DOE O 474.2 Chg 4 (PgChg), Nuclear Material Control and Accountability - Change Chart
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
U.S. Department of Energy PAGE CHANGE
Washington, D.C.
Approved: 6-27-2011
Chg 4 (PgChg): 9-13-2016
SUBJECT: PAGE CHANGE TO DOE O 474.2, NUCLEAR MATERIAL CONTROL AND
ACCOUNTABILITY
1. EXPLANATION OF CHANGES. Previous Order unintentionally required the Office of
Nuclear Materials Integration (ONMI; NA-532) to approve the termination of safeguards
complex wide. The intent of DOE O 474.2 is for ONMI to be consulted for determination
of "no programmatic" value on material for termination of safeguards. The page change
eliminates the unintended burden placed on NA-532.
2. LOCATIONS OF CHANGES:
Page Paragraph Changed To
7-8 4.g. Sites/facilities requests to
terminate regulatory control of
nuclear materials must be
reviewed by their Program Office
DOE line management and the
Office of Nuclear Materials
Integration who will approve or
disapprove the request.
Safeguards can be terminated on
nuclear materials provided the
following conditions are met.
Sites/facilities requests to
terminate regulatory control of
nuclear materials must be
reviewed by their Program
Office DOE line management
who will approve or disapprove
the request. Prior to requesting
termination of safeguards,
sites/facilities must determine
that the nuclear materials have
no programmatic value, in
consultation with their Program
Office and the Office of Nuclear
Materials Integration.
Safeguards can be terminated
on nuclear materials provided
the following conditions are
met.
11 6.a. DOE P 470.1A, Safeguards and
Security Program, dated 12-29-
10.
DOE P 470.1B, Safeguards and
Security Program, dated 2-10-
16.
12 6.c. DOE O 473.3, Protection
Program Operations, dated
6-29-11.
DOE O 473.3A, Protection
Program Operations, dated 3-
23-16.
DOE O 474.2
2 DOE O 474.1 Chg 4 (PgChg)
9-13-2016
Page Paragraph Changed To
Attachment 1
Page 4
5. Sites/facilities requests to
terminate regulatory control of
nuclear materials must be
reviewed by their Program Office
DOE line management and the
Office of Nuclear Materials
Integration who will approve or
disapprove the request.
Safeguards can be terminated on
nuclear materials provided the
following conditions are met.
Sites/facilities requests to
terminate regulatory control of
nuclear materials must be
reviewed by their Program
Office DOE line management
who will approve or disapprove
the request. Prior to requesting
termination of safeguards,
sites/facilities must determine
that the nuclear materials have
no programmatic value, in
consultation with their Program
Office and the Office of Nuclear
Materials Integration.
Safeguards can be terminated
on nuclear materials provided
the following conditions are
met.