29.00, Designation to Patrick T. Cahalane
Rescinded By:
29.00A, Designation to Theodore Wyka on Jul 22, 2018
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
NATIONAL NUCLEAR SECURITY ADMINISTRATION
DESIGNATION ORDER NO. 00-29.00
TO PATRICK T. CAHALANE
I. DESIGNATION. Pursuant to the authority vested in me under Sections 3212 and 3261 of
the National Nuclear Security Administration (NNSA) Act (50 U.S.C. 2402, 2461), I
designate Patrick T. Cahalane, the Principal Deputy Associate Administrator for Safety,
Inii'astructure, and Operations, as the NNSA Cognizant Secretarial Officer (CSO) for safety
related matters. Although the term CSO is not consistently used in Department of Energy
(DOE) directives, NNSA safety-related CSO functions and responsibilities are established in
Departmental regulations and directives, and are described in NNSA SD 450.2 Admin
Change I, Functions, Responsibilities and Authorities (FRA) Document for Safety
Management (or successor document). See the NNSA FRA and the attachment to this Order
for the specific authorities conveyed.
Included within the NNSA safety CSO designation are Startup and Restart Approval
Authorities specified in DOE Order 425.lD, Verification of Readiness to Start Up or Restart
Nuclear Facilities:
a. Startup and Restart Authority for new Hazard Category 3 nuclear facilities, and restart
authority for all NNSA nuclear facilities. These authorities may be delegated to the
appropriate Field Office Manager.
b. Startup Authority for new Hazard Category 2 nuclear facilities with a total project cost
less than $200M. This authority may be delegated (not to be delegated or re-delegated
lower) to the appropriate Field Office Manager if the following conditioIlB are satisfied:
• The processes employed in the new facility are not significantly different than those
in other facilities at the site that are currently authorized to operate.
• The hazards posed by activities in the new facility are not significantly different than
the hazards posed by activities in other facilities at the site that are currently
authorized to operate.
• The safety systems and controls, including administrative controls, cited in the
Documented Safety Analysis for the new facility are not significantly different from
the safety systems and controls cited in the Safety Basis for other facilities at the site
that are currently authorized to operate.
2. RESCISSION. Previous designations of individuals to serve as the NNSA CSO for safety
matters are hereby rescinded. Current delegations made by previous NNSA CSOs remain in
effect. .
3. LIMIT A TION. Although delegations of nuclear safety authorities from the previous CSO to
Field Office Managers remain in effect, for safety basis approval authorities, the CSO retains
approval authority for accident scenarios having calculated mitigated consequences
exceeding the Evaluation Guideline of25 rem.
4. AUTHORITY TO DELEGATE. The NNSA safety CSO may delegate specific safety
authOlities Lo individuals, subject to requirements for delegation and re-delegation in
Department and NNSA regulalions, direetives, and limitations expressed herein. 10 CFR
820 prohibits delegation of the eso responsibilities for approval of exemptions to 10 CFR
830. Authorities delegated by the CSO are delegated to individuals, not positions.
Re-delegation (where permitted by regulation and directives) must be approved by tho CSO
for safety-related matters.
5. DURATION AND EFFECTWE DATE.
5.1 All aotions pursuant to any authority designated prior to this Order or any authority
delegated pursuant to previous designations, taken prior to and in effect on the date of
this Order, are ratified and remain in force as if taken under this Order, unless or until
rescinded, amended or superseded.
Section 2
5.2 copy of this Order shall be provided to NNSA's Ol1ice of Business Operations.
This Order is effective May 1, 2016.
1A#~,e !h.~
Frank G. Klotz • 6
Under Secretary for Nuclear Security
Administrator, NNSA
Attachment
Funt.ltion Reference CSO for Safety Responsibilities and
A" '" .... ~-~-"""""
Basis Approval 10 CFR 830 DOE Management Of1icial
DOE 0 413.3B . Safety Basis Approval Authority
. Change 1
----~------.... -
Facility "'iU"'Y I DOE o 420.1C I Secretarial Of1icer
! Change 1
C( of 0pvHmvll0 DOE 0 422,1 I Program Secretarial Officer
Admin Chang(j 2
-----~--------~-=--
I Restart Approval : DOE 0 425, 1D Program Se()re1ariaJ Of1icer
i AuthoritYm~
i Packaging and ---rDDCO;IEE:<O)4{;QJC -fNNS:AI5eltlli~g(:lffi,ciaii--"""""""""'~"'i
I Transport~tionS:::..a:::.j1..:ce::<t ---+.=,~:::..:::.,.:,m-=-L·:::,,:::,:cc·-:::---:- =, -~,--.,..--c= ....... m~~.....j
Packaging and DOE 0 l'll'lbA Service Center, Assistant uepul.Y
Transportation Offsite Administrator for Nuclear Safety
Shipments of National Operations, and Director Office of Teehnical
Services