DOE M 441.1-1 Chg 1 (Admin Chg), Nuclear Material Packaging - Change Chart
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
AVAILABLE ONLINE AT: INITIATED BY:
www.directives.doe.gov Office of Environment, Health, Safety and Security
U.S. Department of Energy ADMIN CHANGE
Washington, D.C.
Chg 1 (Admin Chg): 02-24-2016
SUBJECT: ADMINISTRATIVE CHANGE TO DOE M 441.1-1, Nuclear Material Packaging
Manual
EXPLANATION OF CHANGES: DOE M 441.1-1 was issued in March 2008, and was last
certified in November 2010. An Administrative Change is requested consistent with the
September 3, 2015 DRB request. AU commits to converting the Manual to either a DOE Order
and/or Standard when it comes up for its requisite FY 2017 review since Manuals are no longer
part of the DOE Directives System.
LOCATIONS OF CHANGES:
Page Paragraph Changed To
Overall Front Cover
Header/Footer
and Header of
whole
document
Cover
Header: Approved: 3-7-08
Footer: Office of Health,
Safety and Security
Header on all pages: 3-7-08
Cover
Header: Approved XX-XX-XX
Footer: Office of Environment,
Health, Safety and Security
Header on all pages: XX-XX-XX
i 1.a Department of Energy
(DOE) Policy (P) 441.1
Department of Energy
Radiological Health and
Safety Policy, dated 4-26-96
Deleted, and paragraphs
renumbered.
i 1.b DOE P 450.4, Safety
Management System Policy,
dated 10-15-96;
Department of Energy (DOE)
Policy (P) 450.4A Integrated
Safety Management Policy, dated
4-25-11;
iii 6 CONTACT. Questions
concerning this Manual
should be addressed to office
of Health, Safety and
Security, Office of Nuclear
Safety and Environment, at
202-586-5680.
CONTACT. Questions
concerning this Manual should
be addressed to Office of
Environment, Health, Safety and
Security, Office of Nuclear
Safety, at 301-903-8396.
DOE M 441.1-1
http://www.directives.doe.gov/
2
Page Paragraph Changed To
I-1 1.a DOE Policy 441.1
Department of Energy
Radiological Health and
safety Policy, dated 4-26-96,
states that DOE will conduct
its radiological operations in
a manner that ensures the
health and safety of all its
employees.
DOE Policy 450.4A, Integrated
Safety Management Policy, dated
4-25-11, states that work be
conducted safely and efficiently
and in a manner that ensures
protection of workers, the public,
and the environment.
I-1 2.c Chief, Health, Safety and
Security Officer.
Associate Under Secretary for
the Office of Environment,
Health, Safety, and Security.
II-1 2.e. nuclear material packaged
for shipment in approved
shipping containers in
compliance with Department
of Transportation (DOT),
DOE O 460.1B,
Packaging and
Transportation Safety (or
successor document), or
DOE O 461.1A, Packaging
and Transfer or
Transportation of Materials
of National
Security Interest (or
successor document)
requirements;
nuclear material packaged for
shipment in approved shipping
containers in
compliance with Department of
Transportation (DOT), DOE O
460.1C, Packaging and
Transportation Safety (or
successor document), or DOE O
461.1B, Packaging and
Transportation for Offsite
Shipment of Materials of
National Security Interest (or
successor document)
requirements;
III-3 2.m Quality Assurance. Packages
must be designed, tested, and
procured in
accordance with the quality
assurance requirements of 10
CFR Part 830 and
DOE O 414.1C, Quality
Assurance.
Quality Assurance. Packages
must be designed, tested, and
procured in
accordance with the quality
assurance requirements of 10
CFR Part 830 and
DOE O 414.1D, Quality
Assurance.
Section 2
III-5 4.a Records Retention.
Packaging and surveillance
records must be maintained
in accordance with DOE O
243.1, Records Management
Program.
Records Retention. Packaging
and surveillance records must be
maintained in accordance with
DOE O 243.1B, Records
Management Program.
3
Page Paragraph Changed To
Attachment
1 Page I-1
2.e nuclear material packaged
for shipment in approved
shipping containers in
compliance with DOT, DOE
O 460.1B, Packaging and
Transportation Safety (or
successor document), or
DOE O 461.1A, Packaging
and Transfer or
Transportation of Materials
of National Security Interest
(or successor document)
requirements;
nuclear material packaged for
shipment in approved shipping
containers in
compliance with DOT, DOE O
460.1C, Packaging and
Transportation Safety (or
successor document), or DOE O
461.1B, Packaging and
Transportation for Offsite
Shipment of Materials of
National Security Interest (or
successor document)
requirements;
Attachment
1 Page II-4
2.m Quality Assurance. Packages
must be designed, tested, and
procured in accordance with
the quality assurance
requirements of 10 CFR Part
830 and DOE O 414.1C,
Quality Assurance.
Quality Assurance. Packages
must be designed, tested, and
procured in accordance with the
quality assurance requirements
of 10 CFR Part 830 and
DOE O 414.1D, Quality
Assurance.
Attachment
1 Page II-
4,5
3. 3., 4., 5., 5.b., 5.c., 5.d., 5.e.,
6
Renumbered to be correct and
consistent with Chapter III.3.
PACKAGING
SURVEILLENCE PROGRAM
3.a., 3.b.,3.c.,3.d.,3.e.,3.f.,and
4.DOCUMENTATION
Attachment
1 Page II-5
6.a 6.a. Records Retention.
Packaging and surveillance
records must be maintained
in accordance with DOE O
243.1, Records Management
Program.
4.a. Records Retention.
Packaging and surveillance
records must be maintained in
accordance with DOE O 243.1B,
Records Management Program.
Attachment
2 Page 1
1.a DOE-HDBK-1081-94,
Primer on Spontaneous
Heating and Pyrophoricity,
December 1994.
DOE-HDBK-1081-2014,
Primer on Spontaneous Heating
and Pyrophoricity, January
2015.
Attachment
2 Page 1
1.b. DOE-HDBK-1129-2007,
Tritium Handling and Safe
Storage, March 2007.
DOE- STD-1129-2015, Tritium
Handling and Safe Storage,
September 2015.
4
Page Paragraph Changed To
Attachment
2 Page 1
1.c. DOE-STD-3013-2004,
Stabilization, Packaging,
and Storage of Plutonium
Bearing Materials, April
2004.
DOE-STD-3013-2012,
Stabilization, Packaging, and
Storage of Plutonium Bearing
Materials, March 2012.
Attachment
2 Page 1
1.e. DOE O 414.1C, Quality
Assurance, dated 6-17-05.
DOE O 414.1D, Quality
Assurance, dated 4-25-2011;
Admin Change: 5-8-2013.
Attachment
2 Page 1
1.f. DOE O 420.1B, Facility
Safety, dated 12-22-05.
DOE O 420.1C, Facility Safety,
dated 12-4-2012; Change 1: 2-
27-2015.
Attachment
2 Page 1
1.g. DOE O 435.1 Chg 1,
Radioactive Waste
Management, dated 7-9-99.
DOE O 435.1, Radioactive
Waste Management, dated
7-9-99; Change 1: 8-28-2001:
Certified: 1-09-2007.
Attachment
2 Page 1
1.h. DOE O 440.1B, Worker
Protection Program For
DOE (Including The
National Nuclear Security
Administration) Federal
Employees, dated 5-17-07.
DOE O 440.1B, Worker
Protection Program for DOE
(Including the National Nuclear
Security Administration)
Federal Employees, dated
5-17-07; Change 2: 3-14-2013.
Attachment
2 Page 1
1.i. DOE P 441.1, Department of
Energy Radiological Health
Section 3
and Safety Policy, dated 4-
26-96
Deleted. This Policy was
cancelled by DOE P450.4A.
Attachment
2 Page 1
1.j. DOE P 450.4, Safety
Management System Policy,
dated 10-15-96.
1.i. DOE P 450.4A, Integrated
Safety Management Policy,
dated 4-25-2011.
Attachment
2 Page 1
1.k. 1.k. DOE G 460.1-1,
Implementation Guide for
use with DOE O 460.1A
Packaging and
Transportation Safety, dated
6-5-97.
1.j. DOE G 460.1-1,
Implementation Guide for use
with DOE O 460.1A Packaging
and Transportation Safety,
dated 6-5-97.
5
Page Paragraph Changed To
Attachment
2 Page 1
1.l. 1.l. DOE O 460.1B,
Packaging and
Transportation Safety, dated
4-4-03.
1.k. DOE O 460.1C, Packaging
and Transportation Safety,
dated 5-14-2010.
Attachment
2 Page 1
1.m. 1.m. DOE O 460.2A,
Departmental Materials
Transportation and
Packaging Management,
dated 12-22-04.
1.l. DOE O 460.2A,
Departmental Materials
Transportation and Packaging
Management, dated 12-22-04.
Attachment
2 Page 2
1.n. 1.n. DOE O 461.1A,
Packaging and Transfer or
Transportation of Materials
of National Security
Interest, dated 4-26-06.
1.m. DOE O 461.1B,
Packaging and Transportation
for Offsite Shipment of
Materials of National Security
Interest, dated 12-20-2010.
Attachment
2 Page 2
1.o. 1.o. DOE M 470.4-7,
Safeguards and Security
Program References, dated
8-26-05.
1.n. Current Safeguards and
Security Program References
can also be found at Safeguards
and Security Policy Information
Resource (http://pir.pnl.gov/).
Attachment
2 Page 2
1.p. 1.p. DOE O 5400.5 Chg 2,
Radiation Protection of the
Public and the
Environment, dated 1-7-93.
1.o. DOE O 458.1 Admin Chg
3, Radiation Protection of the
Public and the Environment,
dated 2-11-11.
Attachment
2 Page 2
1.q. 1.q. DOE O 5660.1B,
Management of Nuclear
Materials, dated 5-26-94.
1.p. DOE O 410.2,
Management of Nuclear
Materials, dated 8-17-2009;
Admin Change 1: 4-10-2014.
Attachment
2 Page 2
1.r. 1.r. DOE O 243.1, Records
Management Program,
dated 2-3-06.
1.q. DOE O 243.1B, Records
Management Program, dated 3-
11-2013; Admin Change 1: 7-8-
2013.
6
Page Paragraph Changed To
Attachment
2 Page 2
1.s. 1.s. Criteria for Interim
Storage of Plutonium-
Bearing Materials, issued
by a memo to field from
DOE Secretary Curtis,
January 25, 1996.
1.r. DOE-STD-3013-2012,
Stabilization, Packaging, and
Storage of Plutonium-Bearing
Materials, dated March 2012.
Attachment
2 Page 2
1.t. 1.t. DOE HDBK 3010-94,
Change Notice 1, Airborne
Release Fractions/Rates
and Respirable Fractions
for Non-Reactor Nuclear
Facilities, March 2000.
1.s. DOE HDBK 3010-94,
Change Notice 1, Airborne
Release Fractions/Rates and
Respirable Fractions for
Non-Reactor Nuclear Facilities,
March 2000; Change 1: March
2013.
Attachment
2 Page 2
1.u. 1.u. The Use of Teflon®
Components in National
Nuclear Security
Administration Nuclear
Facilities, issue by memo to
the field from E. Beckner,
Deputy Administrator for
Defense Programs, May 20,
2004.
1.t. The Use of Teflon®
Components in National
Nuclear Security Administration
Nuclear Facilities, issue by
memo to the field from E.
Beckner, Deputy Administrator
for Defense Programs, May 20,
2004.
Attachment
2 Page 3
3.a ANSI N14.5-1997,
Radioactive Materials –
Leakage Tests on Packages
for Shipment, February 1998.
ANSI N14.5-2014, Radioactive
Materials – Leakage Tests on
Packages for Shipment, June
Section 4
2014.
Attachment
2 Page 3
3.b ANSI N43.6-1977, Sealed
Radioactive Sources,
Classification, August 1998;
Revised: 2008.
ANSI N43.6-2007, Sealed
Radioactive Sources,
Classification, Revised: 2013.
Attachment
2 Page 3
3.c. ISO 2919, Radioactive
Protection - Sealed
Radioactive Sources—
General Requirements and
Classification, February
1999.
ISO 2919, Radioactive
Protection - Sealed Radioactive
Sources—General
Requirements and
Classification, Revised:
February 2012.
7
Page Paragraph Changed To
Attachment
2 Page 3
3.d. Safety Guide No. TS G 1.1
(ST 2), Appendix 1,
Advisory Material for the
IAEA Regulations for the
Safe Transport of
Radioactive Material, 2022.
IAEA Safety Standards SSR-6
Regulations for the Safe
Transport of Radioactive
Material, 2012.
Attachment
2 Page 3
3.f. DOE/NNSA Weapons
Quality Policy (QC-1)
(rev10), 2004.
DOE/NNSA Policy Letter,
Weapons Quality Policy NAP-
24, 6-20-2013.
Attachment
3 Page 1
Footnote 9 A2 Thresholds in 49 CFR
§173.435 correspond to the
maximum amount of
dispersible material that can
be shipped via Type A
packages (which have much
less stringent testing criteria
as compared to Type B
packages). The values
are based on not exposing
workers to greater than 5 rem
dose if the package were to
fail (International Atomic
Energy Agency [IAEA]
Safety Guide TS-G-1.1 [ST-
2] reports that inhalation
from releases from packages
would be on the order of 10
-6
of the packaged material).
A2 Thresholds in 49 CFR
§173.435 correspond to the
maximum amount of dispersible
material that can be shipped
via Type A packages (which
have much less stringent testing
criteria as compared to Type B
packages). The values
are based on not exposing
workers to greater than 5 rem
dose if the package were to fail
(International Atomic
Energy Agency [IAEA] Safety
Standards SSR-6 reports that
inhalation from releases from
packages would be on the order
of 10
-6
of the packaged material).
Attachment
3 Page 2
Table 1 Standards established by the
International Atomic Energy
Agency (IAEA) Safety
Guide TS-G-1.1…
Standards established by the
International Atomic Energy
Agency (IAEA) Safety Standards
SSR-6…
Attachment
4 Page 1
1.a Utilize ANSI N14.5-1997
criteria for leaktight.
ANSI N14.5-1997 defines
leaktight as:
Utilize ANSI N14.5-2014
criteria for leaktight.
ANSI N14.5-2014 defines
leaktight as:
8
Page Paragraph Changed To
Attachment
4 Page 2
2. The basis for this value is
that it is consistent with
IAEA analysis utilized in
establishing DOT shipping
package requirements for
Type B containers. IAEA
Safety Guide TS-G-1.1 (ST-
2),
The basis for this value is that it
is consistent with IAEA analysis
utilized in establishing DOT
shipping package requirements
for Type B containers. IAEA
Safety Standards SSR-6,
Attachment
4 Page 2
3. First Par The testing requirements can
be met by translating the
material release rate into a
He leak rate as described by
Appendix B Section 15.27 of
ANSI N14.5-1997
The testing requirements can be
met by translating the material
release rate into a He leak rate as
described by Appendix B
Section 15.27 of ANSI
N14.5-2014
Attachment
4 Page 3
3. Second Par measuring the release rate
utilizing the ANSI N
14.5-1997 methodology.
measuring the release rate
utilizing the ANSI N
14.5-2014 methodology.
Attachment
4 Page 3
4. Second par Consistent with DOE G
460.1-1, Packaging and
Section 5
Transportation Safety, the
drop test should be
performed…
Consistent with DOE G 460.1-1,
Implementation Guide for Use
with DOE O 460.1A, Packaging
and Transportation Safety, the
drop test should be performed…
Attachment
5 Page 1
First Par This example outlines the
steps involved in performing
these calculations in
accordance with the ANSI
N14.5-1997 methodology...
This example outlines the steps
involved in performing these
calculations in accordance
with the ANSI N14.5-2014
methodology..
Attachment
5 Page 4
Step 4 Using the approach in ANSI
N 14.5, the gas leak rate can
be converted to a He leak
rate at the maximum
operating differential
pressure.
Using the approach in ANSI N
14.5-2014, the gas leak rate can
be converted to a He leak rate at
the maximum operating
differential pressure.
Attachment
5 Page 7
Step 5 Using the methods outlined
in ANSI N 14.5-1997, for
Weapons Grade Pu, a bubble
test (with a criterion of no
bubbles released) or a
pressure drop test may be
shown to suffice.
Using the methods outlined in
ANSI N 14.5-2014, for Weapons
Grade Pu, a bubble test (with a
criterion of no bubbles released)
or a pressure drop test may be
shown to suffice.
Attachment
8 Page 1
Handling covered under DOE O
460.1B, Packaging and
Transportation Safety.
covered under DOE O 460.1C,
Packaging and Transportation
Safety.