Archives of Directives

Rescinded

29.00, Designation to Patrick T. Cahalane

00-29_00_NA.pdf378.96KB
Document text

Text extracted from the attached file. Refer to the original document for the authoritative version.

Section 1

NATIONAL NUCLEAR SECURITY ADMINISTRATION DESIGNATION ORDER NO. 00-29.00 TO PATRICK T. CAHALANE I. DESIGNATION. Pursuant to the authority vested in me under Sections 3212 and 3261 of the National Nuclear Security Administration (NNSA) Act (50 U.S.C. 2402, 2461), I designate Patrick T. Cahalane, the Principal Deputy Associate Administrator for Safety, Inii'astructure, and Operations, as the NNSA Cognizant Secretarial Officer (CSO) for safety­ related matters. Although the term CSO is not consistently used in Department of Energy (DOE) directives, NNSA safety-related CSO functions and responsibilities are established in Departmental regulations and directives, and are described in NNSA SD 450.2 Admin Change I, Functions, Responsibilities and Authorities (FRA) Document for Safety Management (or successor document). See the NNSA FRA and the attachment to this Order for the specific authorities conveyed. Included within the NNSA safety CSO designation are Startup and Restart Approval Authorities specified in DOE Order 425.lD, Verification of Readiness to Start Up or Restart Nuclear Facilities: a. Startup and Restart Authority for new Hazard Category 3 nuclear facilities, and restart authority for all NNSA nuclear facilities. These authorities may be delegated to the appropriate Field Office Manager. b. Startup Authority for new Hazard Category 2 nuclear facilities with a total project cost less than $200M. This authority may be delegated (not to be delegated or re-delegated lower) to the appropriate Field Office Manager if the following conditioIlB are satisfied: • The processes employed in the new facility are not significantly different than those in other facilities at the site that are currently authorized to operate. • The hazards posed by activities in the new facility are not significantly different than the hazards posed by activities in other facilities at the site that are currently authorized to operate. • The safety systems and controls, including administrative controls, cited in the Documented Safety Analysis for the new facility are not significantly different from the safety systems and controls cited in the Safety Basis for other facilities at the site that are currently authorized to operate. 2. RESCISSION. Previous designations of individuals to serve as the NNSA CSO for safety matters are hereby rescinded. Current delegations made by previous NNSA CSOs remain in effect. . 3. LIMIT A TION. Although delegations of nuclear safety authorities from the previous CSO to Field Office Managers remain in effect, for safety basis approval authorities, the CSO retains approval authority for accident scenarios having calculated mitigated consequences exceeding the Evaluation Guideline of25 rem. 4. AUTHORITY TO DELEGATE. The NNSA safety CSO may delegate specific safety authOlities Lo individuals, subject to requirements for delegation and re-delegation in Department and NNSA regulalions, direetives, and limitations expressed herein. 10 CFR 820 prohibits delegation of the eso responsibilities for approval of exemptions to 10 CFR 830. Authorities delegated by the CSO are delegated to individuals, not positions. Re-delegation (where permitted by regulation and directives) must be approved by tho CSO for safety-related matters. 5. DURATION AND EFFECTWE DATE. 5.1 All aotions pursuant to any authority designated prior to this Order or any authority delegated pursuant to previous designations, taken prior to and in effect on the date of this Order, are ratified and remain in force as if taken under this Order, unless or until rescinded, amended or superseded.

Section 2

5.2 copy of this Order shall be provided to NNSA's Ol1ice of Business Operations. This Order is effective May 1, 2016. 1A#~,e !h.~ Frank G. Klotz • 6 Under Secretary for Nuclear Security Administrator, NNSA Attachment Funt.ltion Reference CSO for Safety Responsibilities and A" '" .... ~-~-""""" Basis Approval 10 CFR 830 DOE Management Of1icial DOE 0 413.3B . Safety Basis Approval Authority . Change 1 ----~------.... - Facility "'iU"'Y I DOE o 420.1C I Secretarial Of1icer ! Change 1 C( of 0pvHmvll0 DOE 0 422,1 I Program Secretarial Officer Admin Chang(j 2 -----~--------~-=-- I Restart Approval : DOE 0 425, 1D Program Se()re1ariaJ Of1icer i AuthoritYm~ i Packaging and ---rDDCO;IEE:<O)4{;QJC -fNNS:AI5eltlli~g(:lffi,ciaii--"""""""""'~"'i I Transport~tionS:::..a:::.j1..:ce::<t ---+.=,~:::..:::.,.:,m-=-L·:::,,:::,:cc·-:::---:- =, -~,--.,..--c= ....... m~~.....j Packaging and DOE 0 l'll'lbA Service Center, Assistant uepul.Y Transportation Offsite Administrator for Nuclear Safety Shipments of National Operations, and Director Office of Teehnical Services

Something wrong with this record? Tell us