2008,
Section 11. Quality assurance in support of internal dosimetry programs should be conducted in
accordance with this DOE standard.
The internal dosimetry program should be included as a functional element subject to the
internal audit requirements of 10 CFR 835.102. Chapter 3 provides guidance on internal audit
programs. External peer-review by qualified individuals, on a periodic basis, is also
recommended.
5.3 Air Monitoring and Contamination Control Programs
The objectives of an air monitoring program are to verify the integrity of radioactive material
containment, detect the release of radioactive materials from some routine operations, detect
inadvertent releases of those materials in the workplace, evaluate and provide the basis for
modification to containment systems, provide a basis for the design of radiobioassay programs,
and verify that selected groups do not need to participate in a radiobioassay program. Air
monitoring programs and internal dosimetry programs are complimentary. The air monitoring
program provides an indication of the effectiveness of engineering and administrative controls in
preventing or minimizing worker intakes and the internal dosimetry program provides
verification of the adequacy of these controls in preventing or minimizing worker intakes.
DOE G 441.1-1C 55
5-19-08
The air monitoring and contamination control programs supplement the individual
monitoring program by providing a prospective assessment of radiological conditions, facilitating
decisions regarding postings, access controls, work authorizations, and individual monitoring,
and providing back-up data for use in individual dose evaluations. Because of the need to
evaluate individual internal doses from intakes of radioactive material from uncontained
sources, airborne radioactive material, and surface contamination, the air monitoring and
contamination control programs should include methods for assessing the degree of hazard
arising from each of these hazards to which individuals may be exposed. Guidance for
implementing contamination control and air monitoring programs is provided in Chapters 10 and
11 of this Guide.
In most cases the air monitoring program is used to supplement and validate the individual
monitoring program. However, in the case when there is no practical radiobioassay method or
when there is a technology shortfall (e.g., the DIL is less than the MDA) the air monitoring
program may be the basis for the determination of internal doses. These two cases are
discussed below.
5.3.0 Air Monitoring When There Is No Practical Radiobioassay Method
Section 50
In situations where no radiobioassay method is available for the radionuclides in question,
and no radiobioassay program, either routine or special, can show compliance with 10 CFR 835,
personal (BZ) air monitoring may be used for demonstrating compliance with 10 CFR 835. BZ air
monitoring is part of the Individual Monitoring Program which is detailed below. However, other
fixed or portable monitoring instruments that provide either real-time (such as continuous air
monitors) or retrospective (such as grab sampling which is analyzed at some time after the
sample is collected) may be required when BZ monitoring data is not available or to supplement
or validate the BZ data if it is available. Radionuclides with short half-lives, including the
short-lived decay products of 222Rn (“radon” decay products 218Po, 214Pb, 214Bi, and 214Po) and
220Rn (“thoron” primary decay products 212Pb and 212Bi) are examples of radionuclides where
intakes cannot be determined through radiobioassay and must be determined from personal air
monitoring. For detailed information on non-background exposures to radon and thoron, see
DOE-STD-1121-2008, Section 4.5. Monitoring programs for radon and thoron should be in
accordance with the DOE standard.
5.3.1 Recourse for Technology Shortfall (DIL<MDA)
DILs for reasonable and practical routine radiobioassay programs may be significantly less
than the achievable MDA for certain radionuclides, such as plutonium. Since a technology
shortfall for routine radiobioassay exists, the facility should consider the following actions (note
that some of these suggested actions fall under the category of individual as opposed to area
monitoring, but for completeness they are all listed below):
enhance contamination and air monitoring and the use of indicators (e.g., unexpected
glove or surface contamination, increase in airborne radioactive material contamination,
nasal smears) to trigger early special radiobioassay monitoring;
enhance personal contamination monitoring (e.g., clothing, skin) to trigger special
radiobioassay monitoring;
DOE G 441.1-1C 56
5-19-08
use the best practicable radiobioassay monitoring methods;
implement enhanced design, operation, controls, and personnel protection equipment
and procedures to minimize intakes;
implement supplementary air monitoring; and
document and justify the planned supplementary approach in the facility's internal
dosimetry technical basis documentation.
When air monitoring data are used, each worker's stay times (in hours) and the average
concentration (in DACs) to which the worker is exposed should be multiplied to yield exposures
to airborne radioactive materials in units of DAC-hours. Forty (40) DAC-hours corresponds to 0.1
rem (0.001 Sv) committed effective dose for radionuclides with a stochastic ALI.
A technology shortfall for routine radiobioassay should not be sufficient cause for failing to
place individuals on a minimum or best-available radiobioassay program. Refer to
DOE-STD-1121-2008, Section 4.4.4, for a discussion and examples of technology shortfalls and
suggested methods to handle such situations.
5.4 Individual Monitoring Program
Individual monitoring programs should be designed in accordance with Section 4 of
DOE-STD-1121-2008 and should:
provide for investigation of suspected intakes;
provide data for evaluating internal dose; and
Section 51
provide results that are adequate to demonstrate compliance with the radiation dose
limits given in 10 CFR 835. The primary methods of routine and special worker
radiobioassay are direct (in vivo) radiobioassay and indirect (in vitro) radiobioassay.
In situations where there is no practical radiobioassay, representative air monitoring (e.g.
breathing zone (BZ) air monitoring) is the preferred measurement method on which to base
dose evaluations. Additional guidance on air monitoring programs may be found in Chapter 10
of this Guide.
5.4.0 Establishing the Need for Individual Monitoring
Radiological workers who could likely receive intakes resulting in 0.1 rem (0.001 Sv) or more
committed effective dose in a year shall participate in an internal dose evaluation program
[10CFR 835.402(c)(1)]. Declared pregnant workers, occupationally exposed minors, and
members of the public are also required, under specific conditions [see 10 CFR 835.402(c)] to
participate in internal dosimetry programs. Criteria for participation in individual monitoring
programs which include baseline radiobioassay, routine radiobioassay and/or air sampling, radon
and thoron monitoring, special radiobioassay, and termination or task-ending radiobioassay,
radiobioassay for declared pregnant women, and confirmatory radiobioassay are covered in
DOE G 441.1-1C 57
5-19-08
DOE-STD-1121-2008, Section 5. This section of the technical standard also discusses timely
receipt of radiobioassay results. Participation in individual monitoring programs for internal
dosimetry should be in accordance with the DOE technical standard.
Situations may arise where a decision is made to monitor radiological workers who are not
likely to receive intakes that exceed 0.1 rem (0.001 Sv) committed effective dose in a year. Such
monitoring may be useful for demonstrating compliance with 10 CFR 835.401(a) or established
for other purposes. The internal dosimetry program documentation should clearly identify
those individuals or groups of individuals being monitored for such purposes.
5.4.1 Investigation Levels/Derived Investigation Levels
Refer to DOE-STD-1121-2008, Sections 4.3 and 4.4 for a discussion of and reference levels for
Investigation Levels (ILs) and Derived Investigation Levels (DILs). Programs should be designed in
accordance with this technical standard.
Refer to DOE-STD-1121-2008, Section 4.4.1 for a discussion of factors affecting the DIL.
Additionally, section 4.4.2 provides guidance for calculating the DIL for a given sample frequency,
Section 4.4.3 discusses factors affecting the DIL for air sampling, and Section 4.4.4 deals with
supplementing routine radiobioassay programs when DIL< MDA (technology shortfall).
Programs should be designed in accordance with this technical standard.
5.4.2 Minimum Detectable Amount (MDA)
The internal dosimetry program staff should determine the minimum detectable amount
(MDA) for each radiobioassay and BZ air monitoring method for each radionuclide present. The
MDAs should be documented in procedures and their statistical bases given in the internal
dosimetry technical basis documentation. ANSI Standard N13.30-1996, Performance Criteria for
Radiobioassay, (ANSI/HPS 1996) provides extensive guidance on the calculation of MDAs.
Section 52
As MDAs are affected by various aspects involved with individual monitoring methods,
procedures should contain descriptions of the method(s) of individual monitoring measurements
(e.g., urinalysis, fecal analysis, in vivo counting, BZ air monitoring), analytical methodology (e.g.,
chemical separation followed by alpha counting), and measurement parameters (e.g., counting
time or instrument efficiency) to be used in each component of the individual monitoring
program.
Several other factors affect the method of radiobioassay used and its associated MDA. They
include:
the possible need for improved detection capability to assess individual dose during the
special radiobioassay following an intake requiring internal dose evaluation, due to
diminishing amounts of material in compartments as time goes on;
the need for improved precision and accuracy if residual retention and excretion from
prior intakes interferes with the detection of additional intakes in subsequent years;
timeliness of results needed to manage individuals and keep subsequent intakes low
DOE G 441.1-1C 58
5-19-08
enough to avoid exceeding dose limits;
convenience to the affected individuals;
costs, including lost production time while individuals are participating in the
radiobioassay program; and
the impact of the method of radiobioassay on the frequency of radiobioassay
measurements.
Where practicable, the method of individual monitoring, analytical methodology, and
measurement parameters should result in an MDA less than the corresponding DIL for all
radionuclides to which an individual might be exposed.
The methods of radiobioassay and air monitoring measurements, their MDAs, and their
accuracies should be specified in the internal dosimetry technical basis documentation, along
with a rationale or justification for the methods chosen.
5.4.3 Frequency of Measurement
The routine radiobioassay measurement frequency depends on the radiobioassay
measurement method and associated MDA. The frequency should be chosen so that it is
unlikely that intakes by an individual in a year will result in doses exceeding one IL without
detection.
5.4.4 Detection and Confirmation of Intakes
Section 6 of DOE-STD-1121-2008 provides acceptable methods for detecting and confirming
intakes through workplace monitoring and radiobioassay. Statistical methods for confirming that
an intake has occurred are also discussed. Decisions regarding the detection and confirmation of
suspected occupational intakes of radioactive material should be based on answers to the
following questions:
Can it be concluded reliably that the analyte is present in the measured sample (>Lc)?
Is the measurement result unexpected? In other words, is the result beyond the range
of values that would be expected due to environmental “background” sources or due to
previously recognized intakes?
Is the intake (and resulting dose) implied by the measurement significant enough
(e.g., greater than the IL) to warrant follow-up measurements or investigation?
If the answer to all these questions is “yes”, then follow-up measurements or investigation
is warranted. Internal dosimetry programs should establish appropriate and technically-based
decision criteria to assist in answering these questions. Such decision criteria should be
included in the technical basis document for the site or facility.
The proper decision criteria for the first question is the Lc which is a purely statistical
concept based on an acceptable probability of “false positive” conclusions. The Lc for
Section 53
DOE G 441.1-1C 59
5-19-08
radiobioassay and air sample measurements should be set by considering the acceptable rate
of false positives, the cost and consequences of false positives, and the dosimetric
consequences of false negatives. The analytical laboratory Lc should be based on a reagent
blank. Radiobioassay results above the Lc may be expected in the absence of a new intake due
to normal statistical fluctuations, non-occupational or environmental sources, or prior
confirmed intakes. In the case of environmental sources of interference (e.g., uranium in
urine) an “occupational decision level” should be established, above which the measurement
result is concluded to be statistically significant and above the range of values that would
normally be expected from environmental sources of the radionuclide. In the case of prior
confirmed intakes, an individual-specific “occupational decision level” should be established,
which takes into account the expected contribution from the prior intakes. Finally, for each
route of intake, measurement type, and radioactive material of interest (taking into account
particle size, material type, etc.), time-dependent DILs should be established. Such DILs are
based solely on dosimetric considerations, and typically correspond to an implied intake (and
corresponding dose) of 1 investigation level, i.e., 0.1 rem. This Guide has adopted the value of
0.1 rem (0.001 Sv) committed effective dose as the value which, for regulatory purposes, is
regarded as sufficiently important to justify further investigation. However, a site or facility
may wish to establish lower follow-up levels for ALARA purposes.
If the measurement result is statistically significant, unexpected, and dosimetrically
significant, then follow-up measurements and/or an investigation should be done to attempt to
confirm or rule out the intake. An intake should be considered to be confirmed if the three
criteria above are satisfied and the measurement result is associated with a known incident, or
appropriate follow-up measurements meet the three criteria above, or follow-up investigation
indicates that an intake has occurred.
Refer to DOE-STD-1121-2003, Section 6, for additional information on the detection and
confirmation of intakes. Table 3 addresses reference levels for interpreting or responding to
intake monitoring results. Program elements which address the detection and confirmation of
intakes of radionuclides should be in accordance with the DOE technical standard. Additionally,
NCRP Report No. 84, General Concepts for the Dosimetry of Internally Deposited Radionuclides
(NCRP 1985) and ICRP Publication 30, Limits for Intakes of Radionuclides by Workers (ICRP 1979),
may be useful references.
5.4.5 Internal Dose Management
Internal dose management, which includes routine radiological worker dose management,
management of dose from previous intakes (work restrictions), control of dose to the
embryo/fetus, control of dose to minors and students, dose limitation, interface with the
external dosimetry program, lifetime dose control, accidental dose control, and internal dose
control after an incident, is covered in DOE-STD-1121-2008, Section 8. Individual programs
should be in accordance with the DOE technical standard.
5.4.6 Planned Special Exposures
Planned special exposures are included in an individual’s occupational dose record, but shall
not be considered when determining compliance with the occupational dose limits of
10 CFR 835 [10CFR 835.204(a)]. In order to maintain separate records of doses resulting from
Section 54
DOE G 441.1-1C 60
5-19-08
planned special exposures and routine occupational exposures, dosimetry adequate to measure
the potential doses and appropriate for the work to be performed and specific radiological
circumstances should be provided for the planned special exposure.
5.4.7 Medical Response
Medical response is addressed in DOE-STD-1121-2008, Section 10. The standard addresses
situations where internal dosimetry actions and medical treatment occur simultaneously, the
role of the health physicist in medical treatment, when to treat, how to treat, the impact of
therapy on dosimetry, and the counseling of workers. Medical response should be handled in
accordance with the DOE technical standard.
5.5 Internal Dose Evaluation
10 CFR 835 requires internal dose evaluation programs for assessing intakes of radionuclides
and for maintaining adequate worker exposure records. Technical details and extensive
references for internal dose evaluation are given in DOE-STD-1121-2008. NCRP Report No. 84 is
an additional suggested reference.
5.5.0 Required Dose Calculations
Internal doses should be evaluated for all confirmed intakes, as defined in Section 5.3.5 of
this Guide. For intakes confirmed with radiobioassay results below the DIL, no further
investigation or follow-up radiobioassay are indicated. For intakes confirmed with radiobioassay
results above the DIL or exposures greater than 40 DAC-hours, follow-up radiobioassay (if
practical) and investigation should be performed.
In the 2007 amendment to 10 CFR 835, section 835.702(b) was modified and a provision
was added regarding the recording of internal dose (committed effective dose or committed
equivalent dose). The provision allows for not recording of any positive monitoring result
estimated to correspond to an individual receiving less than 0.01 rem (0.1 mSv) committed
effective dose. Typically, this would be for very sensitive bioassay protocols or for radionuclides
which are easy to detect at very low doses (e.g., routine tritium bioassay). The bioassay or air
monitoring result used to make the estimate shall be maintained in accordance with 10 CFR
835.703(b) and the unrecorded internal dose estimated for any individual in a year shall not
exceed the applicable monitoring threshold at 10 CFR 835.402(c).
The extent of the investigation and the number and frequency of special radiobioassay
measurements following a suspected or confirmed intake should be determined and
documented on an individual, case-specific basis, taking into account the potential
magnitude of the intake, the effective clearance half-time, the health of the worker, and
the number of measurements needed to evaluate the internal dose.
The schedule and frequency of long-term special radiobioassay measurements to evaluate
the committed effective dose to an individual who has had an intake resulting in a dose in excess
of one IL should depend on the expected magnitude of the committed effective dose and the
likelihood of the individual receiving additional intakes.
DOE G 441.1-1C 61
5-19-08
While the investigation should be tailored to the specific individual and exposure
circumstances, the trigger levels and preliminary actions to be taken for exposures to the
different radionuclides encountered at the facility should be documented in the internal
dosimetry technical basis documentation and procedures.
5.5.1 Interpretation of Radiobioassay Data
Section 55
Technical details on the interpretation of radiobioassay data including the use of biokinetic
models are given in DOE-STD-1121-2008, Section 7. Radiobioassay data should be interpreted in
accordance with the applicable portions of this DOE technical standard.
Evaluations of committed effective dose from a specific intake should account for expected
values of radiobioassay measurements from prior confirmed intakes.
5.5.2 Evaluation of Internal Dose from Radiobioassay and Air Monitoring Data
Methods for evaluating the various doses from intakes should be specified in the internal
dosimetry technical basis documentation. The methods should be based on recommendations,
consistent with DOE requirements, given in ICRP Publications, NCRP Reports, and ANSI standards
which embody improvements and updates of the science of internal dosimetry. Other methods
may be used provided they are documented and justified in the procedures and/or internal
dosimetry technical basis documentation.
In the calculation of internal doses less than one IL, default parameters may be used. These
parameters (e.g., intake date, deposition fractions, retention functions, organ masses, and
absorption fractions) should be based on the recommendations of the ICRP, NCRP, other relevant
technical references, or facility-specific factors as documented in the internal dosimetry
technical basis documentation. If the initial evaluation of an intake indicates a dose in excess of
10 times an IL, individual-specific and facility-specific factors should be used when more
appropriate parameters are expected to change the dose calculations by a factor of 1.5 or more
Between 1 and 10 times the IL, either default parameters or individual- and facility-specific
parameters may be used, as deemed appropriate and documented by the internal dosimetry
staff. The basis for determining which individual-specific and facility-specific factors are
expected to change the dose calculations by a factor of 1.5 or more should be documented in
the internal dosimetry technical basis documentation. Determination of individual retention
patterns for a worker requires participation in the special radiobioassay program and may
require temporary work restriction or reassignment to prevent subsequent intakes from
confounding the dose evaluation.
5.5.3 Periodic Reevaluation of Internal Dose
In the case of certain well-retained radionuclides (e.g., plutonium), long-term follow-up and
reevaluation of doses may be required. The internal contribution to lifetime occupational dose
should continue to be reevaluated as further radiobioassay results and improved methods for
evaluating internal dose become available.
DOE G 441.1-1C 62
5-19-08
Evaluations for general employees with prior confirmed intakes should be revised when
information demonstrates a change in the currently evaluated committed effective dose of 0.5
rem (0.005 Sv) or a factor of 1.5 of the previously assigned dose for that intake, whichever is
higher. In cases where intakes are detected or confirmed in a year subsequent to the year of the
intake, the committed effective dose should be attributed to the known or assumed year of the
intake, and all records and reports for that year should be amended as appropriate. An
acceptable approach would be for DOE sites to update their dosimetry program to reflect the
amended 10 CFR 835 tissue and radiation weighting factors, and to assess doses using the
updated factors at some predetermined time. It is not expected that DOE sites recalculate all
previously completed dose estimates performed at that site. Note the Department did not
require recalculation of previous internal doses resulting from uranium intakes when it granted
a DOE contractor an exemption from those requirements in 10 CFR 835 requiring the use of the
specified tissue weighting factors, thus, permitting the use of the tissue weighting factors in
ICRP 60 when calculating internal doses from uranium.
Section 56
DOE does not encourage routine recalculation of internal doses in response to changes in
internal dosimetry methodologies such as biokinetic models, tissue weighting factors, or
improved bioassay techniques after a final dose estimate has been completed and recorded.
Internal doses calculated using technically sound and defensible methods available at the time
of the dose estimate are an acceptable way to meet the Department’s expectations for internal
dose monitoring and compliance with occupational exposure dose limits promulgated in 10 CFR
835. However, in the process of updating methodologies it is recommended that DOE sites
should maintain close communication with cognizant DOE personnel.
DOE recognizes there may be unique situations in which a DOE site may consider or be
directed to reevaluate an internal dose estimate. Examples of such situations are a response to
litigation, determination that an internal dose has been incorrectly estimated, or availability of
new bioassay data. In such cases the decision to recalculate a final internal dose estimate should
be made on a case-by-case basis and consider:
The magnitude of the expected change,
Programmatic costs,
Impact on compliance with dose limits,
Documentation of the recalculated result in official records, and
Communication of the recalculated dose to current and former workers.
To ensure compliance with record-keeping provisions of 10 CFR 835 subpart H, the technical
basis and results of determinations to recalculate a completed internal dose assessment should
be documented in official site records.
5.6 Recordkeeping and Reporting
Requirements and guidance for recording and reporting internal doses and related
information are provided in Chapter 14 and DOE-STD-1121-2008, Section 9. Record-keeping and
DOE G 441.1-1C 63
5-19-08
reporting of internal doses and related information should be in accordance with these DOE
documents.
DOE G 441.1-1C 65
5-19-08
6.0 EXTERNAL DOSIMETRY PROGRAM
Due to the types of material handled or processed, low-level, chronic occupational
exposures to external ionizing radiation are difficult to avoid, necessitating an external dosimetry
program at most DOE and DOE-contractor facilities that use, handle, or store radioactive
materials. An external dosimetry program generally consists of three elements:
an area monitoring program, using an array of fixed and portable devices, as
appropriate;
an individual monitoring program, using personnel dosimeters; and
a dose evaluation program that evaluates the data collected by the area and individual
monitoring programs to determine the magnitude of individual doses.
6.0.1 Protection and Operational Quantities
The ICRP Publication 60 dosimetric quantities adopted in 10 CFR 835 have been designated
by ICRP as “protection quantities” that are intended for defining and calculating the numerical
limits and action levels used in radiation protection standards such as 10 CFR 835. Protection
quantities provide a way to relate the magnitude of a radiation exposure to the risk of a health
effect th