Section 1
U.S. Department of Energy LIMITED CHANGE
Washington, DC
Chg 3 (LtdChg): 11-14-2019
SUBJECT: LIMITED CHANGE TO DOE O 420.1C, FACILITY SAFETY
1. EXPLANATION OF CHANGES. This change cancels DOE O 5480.30, Nuclear
Reactor Safety Design Criteria, and adds a new section on this topic to Attachment 3.
2. LOCATIONS OF CHANGES:
Page Paragraph Changed To
1 2 This Order (O) cancels: DOE O 420.1B,
Chg. 1, Facility Safety; DOE Guide (G)
420.1-2, Guide for the Mitigation of
Natural Phenomena Hazards for DOE
Nuclear Facilities and Nonnuclear
Facilities; and DOE G 420.1-3,
Implementation Guide for DOE Fire
Protection and Emergency Services
Programs for Use with DOE O 420.1B,
Facility Safety.
This Order (O) cancels: DOE O 420.1C
Chg. 2, Facility Safety, dated 7-26-18;
and DOE O 5480.30 Chg. 1, Nuclear
Reactor Safety Design Criteria, dated 3-
14-01.
Att.
3
Page
8
Section
3.c.
Added. Nuclear Reactor Safety Design Criteria.
Nuclear reactors are an important class
of DOE facilities that require special
attention to design criteria and
standards to ensure safe design and
operations.
(1) The Code of Record for existing
DOE nuclear reactors has been
established by their designs. When
a major modification is made to an
existing reactor, the existing Code
of Record is the starting point for
the design of the major
modification, and a design upgrade
analysis is required in accordance
with DOE-STD-1189-2016 to
evaluate the application of nuclear
safety design criteria and
requirements. This design upgrade
analysis may identify updated
nuclear reactor safety design
criteria and updated codes and
standards to be applied to the major
modification.
(2) For any new DOE nuclear reactor,
a set of reactor-specific safety
DOE O 420.1C
Page Paragraph Changed To
design criteria and a set of reactor
design codes and standards must be
established in accordance with the
Safety Design Strategy required by
DOE-STD-1189-2016. Existing
industry codes and standards
should be used to the extent
possible.
LIMITED CHANGE TO DOE O 420.1C, FACILITY SAFETY
1. EXPLANATION OF CHANGES.
2. LOCATIONS OF CHANGES:
FACILITY SAFETY
1. OBJECTIVE
a. Nuclear safety design criteria;
b. Fire protection;
c. Criticality safety;
d. Natural phenomena hazards (NPH) mitigation; and,
e. Cognizant system engineer (CSE) program.
2. CANCELLATIONS.
3. APPLICABILITY.
a. Departmental Applicability.
b. DOE Contractors
c. Equivalencies and Exemptions.
d. Government-Owned, Government-Operated Facilities
4. REQUIREMENTS
5. RESPONSIBILITIES.
a. Heads of Departmental Elements, and Administrator, National Nuclear Security Administration.
b. Associate Under Secretary, Office of Environment, Health, Safety and Security.
c. Director, Office of Enterprise Assessments.
d. Heads of Field Elements.
e. Contracting Officers.
f. Central Technical Authorities.
6. INVOKED STANDARDS
7. APPLICABLE STANDARDS
8. REFERENCES AND ACRONYMS
9. CONTACT
ATTACHMENT 1. CONTRACTOR REQUIREMENTS DOCUMENT DOE O 420.1C, FACILITY SAFETY
1. GENERAL REQUIREMENTS.
2. RELIEF FROM REQUIREMENTS, CODES AND STANDARDS.
3. REFERENCES AND ACRONYMS
FACILITY SAFETY REQUIREMENTS
CHAPTER I. NUCLEAR SAFETY DESIGN CRITERIA
1. OBJECTIVE.
2. APPLICABILITY.
3. REQUIREMENTS.
a. Integration of Safety with Design.
b. Nuclear Facility Design.
Section 2
CHAPTER II. FIRE PROTECTION
1. OBJECTIVE
a. Minimize the likelihood of occurrence of a fire-related event;
b. Minimize the consequence of a fire-related event affecting the public, workers, environment, property and missions; and
c. Provide a level of safety protection consistent with the “highly protected risk” class of industrial risks.
2. APPLICABILITY
3. REQUIREMENTS.
a. General Fire Protection Program Requirements.
b. Fire Protection Program Administration.
c. Design.
d. Operations.
e. Emergency Response. Provide emergency response capabilities, as necessary, to meet site needs as established by the baseline needs assessment (BNA), safety basis requirements, and applicable regulations, codes and standards.
f. Fire Hazard Analyses and Facility Assessments.
g. Wildland Fire. An integrated site-wide wildland fire management plan, consistent with the Federal Wildland Fire Management Policy, must be developed, provided to DOE Head of Field Element for approval, and implemented in accordance with the relevan...
CHAPTER III. NUCLEAR CRITICALITY SAFETY
1. OBJECTIVE
2. APPLICABILITY
3. REQUIREMENTS.
CHAPTER IV. NATURAL PHENOMENA HAZARDS MITIGATION
1. OBJECTIVE
2. APPLICABILITY
3. REQUIREMENTS.
a. General
b. NPH Design Criteria
c. NPH Accident Analysis
d. Review and Upgrade Requirements for Existing DOE Nuclear Facilities (Hazard Category 1, 2 and 3).
e. Seismic Detection
f. Post-Natural Phenomena Procedures
CHAPTER V. COGNIZANT SYSTEM ENGINEER PROGRAM
1. OBJECTIVE
2. APPLICABILITY
3. REQUIREMENTS.
a. General
b. CSE Program Coverage.
c. Configuration Management.
d. CSE Support for Operations and Maintenance.
e. CSE Qualification Requirements.
ATTACHMENT 3. DESIGN CRITERIA FOR SAFETY STRUCTURES, SYSTEMS, AND COMPONENTS
1. OBJECTIVE
2. APPLICABILITY.
3. REQUIREMENTS
Table 1: Codes for Safety Significant and Safety Class Structures
Table 2: Codes for Safety Significant and Safety Class Process Equipment
Table 3: Codes for Safety Significant and Safety Class Ventilation System Components
Table 4: Codes for Safety Significant and Safety Class Handling Equipment
Table 5: Codes for Safety Significant and Safety Class Electrical Systems
Table 6: IEEE Standards used for Both Safety Significant and Safety Class Electrical Systems, as appropriate
ATTACHMENT 4. REFERENCES AND ACRONYMS