DOE O 413.3B Chg 6 (LtdChg), Program and Project Management for the Acquisition of Capital Assets - Change Chart
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
U.S. Department of Energy LIMITED CHANGE
Washington, DC
Chg 6: 01-12-2021
SUBJECT: LIMITED CHANGE TO DOE O 413.3B, PROGRAM AND PROJECT
MANAGEMENT FOR THE ACQUISITION OF CAPITAL ASSETS
1. EXPLANATION OF CHANGES. On July 13, 2020, the Under Secretary of Energy
approved the Cleanup Project Management Protocol and Implementation Standard for
Demolition Projects (“EM Protocol”) and directed that the contents should be
incorporated as an appendix to the subject Order. This limited update of the Order
implements that direction.
2. LOCATIONS OF CHANGES:
Page Paragraph Changed To
4 4.a.(1) “Detailed requirements on capital
asset projects are provided in this
Order.”
“Detailed requirements on
capital asset projects are
provided in this Order. All
projects, with the exception of
demolition projects performed
by the Office of Environmental
Management (EM), follow
Appendices A, B and C. For
demolition projects performed
by EM, Appendix D replaces
Appendix A and modifies
applicable elements in
Appendices B and C.”
A-17 5.a. Added to the end of the
paragraph. “…For demolition
projects performed by EM,
Appendix D replaces Appendix
A and modifies applicable
elements in Appendices B and
C.”
C-31 27.c. “Environmental Management
(EM)…”
“EM…”
C-31 27.c. Added to the end of the
paragraph. “…For demolition
projects performed by the EM,
Appendix D replaces Appendix
A and modifies applicable
elements in Appendices B and
C.”
DOE O 413.3B
Page Paragraph Changed To
D-1 to
D-20
N/A Added Appendix D
Attch 1
Page 5
14 Added to the end of the
paragraph. “…Documented
Safety Analyses will be updated
to document the changed
conditions, as appropriate, in
conjunction with the EM
demolition process.”