N/A, Delegation of Safety Authorities (Hutton - EM)
Related To:
Related From:
Version history and related documents
Related documents
- DOE O 425.1D Chg 1 (Admin Chg)Verification of Readiness to Start Up or Restart Nuclear Facilities
- DOE O 151.1 Chg 1Comprehensive Emergency Management System
- DOE O 225.1BAccident Investigations
- DOE O 450.2Integrated Safety Management
- DOE O 474.2 Admin Chg 2Nuclear Material Control and Accountability
- DOE O 433.1B Chg 1 (Admin Chg)Maintenance Management Program for DOE Nuclear Facilities
- DOE O 470.4B Admin Chg 1Safeguards and Security Program
- DOE O 471.6 Admin Chg. 1Information Security
- DOE O 414.1D Chg 1 (Admin Chg)Quality Assurance
- DOE O 252.1A Admin Chg 1Technical Standards Program
- DOE O 473.3Protection Program Operations
- DOE O 471.1BIdentification and Protection of Unclassified Controlled Nuclear Information
- DOE O 420.1 Chg 1Facility Safety
- DOE O 472.2 Chg 1 (AdminChg)Personnel Security
- DOE O 440.1B Chg 2 (AdminChg)Worker Protection Program for DOE (Including the National Nuclear Security Administration) Federal Employees
- DOE O 150.1AContinuity Programs
- DOE O 420.1CFacility Safety
- DOE O 151.1CComprehensive Emergency Management System
- DOE O 425.1D Chg 1 (Admin Chg)Verification of Readiness to Start Up or Restart Nuclear Facilities
- DOE O 450.2Integrated Safety Management
- DOE O 470.4B Admin Chg 1Safeguards and Security Program
- DOE O 471.6 Admin Chg. 1Information Security
- DOE O 472.2 Chg 1 (AdminChg)Personnel Security
- DOE O 473.3Protection Program Operations
- DOE O 474.2 Admin Chg 2Nuclear Material Control and Accountability
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
Department of Energy
Washington , DC 20585
March 24, 2014
MEMORANDUM FOR JAMES HUTTON
ASSOCIATE DEPUTY ASSISTANT SECRETARY FOR
SAFETY, SECURITY, AND QUALITY PROGRAMS
ENVIRONMENTAL MANAGEMENT
FROM: MATTHEWMOURY 1/JAO
DEPUTY ASSISTANT'~ ARY FOR
SAFETY, SECURITY, AND QUALITY P
ENVIRONMENTAL MANAGEMENT
SUBJECT: Delegation of Safety Authorities
This memorandum serves as your delegation of specific authorities listed in the
attachment and supersedes those delegated by prior memoranda to any official at the
Office of Environmental Management (EM) at Headquarters (HQ). This delegation is
made in accordance with Department of Energy (DOE) Order 450.2, Integrated Safety
Management, appendix A, Delegations of Authority to Perform Safety Management
Functions, and EM Standing Operating Policies and Procedures (SOPP) #44,
Environmental Management Process for Delegation of Safety Authorities.
Designated authorities assigned through rules and DOE directives are established to ensure
objective and consistent decisionmaking by appropriate levels of line management. You
need to assure that organizational lines of responsibilities, reporting, and communication for
safety are clear among your program staff and field oversight personnel while retaining the
responsibility for outcome. If you have any questions in executing your authorities, I
encourage you to seek my input.
These authorities may be further delegated to EM HQ Managers, Field Managers, Deputy
Managers, Assistant Managers, and Federal Project Directors. Current delegations from me
to field management for the calendar year 2014 remain in effect through January 31, 2015,
unless rescinded or modified through a redelegation memorandum either from you or me.
Further delegations of safety-related authorities are to be made in accordance with EM
SOPP#44.
@ Printed with soy ink on recycled paper EMERS-2014-032401 Page 1 of 8 (03/2014)
WhitleyW
Text Box
2014-032401
If you have any questions, please let me know.
Attachment
cc: Matthew McCormick, RL
Kevin Smith, ORP
David Moody, SR
Jose Franco, CBFO
William Murphie, PPPO
Mark Whitney, OR
Susan Cange, OR
Richard Provencher, ID
James Cooper, ID
Bryan Bower, WVDP
Donald Metzler, MOAB
Steven Feinberg, SPRU
Ralph Holland, CBC (Acting)
John Rampe, BNL
Kevin Bazzell, SLAC
John Jones, ETEC
David Huizenga, EM-1 (Acting)
Richard Lagdon, EM-1/CNS
James Owendoff, EM-2 (Acting)
Jack Craig, EM-2.1 (Acting)
Candice Trummell, EM-3 (Acting)
Mark Gilbertson, EM-10
Kenneth Picha, Jr. , EM-20
Frank Marcinowski, EM-30
Todd Lapointe, EM-41
Braj Singh, EM-41
Anthony Weadock, EM-42
Robert Murray, EM-43
Jimmy McMillian, EM-44
J. E. Surash, EM-50
Teresa Tyborowski, EM-60
Melody Bell, EM-70 (Acting)
2
EMERS-2014-032401 Page 2 of 8 (03/2014)
Attachment
Delegation of Safety Authorities for James Hutton, Associate Deputy Assistant
Secretary for Safety, Security, and Quality Programs, Office of Environmental
Management
1. Title 10 Code of Federal Regulations (CFR) 830, Nuclear Safety Management,
Subpart B: For work to be performed in a Department of Energy (DOE) nuclear
facility, 10 CFR Part 830.202 and 830.207 (including appendix A), require DOE
approval of a safety basis that meets the requirements of subpart B, with the issuance
of a safety evaluation report. The following is a list of safety basis elements
delegated to you:
Subpart B 830.202 (b)(3): Approve final hazard categorization for category 2 and 3
nuclear facilities.
Section 2
Subpart B 830.202 (b)(4): Approve the Documented Safety Analysis (DSA) and
revisions thereto.
Subpart B 830.203 (b) and (c): Approve Unreviewed Safety Question (USQ)
procedures and processes of the contractor for hazard category 2 and 3 nuclear
facilities.
Subpart B 830.203 (e): Approve any action determined to involve a USQ for hazard
category 2 and 3 nuclear facilities.
Subpart B 830.204 (a): Approve the methodology, with the Office of Health, Safety
and Security (HSS) concurrence, used to prepare the DSA for hazard category 2 and 3
nuclear facilities, unless the contractor uses a methodology set forth in table 2 of
appendix A to subpart B of 10 CFR Part 830.
Subpart B 830.205 (a)(2): Approve Technical Safety Requirements and revisions
thereto for hazard category 2 and 3 nuclear facilities.
Subpart B 830.206 (b)(l) and (2): Approve the preliminary DSAs, including nuclear
safety design criteria for hazard category 2 and 3 nuclear facilities .
2. Title 10 CFR Part 835, Occupational Radiation Protection:
Subpart B 835.101 (a), (b), and (i): Review and approve or direct changes to
contractor Radiation Protection Programs and Implementation Plans for 10 CFR Part
835 within 180 days after submittal to DOE.
3. Title 10 CFR 851, Worker Safety and Health Program:
Subpart B 851.1 l(b): Approve contractor Worker Safety and Health Programs
(WSHP) submitted for the Office of Environmental Management (EM) small site
EMERS-2014-032401 Page 3 of 8 (03/2014)
contractors that are not otherwise approved by the Head of the Field Element as part
of another landlord's prime contractor WSHP.
2
Subpart C 851.21 (b ): Concur in the Head of Field Element review and acceptance of
contractor identified closure facility hazards and controls.
Subpart D 851.31(a)(l): Review contractor variance requests to safety and health
standards and either forward to the HSS for review and subsequent approval by the
Under Secretary of Energy, or return the request through the field manager to the
contractor with an explanation for denial or direction for additional actions.
4. DOE Order (0) 150.1, Continuity Programs: Approval authority for exemptions to
requirements of this order and concurrence authority on the DOE Continuity of
Operations Plan.
5. DOE 0 151.lC, Comprehensive Emergency Management System: Approval
authority for proposed alternative standards for emergency management and
exemptions to requirements of this order.
6. DOE 0 225.lB, Accident Investigations:
4.a: Consider the criteria identified in appendix A, the value of the knowledge to be
gained by conducting the investigation, and other relevant factors, to determine whether
an Accident Investigation Board (AIB) must be appointed. This determination must be
made expeditiously, taking into account that timeliness is crucial to conducting an
accurate investigation, preserving the accident scene and evidence, and identifying causal
factors (see appendix B, Definitions). The Head of HQ Elements Must document the
determination and immediately notify HSS of the determination whether to appoint or not
appoint an AIB. If the Chief Health, Safety, and Security Officer does not concur with
rationale for not appointing an AIB, the Chief may elevate the matter for resolution by
the Deputy Secretary. After resolution, the Head of HQ Elements must document the
final determination of a decision not to conduct an investigation with a copy to HSS.
Section 3
5.a.(l): Consider the .criteria identified in appendix A, the value of the knowledge to be
gained by conducting the investigation, and any other relevant factors, to determine
whether an AIB must be appointed.
5.a.(2): Serve as the Appointing Official for AIBs for programs, offices, and facilities
under their authority. Alternatively, if you and HSS agree that it is in the best interest of
DOE, HSS will serve as the Appointing Official and conduct the accident investigation.
5.a.(3): Maintain a staff of trained and qualified personnel to serve in the capacity of
Chairperson and DOE Accident Investigators for AIBs and, upon request, provide them
to support other AIBs.
EMERS-2014-032401 Page 4 of 8 (03/2014)
5.a.(4): If requested by the AIB Chairperson, review the draft AIB report for factual
accuracy within the timeframe allowed so that comments may be considered for
incorporation into the final draft report.
3
5.a.(5): Distribute accident investigation reports to all heads of EM Field Elements
and direct an extent-of-condition review be conducted for issues identified during EM
accident investigations that are applicable to work locations and operations.
5.a.(6): As appropriate, require the submittal of corrective action plans to address the
Judgments of Need, approve the implementation of those plans, and track the
effective implementation of those plans to closure.
7. DOE 0 232.2, Occurrence Reporting and Processing of Operations Information:
5.a.(1) and 5.e: Serve as Program Manager that includes authority for implementing
the occurrence reporting requirements and EM HQ event notification guidance.
8. DOE 0 252.lA, Technical Standards Program:
5.b.(2): Designate a Technical Standards Manager (TSM) to serve as the
organization's point of contact for technical standards activities and to coordinate with
the Technical Standards Program (TSP) Manager by participating in the TSM
Committee.
5.b.(3): Ensure through the TSM that technical standards identified or developed by
elements of HSS for DOE-wide use are products of the TSP or recognized standards
development organizations.
9. DOE 0 414.lD, Quality Assurance:
5.b.(1): Notify cognizant contracting officers, (for other than field-issued contracts),
of those contractors that should include the Contractor Requirements Document
(CRD) or its requirements, as appropriate. Direct the contracting officer, as
necessary, to ensure appropriate quality requirements are implemented by the
contractor.
5.b.(2): Act as the approval authority or delegate such authority, as appropriate, for
the Quality Assurance Plan (QAP) within EM and the DOE Field Elements and
contractors within EM.
5.b.(4): Ensure development and approval of the QAP governing the work of EM
that meets the requirements of paragraph 4 of DOE 0 414.lD.
5.b.(5): Ensure reviews are performed of the EM QAP per paragraph 4.b.(2) of
EMERS-2014-032401 Page 5 of 8 (03/2014)
DOE 0 414.lD.
5.b.(6): Ensure review and approval of new or revised QAP for: (a) field elements
under EM; and (b) contractors within the purview of EM, if approval authority is not
delegated.
5.b.(7): Ensure that QAPs are reviewed, and either rejected or approved within
90 calendar days of receipt. Requests for review/approval that are not approved or
rejected within 90 calendar days from receipt will be deemed approved.
5.b.(8): Ensure review of safety documentation for the facility or activity to validate
that safety software has been properly identified.
Section 4
5.b.(9): Ensure review of grading levels of safety software for approval by the QAP
approval authority.
10. DOE 0 420.1 C, Facility Safety:
4
5.b.(1): Ensure that the requirements of this order and the CRD are implemented for
facilities, activities, or programs under their cognizance. Review, and where justified,
approve requests for equivalencies and exemptions to the requirements of this order,
processed in accordance with DOE 0 251.1 C, Departmental Directives Program.
5.b.(2): In accordance with section 3.c.(1) of this order, approve the basis for not
including multiple physical barriers to prevent or mitigate the unintended release of
radioactive materials to the environment, as part of the hazard category 1, 2 and 3
nuclear facility designs, where justified by sound technical basis.
11. DOE 0 425. lD, Verification of Readiness to Start Up or Restart Nuclear Facilities:
4.b.(1): Startup Authorization Authority (SAA) for a newly constructed Hazard
Category 3 nuclear facility.
4.b.(2): SAA for the restart of a Hazard Category 3 nuclear facility following
conversion of an existing facility.
4.b.(3): SAA for a nuclear facility, activity, or operation that has upgraded its Hazard
Categorization to Hazard Category 3.
4.b.(5): SAA for a nuclear facility following a shutdown due to violation of a Safety
Limit approved by a HQ official.
4.b.(6): SAA for the restart of a Hazard Category 2 nuclear facility, activity, or
operation following an extended shutdown.
EMERS-2014-032401 Page 6 of 8 (03/2014)
4.b.(7): SAA for the restart of a Hazard Category 2 nuclear facility, activity, or
operation following shutdown because of substantial process, system, or facility
modifications.
12. DOE 0 433.lB, Maintenance Management Program for DOE Nuclear Facilities:
5.a.(2): For Government-owned and Government-operated activities, serve as
approval authority for nuclear maintenance management program documents
prepared in accordance with the CRD, attachment 1.
5.a.(4): Review and approve requests for equivalencies and exemptions from
requirements of this order after resolving comments in accordance with
DOE 0 251.lC.
13. DOE 0 440.lB, Worker Protection Programfor DOE (Including the NNSA) Federal
Employees:
5.a.(6): Review and be the approving authority for exemptions to requirements
contained in this order (except for those exemptions related to Occupational Safety
and Health Administration standards).
14. DOE 0 450.2, Integrated Safety Management:
5.b.(1): Develop and maintain an Integrated Safety Management (ISM) System
Description Document and an organizational Functional Responsibilities and
Authorities (FRA) for your HQ office. The System Description and FRA can be
provided in separate documents or in the same document.
5
5.b.(2): Review and approve Field Elements' ISM System Descriptions. Monitor the
status of Field Element and Field Element contractors ' ISM systems; monitor Field
Elements' establishment and implementation of safety goals and objectives.
5.b.(3): Determine the need for, and frequency of, ISM Declarations for Field
Element and contractor facilities and activities based on hazards, risk, and
performance history with input from Field Elements.
5.b.( 4): Define the delegations of authorities and specify the responsibilities that are
assigned to specific offices within your organizations in a FRA document.
5 .b.(5): Establish minimum expectations in terms of individual and organizational
capabilities for assigned safety responsibilities or delegated safety authorities.
Section 5
5.b.(6): Establish secretarial office level Memorandum of Understanding, as
appropriate, that define the agreed-upon procedures governing operations at locations
where multiple program offices conduct work.
EMERS-2014-032401 Page 7 of 8 (03/2014)
15. DOE 0 470.4B, Safeguards and Security Program: Approval authority for
deviations under this order relevant to safeguards and security program directive
requirements.
16. DOE 0 471.lB, Identification and Protection of Unclassified Controlled Nuclear
Information, and DOE 0 471.6, Information Security: Approval authority for
equivalencies and exemptions to security and physical protection requirements of
these orders.
6
17. DOE 0 470.4B, Safeguards and Security Program; DOE 0 472.2, Personnel
Security; DOE 0 473.3, Protection Program Operations; and DOE 0 474.2, Nuclear
Material Control and Accountability: Approval authority for equivalencies and
exemptions to security requirements contained in safeguards and security directives
DOE 0 470.4B, DOE 0 472.2, DOE 0 473.3, and DOE 0 474.2
Delegation of Authority Approved: 3 /J.. 'f LJ f
atthew Moury Date
Deputy Assistant Se etary for
Safety, Security, d Quality Programs
Environmental Management
- --------
EMERS-2014-032401 Page 8 of 8 (03/2014)