Section 1
U.S. Department of Energy LIMITED CHANGE
Washington, DC
Chg 3 (LtdChg): 3-21-2023
SUBJECT: LIMITED CHANGE TO DOE O 484.1, REIMBURSABLE WORK FOR THE
DEPARTMENT OF HOMELAND SECURITY
1. EXPLANATION OF CHANGES. This Limited Change updates policy and procedural
roles and responsibilities to align with the current Departmental organizational structure.
No new requirements were added.
2. LOCATIONS OF CHANGES:
Page Paragraph Changed To
1 2 CANCELLATION. DOE N
481.1A, Reimbursable Work for
Department of Homeland
Security, dated 4-21-03, and
DOE N 251.62, Extension of
DOE N 481.1A, dated 4-21-05,
are canceled. Cancellation of the
above Notices does not modify or
otherwise affect any contractual
obligation to comply with the
Notices. Canceled Notices that
are incorporated by reference in a
contract remain in effect until the
contract is modified to delete the
reference to the requirements of
the canceled Notices.
CANCELLATION. DOE O
481.1 Chg 2 (AdminChg),
Reimbursable Work for
Department of Homeland
Security, dated 6-30-14.
Cancellation of a directive does
not, by itself, modify or
otherwise affect any contractual
or regulatory obligation to
comply with the directive.
Contractor Requirements
Documents (CRDs) that have
been incorporated into a
contract remain in effect
throughout the term of the
contract unless and until the
contract or regulatory
commitment is modified to
either eliminate requirements
that are no longer applicable or
substitute a new set of
requirements.
1 3.a.(1) The NNSA Administrator will
ensure that NNSA employees and
contractors comply with their
respective responsibilities under
this Order.
The Administrator of the
National Nuclear Security
Administration (NNSA) must
ensure that NNSA employees
comply with their
responsibilities under this
directive. Nothing in this
directive will be construed to
interfere with the NNSA
DOE O 484.1
Page Paragraph Changed To
Administrator’s authority under
section 3212(d) of Public Law
(P.L.) 106-65 to establish
Administration-specific
policies, unless disapproved by
the Secretary.
1 3.b. (1) Except for the exclusions in
paragraph 3c, the Contractor
Requirements Document
(CRD), Attachment 1, sets
forth requirements of this
Order that will apply to
site/facility management
contracts that include the
CRD.
(2) This CRD must be included in
site/facility management
contracts to provide
authorization to the contractor
to perform reimbursable work
for DHS under the facility
management contract.
The Contractor Requirements
Document (CRD), Attachment 1
must be included in all
site/facility management
contracts that authorize the
contractor to perform
reimbursable work for DHS
unless an exemption in
paragraph 3.c. applies.
1 and 2 3.c.(1)-(2) (1) Any work performed on a
reimbursable basis under DOE
O 481.1C, Work for Others
(Non-Department of Energy
Funded Work), dated 1-24-05.
(2) Work conducted under an
agreement with the private
sector or other agencies,
regardless of whether the
funds originated with DHS.
(1) Exemptions.
This Order
and the
attached CRD
do not apply
to work
performed for
DHS under
the following
situations:
(a) The work is performed
on a reimbursable basis
under DOE O 481.1,
Strategic Partnership
Projects [Formerly
Known as Work for
Others (Non-Department
of Energy Funded
Work)], current version.
(b) The work is performed
under an agreement with
the private sector or
other agencies,
regardless of whether the
Page Paragraph Changed To
funds originated with
DHS.
Section 2
2 3.c.(3) DHS activities that use DOE
laboratory or site intelligence
personnel, information,
technology, or systems defined as
“intelligence and intelligence-
related” per section V of the
“Memorandum of Agreement
between Department of Energy
and Department of Homeland
Security,” dated 2-28-03,
(DOE/DHS MOA), which
provides that these projects will
be conducted through and
administered by the DOE Office
of Intelligence and
Counterintelligence.
Removed.
2 3.c.(4) Renumbered. 3.c.(1)(c)
2 3.c.(2) Added. Equivalency. In accordance
with the responsibilities and
authorities assigned by
Executive Order 12344,
codified at 50 USC sections
2406 and 2511 and to ensure
consistency throughout the joint
Navy/DOE Naval Nuclear
Propulsion Program, the Deputy
Administrator for Naval
Reactors (Director) will
implement and oversee
requirements and practices
pertaining to this Directive for
activities under the Director's
cognizance, as deemed
appropriate.
2 4 REQUIREMENTS. It is
Departmental policy that DOE
resources be available to DHS
consistent with the Homeland
Security Act of 2002, which
authorizes DHS to access the
capabilities of DOE’s
laboratories and other sites to
further DHS mission objectives.
In addition, DOE will provide
access to its facilities under the
terms of the DOE/DHS MOA
REQUIREMENTS. It is
Departmental policy that DOE
resources will be made available
to DHS consistent with the
Homeland Security Act of 2002
(6 U.S.C. 189), which
authorizes DHS to access the
capabilities of DOE’s
laboratories and other sites to
further DHS mission objectives.
In addition, DOE will provide
access to its facilities under the
Page Paragraph Changed To
(Attachment 2). DOE O 481.1C
does not apply to work directly
funded by DHS. All DHS
reimbursable work requires the
approval of a DOE contracting
officer or authorized designee.
Approval must not be delegated
to the contractor. DHS-funded
work at a DOE national
laboratory or site will be
performed on an equal basis to
other missions at the laboratory
or site and not on a non-
interference basis with other
missions of such laboratory or
site.
terms of the DOE/DHS MOA
(Attachment 2).
a. All DHS reimbursable work
conducted under a DOE
site/facility management
contract requires the
approval of a DOE
Responsible Contracting
Officer (RCO). Approval
may not be delegated to the
contractor.
b. The DOE/NNSA Program
Secretarial Officer (PSO) or
designee may approve work
performed at Headquarters.
c. DHS-funded work at a DOE
national laboratory or site
will be performed on an equal
basis to other missions at the
laboratory or site.
2-3 4.a.-k. Renumbered. 4.d.-n.
2 4.d. Unless otherwise noted in this
Order, all DHS reimbursable
work will be performed
consistent with the terms and
conditions set forth in the
applicable DOE facility/site
contracts and subject to other
DOE approvals consistent with
DOE work.
Unless otherwise noted in this
Order, all DHS reimbursable
work will be performed
consistent with the terms and
conditions set forth in the
applicable DOE facility/site
management contracts and will
be subject to other DOE
approvals consistent with DOE
work.
2 4.e. DHS is responsible for costs a
DOE contractor incurs while
performing work for DHS under
DOE O 484.1, including third
party liability costs determined
allowable under the contract and
consistent with the DHS
approved scope of work.
Section 3
DHS is responsible for all costs
a DOE contractor incurs while
performing work for DHS under
DOE O 484.1, including third
party liability costs determined
allowable under the contract and
consistent with the DHS
approved scope of work.
3 4.h. Work will be priced in
accordance with DOE pricing
policies and the pricing
provisions applicable to DHS
work, which includes the
following.
Work will be priced in
accordance with DOE O 522.1,
Pricing of Departmental
Materials and Services, current
version, and the pricing
provisions applicable to DHS
Page Paragraph Changed To
work, which includes the
following:
3 4.h.(1) (2) Costs charged
to DHS will be
consistent with
the costs of
similar work
performed for
DOE.
Costs charged to DHS will be
consistent with similar work
performed for DOE. DHS will
receive an allocation of
safeguards and security costs
congruent with the cost
accounting practices used to
recover these costs from all
reimbursable work customers
(see Chapter 15.1 of the DOE
Financial Management
Handbook for additional
guidance on the allocation of
Safeguard and Security costs).
3 4.h.(2) Costs for the DOE Federal
administrative charge will not be
assessed for directly funded DHS
work.
The DOE Federal
administrative charge will not
be assessed for reimbursable
work done directly for DHS.
3 4.h.(5) Laboratory-directed research and
development (LDRD) costs to be
charged will be identified to DHS
in the proposal and will be
consistent with costs charged to
DOE for similar activities. The
objectives of the LDRD program
are to maintain scientific and
technical vitality of the
laboratories, enhance the
laboratories' ability to address
future DOE and national
missions, foster creativity and
stimulate exploration of forefront
science and technology, serve as
a proving ground for new
research, and support high-risk,
potentially high-value R&D.
Normally, LDRD will also
include one or more of the
following characteristics:
(a) advanced study of
hypotheses, concepts, or
innovative approaches to
scientific or technical
problems;
Laboratory-directed research
and development (LDRD) costs
to be charged will be identified
to DHS in the proposal and will
be consistent with costs charged
to DOE for similar activities.
The objectives of the LDRD
program are to maintain
scientific and technical vitality
of the laboratories, enhance
each laboratory’s ability to
address future DOE and
national missions, foster
creativity and stimulate
exploration of forefront science
and technology, serve as a
proving ground for new
research, and support high-risk,
potentially high-value R&D.
Page Paragraph Changed To
(b) experiments and analyses
directed towards "proof of
principle" or early
determination of the utility of
new scientific ideas, technical
concepts, or devices; and
(c) conception and preliminary
technical analyses of
experimental facilities or
devices.
4 4.i. Equipment acquired as part of a
project must be accounted for and
maintained in the same manner as
DOE property. Disposition of
equipment must be as previously
agreed or as instructed by DHS.
Equipment shipping costs are the
responsibility of DHS.
Equipment acquired as part of a
project must be accounted for in
accordance with the DOE
Financial Management
Handbook and maintained in
the same manner as DOE
property. Disposition of
equipment must be as
previously agreed or as
instructed by DHS. Equipment
shipping costs are the
responsibility of DHS.
Section 4
4 4.l. (3) DHS proposed
project
construction
that exceeds
the general
plant project
(GPP)
threshold at a
DOE site must
be coordinated
with the
cognizant
Secretarial
Officer and the
DOE Chief
Financial
Officer (CFO)
for a DOE site
or, for an
NNSA site, the
NNSA
Associate
Administrator
for
Management
and
Before initiating DHS
construction exceeding the
DOE approved minor
construction threshold as
referenced in the DOE
Financial Management
Handbook at a DOE site:
(4) Approval
must be
granted
by the
DOE
Cognizan
t
Secretaria
l Officer
(CSO),
5.i.(2),
and the
DOE
Chief
Financial
Officer,
5.b.(2).
The CFO
must be
Page Paragraph Changed To
Administration
and the NNSA
Director,
Office of Field
Financial
Management.
Projects must
meet the
following
requirements:
(a) construction projects must be
performed according to the
requirements of DOE O
413.3B, Program and Project
Management for the
Acquisition of Capital Assets,
dated 11-29-10, and
(b) title for permanent
construction must vest with
DOE. Title disposition for
permanent construction
located on DOE-owned or
controlled property shall be
determined and agreed upon
between DOE and DHS
during the initial planning
stages of a project.
notified
seven
days in
advance
of
approval
of a
constructi
on project
funded
through a
DHS
agreemen
t that
exceeds
$1
million
but is less
than the
DOE-
approved
minor
constructi
on limit.
(5) For an
NNSA
site,
approval
for DHS
constructi
on
exceedin
g the
DOE-
approved
minor
constructi
on limit
must be
granted
by the
Associate
Administ
rator for
Infrastruc
ture, 6.c.;
the
Associate
Administ
Page Paragraph Changed To
rator for
Managem
ent and
Budget,
6.b.(4);
and the
cognizant
NNSA
Deputy
Administ
rator, 6.f.;
and
notificati
on
provided
to the
NNSA
Director,
Office of
Deputy
Associate
Administ
rator for
Budget,
6.b.(4),
before
work can
begin.
(6) DOE's
minor
constructi
on
authority
does not
apply to
DHS
funding.
DHS is
responsib
le for
determini
ng that
the
requested
constructi
on
represent
s a valid
purpose
Page Paragraph Changed To
of DHS
funding.
(7) Projects
must
meet the
following
requirem
ents:
(a) Construction projects
must be performed
according to
requirements of DOE O
413.3, Program Project
Management for the
Acquisition of Capital
Assets, current version.
(b) Upon completion, title to
constructed assets must
vest in DOE/NNSA
unless otherwise
approved by the Head of
the Departmental
Element, the CFO, and
the Senior Real Property
Officer or NNSA Real
Estate Director.
(c) Construction funded
through DHS agreements
must not supplement
DOE-funded
construction activities
unless the DHS-funded
portion of the
construction effort is
explicitly approved by
the CFO.
5 5 RESPONSIBILITIES. RESPONSIBILITIES—
NON-NNSA ENTITIES
WITHIN DOE.
5 5.a. Deputy Under Secretary for
Counterterrorism.
(1) Serves as DOE and NNSA
senior point of contact with
DHS.
(2) Provides DHS (Office of
Science and Technology) a
Removed.
Page Paragraph Changed To
copy of DOE’s annual report
to Congress on LDRD
activities.
5- 5.b- Renumbered. 5.a-
5 5.a. Director, Office of Management.
(1) Coordinates the
establishment of DHS
reimbursable work policy and
procedures with Secretarial
Officers and NNSA officials.
(2) Conducts periodic reviews of
the implementation of this
Order by Secretarial Officers
and heads of field
organizations.
(3) Approves requests for
excluding DHS projects from
requirements of this Order
[for NNSA exclusions see
paragraph 6b(4)].
Section 5
Director, Office of
Management.
(1) Establishes DOE DHS
Reimbursable Work policies,
in conjunction with
Cognizant Secretarial
Officers (CSO) and NNSA
officials.1
(2) Approves requests for
excluding DHS projects
from requirements of this
Order [for NNSA exclusions
see paragraph 6.b.(5)].
5 5.a.(1)
Footnote
Added. 1NNSA officials whose
responsibilities parallel those of
DOE Secretarial Officers are
Deputy Administrators and
Assistant Deputy
Administrators.
6 5.b. Chief Financial Officer.
(1) Concurs on all DHS
construction projects that
exceed the GPP threshold
established by the DOE CFO.
(2) Develops and maintains
financial information on DHS
reimbursable work and
prepares financial reports as
required.
(3) Coordinates with the NNSA
Director, Office of Field
Financial Management, on
approval of requests to
exclude NNSA DHS projects
from the requirements of this
Order.
Chief Financial Officer.
(1) Establishes and maintains
DOE financial policies and
procedures.
(2) Concurs on construction
projects funded by a DHS
reimbursable agreement that
exceed the DOE-approved
minor construction limits,
see section 4.l.
(3) Prepares financial
information on DHS
reimbursable work and
financial reports as required.
6 5.c. Director, Office of Procurement
and Assistance Management.
Director, Office of Acquisition
Management. Conducts periodic
Page Paragraph Changed To
Ensures that the Director, Office
of Headquarters Procurement
Services, or an authorized
designee, reviews and accepts all
Headquarters-accepted DHS
projects, unless delegated (see
paragraph 5i).
reviews of implementation of
this Order by Secretarial
Officers and heads of field
organizations as required.
6 5.d.(5) Provides the DHS Office of
General Counsel quarterly reports
of invention disclosures arising
from reimbursable work directly
funded by DHS.
Removed.
6 5.f. DOE Director, Office of
Intelligence and Counter-
Intelligence.
(1) Develops and implements
procedures for DHS
intelligence and intelligence-
related reimbursable work.
(2) Reviews and approves
proposed intelligence and
intelligence-related DHS
reimbursable work and
intelligence SAPs through the
appropriate site office.
(3) Coordinates program reviews
of intelligence and
intelligence-related DHS
reimbursable work with the
participation of appropriate
field organizations.
(4) Reviews intelligence and
intelligence-related DHS
reimbursable work for
duplication of effort.
(5) Serves as the DOE, including
the NNSA, central point of
contact for coordination with
DHS on intelligence and
intelligence-related
reimbursable work for DHS.
(6) Ensures that the cognizant
Secretarial Officer/NNSA
Administrator is informed of
problems in field
management of intelligence
DOE Director, Office of
Intelligence and
Counterintelligence.
(1) Manages, reviews, and
approves proposed DHS
intelligence and intelligence-
related work including
intelligence SAPs pursuant
to 4.j., in coordination with
the appropriate field office
manager or designee.
(2) Coordinates program review
of DHS intelligence and
intelligence-related work
with the participation of
appropriate Field
Intelligence Elements
(defined in paragraph 8.e.)
and Field Office Manager or
designee.
(3) Reviews DHS intelligence
and intelligence-related
work for duplication of
effort if duplication is not
requested by the sponsor.
(4) Serves as central point of
contact for coordination with
DHS intelligence and
intelligence-related work.
Section 6
(5) Informs, if applicable, the
Cognizant Secretarial
Officer, e.g., the Director of
Science of issues with DHS
Page Paragraph Changed To
and intelligence-related DHS
reimbursable work.
intelligence and intelligence-
related work.
7 5.g. Director, Office of Security and
Safety Performance Assurance.
Director, Office of Enterprise
Assessments.
7 5.h. Program Secretarial Officers.
When delegated the authority,
accept agreements for DHS
reimbursable work:
(1) For work that is accepted at
Headquarters but performed in
the field, the responsible
program Secretarial Officer,
when delegated authority to
accept agreements for DHS
work, must ensure the
cognizant field organization
has met the requirements of
this Order (paragraph 4)
before accepting the project.
(2) For work accepted and
performed at Headquarters
involving human and/or
animal subjects, the
responsible program
Secretarial Officer must
ensure that DOE and/or
contractor representatives
review proposed DHS projects
for compliance with
established Federal regulations
and DOE requirements for
protection of these subjects.
NOTE: If the responsible
program Secretarial Officer has
not been delegated authority to
accept agreements for DHS
reimbursable work, the Director,
Office of Headquarters
Procurement Services, will
accept DHS projects.
Program Secretarial Officers.
(1) Accept Headquarters DHS
agreements in accordance
with the requirements of
paragraph 4. Once accepted,
forward copies of all
information to the RCO to
approve placement of work
and funding onto the
contract where the work will
be performed. For work
accepted and performed at
Headquarters copies of all
information and decision
documentation should be
maintained and available by
the accepting office.
(2) For work accepted and
performed at Headquarters
involving human and/or
animal subjects, the
responsible program
Secretarial Officer must
ensure that DOE and/or
contractor representatives
review proposed DHS
projects for compliance with
established Federal
regulations and DOE
requirements for protection
of these subjects.
(3) Provide written delegations
of authority for approving
Headquarters accepted
agreements consistent with
paragraph 4.
Section 7
(a) The work is performed on a reimbursable basis under DOE O 481.1, Strategic Partnership Projects [Formerly Known as Work for Others (Non-Department of Energy Funded Work)], current version.
(b) The work is performed under an agreement with the private sector or other agencies, regardless of whether the funds originated with DHS.
REQUIREMENTS. It is Departmental policy that DOE resources will be made available to DHS consistent with the Homeland Security Act of 2002 (6 U.S.C. 189), which authorizes DHS to access the capabilities of DOE’s laboratories and other sites to further DHS mission objectives. In addition, DOE will provide access to its facilities under the terms of the DOE/DHS MOA (Attachment 2).
(a) advanced study of hypotheses, concepts, or innovative approaches to scientific or technical problems;
(b) experiments and analyses directed towards "proof of principle" or early determination of the utility of new scientific ideas, technical concepts, or devices; and
(c) conception and preliminary technical analyses of experimental facilities or devices.
(a) construction projects must be performed according to the requirements of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, dated 11-29-10, and
(b) title for permanent construction must vest with DOE. Title disposition for permanent construction located on DOE-owned or controlled property shall be determined and agreed upon between DOE and DHS during the initial planning stages of a project.
(a) Construction projects must be performed according to requirements of DOE O 413.3, Program Project Management for the Acquisition of Capital Assets, current version.
(b) Upon completion, title to constructed assets must vest in DOE/NNSA unless otherwise approved by the Head of the Departmental Element, the CFO, and the Senior Real Property Officer or NNSA Real Estate Director.
(c) Construction funded through DHS agreements must not supplement DOE-funded construction activities unless the DHS-funded portion of the construction effort is explicitly approved by the CFO.